Management's discussion and analysis
As filed, 13,081 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following management’s discussion and analysis of the consolidated financial results and condition of Rare Element Resources Ltd. (collectively, “we,” “us,” “our,” “Rare Element” or the “Company”) for the three months ended March 31, 2023, has been prepared based on information available to us as of May 10, 2023. This discussion should be read in conjunction with the unaudited Condensed Consolidated Financial Statements and notes thereto included herewith and the audited Consolidated Financial Statements of Rare Element for the year ended December 31, 2022, and the related notes thereto filed with our Annual Report on Form 10-K, which have been prepared in accordance with U.S. GAAP. This discussion and analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. Our actual results, performance, or achievements may differ materially from those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set forth elsewhere in this report. See “Cautionary Note Regarding Forward-Looking Statements.”
All currency amounts are expressed in thousands of U.S. dollars, unless otherwise noted.
Overview and Outlook
Our primary focus has been and continues to be the engineering, permitting, licensing, construction and operation of a demonstration-scale REE processing and separation plant (the “Demonstration Plant”) at the planned location in Upton, Wyoming. If successful, this Demonstration Plant will show that our propriety extraction technology is able to process and separate certain REEs from sample materials extracted from our Bear Lodge REE Project in a more efficient and economical manner than traditional processing methods and will serve as a precursor to inform the design and estimated cost for a future full-scale production facility.
During 2023, the Company, along with the other consortium members, continued their work on the Demonstration Plant, and this work is expected to continue through the project’s expected completion date in the early part of 2025. In December 2022, the Demonstration Plant achieved its final engineering design milestone marking the completion of the DoE’s first go/no-go decision point. The completion of this milestone was a gating event for the DoE’s continued funding of the project as provided for in the 2021 award grant. Future gating milestones include the expected completion of permitting activities in the second half of 2023 and the completion of the Demonstration Plant’s construction thereafter. Operations to process and separate the REE from the stockpiled sample are expected to follow the completion of the Demonstration Plant’s construction for an additional eight-to-10-month period.
In November 2022, the Company received notice that it had been awarded a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. This award, along with the funds remaining from the Company’s December 2021 rights offering, will be used to fund the Company’s fifty percent (50%) share of the Demonstration Plant’s total expected cost of approximately $43,800 with the other fifty percent of the funding coming from the DoE. Through March 31, 2023, the Company had paid a total of $7,700 toward its share of the expected cost of the Demonstration Plant (see Note 4 to our Consolidated Financial Statements for a more complete discussion). To the extent that inflationary pressures would cause the Demonstration Plant’s total cost to exceed its initial estimate of approximately $43,800, the Company and the DOE’s responsibility for funding any amounts in excess of the $43,800 would have to be further considered and determined.
The Company will not have sufficient funds to progress its development activities beyond the Demonstration Plant, including with respect to feasibility studies, permitting, and licensing, and development and construction related to its Bear Lodge REE Project. Therefore, the achievement of these other activities will be dependent upon securing additional funds through financings, off-take agreements, joint ventures, strategic transactions, grants, or sales of non-core assets. There is no assurance, however, that the Company will be successful in completing any such other financings or transactions. Ultimately, in the event the Company cannot secure additional financial resources or complete a strategic transaction in a timely manner, it may need to suspend its operational plans or potentially liquidate its business interests, and investors may lose all or part of their investment.
Current External Factors Impacting our Business
We continued to monitor the general U.S. political climate and actions taken by the U.S. government to secure a domestic, rare earth supply chain. The U.S. federal government issued two Presidential Executive Orders in 2017 to encourage and support the establishment of a domestic rare earth supply chain and to strengthen the defense industrial base with respect to critical minerals including rare earths. In June 2019, the Department of Commerce released its report entitled “Federal strategy to ensure secure and reliable supplies of critical minerals.”
This was followed by five U.S. Presidential Determinations on July 22, 2019, directed to the Secretary of Defense. One Presidential Determination declared that “the domestic production capability for Rare Earth Metals and Alloys is essential to the national defense.” These initiatives have increased the federal government’s level of interest in the rare earth industry and our potential rare earth products as a critical upstream segment of the supply chain, particularly considering China’s dominance in the global rare earth market.
In addition, the impacts of the COVID-19 pandemic and other external influences (such as the Russia/Ukraine war) have further focused the U.S. government on the importance of implementing secure domestic supply chains, including for rare earths, leading to a further Presidential Executive Order issued in February 2021 calling for an expedited 100-day review to address the strengthening of America’s supply chains, specifically requiring the Department of Defense (“DOD”) to (i) submit a report identifying “risks in the supply chain of critical minerals and other strategic materials including rare earth elements” and (ii) make policy recommendations to address the risks. The 100-day review led to another Executive Order on June 8, 2021, calling for an investment in sustainable domestic and international production and processing of critical minerals, including a recommendation that Congress take actions to recapitalize and restore the National Defense Stockpile of critical minerals and materials. In February 2023, a Presidential Waiver of Statutory Requirements Pursuant to Section 303 of the Defense Production Act of 1950, as amended, on DOD Supply Chains Resilience was declared to avert shortfalls in critical DOD supply chains that would severely impair national defense capability, specifically for defense organic industrial base supply chains critical to the DOD and critical supply chains for electronics, kinetic capabilities, castings and forgings, minerals and materials, and power and energy storage. The Company monitors and participates in these initiatives as they are critical to the production of rare earth magnets to support the manufacturing of, among other things, defense technologies, electric vehicles, wind turbines, consumer electronics, and oil refining equipment.
Results of Operations
Summary
Our consolidated net loss for the three months ended March 31, 2023 was $2,222, or $0.01 per share, compared with our consolidated net loss of $2,196, or $0.01 per share, for the same period in 2022. See our discussion below for the primary drivers of this change. As an exploration stage company, we had no properties in production and generated no revenues during either period.
Exploration and evaluation
Our exploration and evaluation costs totaled $1,510 for the three months ended March 31, 2023, compared with $630 for the same period in 2022. This increase of $880 was largely attributable to the activities associated with our Demonstration Plant as work progressed under the Cost Share Agreement. See Note 4 to the Consolidated Financial Statements for a more complete discussion of this Cost Share Agreement.
Corporate administration
Our corporate administration costs decreased to $742 for the three months ended March 31, 2023, compared with $1,470 for the same period in 2022. This decrease of $728 over the comparative period was driven by a decrease in our stock-based compensation of $823.
Interest Income
For the three months ended March 31, 2023 and 2022, the Company generated interest income of $122 and $1, respectively, from investments of the remaining proceeds from its December 2021 rights offering. This increase of $121 was primarily the result of the substantially higher short-term interest rates that existed during the quarter ended March 31, 2023, partially offset by the lower average cash balances available for investment during the quarter ended March 31, 2023.
Accretion expense
For the three months ended March 31, 2023 and 2022, we recorded accretion expense of $71 each period related to the Company’s option to repurchase approximately 640 acres of non-core real property in Wyoming for not less than $1,200 or greater than $1,850 in the form of cash, common shares of the Company, or a combination of cash and common shares of the Company. Accretion expense is recorded each reporting period to increase the repurchase option liability to the maximum exercise price of $1,850, less any annual option payments of $25. See Note 7 to the Consolidated Financial Statements for a more complete discussion of the repurchase option.
Financial Position, Liquidity and Capital Resources
Operating Activities
Net cash used in operating activities was $1,543 for the three months ended March 31, 2023, compared with $3,481 for the same period in 2022. This decrease of $1,938 was mostly driven by a decrease of $1,700 in amounts advanced by the Company to General Atomics, as leader of the consortium, under the Cost Share Agreement for work on the Demonstration Plant.
Investing Activities
Net cash provided by investing activities of $12 for the three months ended March 31, 2023 resulted from the sale of non-essential equipment. There were no similar transactions during the three months ended March 31, 2022.
Financial Position, Liquidity and Capital Resources
At March 31, 2023, we had a working capital balance of $15,651 which represented a decrease of $1,977 from our December 31, 2022 working capital balance of $17,628. This decrease was largely the result of amounts paid by the Company during the three months ended March 31, 2023 under the Cost Share Agreement and for the payment of other ongoing expenses.
In November 2022, the Company received notice that it had been awarded a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. The WEA grant is a cost-reimbursement award that will be available to the Company for the reimbursement of future Demonstration Plant expenses. At March 31, 2023, the terms of this grant were still being finalized by the WEA pursuant to a funding or similar agreement and no amount of the $4,400 award had been received by the Company. Depending on the award’s final terms and conditions, the Company may be able to claim a portion of the $4,400 grant during 2023. No amounts related to this grant have been included in the Company’s March 31, 2023 financial statements.
Inclusive of amounts already advanced of $7,700 through March 31, 2023, the Company’s share of the total costs under the Cost Share Agreement are expected to equal or exceed $22,000 over the life of the Demonstration Plant project. As a result, the Company will not have sufficient funds to progress with its other activities, including with respect to feasibility studies, permitting, development and construction related to the Bear Lodge REE Project, even after taking into account the expected receipt of the $4,400 in WEA grant monies. Therefore, the achievement of these other activities will be dependent upon additional financings, off-take agreements, joint ventures, strategic transactions, grants, or sales of various assets. There can be no assurance, however, that the Company will be successful in completing any such financings or other transactions. Ultimately, in the event the Company cannot secure additional financial resources or complete a strategic transaction in a timely manner, it may need to suspend its operational plans or potentially liquidate its business interests, and investors may lose all or part of their investment.
Contractual Obligations
There were no material changes to the contractual obligations disclosed in Item 8 of Part II of our Annual Report on Form 10-K for the year ended December 31, 2022.
Controls and procedures
As filed, 1,411 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Disclosure Controls and Procedures
As of the end of the period covered by this Quarterly Report on Form 10-Q, an evaluation was carried out under the supervision of, and with the participation of the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), of the effectiveness of the design and operations of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)). Based on that evaluation, the CEO and the CFO have concluded that, as of the end of the period covered by this Quarterly Report on Form 10-Q, our disclosure controls and procedures were effective in ensuring that (i) information required to be disclosed by us in the reports that we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms and (ii) information required to be disclosed by us in the reports that we file or submit under the Exchange Act is accumulated and communicated to our CEO and CFO, as appropriate, to allow timely decisions regarding required disclosure.
Changes in Internal Controls
There has been no change in our internal control over financial reporting during the quarter ended March 31, 2023, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.
Risk factors
As filed, 198 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
During the three months ended March 31, 2023 there were no material changes to the risk factors disclosed in Item 1A of Part I of our Annual Report on Form 10-K for the year ended December 31, 2022.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2023-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Interest expense | 3 months2023-01-01 to 2023-03-31 | $8.0k | us-gaap:InterestExpense |
| Net income | 3 months2023-01-01 to 2023-03-31 | −$2.2m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2023-01-01 to 2023-03-31 | −$0.01 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2023-01-01 to 2023-03-31 | −$0.01 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2023-01-01 to 2023-03-31 | 212,515,951 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2023-01-01 to 2023-03-31 | −$1.5m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2023-03-31 | $14.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2023-03-31 | $16.1m | us-gaap:AssetsCurrent |
| Total assets | At period end2023-03-31 | $17.0m | us-gaap:Assets |
| Current liabilities | At period end2023-03-31 | $453.0k | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2023-03-31 | $2.1m | us-gaap:Liabilities |
| Shareholders' equity | At period end2023-03-31 | $14.9m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001419806-23-000010. Last ingested by Listed: Nov 4, 2026, 15:46 ET. Listed shows no prices and gives no investment advice.