Rare Element Resources Ltd: Form 10-K for the period ended Dec 31, 2025
Filed with the SEC on Mar 12, 2026 and accepted by EDGAR at Mar 12, 2026, 15:14 ET.
Business
As filed, 40,739 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Rare Element was incorporated under the laws of the Province of British Columbia, Canada on June 3, 1999 as Spartacus Capital Inc. We are currently governed under the Business Corporations Act (British Columbia) (the “BCBCA”). Our executive office address is P.O. Box 80, Firestone, Colorado 80520. The telephone number for our executive office is (720) 278-2460. We maintain a corporate website at www.rareelementresources.com (http://www.rareelementresources.com).
Originally organized as a “capital pool” company whose activities were focused on the identification and completion of a qualifying transaction as required by the rules of the TSX Venture Exchange (“TSX-V”), we transitioned to a “venture company” on July 25, 2003, coincident with (1) the completion of a reverse takeover acquisition of Rare Element Holdings Ltd. (the qualifying transaction), (2) a name change of “Spartacus Capital Inc.” to “Rare Element Resources Ltd.”, and (3) the completion of a private placement. The Company’s main assets include its proprietary rare earth processing and/or beneficiation and separation technology and its 100% interest in a group of unpatented mining claims and ownership of adjacent private property, together known as the Bear Lodge Property, owned through a wholly owned subsidiary, Rare Element Resources, Inc., a Wyoming corporation.
SUBSIDIARIES
We have one direct wholly owned subsidiary, Rare Element Resources, Inc., incorporated in 1997 in the state of Wyoming, USA, formerly known as Paso Rico (USA), Inc. (“Paso Rico”).
DESCRIPTION OF BUSINESS
We are currently focused on demonstrating the technical and economic feasibility of our proprietary processing and separation technology through the operation of a Demonstration Plant and advancing the Bear Lodge REE Project through permitting and licensing. The Bear Lodge REE Project consists of several large, disseminated REE deposits in northeast Wyoming, near the town of Sundance, and a planned hydrometallurgical plant that may be located near Upton, Wyoming. The Bear Lodge REE Project is one of the highest-grade REE deposits identified in North America containing a favorable distribution of CREE.
In its development efforts for the Bear Lodge REE Project, the Company has done extensive laboratory bench-scale and pilot plant testing on metallurgical processes to recover saleable rare earth products and has been granted two patents on its metallurgical processing innovations. More specifically, the Company has pilot tested and received patent protection for the removal of thorium from a rare earth element (REE)-containing acidic solution, as well as the selective extraction of REEs using oxalic acid. In accordance with our Intellectual Property Rights Agreement with Synchron, these patented processes have been further advanced through a trade secret process alongside General Atomics, an affiliate of Synchron, the Company’s majority shareholder.
Our near-term focus is on the operation of the Demonstration Plant and the permitting and licensing of the Bear Lodge REE Project as further described below. Assuming operation of the Demonstration Plant is successful, the Company plans to evaluate the feasibility of commercial operations through production of separated rare earth oxides utilizing ore from the Bear Lodge REE Project, as well as rare earth oxides from other sources on a commercial scale.
During the first quarter of 2016, we placed the Bear Lodge REE Project under care-and-maintenance due to financial resource constraints and market conditions, and all permitting and licensing activities were suspended at that time. With improved market conditions and the availability of necessary financial resources, we recently restarted these permitting and licensing efforts. We now anticipate that all permits and licenses for the Bear Lodge REE Project could be received within the next 24 months under the U.S. federal government’s recently implemented streamlining measures.
If and when the decision to resume the Bear Lodge REE Project development activities is made, our plan, subject to the availability of the necessary financial resources, is to commence detailed engineering for the mine and commercial processing plant. Additionally, our ability to begin construction activities on the Bear Lodge Property will be subject to various factors, including (i) the availability of adequate capital, (ii) positive results from the Demonstration Plant’s operations, (iii) an affirmative feasibility analysis, (iv) securing off-take agreements with customers at adequate prices, (v) obtaining necessary permits and licenses, and (vi) approval from the Company’s board of directors (the “Board of Directors” or the “Board”).
The Bear Lodge REE Project deposit is located near excellent mining infrastructure, including good road access and power lines within two kilometers (1.2 miles) of the Bear Lodge Property. Geographically, the Bear Lodge Property is located 100 kilometers (62.1 miles) east of Gillette, Wyoming, a major infrastructure, support, and logistics center for coal mines in the Powder River Basin that should provide ready access to many of the required production supplies and materials as well as skilled labor. Additionally, the deposit is situated only 64 kilometers (39.8 miles) from the nearest railhead at Upton, Wyoming, where the Demonstration Plant is sited and the proposed hydrometallurgical plant may also be sited, allowing access to major distribution channels via the adjacent railhead as well as convenient access to utilities and other infrastructure.
Additional information regarding the Bear Lodge REE Project and the Bear Lodge Property is included under the section heading “Item 2. Properties” in this Annual Report.
RECENT CORPORATE DEVELOPMENTS
Rare Earth Demonstration Plant Project
Construction, Commissioning and Operation of the Demonstration Plant
In January 2021, a consortium of companies, of which the Company is a part, received notice from the DoE that the consortium had been selected for negotiation of a potential financial award for the engineering, construction and operation of a rare earth separation and processing demonstration plant. The consortium of companies is led by General Atomics, an affiliate of Synchron, the Company’s majority shareholder, and includes certain of General Atomics’ affiliates, the Company, and LNV, an Ardurra Group, Inc. company, as engineering and construction subcontractor. A formal proposal was submitted by the consortium in response to a published Funding Opportunity Announcement in mid-2020 for the construction and operation of a rare earth separation and processing plant utilizing the Company’s proprietary technology to produce commercial-grade products. The DoE finalized the award, and an agreement was executed by the DoE’s grants/agreement officer on September 27, 2021, with an effective date of October 1, 2021. The Company, as a subrecipient of the award, along with the other consortium members, commenced work on the planning and design of the Demonstration Plant project in November 2021, with the Company’s contractual arrangement with General Atomics finalized in December 2021 (“Cost Share Agreement”). The DoE’s original funding commitment was in the amount of $21,900 and represented approximately one-half of the originally estimated costs for the Demonstration Plant.
In September 2024, the DoE issued its final Project Continuation Notice, confirming the Demonstration Plant’s readiness for operations. This notice, along with the U.S. Nuclear Regulatory Commission’s (the “NRC”) approval of operations received in October 2024, cleared the path for operations of the Demonstration Plant to formally commence, with operations to process and separate REEs from the previously stockpiled Bear Lodge Property mineral sample. At this time, the DoE increased its funding commitment to $24,200.
Since inception, the General Atomics-led consortium has seen increases in the Demonstration Plant’s project costs, including its final equipment costs, due to, among other factors, inflation. As a result of these cost pressures, General
Atomics, on behalf of the consortium, submitted to the DoE an updated Demonstration Plant construction and operations budget in 2024 of approximately $53,600, which was approximately 22% higher than the original budget of approximately $43,800. In response, the DoE pledged an additional commitment of $2,400 (increasing its total commitment to approximately $24,200) in September 2024 to help fund a portion of this budget increase, with the balance to be funded by the Company, including any amounts in excess of the $53,600 revised budget total, now estimated to be approximately $77,500, inclusive of operating cost estimates through December 31, 2026.
As of December 31, 2025, approximately $3,700 of the DoE’s total funding commitment of $24,200 remained outstanding.
Wyoming Energy Authority Financial Award
In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. This award, along with funds contributed by the Company and the DoE, is being used to fund the Demonstration Plant’s construction and operating costs. As of December 31, 2023, the Company had met the conditions allowing for the invoicing of $2,000 of the $4,400 WEA grant total. This $2,000 was subsequently received on January 31, 2024. By September 30, 2024, the Company had met the conditions allowing for the invoicing of an additional $2,000, which was subsequently received in November 2024. The remaining $400 of the $4,400 grant total, which is conditioned on the operations of the Demonstration Plant and a final report submittal, will be invoiced to the WEA upon submission of the final report, which is currently expected to occur mid-2026.
Bear Lodge Permitting and Licensing Restart
In early 2016, we placed the Bear Lodge REE Project on care-and-maintenance, and all licensing and permitting activities were suspended, including the National Environmental Policy Act (“NEPA”) process, state permitting, and the NRC source material license process. The Company continued to hold the Bear Lodge REE Project on care-and-maintenance through 2023. In 2024, we resumed certain of these activities, including certain environmental data collection and technical report updates. In early 2026, the Company formally restarted the licensing and permitting of the Bear Lodge REE Project for both federal and state permitting.
Financing Activities
As a result of its financing needs, the Company commenced a rights offering on February 6, 2026, in which each holder of the Company’s common shares as of the record date of January 30, 2026, was eligible to participate. On March 4, 2026, the Company closed the rights offering for gross proceeds of approximately $30,900 (the “2026 Rights Offering”).
Even with the funds currently on hand, the funds raised in the 2026 Rights Offering and the expected receipt of the remainder of the DoE financial support and WEA grant monies, the Company will not have sufficient funds to progress certain activities, including the engineering, development, and construction of its Bear Lodge REE Project. In the event the Company cannot secure additional financial resources or complete a strategic transaction in the longer term relating to the development of its Bear Lodge REE Project, it may need to suspend its operational plans or liquidate its business interests, and investors may lose all or part of their investment.
Current External Factors Impacting our Business
Throughout 2025, we continued to monitor the general U.S. political climate and actions taken by the U.S. government to secure a domestic rare earth supply chain. Due to the dominance of China over the REE supply chain, the U.S. federal government has issued several Presidential Executive Orders, under the Biden Administration and the first and second Trump Administrations, to encourage and support the establishment of a domestic REE supply chain and to strengthen the defense industrial base with respect to critical minerals, including REEs. In 2025 and into early 2026, the Trump Administration has continued the federal government’s focus on advancing a robust domestic critical mineral and rare earth supply chain, through agency regulatory actions and financial support initiatives directed to industry participants.
Presidential and Administrative Critical Mineral Initiatives
On January 20, 2025, President Trump issued the “Unleashing American Energy” Executive Order, which included: (1) several urgent critical mineral and rare earth directives, including the immediate review of all agency actions that potentially burden the development of domestic energy resources with particular attention to critical minerals; (2) directing the Secretary of Energy to ensure that critical mineral projects, including the processing of critical minerals, receive consideration for federal support; (3) directing the Secretary of Defense to consider the needs of the U.S. in supplying and maintaining the national defense stockpile to provide a robust supply of critical minerals; and (4) establishing the U.S. position as the leading producer and processor of REEs, which will create jobs and prosperity at home, strengthen supply chains for the U.S. and its allies, and reduce the global influence of malign and adversarial states.
In March 2025, President Trump issued the “Immediate Measures to Increase American Mineral Production” Executive Order. In this Executive Order, President Trump directed the federal agencies, including the Export-Import Bank (“EXIM Bank”), to unlock the permitting, funding and issuance of off-take agreements for critical minerals, including REEs. The Executive Order includes near-term actions to be determined and implemented by the federal agencies to fast-track permits, mobilize capital for mineral producers and create off-take agreements for the strategic stockpiling of minerals critical to the United States’ defense, technology and energy.
In April 2025, President Trump directed the U.S. Department of Commerce to initiate a Section 232 investigation into whether imports of processed critical minerals and derivative products threaten national security, with a focus on REEs essential for defense and technology applications. This action was aimed at enhancing economic resilience and reducing reliance on foreign supplies.
In August 2025, the DoE announced new initiatives to secure the American critical minerals and materials supply chain, including the establishment of a Critical Minerals and Materials Accelerator program to support domestic production and processing.
In November 2025, the U.S. Department of the Interior, through the U.S. Geological Survey (USGS), published the Final 2025 List of Critical Minerals. The updated list expanded to 60 minerals, including the addition of copper and uranium, while reaffirming the “highest cost” status of REEs to the U.S. economy in the event of supply disruptions.
In December 2025, the DOE announced $134 million in specialized funding targeted at strengthening the domestic REE supply chain. This initiative prioritizes projects capable of separating and refining HREEs and producing high-strength permanent magnets, aiming to bridge the "midstream gap" between domestic mining and end-product manufacturing.
In January 2026, following the completion of the Section 232 investigation initiated in April 2025, President Trump issued a Presidential Proclamation on Adjusting Imports of Processed Critical Minerals. The Proclamation identified current import levels of processed REEs as a threat to national security. It directed the U.S. Trade Representative to negotiate “Critical Mineral Trade Agreements” with allied nations to establish a “minerals-secure” trade bloc and possible future implementation of minimum import prices for specific refined REE products to protect domestic producers from predatory foreign pricing.
In early January 2026, the administration proposed a G7-level “Price Floor” mechanism for neodymium-praseodymium (NdPr) and other magnet-related rare earths. The proposal is intended to help insulate Western REE projects from price volatility associated with China’s regulated market, and to support the economic viability of domestic facilities during periods of global oversupply.
In February 2026, President Trump signed an Executive Order launching “Project Vault,” a landmark $12 billion U.S. Strategic Critical Minerals Reserve. Unlike traditional stockpiles, Project Vault is structured as a public-private partnership, backed by a $10 billion direct loan from the EXIM Bank. The reserve is designed to act as a “buyer of last resort” for domestic producers, providing a guaranteed offtake for U.S.-processed REEs and shielding the domestic industrial base from sudden foreign export restrictions.
Tariffs and Trade Restrictions for Critical Minerals
Since early 2025 and continuing into early 2026, the Trump Administration has announced several potential new and/or increased tariffs and other trade restrictions on imports to the United States in response to China’s export and licensing restrictions. In December 2023, China announced that it had banned the export of technology to make rare earth magnets, adding to its previous export ban of critical material extraction and separation technology. In December 2024, China further banned the export of certain critical minerals, including gallium, germanium, and antimony, which have widespread military applications. In February 2025, China expanded its export licensing requirements to include five additional minerals: tungsten, indium, bismuth, tellurium, and molybdenum. In April 2025, China imposed export restrictions on an additional seven REEs (samarium, gadolinium, terbium, dysprosium, lutetium, scandium, and yttrium) as well as related magnets and processing technologies used in defense, energy, and automotive sectors, requiring exporters to obtain licenses from China’s Ministry of Commerce. As U.S.-China trade negotiations continued, including a temporary 90-day suspension of non-tariff countermeasures in May 2025, and a June 2025 framework agreement to expedite shipments and create a “green channel” for trusted U.S. companies, these restrictions were partially eased for non-military uses. However, a Chinese REE licensing system remains in place, controlling the export of REEs and related technologies.
In October 2025, China announced further expansions to cover five additional REEs (holmium, erbium, thulium, europium, and ytterbium), bringing the total to 12 out of 17 REEs under restriction, along with (i) extraterritorial requirements for foreign-produced items containing even 0.1% Chinese-origin REEs or made using Chinese refining equipment, originally set to become effective December 1, 2025, and (ii) prohibiting exports for military applications. Following a meeting between President Trump and Chinese President Xi Jinping on October 30, 2025, China agreed to suspend the October 2025 export controls, along with certain other related curtailments, for one year as part of a broader trade truce, providing a pause on further escalations. While Nd and Pr are not subject to the enhanced dual-use export controls applied to 12 other REEs, all Chinese rare earth exports (including NdPr) remain subject to a general licensing regime, and downstream NdFeB magnets incorporating controlled HREEs continue to face licensing requirements.
As of February 2026, the one-year suspension of China’s October 2025 export controls remains in effect, with no new restrictions announced on REEs. Rare earth export volumes from China increased in late 2025 following the implementation of streamlined licensing and the broader trade truce. Geopolitical tensions and supply chain uncertainties persist, however, as demonstrated by ongoing U.S. initiatives to diversify sources and China’s emphasis on the strategic importance of REEs. The Company continues to monitor these developments closely, as they may impact the timing and economics of domestic REE projects.
The impact of the Trump Administration’s tariffs and other trade restrictions, and China’s continued use of export controls and restrictions, is currently unknown and could have an impact on the REE supply chain and/or our business operations.
U.S. Government Critical Mineral Investments
In response to global market volatility and the concentration of critical mineral production in certain adversarial foreign states, the U.S. government significantly accelerated its direct investment in the domestic REE and critical minerals supply chain throughout 2025 and early 2026. This approach transitioned from foundational framework agreements with key allies to aggressive financial participation, characterized by the federal government taking direct equity positions or warrant stakes in industry participants. Support for technical infrastructure further intensified in December 2025, with the DoE’s commitment of up to $134 million for commercial-scale REE demonstration facilities, while diplomatic efforts culminated in the February 2026 inaugural Critical Minerals Ministerial, which established the Forum on Resource Geostrategic Engagement (FORGE) and new bilateral action plans with Mexico and the European Union. Central to this strategy was the concurrent launch of “Project Vault,” a $12 billion Strategic Critical Minerals Reserve supported by a $10 billion EXIM Bank loan facility designed to act as a “buyer of last resort.” By providing guaranteed offtake and stockpiling mechanisms, these initiatives serve as a strategic backstop for domestic producers, insulating the U.S. industrial base from foreign export restrictions and predatory pricing. The Company continues to evaluate opportunities for participation in these evolving federal programs.
Other External Factors
The impacts of certain external influences, such as the COVID-19 pandemic, the Russia/Ukraine war, and conflicts in the Middle East, have also contributed to the U.S. government’s focus on implementing secure domestic supply chains, including for REEs.
TRENDS AND DESCRIPTION OF THE REE MARKET
Uses for REE Products
Due to variations in physical, chemical, molecular and application characteristics, different rare earth metals possess their own market uses, drivers and challenges. REEs are used in computers, cellular telephones, television screens, wind turbines, fuel cells, automobiles, magnetic refrigeration, energy-efficient lighting, petroleum-refining catalysts, and numerous other modern specialty technologies, including military applications. Lately, the major driver for the rare earth metals market has been increasing consumption in the manufacture of permanent NdFeB rare earth magnets, in which rare earth metals such as Nd, Pr, Tb, and Dy are used. Specifically, these REEs are used in hybrid and electric vehicle motors as well as in wind turbines. Ce, La, and other REEs are widely used in applications such as metallurgy, catalysts, glass, ceramics, optical instruments, and polishing.
Trends Affecting REE Supply, Demand and Prices
According to the research and advisory firm Benchmark Mineral Intelligence, a U.K.-based mine-to-grid supply chain intelligence and forecast service (“Benchmark”), rare earth mine production in 2025 increased by approximately 4% to 403,134 tonnes (444,379 tons) TREO relative to 2024. TREO mine production from China (+12,410 tonnes or 13,679 tons) and the U.S. (+2,603 tonnes or 2,869 tons) were the main contributors to this increase. Refined TREO supply in 2025 was estimated to be 372,390 tonnes (410,489 tons), an approximate 1% increase from 2024. Despite production increases from the U.S. (mainly from the Mountain Pass mine in California and new refining and separation providers, including Energy Fuels), China still dominates the global supply of REEs at both the mined and refined stages, accounting for approximately 70% of global mine production and approximately 91% of refined production in 2025.
In the rest of the world, specifically in the United States and Australia, certain competitors form a second tier of rare earth concentrate producing companies, with 48,458 tonnes (53,415 tons) TREO mine production coming from North America and approximately 11,716 tonnes (12,914 tons) TREO coming from Oceania, in each case in 2025. A facility in Malaysia produces separated rare earths from TREO mined primarily in Australia.
The growth in demand for certain REEs, specifically Nd and Pr, has been driven in part by permanent magnet synchronous motor adoption used in electric motors and generators. According to Ember Energy and MMR Statistics, global demand for wind turbines (which increased by 8%) in 2025 and electric vehicle sales reached 18 million units, representing a 20% increase from 2024. This growth translated into increased rare earth magnet consumption, although overall demand was tempered by economic headwinds in China, supply chain diversification efforts in the United States and other regions, and emerging recycling initiatives that offset certain raw material needs. Overall, rare earth magnets accounted for about 41% of total TREO volume demand (76,903 tonnes or 84,771 tons) but over 80% of global REE market value (approximately $67.2 billion), according to Persistence Market Research and Research Nester, market research and industry intelligence firms, underscoring their disproportionate economic impact amid ongoing supply vulnerabilities and geopolitical tensions.
NdPr oxide prices have trended upward, with end-of-year 2025 prices around $90/kg, compared to 2024 prices of approximately $70/kg. In the medium-term, NdPr oxide prices are projected to decrease, dropping back to the $70/kg price range by 2028. Many projects are expected to become operational during this time, which could add to a market surplus between 2027 and 2029. According to Benchmark, price volatility is expected to stabilize through 2029, reflecting a more stable market. Longer term, prices are expected to increase to around $120/kg by 2030 as a supply gap begins to take hold and existing visible sources of supply become more strained to match strong demand growth.
Benchmark forecasts that magnet applications will continue to increase their share of overall demand for TREO rising from 41% in 2025 to 49% by 2030. Further, according to Benchmark, electric vehicle sales have grown, going from 2.1% of global market penetration in 2018, to 22.5% in 2025, and are expected to achieve 38% penetration by 2030.
Supply and demand factors for REE products that could positively impact future REE prices include, among other factors, the following:
- the use of Nd, Pr, Tb and Dy in high-strength magnets that are critical to multiple defense applications, hybrid and electric vehicles and wind power generation facilities, particularly large offshore installations;
- the use of high-strength NdFeB magnets in the miniaturization of electronic products, including consumer devices, robotics, and emerging AI/data center technologies;
- the use of La in the fluid catalytic cracking process used by refineries in the processing of lower quality crude oil that consumes greater quantities of the catalysts;
- the increased use of REEs to reduce global carbon emissions, driven by accelerating EV adoption, expanding wind energy capacity, and broader clean energy transitions;
- China’s ongoing consolidation of its REE industry, including efforts to close or regulate small, inefficient, and polluting producers, alongside production quotas and tighter export controls on key elements;
- geopolitical tensions and trade policies, including China’s export restrictions or production caps on REEs, magnets, and related technologies, along with potential changes in U.S. tariffs, import/export duties, or incentives for domestic supply chains;
- the rising costs in China due to stricter environmental regulations, compliance requirements, and increasing wages, which contribute to higher production expenses and pricing;
- the strategic importance of REEs in defense modernization and high-tech sectors, amplifying demand for secure, non-Chinese sources amid supply vulnerabilities;
- the use of Ce in glass, ceramics, glass polishing, and advanced water filtration applications;
- the continued research and commercialization of new applications for REE products; and
- the U.S. government’s Project Vault created in February 2026, is a $12 billion strategic critical minerals reserve designed to create new demand via stockpiling, reduce reliance on Chinese supply chains, and provide price support for domestic and allied producers.
Supply and demand factors for REE products that could negatively impact future REE prices include, among other factors, the following:
- the potential for oversupply of certain REEs due to new production inside and outside of China and/or increased exports from China;
- government policy changes (U.S. or elsewhere) that would curtail incentives for electric vehicle adoption and/or wind energy development;
- development or enhancements of alternative electric motor or generator technologies that use less or no REE magnet materials;
- strong demand for selected REEs, such as magnet materials, driving overproduction of other co-product REEs and creating oversupply conditions for non-magnet REEs;
- the potential substitution of other materials for higher-priced REEs;
- the development of new, lower cost sources of supply that could reduce the market prices for REEs;
- economization by intermediate and end-users to reduce the usage of REEs in end-products;
- the potential for increased recycling of higher-priced REEs;
- fluctuating or lower fossil fuel prices (oil, gas, and coal) that could reduce the demand for technologies using REEs;
- static or lower global economic growth, reducing overall demand growth for REEs;
- potential recovery of REEs from coal mine waste and other mineral waste stockpiles; and
- potential by-product production of REEs that may increase supply irrespective of the economics of REE production from primary mines.
The feasibility of the Bear Lodge REE Project and our ability to raise additional funds to develop the Bear Lodge REE Project will likely be impacted by global supply and demand and future prices of REEs.
SEASONALITY
At this stage, seasonality in the state of Wyoming is not a material factor to our exploration, development, and operating activities on the Bear Lodge Property. Snowfall or extreme temperature in the winter may temporarily limit (i) our access to the Bear Lodge Property, (ii) work activities on the Demonstration Plant or (iii) future work on a commercial-scale processing facility, from time to time, during the months of November through June.
COMPETITION
The industry in which we operate is highly competitive. We compete with other mining and exploration companies, both within the U.S. and internationally, for the exploration and development of mineral properties and production of REEs as well as funding for our projects. There is competition for the limited number of opportunities, some involving companies having substantially greater financial resources, staff, and facilities than we do, and some with rare earth operational experience. We also compete with other mining and exploration companies in our efforts to hire and retain experienced professionals. As a result, we may have difficulty attracting or retaining key personnel or securing outside technical resources.
In 2025, China accounted for an estimated 70% of global REE mine production and 91% of global refined production. Benchmark has forecasted that China will remain the primary source of mine supply, although China’s share of global mine production is projected to decline to 54% by 2030. China is also expected to remain the largest contributor of refined supply, but China’s share of total refined production is projected to decrease to 68% by 2030. Demand is projected to remain Asia-driven, with China maintaining a dominant position. This gives the Chinese producers a continued competitive advantage in controlling the supply and processing of REEs and an opportunity to influence prices to discourage competition. Additionally, any increase in the quantities of REEs exported from other nations will likely only increase supply and may result in price reductions, reduced margins, and loss of potential market share, any of which could materially and adversely affect our business. As a result of these factors, the Company may not be able to compete effectively against current and future competitors. See “Item 1A. Risk Factors” of this Annual Report.
PATENTS, TRADEMARKS AND LICENSES
We rely on a combination of trade secret protection, nondisclosure agreements, trademarks, and patents to establish and protect our proprietary intellectual property rights in our rare earth technology.
As of December 31, 2025, we had a patent portfolio which includes two issued U.S. patents and one pending U.S. divisional patent application, and fifteen issued foreign patents across thirteen foreign jurisdictions. The patent claims are generally directed to (1) selective recovery of REEs from mixed chloride leach solutions using oxalic acid, and (2) separation of thorium from bulk REEs in a solvent extraction (“SX”) process. These patents claim priority to provisional applications filed in 2013 and 2014. The issued U.S. patents have a term of 20 years measured from the filing date of the utility patent applications. We licensed our intellectual property, including patents and related technical information, to our majority shareholder, Synchron, in October 2017, and the license became exclusive to Synchron and its affiliates in October 2019. The Company retains a limited right to use its intellectual property and any enhancements thereto. Several of these technologies may have potential value for application in other industries. See “Item 1A. Risk Factors” of this Annual Report.
ENVIRONMENTAL REGULATION
Our exploration and planned development, mining and processing activities are subject to extensive and demanding environmental laws and regulations under various federal, state, county and local laws relating to the protection of the environment, which generally includes air and water quality, hazardous waste management, radionuclide handling and reclamation. Failure to comply with these requirements can result in civil and/or criminal liability and governmental fines and penalties. Also, developments or changes in the law could require us to make environmental expenditures significantly greater than those we currently expect that could materially or adversely affect us. Environmental laws historically have evolved in a manner that requires stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors, and employees. Current and future laws, regulations and permits could impose significant costs, liabilities or obligations and could limit or prevent our ability to continue operations or undertake new operations. While there is presently a trend toward streamlining the licensing and permitting process, a future change in the U.S. presidential administration or in the composition of the Congress could result in more stringent environmental review and regulation of our operations. In addition, under various federal, state and local laws and regulations, a current or former owner or operator of a property may be liable for the cost to remove or remediate contamination resulting from the presence or discharge of hazardous or toxic substances, wastes or products on, under or from such property. Costs to address contamination can be substantial and liability under such laws may attach without regard to whether the owner or operator caused or was responsible for such contamination, and the liability may be joint and several. Moreover, the presence of contamination could expose us to third-party liability (e.g., for cleanup costs, bodily injury or property damage), subject our properties to liens in favor of the government, impose restrictions on the manner in which a property may be used, or materially or adversely affect our ability to sell, lease or develop properties.
Our Bear Lodge Property is subject to federal and state environmental laws, regulations, and permits. The federal agency with primary regulatory jurisdiction is the U.S. Forest Service (the “USFS”) Bear Lodge Ranger District, Sundance, Wyoming. The state agency with regulatory jurisdiction is the Wyoming Department of Environmental Quality (the “WDEQ”). We operate under approvals and permits granted by these two agencies and have established surety bonds to ensure environmental reclamation of areas disturbed. As of December 31, 2025, the Company holds surety bonds with the state of Wyoming totaling $185. Prior to operating, we will require several other permits and licenses, including those issued by the NRC, U.S. Army Corps of Engineers, and others.
Our Demonstration Plant is subject to federal, state, county and local licenses and permits, including an NRC source material possession license, USFS road use permit, and WDEQ air quality and storm water permits, among others. As of December 31, 2025, the Company held a surety bond, totaling $917 and secured by cash collateral of $202, with the state of Wyoming for the reclamation of the Demonstration Plant.
MINERALS EXPLORATION REGULATION
Mining operations and exploration and development activities are subject to various federal, state, county and local laws and regulations in the U.S. that govern prospecting, exploration, development, mining, production, processing, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances, and other matters. The Company believes that it is in compliance in all material respects with applicable mining, health, safety and environmental statutes and regulations. There are no current orders or notices of violations relating to the Company under applicable laws and regulations.
Compliance with these laws and regulations may impose substantial costs on the Company and could subject it to significant potential liabilities. Changes in these laws or regulations could require us to expend significant resources to comply with new laws or regulations, or changes to current requirements, and could have a material adverse effect on our business operations.
MINE SAFETY AND HEALTH REGULATIONS
Pursuant to Section 1503(a) of the Dodd–Frank Wall Street Reform and Consumer Protection Act (the “Dodd–Frank Act”), issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the U.S. are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. During the year ended December 31, 2025, our Bear Lodge Property was not subject to regulation by the federal Mine Safety and Health Administration under the Federal Mine Safety and Health Act of 1977.
EMPLOYEES
As of December 31, 2025, we had nine full-time employees and no part-time employees. Our employees are not covered by any collective bargaining agreements. When required, we will engage the services of third parties under consulting or service agreements.
AVAILABLE INFORMATION
We make available, free of charge, on or through our Internet website, at www.rareelementresources.com (http://www.rareelementresources.com), our annual reports on Form 10-K, our quarterly reports on Form 10-Q and our current reports on Form 8-K and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Exchange Act. Our website and the information contained therein or connected thereto are not intended to be, and are not, incorporated into this Annual Report.
Our reports and other information can be inspected on the SEC’s website at www.sec.gov (http://www.sec.gov). The Company also files reports under Canadian regulatory requirements on the System for Electronic Document Analysis and Retrieval+ (“SEDAR+”). The Company’s reports which are filed on SEDAR+ can be found under the Company’s SEDAR+ profile at www.sedarplus.ca (http://www.sedarplus.ca).
Risk factors
As filed, 71,351 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following sets forth certain risks and uncertainties that could have a material adverse effect on our business, financial condition and/or results of operations and the trading price of our common shares, which may decline, and investors may lose all or part of their investment. Additional risks and uncertainties that we do not presently know or that we currently deem immaterial may also impair our business operations. We cannot assure you that we will successfully address these risks. Our risk factors are grouped into the following categories:
- Risks Related to Our Business;
- Risks Related to the Mineral Exploration, Development, Mining and Processing Industries;
- Risks Related to Our Common Stock; and
- General Risk Factors.
Risks Related to Our Business
We may not be able to operate our Demonstration Plant project for a sufficient period of time to gather the information required for a commercialization decision and we do not have direct control over the DoE relationship for its cost-share funding.
We are subject to the impact of inflation on wages, capital equipment, general supplies and reagents in the operation of our Demonstration Plant. If the additional funds required by these inflationary cost measures were to prevent us from having or being able to secure the funds to operate the Demonstration Plant for a sufficient amount of time to gather the information required for a commercial-scale plant decision, this could have an adverse impact on our development plans. Additionally, the contracting for some services relating to the Demonstration Plant, including engineering and construction services, was completed by another consortium member and any disputes, including over cost increases, are not controlled by us and may result in contractor payment disputes, liens or other delays to the project. Further, the DoE agreement is with General Atomics, and we do not have direct control over the DoE relationship, invoicing and disposition of the equipment post-operations.
The operation of our Demonstration Plant comes with several inherent risks, any of which, could result in the disruption of plant operations and/or unplanned expenses.
Operations at our Demonstration Plant involve the use of acids and other toxic chemicals, the handling and storage of radioactive materials, and other workplace risks typical of an industrial operation of this kind. Although we consider health, safety, and environmental stewardship a core value of our operations, certain events may occur which could result in injury or harm to human health or the environment, resulting in significant fines and penalties and/or the possible suspension of our operations.
We have no revenues from operations and expect to incur losses for a significant period of time. Any future revenues and profits are uncertain.
We have incurred losses since our inception, and further losses are anticipated in the development of our business. As of December 31, 2025, we had cash and cash equivalents of $19,315. During the year ended December 31, 2025, we consumed cash of $7,410 between our operating and investing activities.
Even with the funds already on hand, the funds raised in the 2026 Rights Offering, the expected receipts of the final $400 in grant monies from the WEA in mid-2026, and the final $3,700 remaining under the DoE cost share award, we will not have sufficient funds to progress our longer-term activities, including the development, and construction of our Bear Lodge REE Project. Therefore, the achievement of these activities will be dependent upon the receipt of additional funds through one or more of the following: financings, off-take agreements, joint ventures, strategic transactions, or sales of various assets. Ultimately, in the event that we cannot secure additional financial resources, or complete a strategic transaction in the longer term, we may need to suspend our operational plans or liquidate our business interests, and investors may lose all or part of their investment.
Our largest shareholder beneficially owns a majority of our common shares, has significant influence on, and control over the outcome of, our major corporate decisions, including veto power over some matters, and could take actions that may not be viewed favorably by certain other shareholders, any of which actions could adversely affect the market price of our common shares.
As of March 6, 2026, Synchron owned approximately 71.4% of the issued and outstanding common shares of the Company. Additionally, Synchron has approval rights for certain corporate actions and the right to nominate three of seven directors to the Board. Pursuant to the investment agreement, dated October 2, 2017, by and between the Company and Synchron (“the Investment Agreement”), Synchron has significant influence on, and control over the outcome of, certain of our major corporate decisions and matters requiring shareholder approval, including the election of directors, mergers, consolidations and acquisitions, the sale of all or substantially all of our assets and other decisions affecting our capital structure, the amendment of our certificate of incorporation and articles, and our winding up and dissolution. These rights, along with the concentration of ownership and voting power with Synchron, (i) may make it more difficult for any other holder or group of holders of our common shares to significantly influence the way we are managed or the direction of our business, and (ii) may make it more difficult for another company to acquire us and for shareholders to receive any related takeover premium unless Synchron approves the acquisition. The interests of Synchron with respect to matters potentially or actually involving or affecting us, such as future acquisitions, financings, and other corporate opportunities, and attempts to acquire us, may conflict with the interests of our other shareholders.
By granting a license in our intellectual property rights, we may be limited in our ability to protect our intellectual property rights, which could adversely impact our competitive position or results of operations.
On October 2, 2017, we entered into an Intellectual Property Rights Agreement with Synchron pursuant to which Synchron and its affiliates were granted certain perpetual rights to the intellectual property of the Company relating to its rare earths’ patents and related technical information. Upon the exercise of its option on October 16, 2019, Synchron and its affiliates’ intellectual property rights became exclusive, subject to the Company’s ownership and limited use rights in the intellectual property and any improvements made thereon. As a result of the Intellectual Property Rights Agreement, we may be forced to enforce or defend our intellectual property rights against infringement and unauthorized use, and to protect our trade secrets. Further, by granting a license to use our intellectual property, we may be limited in our ability to protect our intellectual property rights by legal recourse or otherwise. In defending our intellectual property rights, we may place our intellectual property at risk of being invalidated, held unenforceable, narrowed in scope, or otherwise limited, any of which could have a material adverse effect on our business and financial condition. Our inability to preserve or maintain an interest in certain intellectual property rights could adversely impact our competitive position or results of operations.
We have restarted our federal and state licensing, permitting progression for our Bear Lodge REE Project, and there is a risk to the completion of those efforts in a timely and cost-effective manner.
During the first quarter of 2016, we placed the Bear Lodge REE Project on care-and-maintenance, and all licensing and permitting activities were suspended, including the environmental impact statement (“EIS”) process, state permitting, and the NRC licensing process. The Company continued to hold the Bear Lodge REE Project on care-and-maintenance through 2023. In 2024, we resumed certain of these activities, including certain environmental data collection and technical report updates. In early 2026, the Company formally restarted the licensing and permitting of the Bear Lodge REE Project for both federal and state permitting; however, our ability to complete the permitting and licensing on terms that support the project is uncertain.
We have no history of producing mineral products from our properties.
We have no history of mining, recovering, or refining any mineral products, and our Bear Lodge REE Project is not in development or production. There can be no assurance that the Bear Lodge REE Project will be successfully developed and placed into production, produce minerals or products in commercial quantities or otherwise generate operating earnings. Advancing properties from the exploration stage into development and commercial production requires significant capital and time and will be subject to further feasibility studies, permitting and licensing requirements and construction of the mine, processing plants, roads and related works and infrastructure. We will continue to incur losses until such time, if ever, when our mining activities successfully reach commercial production levels and generate sufficient revenue to fund continuing operations. There is no certainty that we will produce revenue from any source, operate profitably, or provide a return on investment in the future. If we are unable to generate revenues or profits, our shareholders may not be able to realize returns on their investment in our common shares.
The planned development of our Bear Lodge REE Project involves numerous uncertainties that could affect the feasibility or profitability of the project.
Mine development projects typically require a number of years and significant expenditures during the exploration and development phases before production is possible. The economic feasibility of exploration and development projects is based on many factors, such as the following:
- completion of feasibility studies to evaluate mineral resources and mineral reserves and commercial viability;
- the timing and cost, which can be considerable, of further exploration, licensing, permitting and construction of infrastructure, mining, processing and/or beneficiation facilities;
- our ability to utilize our proprietary process technologies, which could encounter problems, prove to be uneconomical or result in other unexpected complications during scale-up;
- securing commercially viable sales outlets for our REE products;
- the potential need to enter into a joint venture or other partnership arrangement to develop the Company’s projects;
- the availability and costs of equipment, supplies and skilled labor;
- the availability and cost of appropriate processing and/or refining arrangements, if required;
- compliance with environmental and other governmental approval, licensing and permit requirements;
- the availability of funds to finance exploration, development, and construction activities;
- future prices for rare earth minerals;
- potential opposition from non-governmental organizations, environmental, indigenous, or local groups or inhabitants that may delay or prevent development activities;
- potential increases in exploration, engineering, construction, operating, and decommissioning costs due to changes in the cost of labor, fuel, power, materials, or supplies;
- potential shortages of mineral processing and/or beneficiation, construction or other facilities-related equipment or supplies; and
- the ability to attract and retain talent for development and operation of the Bear Lodge REE Project.
It is common in exploration programs and in development, construction, and mine start-ups to experience unplanned problems, delays, and substantial cost overruns. Accordingly, our activities may not result in profitable mining operations, and we may not succeed in establishing mining operations or profitably producing minerals from our projects at all or in a reasonable timeframe.
Joint ventures and other partnerships may expose us to risks.
We will require additional capital through investment, off-take agreements, joint ventures and/or other partnership arrangements with current investors or other parties for the development of our projects. Although such arrangements may lessen our financial burden in exploring and developing the projects, they will likely also dilute our interest therein or affect our ability to control the development and/or operation of any of our projects. Our ability to attract additional capital may be limited by our majority shareholder Synchron, as it holds certain contractual approval rights pursuant to the Investment Agreement, and its approval may be required. In addition, Synchron has significant influence on, or the ability to control the outcome of, certain of our major corporate decisions and matters requiring shareholder approval. Any failure of an off-take partner, joint venture partner, or other partner to meet its obligations to us or to third parties, or any disputes with respect to the parties’ respective rights and obligations, could have a material adverse effect on the off-take agreement, joint venture, or other partnership arrangement and, in turn, on our business performance and on our ability to develop and/or operate our projects.
Subject to further financing, and progression and outcome of the Demonstration Plant, we may commence a FS on our Bear Lodge REE Project, and the results of this FS are uncertain.
In October 2014, we completed a PFS for our Bear Lodge REE Project that updated our mineral resource estimate and refined plans for our process technology. We subsequently updated the mineral resource and completed a TRS (See “Item 2. Properties” of this Annual Report) and Technical Report for the Bear Lodge REE Project; however, the economic assessment of the Bear Lodge REE Project has not been progressed through an updated FS. Subject to further financing and the results of the Demonstration Plant, we may resume work on a FS. Whether the Company undertakes a FS in the future and, if so, the results of any such study, are uncertain and may indicate project economics that are more or less favorable than those previously reported in 2014 or in the TRS or Technical Report. As our project optimization efforts continue, we cannot ensure that the FS, if one is undertaken, will be based upon all of the same inputs used in the PFS and TRS. As a result, we may need to update our processing and/or beneficiation technology, and/or project development plans to enhance economics or further study aspects of the Bear Lodge REE Project. This could result in significant additional delays and expenses or could make financing efforts with respect to such efforts more difficult or not possible. In addition, there is a risk that the Company may not resume work on a FS.
Our viability as a rare earth company depends, in large part, on the financing, licensing, permitting, development and operation of our Bear Lodge REE Project, which is our only rare earth project.
Our only rare earth project at this time is the Bear Lodge REE Project. Our continued viability is based, in large part, on successfully implementing our strategy, including completion of licensing, permitting and construction of a mine and processing and/or beneficiation facilities in a reasonable timeframe. If we are unable to secure additional capital or enter into a strategic transaction and implement our strategy, or in the event of the imposition of significant additional regulatory burdens or delays or a significant deterioration of the market for rare earth products, our ability to develop a sustainable or profitable business would be materially adversely affected. If the Bear Lodge REE Project does not proceed, then the viability of the Company may depend upon the ability to process REE from sources other than our Bear Lodge REE Project using our proprietary technology assuming the technology is successfully proven through the operation of the Demonstration Plant.
Increased costs could affect our ability to bring the Bear Lodge REE Project into production and, once in production, to be profitable.
We estimated the initial capital costs required to bring the Bear Lodge REE Project into commercial production in our historical PFS, dated October 9, 2014, at approximately $290,000. We did not evaluate the capital cost estimates in our 2024 TRS or Technical Report for the Bear Lodge REE Project. A future FS, if and when completed, is expected to show our capital and operating costs will be materially higher than those we previously anticipated, which could make it more difficult to finance the Bear Lodge REE Project or to successfully establish mining operations.
We anticipate that our future operating costs at the Bear Lodge REE Project will vary from year to year due to a number of factors, such as changing grade, metallurgy, and revisions to mine plans in response to the physical shape and location of the ore body. In addition, costs are affected by the price of commodities such as oil, gas, reagents/chemicals, steel, rubber, and electricity. Such commodities are at times subject to volatile price movements, including increases that could make production less profitable or not profitable at all. A material increase in costs could also impact our ability to commence or maintain future development of mining operations.
External influences, like a pandemic or other world health crisis, may have an adverse impact on our business.
A future pandemic or similar public health issues, as seen in the COVID-19 pandemic, could have a material adverse effect on our ability to raise capital, construct or operate our Demonstration Plant, mine, or production facility, or execute our business plans. In addition, preventive measures we may voluntarily put in place may have a material adverse effect on our business for an indefinite period of time, such as decreased employee or contractor availability, unavailability of needed products or services, or disruptions to the businesses of our contracted service providers and others. Our suppliers may also face these and other challenges, which could lead to a disruption or delay in their services. Any pandemic and resulting economic slowdown may also impact the supply and demand for rare earths domestically and globally. Although these disruptions may continue to occur, the long-term economic impact and near-term financial impacts of a pandemic, its ongoing variants, and other possible public health threats cannot be reasonably estimated at this time due to the uncertainty of future developments.
We expect to rely on our proprietary technology and processes to further our Bear Lodge REE Project.
We rely on a combination of trade secret protection, nondisclosure agreements, trademarks, and patents to establish and protect our proprietary intellectual property rights in our rare earth technology. As of December 31, 2025, we had a patent portfolio which includes two issued U.S. patents and one pending U.S. divisional patent application, and fifteen issued foreign patents across thirteen foreign jurisdictions. The patent claims are generally directed to (1) selective recovery of REEs from mixed chloride leach solutions using oxalic acid, and (2) separation of thorium from bulk REEs in a solvent extraction (“SX”) process. These patents claim priority to provisional applications filed in 2013 and 2014. The issued U.S. patents have a term of 20 years measured from the filing date of the utility patent applications. We licensed our intellectual property, including patents and related technical information, to our majority shareholder, Synchron, in October 2017, and the license became exclusive to Synchron and its affiliates in October 2019. The Company retains a limited right to use its intellectual property and any enhancements thereto. Several of these technologies may have potential value for application in other industries. The success of our business depends, in part, on our ability to utilize our proprietary process technologies, and we could encounter unforeseen problems or costs, or both, in scaling up our technologies to commercial applications.
Our mineral resource estimate may be inaccurate and any material change in this estimate could affect the viability of placing our property into production.
In March 2024, the Company published a mineral resource estimate based on maximizing the recovery of La and the key magnet materials of Nd, Pr, Tb, and Dy. The estimate was focused on the Bull Hill deposit at the Bear Lodge REE Project with long-term upside existing in the Carbon, Whitetail, and Taylor deposits. Unless otherwise indicated, our mineral resources are based upon estimates made by independent geologists. When making determinations about whether to advance the Bear Lodge REE Project to development, we must rely upon such estimated calculations as to the quantity and grades of mineralization contained in the property. Until mineralized material is actually mined and processed, mineral resources and grades of such mineralization must be considered estimates only, which may be unreliable. Because we have not completed a FS on the Bear Lodge REE Project and have not commenced actual production, the mineral resource estimate for the Bear Lodge REE Project may require adjustments or downward revisions. In addition, the grade of material ultimately mined, if any, may differ from that indicated in our mineral resource estimate or in future feasibility studies. Our mineral resource estimate has been determined based on assumed cut-off grades that depend upon estimated REE prices and recovery rates. Any significant increase in cut-off grades could reduce our estimates of mineralization, or the amount of mineralization to be extracted, and could have a material adverse effect on our share price and the value of our Bear Lodge REE Project.
The historical mineral resource estimates for our Sundance Gold Project are not considered current, need to be updated, and should not be relied upon.
The 2011 historical mineral resource estimates for our Sundance Gold Project have not been updated and, as such, should not be relied upon. The Sundance Gold Project is in the early exploration stage and has been on hold since 2011. We have not done sufficient work to classify the historical mineral estimates for our Sundance Gold Project as a current estimate of mineral resources, and we are not treating the historical mineral resource estimates as current estimates of mineral resources.
We depend on key personnel, and the absence of any of these individuals could adversely affect our business.
Our success is currently largely dependent on the performance, retention and abilities of our directors, President and Chief Executive Officer (“CEO”), other officers and personnel. The loss of the services of these persons could have a material adverse effect on our business and prospects. There is no assurance that we can maintain the services of our directors, CEO, other officers, or other qualified personnel and consultants required to operate our business. Failure to do so could have a material adverse effect on us and our prospects.
U.S. investors may not be able to enforce their civil liabilities against us or our directors, controlling persons and officers.
It may be difficult to bring and enforce suits against us. We are incorporated in the province of British Columbia, Canada under the BCBCA. Some of our directors may be residents of Canada, and a substantial portion of their assets are located outside of the U.S. As a result, it may be difficult for U.S. holders of our common shares to effect service of process on these persons within the U.S. or to recover in the U.S. on judgments rendered against them. In addition, a shareholder should not assume that the courts of Canada (i) would enforce judgments of U.S. courts obtained in actions against us or such persons predicated upon the civil liability provisions of the U.S. federal securities laws or other laws of the U.S., or (ii) would enforce, in original actions, liabilities against us or such persons predicated upon the U.S. federal securities laws or other laws of the U.S.
We believe that we were a “passive foreign investment company” (“PFIC”) for the year ended December 31, 2025, and could be a PFIC in subsequent years, which could have adverse U.S. federal income tax consequences for U.S. shareholders.
An investor in our common shares that is a U.S. taxpayer (referred to as a U.S. shareholder) should be aware that we believe that we were a PFIC for the year ended December 31, 2025. We also expect that we will be a PFIC for the year ending December 31, 2026 and that we may be a PFIC in subsequent years. The tests for determining PFIC status are dependent upon a number of factors, some of which are beyond our control and can be subject to uncertainties. Accordingly, we cannot provide certainty that we were or were not a PFIC for the year ended December 31, 2025, or that we will or will not be a PFIC for the year ending December 31, 2026, or for any future year. We will use commercially reasonable efforts to provide information regarding our status as a PFIC, and the PFIC status of any subsidiary in which the Company owns more than 50% of such subsidiary’s total aggregate voting power, to U.S. shareholders who make a written request for such information. Adverse rules apply to U.S. shareholders who own our common shares if we are a PFIC. Each U.S. shareholder should consult its own tax advisor regarding the U.S. federal, U.S. federal alternative minimum, U.S. federal estate and gift, and U.S. state and local tax consequences of the PFIC rules and the acquisition, ownership, and disposition of our common shares if we are or become a PFIC. For additional information regarding PFIC tax consequences, see “Part II, Item 5. Market for Registrant’s Common Equity, Related Stockholder Matters and Issuer Purchases of Equity Securities—Certain U.S. Federal Income Tax Considerations—Passive Foreign Investment Company Rules.”
Risks Related to the Mineral Exploration, Development and Mining Industries
We may be adversely affected by fluctuations in demand for, and prices of, rare earth products.
Because our primary focus is currently the advancement and development of the Demonstration Plant and ultimately the Bear Lodge REE Project, changes in demand for, and the market price of, REE products could significantly affect our ability to develop or finance the Bear Lodge REE Project and eventually attain commercial production or profitability. REE product prices may fluctuate and are affected by numerous factors beyond our control such as interest rates, exchange rates, inflation, deflation, fluctuation in the relative value of the U.S. dollar against foreign currencies on the world market, global and regional supply, and demand for REE products, and the political and economic conditions of countries that produce and use REEs. Protracted periods of low prices for REE products could significantly reduce our ability to develop the Bear Lodge REE Project and, if we attain commercial production, to maintain profitable operations.
Demand for REE products is impacted by demand for downstream products incorporating rare earths, including hybrid and fully electric vehicles, wind power equipment and other clean technology products, as well as demand in the general automotive and electronics industries. Lack of growth in these markets or the introduction of substitute products could adversely affect the demand for REE products, which would have a material adverse effect on our Bear Lodge REE Project and our business. In contrast, periods of high REE prices are generally beneficial to us; however, strong REE prices, as well as real or perceived disruptions in the supply of REE, also create economic pressure to identify or create non-REE alternate technologies that ultimately could reduce future long-term demand for REE products, and at the same time, may incentivize the development of otherwise marginal mining properties or the development of new, lower cost sources of supply that could reduce or eliminate the market for REEs altogether. For example, automobile manufacturers have announced plans to develop motors for electric and hybrid cars that do not require REE products due to concerns about the available supply of REEs. If the automobile industry or other industries reduce their reliance on REE products, the resulting change in demand could have a material adverse effect on our business. In particular, if prices or demand for REEs were to decline, our share price would likely decline, and this could impair our ability to obtain the funding needed for our operations and our ability to find purchasers for our products at prices acceptable to us or at all.
An increase in the global supply of rare earth products, dumping and/or predatory pricing by our competitors may materially and adversely affect our ability to raise capital, develop our Bear Lodge REE Project or operate profitably.
The pricing and demand for REE products is affected by a number of factors beyond our control, including growth of economic development and the global supply and demand for REE products. REE supply markets continue to be dominated by production from China, which produced an estimated 70% of the global REE mine production and 91% of refined product in 2025. China also dominates the manufacture of metals, NdFeB magnets and other products from REEs. The threat of increased competition may lead our competitors to engage in predatory pricing behavior or manipulation of the available supply of REEs. Advanced technology in recycling REEs may also impact supply and prices. Any increase in the amount of REE products exported from other nations and increased competition may result in price reductions, reduced margins, or loss of potential market share, any of which could materially adversely affect our business. As a result of these factors, we may not be able to compete effectively in the market.
The success of our business may depend, in part, on the establishment of new uses and markets for rare earth products.
The success of our business may depend, in part, on the establishment of new markets for certain rare earth products. Although we plan to produce rare earth products for use in end-products such as NdFeB magnets, which are used in critical existing and emerging technologies (hybrid and fully electric vehicles, wind power turbines, robotics, and AI data centers), as well as other REE applications such as oil refining catalysts, the success of our business may depend on the creation of new markets in addition to the successful commercialization of REE products in existing and emerging markets. Any unexpected costs or delays in the commercialization of any of the foregoing products or applications could have a material adverse effect on our ability to develop our Bear Lodge REE Project or operate our business profitably.
We are subject to significant governmental regulations, including permitting, licensing and approval processes, that affect our operations and could impact the cost and timing of conducting our business.
Our current and future activities will be governed by laws and regulations, including the following, among others:
- laws and regulations governing mineral concession acquisition, prospecting, development, mining, processing, production, and decommissioning;
- laws and regulations related to exports, taxes, and fees;
- labor standards and regulations related to occupational health and mine safety;
- laws and regulations relating to environmental protections concerning, among other things, waste management, greenhouse gas emissions, transportation, and disposal of toxic and radioactive substances, land use, water, air, and the protection of threatened and endangered species.
We believe that we hold, or are in the process of obtaining, all licenses and permits necessary to carry on the activities that we currently are conducting or propose to conduct in the near term under applicable laws and regulations. Such licenses and permits are subject to changes in regulations and changes in various operating circumstances. There is no guarantee that we will be able to obtain all necessary licenses and permits that may be required for future exploration, development and mining activities, including constructing mines and/or processing and/or beneficiation facilities, and commencing operations at the Bear Lodge REE Project. In addition, if we proceed to production on the Bear Lodge REE Project, we will be required to obtain and comply with permits and licenses that may contain specific operating or other conditions. There can be no assurance that we will be able to obtain such permits and licenses or that we will be able to comply with any such conditions. Our Sundance Gold Project, previously in the exploration stage, but on hold since 2011, does not have any of the permits or licenses that would be necessary to carry on further activities on the project. Costs related to applying for and obtaining permits and licenses may be prohibitive and could delay planned exploration and development activities. Failure to comply with applicable laws, regulations and permitting and licensing requirements may result in enforcement actions, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions.
Parties engaged in mining operations may be required to compensate those suffering loss or damage relating to mining activities and may be subject to civil or criminal liability, fines or penalties imposed for violations of applicable laws or regulations. Amendments to current laws, regulations and permits governing operations and activities of mining companies, or more stringent implementation thereof, could have a material adverse impact on our operations, cause increases in capital expenditures or production costs, or require abandonment or delays in the exploration or the development of our projects.
Our activities are subject to environmental risks and compliance with environmental laws and regulations that are increasing and costly.
Our business is subject to environmental regulation in the jurisdictions in which we operate. Environmental laws and regulations at the local, state, and federal level could evolve in a manner that may impose stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors, and employees. These laws address, among other issues, emissions into the air, discharges into water, management of waste and hazardous substances, protection of natural resources, antiquities, endangered species, and reclamation of lands disturbed by mining operations. Compliance with environmental laws and regulations at the local, state, and federal level and future changes in these laws and regulations may require significant capital outlays and may cause material changes or delays in our current and planned operations and future activities. It is possible that future changes in these laws or regulations could have a significant adverse impact on our projects or some portion of our business, causing us to reevaluate those activities at that time.
Examples of some of the current U.S. federal laws that may affect our business and planned operations include, but are not limited to, the following:
- NEPA requires federal agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of proposed actions, including issuance of permits to mining facilities, and assessing alternatives to those actions. Under NEPA, a federal agency must prepare an EIS detailing the environmental impacts of “major federal actions significantly affecting the quality of the human environment.” If no significant impacts are found, the federal agency may conduct an Environmental Assessment (“EA”) finding no significant impact.
- We began, in 2012, to undertake the NEPA process for the Bear Lodge REE Project with the USFS as the lead agency. However, in 2016, we placed the Bear Lodge REE Project under care-and-maintenance, and all permitting and licensing activities were suspended, including the NEPA process. The NEPA process can cause delays in issuance of required permits or result in changes to a project to mitigate potential environmental impacts, which in turn can impact the economic feasibility of a proposed project, including the ability to construct or operate the Bear Lodge REE Project or other projects entirely. Recent, federal agency regulatory and legislative changes, along with a recent Supreme Court decision, may have the impact of lessening the administrative burden imposed by NEPA and other federal permitting requirements, but the exact impacts of these changes to longstanding practices are still unknown.
- The NRC, pursuant to its authority under the Atomic Energy Act of 1954, as amended (the “Atomic Energy Act”), oversees the regulatory framework governing the control of radioactive materials, including processing and/or beneficiation of REE that contain radioactive source materials such as uranium and thorium. The NRC is responsible for issuing licenses for source material involving concentrations of uranium or thorium that exceed 0.05% by weight. If a proposed action, including waste generation, results in materials with concentrations of uranium and thorium that equal or exceed 0.05% by weight, a license to receive title to, possess, use, transfer, or deliver source and byproduct materials may be required. As our operations are expected to exceed this concentration, we are required to follow the regulations pertaining to a license application for the Demonstration Plant project and the Bear Lodge REE Project. The Demonstration Plant project received the necessary NRC license in the third quarter of 2023. Commending in 2026, the WDEQ will have primacy for source material licensing in Wyoming, including the oversight of the Demonstration Plant NRC license. The licensing process, including NEPA review relating to the NRC licensing, when initiated for the Bear Lodge REE Project, will be completed by the WDEQ pursuant to that primacy delegation. That licensing may cause delays or result in changes to the Bear Lodge REE Project design to mitigate impacts as required under the license.
- Under the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (“CERCLA”) and similar state laws, responsibility for the entire cost of cleanup of a contaminated site, as well as natural resource damages, can be imposed upon current or former site owners or operators, or upon any party who released one or more designated “hazardous substances” at the site, regardless of the lawfulness of the original activities that led to the contamination or whether the owner or operator caused or knew of the release. CERCLA also authorizes the EPA and, in some cases, third parties to take actions in response to threats to public health or the environment and to seek to recover from the potentially responsible parties the costs of such actions. We may also be an owner or operator of facilities at which hazardous substances have been released by previous owners or operators. We may be responsible under CERCLA for all or part of the costs of cleaning up facilities at which such substances have been released and for natural resource damages. We have not, to our knowledge, been identified as a potentially responsible party under CERCLA, nor are we aware of any prior owners or operators of our properties that have been so identified with respect to their ownership or operation of those properties.
- The Resource Conservation and Recovery Act, as amended (“RCRA”), and comparable state statutes, regulate the generation, transportation, treatment, storage, and disposal of “solid” and “hazardous” waste and authorize the imposition of substantial fines and penalties for noncompliance, as well as requirements for corrective actions. Although certain mining, mineral processing and/or beneficiation wastes currently are exempt from regulation as hazardous wastes under RCRA, the EPA has limited the disposal options for certain wastes designated as hazardous wastes under RCRA. It is possible that certain wastes generated by our potential future operations that currently are exempt from regulation may in the future be designated as hazardous wastes and may therefore become subject to more rigorous and costly management, disposal, and clean-up requirements.
- The Clean Air Act, as amended (“CAA”), and comparable state statutes, restricts the emission of air pollutants from many stationary and mobile sources, including mining, processing and/or beneficiation activities. Our
planned mining operations may produce air emissions, including fugitive dust and other air pollutants, from stationary equipment, storage facilities, and the use of mobile sources such as trucks and heavy construction equipment that are subject to review, monitoring, control requirements and emission limits under the CAA and state air quality laws. New facilities may be required to obtain permits before work can begin, and existing facilities may be required to incur capital costs to remain in compliance. In addition, permitting and licensing rules and issued permits may impose limitations on production levels or result in additional capital expenditures to comply with such rules or permits. In certain circumstances, private citizens may also sue sources of pollutants for alleged violations of the CAA.
- The Clean Water Act, as amended (“CWA”), and comparable state statutes impose restrictions and controls on the discharge of pollutants into waters of the U.S. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of a permit issued by the EPA or an analogous state agency. These controls generally have become more stringent over time, and it is possible that additional restrictions will be imposed in the future. A 2025 U.S. Supreme Court decision provided additional guidance regarding agency determination of regulated waters and the requirement for CWA permits, which may lessen the requirements for these permits for resource projects in the future. Violation of the CWA and similar state regulatory programs can result in civil, criminal, and administrative penalties for unauthorized discharges of hazardous substances and other pollutants. They also can impose substantial liability for the costs of removal or remediation associated with such discharges. The CWA also requires the implementation of a Stormwater Pollution Prevention Plan establishing best management practices, training, periodic monitoring of covered activities, and monitoring and sampling of stormwater run-off. The CWA and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the U.S. unless authorized by a permit issued by the U.S. Army Corps of Engineers.
- The Safe Drinking Water Act, as amended (“SDWA”), and the Underground Injection Control (“UIC”) program promulgated thereunder regulate the drilling and operation of subsurface injection wells. The program requires that a permit be obtained before drilling a disposal well. The EPA directly administers the UIC program in some states, and in others the responsibility for certain aspects of the program has been delegated to the state. Violation of these regulations and/or contamination of groundwater by mining related activities may result in fines, penalties, and/or remediation costs, among other sanctions and liabilities under the SDWA and state laws.
- The Endangered Species Act (“ESA”) regulates activities that could have an adverse effect on threatened and endangered species, including the habitat and ecosystems upon which they depend. The ESA protects threatened and endangered species primarily by prohibiting the unauthorized “taking” of listed species, which includes harassing or harming members of such species or significantly modifying their habitat. The ESA also requires consultation with other agencies in certain circumstances. Compliance with ESA requirements can significantly delay, limit, or even prevent the development of projects, including the development of mining claims, and can also result in increased development costs. In addition, the ESA authorized both civil and criminal penalties for ESA violations and authorizes citizen suits against any person alleged to be in violation of the ESA.
Regulations and pending legislation governing issues involving climate change could result in increased operating costs that could have a material adverse effect on our business.
A number of governments or governmental bodies have adopted or are contemplating regulatory changes in response to the potential impact of climate change. In the U.S., on December 15, 2009, the EPA published its findings that emissions of carbon dioxide, methane and other GHGs present an endangerment to public health and the environment because emissions of such gases are, according to the EPA, contributing to the warming of the earth’s atmosphere and other climate changes. Based on these findings, the EPA developed and implemented regulations that restrict GHG emissions under existing provisions of the CAA. The EPA rescinded its endangerment finding on February 12, 2026, prompting immediate legal challenges. The EPA’s ability and obligation to regulate GHG emissions is therefore in legal flux at the moment, creating regulatory uncertainty.
In addition, both houses of Congress have considered legislation to reduce GHG emissions, and many states have already taken measures to reduce GHG emissions, primarily through the development of GHG inventories, GHG emission fees, GHG permitting and/or regional GHG “cap and trade” programs. Most of these “cap and trade” programs work by requiring major sources of emissions to acquire and surrender emission allowances, with the number of allowances available for purchase reduced each year until the overall GHG emission-reduction goal is achieved. It is likely that, in the absence of federal regulation over GHG following the EPA’s recission of the endangerment finding, certain states will pass additional legislation regulating GHG emissions at the state level.
Legislation and increased regulation regarding climate change could impose significant costs on us and/or our suppliers, including costs related to increased energy requirements, capital equipment, environmental monitoring, and reporting and/or other costs to comply with such regulations. Any adopted future climate change regulations could also negatively impact our ability to compete with companies situated in areas not subject to such regulations. Alternatively, climate change legislation could potentially benefit our business by driving demand for products utilizing rare earth containing products. We cannot predict how legislation and regulation will affect our financial condition, operating performance, or ability to compete. Even without such regulation, increased awareness, or any adverse publicity in the global marketplace about the rare earth industry’s potential impacts on the environment could harm our reputation and business. The potential physical impacts of climate change on our operations are highly uncertain and would be particular to the geographic circumstances in the areas in which we operate. These may include changes in precipitation, storm patterns and intensities, water shortages and changing temperatures. These factors may have an adverse impact on the cost, production, or financial performance of our operations.
A shortage of equipment and supplies could adversely affect our ability to operate our business.
We currently do and likely will depend on various supplies and equipment to carry out our activities, including those for the Demonstration Plant, and, if warranted, future exploration, development, mining, and processing operations. A shortage of such supplies, equipment or parts could have a material adverse effect on our ability to carry out our planned activities or increase our operating costs and expenses.
Mineral exploration and development and mining are potentially hazardous and subject to conditions or events beyond our control, which could have a material adverse effect on our business or plans.
Mineral exploration, development and mining involve various types of risks and hazards, including, but not limited to, the following:
- environmental hazards;
- power outages;
- metallurgical and other processing problems;
- unusual or unexpected geological formations or conditions;
- personal injury, flooding, fire, explosions, cave-ins, earthquakes, landslides, and rock-bursts;
- mineral exploration, transportation, or mining accidents;
- concentrate losses;
- fluctuations in exploration, development, and production costs;
- labor disputes;
- supply interruptions;
- unanticipated variations in grade;
- mechanical equipment failure;
- periodic interruptions due to inclement or hazardous weather conditions; and
- regulatory delays, curtailments, or shutdowns.
These risks could result in damage to, or destruction of, mineral properties, production equipment, facilities or other properties, personal injury, environmental damage, delays in mining, increased production costs, monetary losses, or possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums or at all. Insurance against certain environmental risks, including potential liability for pollution or other hazards resulting from the disposal of waste products from production, may be prohibitively expensive or not available. Any losses we incur related to any significant events that are not covered by insurance policies may have a material adverse effect on our business.
Mineral exploration and development is highly speculative, and certain inherent risks could have a negative effect on our business.
Our long-term success depends primarily on our ability to develop mineral deposits on existing properties that can be developed into commercially viable mining operations. Resource exploration is a highly speculative business, characterized by a number of significant risks, including, among other things, unprofitable efforts resulting not only from the failure to discover mineral deposits but from finding mineral deposits which, though present, are insufficient in quantity and quality to return a profit from production. Substantial expenditures are required to establish proven and probable mineral reserves through drilling and analysis, to develop metallurgical processes to extract metal, and to develop the mining, processing and/or beneficiation facilities and infrastructure at any site chosen for mining. The marketability of minerals discovered by us may be affected by numerous factors that are beyond our control and cannot be accurately predicted, such as market pricing fluctuations, the proximity and capacity of milling facilities, mineral markets demand, available supply and processing equipment, and other factors such as government regulations, including regulations relating to royalties, allowable production, importing and exporting of minerals, and environmental protection. Any one or a combination of these factors may result in a failure to receive an adequate return on our investment capital. The decision to abandon a project may have a material adverse effect on the market value of our common shares or our ability to complete future financings.
Title to our Bear Lodge Property may be subject to other claims, or we may lose our interest in our claims, which could affect our property rights and claims.
There are risks that title to our Bear Lodge Property may be challenged or impugned. Our Bear Lodge Property is located in the state of Wyoming and may be subject to prior unrecorded agreements, transfers or native land claims, and title may be affected by undetected defects. There may be valid challenges to the title of our Bear Lodge Property which, if successful, could impair or result in the cessation of development and/or operations.
The vast majority of the mineral rights to our Bear Lodge Property consist of “unpatented” mining claims created and maintained in accordance with the U.S. General Mining Act of 1872 (“U.S. General Mining Law”). Unpatented mining claims are unique property interests and are generally considered to be subject to greater title risk than are other real property interests because the validity of unpatented mining claims can be uncertain. This uncertainty arises, in part, out of the complex federal and state laws and regulations an owner of an unpatented mining claim must comply with to locate and maintain a valid claim. Also, unpatented mining claims are always subject to possible challenges by third parties or validity contests by the federal government. The validity of an unpatented mining claim, in terms of both its location and its maintenance, is dependent on strict compliance with not only a complex body of U.S. federal and state statutory law, but also administrative and judicial decisions interpreting those statutes and case law. In addition, there may be limitations as to the completeness of public records that determine prior claimants that could impact the validity or ownership of unpatented mining claims. The Company’s right to continue activities on the Bear Lodge Property is dependent upon our ability to pay annual claim maintenance fees.
Our operations are subject to significant uninsured risks that could negatively impact future profitability as we maintain limited insurance against our operations.
Any exploration or operation of our Bear Lodge Property will entail certain risks, including unexpected or unusual operating conditions, such as rockslides, cave-ins, flooding, fire, and earthquakes. It is not always possible to insure against these risks. Should events such as these arise, they could reduce or eliminate our assets and shareholder equity as well as result in increased costs and/or a decline in the value of our assets or common shares. We expect to maintain general liability, director and officer insurance, and some insurance against our assets but not with the expectation of full replacement value. We may decide to update or amend our insurance portfolio in the future if coverage is available at economically viable rates.
Increased competition could adversely affect our ability to attract necessary capital funding.
The mining industry is intensely competitive, and we must compete with other individuals and companies, many of which have greater financial resources, operational experience, and technical capabilities than we have. This competition from other mining companies could adversely impact our efforts to hire experienced professionals. Competition for resources at all levels can be very intense, particularly affecting the availability of manpower, drill rigs, mining equipment and production equipment. Increased competition could adversely affect our ability to attract necessary capital funding or attract or retain key personnel or outside technical resources.
Land reclamation requirements for our properties may be burdensome or expensive.
Although land reclamation requirements vary depending on the location and governing authority, such requirements generally are imposed on mineral exploration companies as well as companies with mining and processing operations to minimize long-term effects of land disturbance.
Reclamation requirements may include the following, among other things:
- control dispersion of potentially deleterious effluents;
- manage and control mine tailings and other processing wastes;
- reduce open pit mine slope angles;
- treat ground and surface water to drinking water standards; and
- reasonably re-establish pre-disturbance vegetation and land forms.
To carry out reclamation obligations imposed on us in connection with the potential future development activities at the Demonstration Plant and the Bear Lodge Property, we must allocate financial resources that might otherwise be spent on further exploration and future development programs. We have set up a provision for reclamation obligations as currently anticipated for exploration completed on the Bear Lodge Property and operations conducted at the Demonstration Plant, as appropriate, but these provisions may not be adequate. If we are required to carry out unanticipated reclamation work, our financial position could be adversely affected.
Legislation and regulations have been proposed that would significantly affect the mining industry and our business.
The U.S. Congress from time to time has considered proposed revisions to the U.S. General Mining Law. If Congress again considers and enacts any such revisions, such legislation could change the cost of holding unpatented mining claims or significantly impact our ability to develop mineralized resources on unpatented mining claims. Changes in the U.S. presidential administration or changes in the composition of Congress from time to time may increase the likelihood that Congress considers such revisions at some point. Past bills have proposed, among other things, to (i) impose a federal royalty on production from unpatented mining claims, (ii) impose a fee on the amount of material displaced at a mine, (iii) impose time limits on the effectiveness of plans of operation that may not coincide with mine life, (iv) impose more stringent environmental compliance and reclamation requirements on activities on unpatented mining claims, (v) establish a mechanism that would allow states, localities and Native American tribes to petition for the withdrawal of identified tracts of federal land from the operation of the U.S. General Mining Law, (vi) replace the location of mining claims with federal leases for locatable minerals, and (vii) allow for administrative determinations that mining would not be allowed where undue degradation of the federal lands in question could not be prevented. Although we cannot predict what legislated royalties might be, the enactment of a federal royalty or other provisions contained in any such proposed bills could adversely affect the potential for development of our unpatented mining claims, our ability to operate, or our financial performance. The effect of any proposed revision of the U.S. General Mining Law on operations cannot be determined until enactment. However, it is possible that revisions would materially increase the carrying and operating costs of mineral properties located on federal unpatented mining claims.
Risks Related to Our Common Stock
We may elect to deregister our common shares under the Exchange Act. Deregistration would result in less disclosure about us and may negatively affect the liquidity and trading prices of our common shares.
Due to the relatively high cost of being a public company in the U.S., our Board of Directors may elect to voluntarily deregister our common shares under the Exchange Act and suspend our reporting obligations in the U.S., possibly in combination with an effort to list our common shares on a securities exchange other than the OTCQB Venture Marketplace.
No Board approval of deregistration has taken place, but in the future, the Board may authorize the Company to file with the SEC a Form 15 to voluntarily deregister our common shares under Section 12(g) of the Exchange Act and suspend our reporting obligations under Section 15(d) of the Exchange Act. If the Board approves such deregistration, we would file a Form 15 and our obligations to file periodic reports, such as annual reports on Form 10-K, quarterly reports on Form 10-Q and current reports on Form 8-K, would be suspended immediately upon the filing of the Form 15 with the SEC, and our proxy statement, Section 16 and other Section 12(g) reporting responsibilities would terminate effective 90 days after the filing of the Form 15. We believe that we are eligible to deregister under the Exchange Act. If we were to file a Form 15, we expect that our common shares, which currently trade on the OTCQB Venture Marketplace, would not continue to be quoted on the OTCQB Venture Marketplace. Following any deregistration, we would not expect to publish periodic financial information or furnish such information to our shareholders except as may be required by applicable laws, including Canadian securities laws, or stock exchange rules. As a result of the foregoing factors, deregistration may result in less disclosure about us and may negatively affect the liquidity and trading prices of our common shares.
We do not currently intend to pay cash dividends.
We have not declared any dividends since our incorporation and do not anticipate that we will do so in the foreseeable future. Our present policy is to retain all available funds for use in our business development and operations. Payment of future cash dividends, if any, will be at the discretion of the Board of Directors and will depend on our financial condition, results of operations, contractual restrictions, capital requirements, business prospects and other factors that the Board of Directors considers relevant. In the absence of dividends, investors will only see a return on their investment if the value of our common shares appreciate.
Future sales of our securities in the public or private markets could adversely affect the trading price of our common shares or our ability to continue to raise funds in new equity offerings.
It is possible that we will sell common shares, or securities exercisable or convertible into common shares, in order to finance our planned development activities. Future sales of substantial amounts of our securities in the public or private markets could potentially dilute our existing shareholders and potentially adversely affect the trading prices of our common shares or could impair our ability to raise capital through future offerings of securities. Alternatively, we may rely on debt financing and assume debt obligations that require us to make substantial interest and principal payments that could adversely affect our business or future growth potential.
Price volatility of our publicly traded securities could adversely affect investors’ portfolios.
In recent years and months, the securities markets in the U.S. and Canada have experienced high levels of price and volume volatility, and the market prices of securities of many companies have experienced wide fluctuations that have not necessarily been related to the operating performance, underlying asset values or prospects of such companies. There can be no assurance that continual fluctuations in the market price of our common shares will not occur. It may be anticipated that any quoted market for the common shares will be subject to market trends and conditions generally, notwithstanding any potential success we have in creating revenues, cash flows or earnings. The price of our common shares has been subject to price and volume volatility in the past and will likely continue to be subject to such volatility in the future.
Because our common shares are not listed on a national securities exchange, a broker-dealer may find it more difficult to trade our common shares, and an investor may find it more difficult to acquire or dispose of our common shares in the secondary market.
We are subject to the so-called “penny stock” rules. The SEC has adopted regulations that define a “penny stock” to be any equity security that has a market price per share of less than $5.00, subject to certain exceptions, such as any securities listed on a national securities exchange. For any transaction involving a “penny stock,” unless exempt, the rules impose additional sales practice requirements on broker-dealers, subject to certain exceptions. A broker-dealer may find it more difficult to trade, and an investor may find it more difficult to acquire or dispose of our common shares on the OTCQB Venture Marketplace. Additionally, our trading volume on the over-the-counter exchange fluctuates and has a limited volume, which can impact on the price and trading, and our majority shareholder holds approximately 71% of the shares, which further limits our public float and access to liquidity on our trading platform. These factors could significantly negatively affect the market price of our common shares and our ability to raise capital and may deter other potential investors from investing in our common shares.
General Risk Factors
Market factors outside of our control could have significant adverse impacts on our business, operations and/or prospects.
Operating in the volatile and cyclical natural resource industry subjects us to numerous market factors outside of our control that could have significant and sometimes adverse impacts on our business. Such factors could include significant price declines for key rare earth materials, inflationary impacts on capital and operating costs, public opposition, poor financial and operating performance of other companies in the same industry sector, environmental incidents from resource projects, major technological advances that reduce demand for key rare earth products, unforeseen regulation, military conflict, such as the Russia/Ukraine war, the conflicts in the Middle East, terrorism, banking institution stability, or other geopolitical events that broadly impact the global or domestic economy or natural resource industry. To the extent that such events affect attitudes toward investments in the natural resource sector generally or the rare earths industry specifically, or impact the overall economic climate, could affect our ability to raise the additional capital needed to continue to advance our projects and business plan.
Global and regional political and economic conditions could adversely impact our business.
Political and economic shifts, both domestic and international, may create uncertainty and pose risks to our operations. Policies related to populism, protectionism, economic nationalism, and attitudes toward multinational corporations could result in regulatory changes, trade barriers, or investment restrictions. Additionally, international trade disputes, including tariffs, counter-tariffs, export controls, sanctions, and currency regulations, may increase costs and disrupt supply chain, operating model, and customer relationships.
Further, market volatility, driven by shifts in U.S. and foreign trade policies, fluctuating interest rates, or currency controls may affect REE prices, capital availability, and investor confidence. Even the perception of these risks could lead to reduced investment, higher production costs, and operational challenges. If such trends continue, they may have a material adverse effect on our business and financial performance.
Our directors, officers and consultants may be engaged in other businesses.
Some of our directors and officers are or may become directors or officers of other entities engaged in other business ventures. As a result of their other business endeavors, our directors, officers, and consultants may not be able to devote sufficient time to our business affairs, which may negatively affect our ability to conduct ongoing operations or to generate revenues.
We are subject to the risk of litigation, the causes and costs of which are not always known.
We are subject to litigation arising in the normal course of business and may be involved in disputes that may result in litigation. Although we are not aware of any material pending or threatened litigation or of any legal proceedings known to be contemplated which are, or would be, likely to have a material adverse effect upon us or our operations, taken as a whole, the causes of potential future litigation cannot be known and may arise from, among other things, business activities, environmental and health and safety concerns, share price volatility or failure to comply with disclosure obligations. The results of litigation cannot be predicted with certainty but could include costly damage awards or settlements, fines, and the loss of licenses, concessions, or rights, among other things. If we are unable to resolve a dispute favorably, either by judicial determination or settlement, it may have a material adverse effect on our financial condition, cash flows or results of operations.
We depend upon information technology systems, which are subject to cyber-attacks, disruption, damage, or failure and have risks associated with implementation and integration.
We depend upon information technology systems in the conduct of our operations. Our information technology systems are subject to disruption, damage, or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyber-attacks, natural disasters, and defects in design. Cybersecurity incidents, in particular, are evolving and include, but are not limited to, malicious software, attempts to gain unauthorized access to data and other electronic security breaches that could lead to disruptions in systems, financial losses, unauthorized releases of confidential or otherwise protected information or the corruption of data. Furthermore, as artificial intelligence capabilities improve and are increasingly adopted, we may see cyber-attacks created through artificial intelligence. Various measures have been implemented to manage our risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information technology disruptions, we could potentially be subject to downtimes, operational delays, the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on our cash flows, competitive position, financial condition or results of operations. See “Item 1C. Cybersecurity” of this Annual Report for more information about the systems and processes we use to manage these risks.
Cybersecurity
As filed, 4,283 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We face cybersecurity risks due to the breadth of networks and systems we must defend against cybersecurity attacks and threat actors seeking to inflict harm on us; and the substantial level of harm that could occur to us were we to suffer impacts of a material cybersecurity incident. We are committed to maintaining robust governance and oversight of these risks and to implementing mechanisms, controls, technologies, and processes designed to help us assess, identify, and manage these risks. In the year ended December 31, 2025, we did not experience a material “cybersecurity incident” as such term is defined in Item 106(a) of Regulation S-K. However, there can be no guarantee that we will not experience such an incident in the future. Such incidents, whether or not successful, could result in us incurring significant costs related to, for example, implementing additional threat protection measures and increased cybersecurity insurance premiums, defending against litigation, responding to regulatory inquiries or actions, paying damages, or taking other remedial steps with respect to third parties, as well as incurring significant reputational harm. In addition, these threats are constantly evolving, thereby increasing the difficulty of successfully defending against them or implementing adequate preventative measures. We seek to detect and investigate unauthorized attempts and attacks against our network, and to prevent their occurrence and recurrence where practicable through changes or updates to our internal processes and tools; however, we remain potentially vulnerable to known or unknown threats. In some instances, we and our suppliers may be unaware of a threat or incident or its magnitude and effects. Further, there is increasing regulation regarding responses to cybersecurity incidents, including reporting to regulators, which could subject us to additional liability and reputational harm. See “Item 1A. Risk Factors” of this Annual Report for more information on our cybersecurity risks and product vulnerability risks.
We aim to incorporate industry best practices, consistent with other companies our size, throughout our cybersecurity program. Our cybersecurity strategy focuses on implementing effective and efficient controls, technologies, and other processes to assess, identify, and manage material cybersecurity risks. Our cybersecurity program is designed to be aligned with applicable industry standards and is maintained by a third-party technology firm. The third-party firm has processes in place to assess, identify, manage, and address material cybersecurity threats and incidents. These include, among other things, security awareness training for employees; mechanisms to detect and monitor unusual network activity; and containment and incident response tools.
Our Board of Directors has ultimate oversight of our cybersecurity risk, which it manages as part of our enterprise risk management program. That program is utilized in making decisions with respect to Company priorities, resource allocations, and oversight structures. The Board of Directors is assisted by the Audit Committee, which regularly reviews our cybersecurity program with management and reports to the Board of Directors.
Our information technology systems and programs, which encompass our cybersecurity program, are run by a third-party managed service provider (“MSP”), which reports to our Chief Financial Officer (“CFO”). The third-party firm is informed about and monitors prevention, detection, mitigation, and remediation efforts through regular communication and reporting from professionals within its team and through the use of technological tools and software. Our CFO regularly reports directly to the Audit Committee or the Board of Directors on our cybersecurity program and efforts to prevent, detect, mitigate, and remediate issues. Cybersecurity reviews by the Audit Committee or the Board of Directors generally occur at least annually, or more frequently as determined to be necessary or advisable.
In 2025, the Company engaged, and may again in the future, engage an independent, third-party technology firm to help assess its cybersecurity risks and the controls in place through our MSP to prevent or mitigate those risks.
Properties
As filed, 35,424 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Information concerning our mining property in this Annual Report has been prepared in accordance with the SEC requirements of CFR Title 17, Subpart 229, Item 1300-1305 of Regulation S-K, which requires us to disclose our mineral resources and reserves as of the end of our most recently completed fiscal year for our material mining property.
As used in this Annual Report, the terms “mineral resource,” “measured mineral resource,” “indicated mineral resource,” “inferred mineral resource,” “mineral reserve,” “proven mineral reserve” and “probable mineral reserve” are defined and used in accordance with Subpart 229, Item 1300 of Regulation S-K. Under Subpart 1300 of Regulation S-K and NI 43-101, mineral resources may not be classified as “mineral reserves” unless the determination has been made by a qualified person that the indicated and measured mineral resources can be the basis of an economically viable project. We currently have no mineral reserves, and you are specifically cautioned not to assume that any part or all of the mineral resources will ever be converted into mineral reserves, as defined by the SEC. See “Item 1A. Risk Factors” of this Annual Report.
You are cautioned that, except for that portion of mineral resources classified as mineral reserves, mineral resources do not have demonstrated economic value. Inferred mineral resources are estimates based on limited geological evidence and sampling and have too high of a degree of uncertainty as to their existence to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. It should not be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. A significant amount of exploration must be completed in order to determine whether an inferred mineral resource may be upgraded to a higher category. Therefore, you are cautioned not to assume that all or any part of an inferred mineral resource exists, that it can be considered when assessing the economic viability of a mining project, or that it will ever be upgraded to a higher category. Likewise, you are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted to mineral reserves. See “Item 1A. Risk Factors” of this Annual Report.
The information that follows relating to the Bear Lodge REE Project is derived from, and in some instances is an extract from, the TRS. Portions of the following information are based on assumptions, qualifications and procedures that are not fully described herein. Reference should be made to the full text of the TRS, incorporated herein by reference and made a part of this Annual Report. We also completed the Technical Report, which is NI 43-101 compliant for the Bear Lodge REE Project, and there are no material differences between the Technical Report and the information set forth below and contained in the TRS.
Qualified Persons
The scientific and technical disclosures about the Bear Lodge REE Project in this Annual Report are derived from the TRS and the Technical Report and have been reviewed and approved by:
- Mr. Alan C. Noble, Professional Engineer, Ore Reserves Engineering;
- Ms. Monica Barrero Bouza, Geologist, EurGeol; and
- Mr. Jaye Pickarts, Professional Engineer, consultant to the Company and former Chief Operating Officer (from October 2024 to December 2025).
Mr. Noble and Ms. Bouza are both independent of the Company and all three are qualified persons as defined by Regulation S-K (Subpart 229, Item 1300) and NI 43-101 (Standard of Disclosure for Mineral Projects). Mr. Pickarts, as prior Chief Operating Officer of the Company, is not deemed independent of the Company. For a description of the key assumptions, parameters and methods used to estimate mineral resources included in this Annual Report, as well as data verification procedures and a general discussion of the extent to which the estimates may be affected by any known environmental, permitting, legal, title, taxation, sociopolitical, marketing or other relevant factors, please review the TRS on the Bear Lodge REE Project (as described below), which is incorporated by reference in this Annual Report, as well as the Technical Report available under the Company’s profile at www.sedarplus.ca (http://www.sedarplus.ca).
Individual Property Disclosure
Bear Lodge Property
The Bear Lodge Property, which is located in central Crook County, Wyoming, contains two projects, the Bear Lodge REE Project and the Sundance Gold Project. The Bear Lodge REE Project consists of the Bull Hill and Whitetail Ridge REE deposits and the exploration targets of East Taylor (“Taylor”) and Carbon Hill (“Carbon”), all of which are located near Sundance, Wyoming. The Bear Lodge REE Project also incorporates the proposed processing and separation plant as well as the Demonstration Plant (under construction) in Upton, Wyoming. See the property location map below. Additional details on each of these areas are set forth below under the heading “Bear Lodge REE Project.” We hold our interest in the Bear Lodge Property through our wholly-owned subsidiary, Rare Element Resources, Inc., a Wyoming corporation.
Bear Lodge Property – Location Map
We control 100% of the mineral rights at the Bear Lodge Property, consisting of unpatented mining claims and an adjacent property (hereinafter referred to as the “Section 16 property”) owned by the Company. We hold 499 unpatented mining claims located on land administered by the USFS. The Bear Lodge Property is located within parts of Sections 5, 6, 7, 8, 9, 14, 15, 16, 17, 18, 19, 21, 22, 23, 26, 27, 28, 29, 30, 31, 32, 33, 34 and 35 in Township 52 North and Range 63 West, Sixth Principal Meridian, Crook County, Wyoming. All of the public property mining claims are unpatented, such that the paramount title to the land is held by the U.S. All of the mineral resources identified in the TRS are located on mining claims that we hold.
Our 100% interest in the 499 unpatented mining claims was, in part, acquired from Phelps Dodge Exploration Company (now a subsidiary of Freeport-McMoRan Copper and Gold Inc. (“Freeport”)) by way of a Mineral Lease and Option for Deed in 2000, and 404 claims were transferred from Newmont Mining Corporation (“Newmont”) to us in May 2010.
Some of our mining claims and a portion of a defined area of influence surrounding the claims were previously subject to a production royalty of 2% of net smelter returns (“NSR”) royalty payable to Freeport, but the Company purchased the NSR royalty in March 2009. We hold an unencumbered REE project, including all 499 unpatented mining claims, free of third-party royalties for REE production.
In order to maintain all claims in good standing, the Company is responsible for the payment of annual federal claim maintenance fees (currently $200/claim) and the recording of the annual claim maintenance and intent to hold notice with Crook County, Wyoming. All 499 unpatented claims included in the project are located on both federal and private lands and are subject to annual maintenance fees payable to the United States Bureau of Land Management. Mineral rights on the mining claims and the approximately 640-acre Section 16 property provide the Company with mineral and surface rights to explore, develop, and mine the Bear Lodge Property, subject to the prior procurement of required operating permits and approvals and compliance with applicable federal, state, and local laws, regulations, and ordinances.
Infrastructure
Exploration has been conducted on the Bear Lodge Property since 1949. In addition to Freeport, several mining companies have conducted exploration and drilling programs at or near the Bear Lodge Property since the discovery of mineralization. No mining operations were conducted at the Bear Lodge Property by any of the prior owners.
Motels, restaurants, gas stations, and other services are available at Sundance, Upton, and other nearby towns, and a greater variety of accommodations are available to the east in Spearfish, South Dakota. All necessary infrastructure, such as housing, food, fuel, etc. would be available in these towns or further to the west in Gillette and southeast in Newcastle. Water rights at the mine site are available through permitting by the Wyoming State Engineer’s Office; these water rights have not been secured at the time of reporting. Near the mine site, a power line, which requires upgrading, runs within a mile of the Bear Lodge Property.
Supplies can be trucked to the Bear Lodge Property 60 miles (100 kilometers) from Gillette, which is located on both U.S. Interstate Highway 90 and rail lines. A Burlington Northern Santa Fe rail transport line is also located at Moorcroft, 34 miles (54 kilometers) west of Sundance, and at Upton, 40 miles (64 kilometers) south. The Powder River Basin contains multiple power plants, and Gillette, the largest city in the basin, would be a major logistics center for any development at the Bear Lodge Property. The current size of the mine property is sufficiently large to support a mining operation, with no foreseeable obstacles to expansion, subject to a favorable outcome regarding permitting.
Condition of the Property
We are not aware of any outstanding environmental liabilities associated with the Bear Lodge Property, except for the required reclamation work associated with our exploration and drilling activities. Previous activities were approved by both the USFS and WDEQ. We have an approved reclamation plan and have posted surety bonds to cover the required reclamation. Certain of these reclamation activities were completed in 2024, and we are now awaiting final WDEQ approval for the removal of these obligations from our reclamation liability.
Additional local, state, and federal licenses and permits will be required for exploration, mining, processing and/or beneficiation operations, if we decide to proceed with further exploration or mine development and operations.
The Bear Lodge Property is an exploration stage property with no proven or probable reserves. There has been no historical production from the property.
The Bear Lodge REE Project
The Bear Lodge REE Project is located in central Crook County, northeastern Wyoming, in the northwestern portion of the Black Hills uplift. The property is situated in the central Bear Lodge Mountains, a relatively small northwesterly trending range. The project is flanked to the west by the Powder River Basin, famous for its extensive coal mining, and is adjoined by the Great Plains to the southeast. See the property location map below.
The Bear Lodge REE Project lies about seven air miles (11 kilometers) or 12 road miles (19 kilometers) northwest of the town of Sundance (Wyoming), approximately 22 air miles (35 kilometers) west of the South Dakota state line, 55 air miles (89 kilometers) east of Gillette (Wyoming), and 230 miles (370 kilometers) north of Cheyenne, the Wyoming state capital. Gillette is the headquarters for much of the Wyoming coal mining industry.
General Property Location Map
Geological Setting
The Bear Lodge Mountains of northeast Wyoming are part of the Black Hills Uplift, which has a northwesterly orientation and extends from the western South Dakota – Nebraska border through northeastern Wyoming into southeastern Montana. The exposed basement consists of Precambrian schist, gneiss, and granite overlain by Paleozoic and Mesozoic clastic and carbonate sedimentary rocks eroded from higher elevations. Eocene (Tertiary) alkaline intrusive and extrusive bodies in the northern Black Hills form an N70°-80°W trending belt that extends from Bear Butte in South Dakota through the Bear Lodge Mountains, Devil’s Tower, and Missouri Buttes in northeastern Wyoming. These alkaline igneous rocks are represented by dikes, sills, stocks, laccoliths, diatremes, and ring complexes are associated with REE-enriched carbonatite dikes in the Bear Lodge alkaline-igneous complex.
The Bear Lodge alkaline-igneous complex is a northwest-trending alkaline intrusive dome with dimensions of approximately 10 kilometers (6.2 miles) NW-SE by six kilometers (3.7 miles) NE-SW. The complex consists predominantly of multiple intrusions of phonolite, trachyte, and other alkaline igneous rocks, and a variety of associated breccias and diatremes.
Exploration and Drilling
The Bear Lodge Mountains were initially prospected for gold during the late nineteenth and early twentieth centuries. Rare earth mineralization was first discovered in approximately 1949. Various companies conducted sporadic exploration of the area from the 1970s through the 1990s, both for rare earths and for gold. We conducted REE exploration activities and from 2004 through 2013, a total of more than 48,768 meters (160,000 feet) of drilling was completed in over 200 core holes. These exploration activities included geochemical, geophysical, geological, and mineralogical modeling of the district and individual deposits.
The 2013 drilling program involved infill drilling at the Whitetail Ridge deposit, including 14 core holes for a total of 3,556.5 meters (11,698 feet). The second phase consisted of 21 core holes totaling 3,247 meters (10,651 feet) and six reverse circulation (“RC”) twin holes totaling 832 meters (2,730 feet). The RC twin holes were drilled using a center return hammer with the objective of minimizing hole erosion and obtaining assay data directly correlative to that from the adjacent core holes.
The 2014 program consisted of excavating a test trench along the southwestern flank of Bull Hill in August. The main mineralized zone was exposed and exploited to collect geological information, including dike dimension and structural continuity, grade variation, ore and gangue mineralogy, pit slope stability engineering and confirmation of parameters utilized in ore resource calculations. The program netted approximately 630 tonnes (695 tons) of sample materials that will be utilized in the Demonstration Plant.
No exploration drilling was conducted from 2013 through the end of 2025, and no drilling or exploration activities are currently planned for 2026.
Mineralization
The Bear Lodge REE Project comprises two main areas represented by the Bull Hill and Whitetail Ridge deposits, as well as the exploration targets of the Carbon Hill and East Taylor deposits (see map below). All the deposits have carbonatite-related dikes and veins that range in size from hairline fracture veinlets to dikes that may exceed 80 feet (24.4 meters) in width. Lower-grade stockworks of veinlets commonly surround the higher-grade REE-bearing dikes and veins. Oxidized mineralization (FMR and OxCa) extends to depths of 500 to 600 feet (152 to 183 meters). Oxide zone REE mineralization is dominated by REE minerals of the bastnäsite group, with variable and typically subordinate quantities of monazite and cerianite. Oxide-carbonate mineralization contains a variable mix of bastnäsite group minerals and ancylite, with varied and subordinate amounts of monazite and cerianite.
Bull Hill District Grade Shells
REE mineralization is widespread on the property. However, the area proximal to the Bull Hill and Whitetail diatreme bodies is believed to be the most prospective for significant REE mineralization.
Bull Hill and Whitetail Ridge Deposits
The Bull Hill deposit mineralized bodies occur as steeply dipping, FMR-carbonatite dike swarms, and associated stockwork. Geological interpretation of results from the 2010–2014 drill and trench programs indicates that the Bull Hill deposit area is dominated by northwest-striking mineralized bodies in the southern two-thirds of the resource area, while the northern part of the resource area exhibits a transitional change in strike from a north-westerly to a north-easterly direction. The dike swarm primarily intrudes heterolithic intrusive breccia of the Bull Hill diatreme and adjacent trachytic and phonolitic intrusive rocks. Carbonatite dikes at depth are interpreted to transition toward the surface into OxCa and FMR bodies. The mineralized structures range in size from veinlets to large dikes more than 30 meters (98 feet) in width. The Bull Hill deposit consists of one dominant dike set and several subsidiary dike sets in a swarm that has dimensions of more than 457 meters (1,499 feet) along strike and less than 100 meters (328 feet) in width. The dikes appear to pinch and swell in both strike and dip directions, and they can be traced in drill holes more than 305 meters (1,001 feet) down dip.
The Whitetail Ridge deposit occurs about 700 meters (2,297 feet) northwest of the Bull Hill deposit. The REE mineralization consists of northwest- and north-striking FMR dikes, and an FMR stockwork zone that is also elongated northeasterly, with dimensions of roughly 380 meters by 290 meters (1,247 feet by 951 feet). The enveloping gravity and radiometric geophysical anomalies and coincident soil geochemical anomalies are larger and may indicate a broader distribution of REE mineralization beneath the extensive soil and colluvial cover. Drilling conducted from 2011 through 2013 indicates that much of the mineralization is confined within the volume of the Whitetail Ridge diatreme.
Other Exploration Target Areas at the Bear Lodge REE Project
The discovery of high-grade REE mineralization at the East Taylor and the Carbon target areas expanded the area of known REE mineralization outside of the Bull Hill and Whitetail Ridge deposits. The data indicates that the Bear Lodge REE Project area covers a crudely elliptical area that extends approximately 1,750 meters (5,741 feet) northwest-southeast by 1,300 meters (4,265 feet) northeast-southwest. The Carbon exploration target area is located northwest of the Bull Hill deposit, and the East Taylor target area is located west of the Bull Hill deposit. Drill assay data from the East Taylor and the Carbon target areas identify these areas as zones of HREE-enrichment relative to the Bull Hill deposit. These two exploration target areas, along with the Whitetail Ridge deposit, are peripheral to the Bull Hill deposit. The discovery of these target areas indicates good potential for additional deposits of high-grade REE in the western half of the Bear Lodge REE Project, and those deposits appear to be particularly enriched in HREE.
Permitting and Licensing
The USFS is the lead agency in the NEPA process to prepare an EIS on the Bear Lodge REE Project. This process is essential to securing the permits and approvals necessary to move into production. In early 2012, we submitted the plan of operations for the Bear Lodge REE Project, which the USFS accepted as complete in May 2013. The USFS selected a project manager and prime contractor for the preparation of the draft EIS, published notice in the Federal Register and completed necessary scoping work. The USFS issued a draft EIS on January 15, 2016, outlining plan alternatives and proffering a preferred alternative. The U.S. Army Corps of Engineers and the appropriate state and local government agencies were involved in the EIS process as cooperating agencies. On January 22, 2016, our Board of Directors decided to conserve cash due to the difficult market conditions at the time and suspended all permitting and licensing efforts, including the EIS process. We notified the USFS and cooperating agencies, the NRC, and the state of Wyoming of our decision to suspend permitting and licensing efforts, and the parties acknowledged receipt of the notice. During 2022, the Company undertook environmental sampling to update the baseline environmental data for the Bear Lodge REE Project and in late 2025 re-started the previously suspended permitting and licensing efforts. These permitting and licensing efforts are expected to continue through 2027.
The Company will be required to obtain permits and licenses to further develop the Bear Lodge REE Project from the USFS, the WDEQ (Land Quality Division, Air Quality Division, and Water Quality Division), the NRC, and Crook County, among others.
Processing and Decommissioning
The Company is proceeding with the operations of a rare earth processing and separation Demonstration Plant. The Demonstration Plant construction was substantially completed in late 2025, with the start of plant operations having commenced in early 2026. The Demonstration Plant is expected to advance the Company’s proprietary processing and separation technology and generate the operational and economic data necessary for the design of a commercial-scale facility.
Reclamation of mining-related facilities are planned to occur during mine operations, where applicable, and upon completion of mining and stockpiling of materials. Other facilities would be reclaimed as soon as the stockpiled materials are depleted.
Mineral Resource Estimate
In March 2024, the Company announced the completion of a new mineral resource estimate based on maximizing the recovery of La and the key magnet materials of Nd, Pr, Tb, and Dy. The estimate was focused on the oxide zone of the Bull Hill deposit at the Bear Lodge REE Project with long-term upside existing in the Carbon, Whitetail, and Taylor deposits. The resource estimate was based on 252 core holes drilled between 2009 and 2013, including 20,491 assay intervals that totaled 186,712 feet (56,910 meters) of drilling from the Company’s drill hole database. The estimate also used the economic data generated from the 2021 pilot plant testing of the Company’s proprietary processing and separation technology. The resource estimate focuses on the Ox and OxCa zones of the Bull Hill deposit, which are considered the best plant feed and are expected to have the best recoveries and costs by utilizing the Company’s innovative technology.
The Bull Hill deposit estimates of measured, indicated, and inferred mineral resources, based on a base-case cutoff grade for resource reporting of 2.18% TREO, are summarized in Table 1 below. As noted in the TRS, the effective date of the mineral resource estimate is December 31, 2023. The Company has determined that the assumptions included in the mineral resource estimate are reasonable as of December 31, 2025 and that there has been no change in the mineral resource estimate from that which is contained in the TRS and the Technical Report.
Table 1. Bull Hill TREO Mineral Resource Summary for the Total Oxide (Ox & OxCa)
at the End of the Fiscal Year Ended December 31, 2025
| Resource Class (millions) | Cutoff %TREO (000’s) | Metric Tonnes (000’s) | %TREO (000’s) | Contained TREO Metric Tonnes | Recovered TREO Metric Tonnes | Recovered NdPr Metric Tonnes |
|---|---|---|---|---|---|---|
| Measured mineral resources | 2.18 | 2.04 | 4.53 | 92.4 | 60.6 | 18.4 |
| Indicated mineral resources | 2.18 | 3.98 | 3.85 | 153.1 | 99.9 | 31.3 |
| Measured & indicated (M&I) mineral resources | 2.18 | 6.02 | 4.08 | 245.5 | 160.5 | 49.7 |
| Inferred mineral resources | 2.18 | 1.90 | 3.61 | 68.5 | 44.9 | 14.4 |
| Notes: 1. Mineral resources do not have demonstrated economic viability. There is no guarantee that any part of the mineral resource will be converted to mineral reserves in the future. All figures in the above table have been rounded to reflect the accuracy of the grade and tonnage estimates. 2. This mineral resource estimate is reported in accordance with Regulation S-K (CFR Title 17 Part 229 Items 1300–1305) at a cut-off grade of 2.18% TREO. 3. Only certain rare earth elements (La, Nd, Pr, Dy, and a heavy rare earth element mixed oxide, including Yb, Tm, Tb, Er, Ho, Lu) are considered payable for pit optimization purposes. 4. The estimated overall NdPr process recovery is 90%. 5. The point of reference for mineral resource is in situ mineralization. 6. See Table 2 for metallurgical recoveries, pay factors, and commodity price assumptions used for the purposes of preparing mineral resource estimates. |
At December 31, 2025, we had no proven or probable mineral reserves. The metallurgical recoveries, pay factors, and commodity price assumptions used in the preparation of the mineral resource estimate are shown in Table 2 below. Additional information about these assumptions is provided in Chapter 11 of the TRS and in the Technical Report.
Table 2. Pay Factors, Hydromet Plant Recoveries and Rare-Earth Elements Prices
| Element | Pay Factor | Hydromet Plant Recoveries | Prices (US $ /Kg) |
|---|---|---|---|
| La (Lanthanun) | 1 | 0.907 | 0.93 |
| Nd (Neodymium) | 1 | 0.898 | 77.25 |
| Pr (Praseodymium) | 1 | 0.902 | 76.48 |
| Dy (Dysprosium) | 0.75 | 0.835 | 320 |
| *HREE (Yb+Tm+Tb+Er+Ho+Lu) | 0.5 | 0.816 | 1200 |
| Ce (Cerium) | 0 | 0.336 | 0 |
| Sm (Samarium) | 0 | 0.912 | 0 |
| Eu (Europium) | 0 | 0.913 | 0 |
| Gd (Gadolinium) | 0 | 0.924 | 0 |
| Y (Ytrrium) | 0 | 0.788 | 0 |
*HREE (Heavy Rare Earth Elements) = Ytterbium (Yb)+Thulium (Tm)+ Terbium (Tb)+ Erbium (Er)+Holmium (Ho)+Lutetium (Lu)
Data Verification
The Company obtained the geological, exploration, and drilling data package from Phelps Dodge and Newmont Corporation, covering most of the work done on the property by various companies and claim owners through 1996. From 2006 until spring 2010, the Company conducted its own REE drilling programs throughout the Bear Lodge Property under a joint venture agreement with the Newmont Mining Corporation (“Newmont”), with the Company maintaining a separate database of REE drilling results. While the Company continued focusing on the exploration for REEs, Newmont’s efforts continued in gold exploration. Separation of the two exploration drilling programs for REEs and gold, and their respective drilling data continued through the 2009 drill season when the Company assumed control of the program with the termination of Newmont’s interest in the property in May 2010.
Drill hole data prior to 2008 has not been used for resource estimates.
From 2008 through 2010, the Company compiled analytical data in Excel, Access, and Datamine for use in GIS and 3D mapping software. Between 2010 and 2011, a drill data management system was implemented by EDM Solutions. The drill data management database was built on an MS SQL SERVER platform and was hosted on a secure “Cloud” server with restricted access. Security and backup features were built into the system and were considered industry standard. The data is currently maintained in the Company’s archives.
All on-site drilling programs conducted by the Company were supervised by experienced geology professionals. Company geologists and consultants from Ore Reserves Engineering conducted extensive reviews and verified data from the 2009 – 2013 drilling programs, for use in the TRS resource estimate.
Drill hole collar surveys for all 2008 through 2013 core holes were surveyed by Bear Lodge Ltd., professional engineers and land surveyors based in Sundance, Wyoming. Down-hole surveys were conducted on all core holes drilled by Company personnel from the 2008 through 2013 drill programs.
REE assays for the 2009, 2012, and 2013 programs were conducted by Activation Laboratories of Ancaster, Ontario, and assays for the 2010 and 2011 drill programs were done by ALS Laboratories. Both laboratories are independent, ISO 9001 accredited and operate to standards consistent with ISO 17025 methods.
Dr. Jeffrey Jaacks of Geochemical Applications International Inc. conducted a review of the results for the quality assurance and quality control (QA/QC) program used in rare earth element assaying for the Bear Lodge exploration drill programs (2009-2013). Dr. Jaacks, in his review, concluded that the 2009-2013 drill program analysis/assays to be of an acceptable quality and appropriate for resource estimation.
Rare Earth Processing and Separation Demonstration Plant Project
During 2021, a consortium of companies, of which the Company is a member, and which is led by General Atomics, secured with the DoE an assistance agreement for the engineering, construction, operation and decommissioning of a rare earth separation and processing demonstration plant to be located in Upton, Wyoming at a leased industrial site near infrastructure (the “Demonstration Plant”). The consortium created by General Atomics, an affiliate of Synchron, includes certain of General Atomics’ affiliates, the Company, and LNV, an Ardurra Group, Inc. company, as engineering and construction subcontractor. The Company, as a subrecipient of the award, along with the other consortium members, commenced work on the planning and design of the demonstration project in November 2021.
The purpose of the Demonstration Plant is to process and separate certain REEs from previously stockpiled high-grade sample materials from the Bear Lodge REE Project, utilizing the Company’s proprietary extraction and separation processes. The Demonstration Plant has been designed as a demonstration-scale facility that will produce high-purity NdPr, as well as other rare earth oxides. Successful operation will serve as a precursor to a future full-scale production facility.
As of December 31, 2025, construction of the Demonstration Plant was substantially complete with operations formally commencing in early 2026, which are expected to continue through December 31, 2026. During the operations phase, the Demonstration Plant is expected to produce up to 10 tons of NdPr oxide.
Demonstration Plant Permitting and Licensing
On July 31, 2023, the NRC issued the Company a Source Material License. This license is necessary to allow the processing of previously stockpiled material from the Bear Lodge REE Project at the Demonstration Plant. In November 2023, the DoE’s Office of Energy Efficiency and Renewable Energy finalized its NEPA review of the Demonstration Plant issuing a finding of no significant impact (also known as a “FONSI”), completing the federal permitting activity required for construction of the Demonstration Plant. On December 21, 2023, the DoE’s Office of Energy Efficiency and Renewable Energy issued a Project Continuation Notice following its approval of the budget for construction of the Demonstration Plant. This approval, along with the completion of the DoE’s NEPA review, allowed for the commencement of the construction of the Demonstration Plant.
The Demonstration Plant will encompass the physical processing of the sample materials followed by chemical processing to extract selected elements. All chemicals will be managed in accordance with federal, state, and local environmental and safety regulations. The Company has obtained a source materials possession license from the NRC as well as an air quality permit from the WDEQ. A road use permit was secured from the USFS to improve the access road to the sample storage location. All licenses and permits required for the construction of the Demonstration Plant have now been secured.
As part of the project licensing with the NRC, the Company has secured and maintains, on behalf of the Demonstration Plant project, a reclamation bond in the amount of $917 and has posted cash collateral of $202 as security for the bond. The ultimate clean-up and any associated decommissioning costs of the Demonstration Plant are the responsibility of the Company and payment of these costs will be handled through the Cost Share Agreement.
Demonstration Plant Project Schedule
To achieve the Demonstration Plant project objectives, the schedule was divided into three distinct performance periods, which commenced on October 1, 2021. During the performance periods, there were three DoE go/no-go decision points.
- Performance Period 1: Design, Permitting and Licensing Commencement
- Performance Period 2: Procurement and Construction
- Performance Period 3: Operations
The objective of Performance Period 1, which was achieved in December 2022, was the completion of the design of the facility and the establishment of requirements and standards to support the subsequent procurement of process equipment, as well as commencement of permitting and licensing. Licensing and permitting was extended into Performance Period 2 and achieved in early 2024. The objective of Performance Period 2, now complete, was the final procurement of the process equipment and construction of the Demonstration Plant. The objective of Performance Period 3 is the actual operation of the Demonstration Plant itself in accordance with all local, state, and federal permits, licenses, and regulations.
In December 2022, the Demonstration Plant achieved its final engineering design milestone, marking the DoE’s first go/no-go decision point. A second go/no-go gating milestone was achieved in December 2023 with the issuance by the DoE of a Project Continuation Notice, allowing for the construction of the Demonstration Plant. In September 2024, the DoE issued its final Project Continuation Notice confirming the Demonstration Plant’s readiness for operations. This notice, along with the NRC operations approval under its previously issued license (received in October 2024), allowed for the commencement of Demonstration Plant operations. In November 2024, the Company commenced equipment shakedown and plant commissioning activities. These activities were subsequently paused to allow for a comprehensive review of the as-built Demonstration Plant to support efficient and safe operation. Following completion of the review and related rework activities, plant operations formally commenced in early 2026.
End-of-Project Goals
The goal of the project is to build and operate a permitted and licensed Demonstration Plant that:
- demonstrates the separation of NdPr at commercially required purity levels;
- produces commercial-purity NdPr as well as mixed light/medium REE concentrate, subject to further refining;
- provides a path for the separation of other rare earths, including Sm, Dy and other essential HREEs;
- provides a basis for economic scale-up to future commercial capacity;
- provides a basis for the demonstration of improved separation economics with expected fewer process steps and a smaller closed-cycle plant as compared with traditional processing methods; and
- demonstrates a process which may be capable of processing feed from other sources, either from the U.S. or other allied countries.
Sundance Gold Project
The Sundance Gold Project is the second project located on our Bear Lodge Property. The Sundance Gold Project consists of 288 unpatented lode mining claims adjacent to the Bear Lodge REE Project in Crook County, Wyoming. In 2011, we published an NI 43-101 compliant technical report that now contains historical estimates of inferred mineral resources on the Sundance Gold Project. As a result of the Company’s current focus on the Bear Lodge REE Project, no drilling or exploration on the Sundance Gold Project has been conducted since the end of 2011 and none is currently planned. We have not done sufficient work to classify the historical estimate as a current estimate of mineral resources, mineral reserves, or exploration results, and we are not treating the estimate as a current estimate of mineral resources, mineral reserves, or exploration results.
Legal proceedings
As filed, 582 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We are not aware of any material pending or threatened litigation or of any proceedings known to be contemplated by governmental authorities which are, or would be, likely to have a material adverse effect on the Company or our operations, taken as a whole. There are no material proceedings pursuant to which any of our directors, officers or affiliates or any owner of record or beneficial owner of more than 5% of our securities or any associate of any such director, officer or security holder is a party adverse to the Company or has a material interest adverse to the Company.
Management's discussion and analysis
As filed, 23,546 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
You should read the following discussion and analysis of our financial condition and results of operations together with our financial statements and related notes appearing elsewhere in this Annual Report. This discussion and analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. See “Cautionary Note Regarding Forward-Looking Statements.” Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set forth in “Item 1A. Risk Factors” and elsewhere in this Annual Report.
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our Consolidated Financial Statements and accompanying notes included in Item 8 of this Annual Report. This Management’s Discussion and Analysis (this “MD&A”) has been prepared based on information known to management as of March 12, 2026. This MD&A is intended to help the reader understand the consolidated audited financial statements of the Company.
All currency amounts are expressed in thousands of U.S. dollars, except per share and common share amounts, unless otherwise noted.
OVERVIEW AND OUTLOOK
Our primary focus has been and continues to be the engineering, permitting, licensing, construction, and operation of the Demonstration Plant, and as of late 2025, the resumption of licensing and permitting activities for our Bear Lodge REE project. The licensing and permitting efforts are expected to continue through 2027.
If successful, the Demonstration Plant will show that our proprietary extraction technology is able to process and separate certain REEs from high grade sample materials extracted from our Bear Lodge REE Project in a more efficient and economical manner than traditional REE processing methods and will serve as a precursor to inform the design and estimated cost for a full-scale production facility.
In September 2024, the DoE issued its final Project Continuation Notice, confirming the Demonstration Plant’s readiness for operations. This notice, along with the NRC’s approval of operations received in October 2024, cleared the path for operations of the Demonstration Plant to formally commence, with operations to process and separate REEs from the previously stockpiled high-grade sample materials from the Bear Lodge REE Project to follow the completion of construction and pre-operation activities. During the year ended December 31, 2025, the Company continued work on the Demonstration Plant project as described below, and this work is expected to continue until the completion of the Demonstration Plant’s operations.
In early 2025, several design and equipment issues were identified during the Demonstration Plant’s equipment testing phase. As a result of these issues, we conducted an as-built design review in April 2025. Following the review and related project rework, Demonstration Plant operations formally commenced in early 2026 and are expected to continue through December 31, 2026. During the operations phase, the Demonstration Plant is expected to produce up to 10 tons of NdPr oxide.
In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. This award, along with funds contributed by the Company and the DoE, is being used to fund the Demonstration Plant’s construction and operating costs. As of December 31, 2023, the Company had met the conditions allowing for the invoicing of $2,000 of the $4,400 WEA grant total. This $2,000 was received on January 31, 2024. By September 30, 2024, the Company had met the conditions allowing for the invoicing of an additional $2,000, which was received in November 2024. The remaining $400 of the $4,400 grant total, which is conditioned on Demonstration Plant operations and a report to the WEA, will be invoiced to the WEA once that final milestone has been achieved, which is currently expected in mid-2026.
Since inception, the General Atomics-led consortium has seen increases in the Demonstration Plant’s project costs, including final equipment costs, due to, among other factors, inflation. As a result of these cost pressures, General Atomics, on behalf of the consortium, submitted to the DoE an updated Demonstration Plant construction and operations budget of approximately $53,600, which was approximately 22% higher than the original budget of approximately $43,800. In response, the DoE pledged an additional commitment of $2,400 to help fund a portion of this budget increase, with the balance to be funded by the Company, including any amounts in excess of the $53,600 revised DoE approved budget total. The Company currently estimates the total cost of the Demonstration Plant from inception, inclusive of operating costs estimates through December 31, 2026, to be approximately $77,500.
Through December 31, 2025, the DoE had made payments totaling approximately $20,500 towards its commitment of approximately $24,200, leaving a balance of approximately $3,700 to be collected from the DoE under the current cost share award.
To fund the Company’s share of these cost increases, in February 2026, the Company commenced a rights offering (the “2026 Rights Offering”) for gross proceeds of approximately $30,900, in which each holder of the Company’s common shares as of the record date of January 30, 2026, was eligible to participate. The 2026 Rights Offering closed on March 4, 2026, generating net proceeds of approximately $30,500. These funds, in conjunction with the funds already on hand will be used to progress the Company’s business strategy, which includes (i) the continuation of the operation of the Demonstration Plant for a sufficient time to provide the information to support a commercialization decision, (ii) the advancement of projects for the as-constructed Demonstration Plant beyond the current NdPr separation objectives, including applying the technology to the separation of HREEs and possibly to third party feed sources, (iii) the completion of federal and state permitting and licensing for the Bear Lodge REE Project, and (iv) other general corporate purposes.
Even with the funds already on hand, the funds raised in 2026 Rights Offering, and the expected receipt of the remaining WEA grant monies and DoE funds, the Company will still require additional funding to design, construct, and operate the Bear Lodge REE Project.
Ultimately, in the event the Company cannot secure additional financial resources or complete a strategic transaction, the Company may need to curtail its plans for the Demonstration Plant, suspend permitting and development of the Bear Lodge REE Project or other initiatives, or potentially liquidate its business interests, and investors may lose all or part of their investment.
RESULTS OF OPERATIONS
Year Ended December 31, 2025 Compared with the Year Ended December 31, 2024
Summary
Our consolidated net loss for the year ended December 31, 2025 was $4,899, or $0.01 per share, compared with our consolidated net loss of $18,451, or $0.04 per share, for the year ended December 31, 2024. See our discussion below for the primary drivers of this change. As an exploration stage company, we had no properties in production and generated no revenues during either year.
Exploration and Evaluation
Our exploration and evaluation costs totaled $2,887 for the year ended December 31, 2025, compared with $18,479 for the year ended December 31, 2024. This decrease of $15,592 was largely attributable to (i) the activities associated with our Demonstration Plant as we shifted from the more expensive equipment acquisition and installation activities during 2024 to the less expensive plant rework and equipment upgrades in 2025, and (ii) the decision to include certain past Demonstration Plant expenses (formerly excluded from our billings under the Cost Share Agreement) in our billings to the DoE under the Cost Share Agreement. This change to include certain previously excluded costs from the Cost Share Agreement reduced the Company’s share of these costs as partial reimbursement is now expected to be received from the DoE. See Note 4 to the Consolidated Financial Statements for a discussion of the Cost Share Agreement.
Corporate Administration
Our corporate administration costs increased by $147 on a comparative year-over-year basis, increasing from $2,666 in the year ended December 31, 2024 to $2,813 for the year ended December 31, 2025. The majority of these expenses relate to costs associated with our public company compliance and reporting obligations.
Interest Income
For the years ended December 31, 2025 and 2024, the Company generated interest income of $1,009 and $1,182, respectively, on investments of its excess cash balances. This change was largely attributable to our larger excess cash balances available for investment during 2024 as compared to 2025 due to the rights offering that closed in March 2024 (the “2024 Rights Offering”).
Grant Income
During 2024, the Company recognized grant income of $2,000 with the achievement of the second milestone under the WEA Funding Agreement. There was no similar transaction during the year ended December 31, 2025. See Note 5 to the Consolidated Financial Statements for a discussion of the WEA Funding Agreement.
Accretion Expense
For the year ended December 31, 2025, we recorded accretion expense of nil compared to $236 for the year ended December 31, 2024, with the accretion expense recorded during 2024 being related to the Company’s option to repurchase approximately 640 acres (257 hectares) of real property in Wyoming. With the Company’s repurchase of this land in October 2024, the Company discontinued its recording of accretion expense and will not incur further accretion expense in future periods related to this repurchase option.
FINANCIAL POSITION, LIQUIDITY AND CAPITAL RESOURCES
Operating Activities
Net cash used in operating activities was $7,121 for the year ended December 31, 2025, compared with $10,619 for the year ended December 31, 2024. The decrease of $3,498 was primarily attributable to lower exploration and evaluation expenditures, as activities shifted from Demonstration Plant equipment acquisitions and installation in 2024 to plant rework activities and equipment upgrades in 2025. This decrease was partially offset by the receipt of $2,000 in WEA grant offset funds in 2024. Excluding the $2,000 in WEA grant funds, net cash used in operating activities for the year ended December 31, 2024 would have been $12,619.
Investing Activities
Net cash used in investing activities of $289 for year ended December 31, 2025 was for the purchase of buildings and equipment. For the year ended December 31, 2024, our investing activities consumed cash of $1,559, with the majority of the spending related to the repurchase of property from Whitelaw Creek LLC in the amount of $1,507.
Financing Activities
Net cash provided by financing activities of $35,286 for the year ended December 31, 2024, stemmed from the receipt of the net proceeds from the 2024 Rights Offering. There were no similar transactions during the year ended December 31, 2025.
Liquidity and Capital Resources
At December 31, 2025, we had a working capital balance of $19,666, which represented a decrease of $5,155 from our December 31, 2024 working capital balance of $24,821. This decrease was largely the result of the reduction in our cash and cash equivalents balance, which decreased by $7,417 from $26,732 at December 31, 2024, to $19,315 at December 31, 2025, partially offset by an increase of $2,509 in our related party balance, which changed from a $895 liability at December 31, 2024, to an asset of $1,614 at December 31, 2025.
In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. Following the achievement of the first milestone under the WEA Funding Agreement, the Company received in January 2024 the first $2,000 of the $4,400 grant. In September 2024, a second funding request of $2,000 was submitted to the WEA with the achievement of the second milestone under the WEA Funding Agreement. The collection of this second $2,000 tranche was received in November 2024, with the remainder, or the $400 retainer, forecasted for collection in mid-2026.
Due to inflationary cost pressures on labor, equipment, and consumables, as well as cost increases associated with certain optimized plant engineering and design parameters, General Atomics, on behalf of the consortium, submitted to the DoE an updated Demonstration Plant project budget of approximately $53,600, which was approximately 22% higher than the original budget of approximately $43,800. In response, the DoE pledged an additional commitment of $2,400 (increasing its total commitment to approximately $24,200) in September 2024 to help fund a portion of this budget increase, with the balance to be funded by the Company, including any amounts in excess of the $53,600 revised budget total, now estimated to be approximately $77,500 inclusive of operating cost estimates through December 31, 2026.
Through December 31, 2025, the DoE has paid a total of approximately $20,500 towards its commitment of approximately $24,200, leaving a balance of approximately $3,700 to be invoiced and collected from the DoE under the current cost share award.
Early in 2025, we identified several design and equipment issues during the Demonstration Plant’s equipment testing phase, which followed the completion of construction activities. After identifying these issues, we initiated an as-built design review in April 2025, which continued through December 31, 2025. As a result of this as-built design review, Demonstration Plant operations did not formally commence until early 2026.
The funds raised by the Company in the 2026 Rights Offering, in conjunction with the funds already on hand will be used to progress the Company’s business strategy, which includes (i) the continuation of the operation of the Demonstration Plant for a sufficient time to provide the information to support a commercialization decision, (ii) the advancement of projects for the as-constructed Demonstration Plant beyond the current NdPr separation objectives, including applying the technology to the separation of HREEs and possibly to third party feed sources, (iii) the completion of federal and state permitting and licensing for the Bear Lodge REE Project, and (iv) other general corporate purposes. However, even with these funds and the expected receipt of the remaining WEA grant monies and DoE funds, the Company will still require substantial additional funds to complete the design, construction, and operation of a commercial mine and plant for the Bear Lodge REE Project.
Ultimately, in the event the Company cannot secure additional financial resources or complete a strategic transaction, the Company may need to curtail its plans for the Demonstration Plant, suspend permitting and/or development of the Bear Lodge REE Project or other initiatives, or potentially liquidate its business interests, and investors may lose all or part of their investment.
Off-Balance Sheet Arrangements
None.
Contractual Obligations
Financial Assistance Agreement – Related Party
In September 2025, at the Company’s request, General Atomics and the Company formally requested a novation of the financial assistance agreement between General Atomics and the DoE, under which General Atomics’ interests under the agreement would be transferred to the Company. Once the novation process is complete, the Company will be named the recipient of the award under the agreement and certain conditions are expected to be confirmed, including the potential for additional DoE funding support for further advancements of the Demonstration Plant.
Intellectual Property Rights – Related Party
During October 2017, the Company and Synchron executed an intellectual property rights agreement, whereby Synchron received rights to use and improve the Company’s intellectual property relating to the Company’s patents and related technical information. The Company retains the right to use any such improvements. See “Item 1A. Risk Factors” of this Annual Report.
CRITICAL ACCOUNTING POLICIES
For a summary of our significant accounting policies, including those discussed below, see Note 3 to our Consolidated Financial Statements.
CRITICAL ACCOUNTING ESTIMATES
The preparation of consolidated financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of expenses during the reporting period. Actual results could differ from those estimates.
Reclamation Obligations
Our mining and exploration activities are subject to various laws and regulations, including legal and contractual obligations to reclaim, remediate, or otherwise restore properties at the time the property is removed from service. Reclamation obligations are recognized when incurred and recorded as liabilities at fair value. The reclamation obligation is based on when spending for an existing disturbance will occur. We reclaim the disturbance from our exploration programs on an ongoing basis and, therefore, the portion of our reclamation obligation corresponding to our exploration programs that are expected to be settled in the near term are classified as a current liability. The remaining reclamation associated with environmental monitoring programs is classified as a long-term liability; however, because we have not declared proven and probable reserves as defined by Item 1300 of Regulation S-K or NI 43-101, the timing of these reclamation activities is uncertain as the reclamation areas will be utilized once the project is operating. For exploration stage properties that do not qualify for asset capitalization, the costs associated with the obligation are charged to operations. For development and production stage properties, the costs are added to the capitalized costs of the property and amortized using the units-of-production method. We review, on a quarterly basis, unless otherwise deemed necessary, the reclamation obligation associated with our properties.
Our Bear Lodge REE Project reclamation obligation is secured by a surety bond held for the benefit of the state of Wyoming in an amount determined by the applicable federal or state regulatory agency. We also maintain a surety bond for the decommissioning and reclamation of the Demonstration Plant property.
Accounting for reclamation and remediation obligations requires management to make estimates unique to each mining and processing operation of the future costs the Company expects to incur to complete the reclamation and remediation work required to comply with existing laws and regulations. These estimates require considerable judgment and are sensitive to changes in underlying inputs and assumptions. Such changes, including, but not limited to, (i) changes to environmental laws and regulations, which could increase the scope and extent of work required, (ii) changes in the timing of reclamation and remediation activities, which could occur over an extended future period and (iii) changes in the methods and technology utilized to settle reclamation and remediation obligations, could have a material impact on our business, financial condition, results of operations and cash flows.
Income Taxes
The Company applies the provisions of Financial Accounting Standards Board Accounting Standard Codification (“ASC”) 740 Income Taxes. The Standard requires an asset and liability approach for financial accounting and reporting for income taxes and the recognition of deferred tax assets and liabilities for the temporary differences between the financial reporting basis and tax basis of the Company’s assets and liabilities at enacted tax rates expected to be in effect when such amounts are realized or settled. Due to losses from inception, the Company has no tax liability. Currently, the Company has no deferred taxes arising from temporary differences between income for financial reporting and income tax purposes as a full valuation allowance has been recorded against the deferred tax assets.
The Company classifies tax-related penalties and net interest on income taxes as income tax expense. As of December 31, 2025 and 2024, no income tax expense had been incurred or accrued.
New Accounting Pronouncements
As of December 31, 2025, the Company had adopted all accounting pronouncements affecting the Company.
Improvements to Income Tax Disclosures
Issued in December 2023, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) 2023-09, Income Taxes (Topic 740): Improvements to Income Tax Disclosures, focuses on the rate reconciliation and income taxes paid. This ASU requires disclosure, on an annual basis, a tabular rate reconciliation using both percentages and currency amounts, broken out into specified categories with certain reconciling items further broken out by nature and jurisdiction to the extent those items exceed a specified threshold. In addition, the ASU requires disclosure of income taxes paid, net of refunds received disaggregated by federal, state/local, and foreign and by jurisdiction if the amount is at least 5% of total income tax payments, net of refunds received. The new standard is effective for the Company for 2025, with early adoption permitted. Amendments in this ASU may be applied prospectively for the revised disclosures for the period ended December 31, 2025 and continuing to provide the pre-ASU disclosures for the prior periods or may be applied retrospectively by providing the revised disclosures for all periods presented. The adoption of this ASU only impacted our disclosures, with no impacts to our results of operations, cash flows, and financial condition.
Disaggregation of Income Statement Expenses
Issued by FASB in November 2024, ASU 2024-03, Disaggregation of Income Statement Expenses (Subtopic 220-40), requires the disaggregated disclosure of specific expense categories, including purchases of inventory, employee compensation, depreciation, and amortization, within relevant income statement captions. This ASU also requires disclosure of the total amount of selling expenses along with the definition of selling expenses. The ASU is effective for annual periods beginning after December 15, 2026, and interim periods within fiscal years beginning after December 15, 2027. Adoption of this ASU can either be applied prospectively to consolidated financial statements issued for reporting periods after the effective date of this ASU or retrospectively to any or all prior periods presented in the consolidated financial statements. While early adoption is permitted, we do not plan to adopt this standard early. This ASU will likely result in additional disclosures being included in our consolidated financial statements once adopted. We are currently evaluating the provisions of this ASU.
Controls and procedures
As filed, 3,973 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
The principal executive officer and principal financial officer, with the supervision of the Board of Directors and Audit Committee and participation of management, have evaluated the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) under the Exchange Act), as of December 31, 2025. Based on the evaluation, the principal executive officer and principal financial officer concluded that the disclosure controls and procedures in place are effective to ensure that information required to be disclosed by the Company in reports that the Company files or submits under the Exchange Act is recorded, processed, summarized, and reported within time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by the Company in reports that it files or submits under the Exchange Act is accumulated and communicated to our management, including our principal executive and financial officers, or persons performing similar functions, as appropriate, to allow timely decisions regarding required disclosure.
Management’s Report on Internal Control over Financial Reporting
Our management is responsible for establishing and maintaining adequate internal control over financial reporting of the Company. Internal control over financial reporting is defined in Rule 13a-15(f) promulgated under the Exchange Act as a process designed by, or under the supervision of, our principal executive and principal financial officers, and effected by our Board of Directors, management, and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP. Our internal control over financial reporting includes those policies and procedures that:
- pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of our assets;
- provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with GAAP, and that our receipts and expenditures are being made only in accordance with authorizations of our management and directors; and
- provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of our assets that could have a material effect on the financial statements.
Because of their inherent limitations, internal controls over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
Our management assessed the effectiveness of our internal control over financial reporting as of December 31, 2025. In making this assessment, our management used the criteria set forth in the Internal Control—Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on management’s assessment, we have concluded that, as of December 31, 2025, our internal control over financial reporting was effective. Because we are a smaller reporting company and a non-accelerated filer, our independent registered public accounting firm is not required to attest to or issue a report on the effectiveness of our internal control over financial reporting.
Changes in Internal Control over Financial Reporting
There were no changes in our internal control over financial reporting during the quarter ended December 31, 2025 that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-12-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 12 months2025-01-01 to 2025-12-31 | $0 | us-gaap:Revenues |
| Interest expense | 12 months2025-01-01 to 2025-12-31 | $23.0k | us-gaap:InterestExpenseNonoperating |
| Net income | 12 months2025-01-01 to 2025-12-31 | −$4.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months2025-01-01 to 2025-12-31 | −$0.01 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months2025-01-01 to 2025-12-31 | −$0.01 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months2025-01-01 to 2025-12-31 | 516,131,921 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months2025-01-01 to 2025-12-31 | −$7.1m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2025-12-31 | $19.3m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-12-31 | $21.2m | us-gaap:AssetsCurrent |
| Total assets | At period end2025-12-31 | $24.1m | us-gaap:Assets |
| Current liabilities | At period end2025-12-31 | $1.5m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2025-12-31 | $1.8m | us-gaap:Liabilities |
| Shareholders' equity | At period end2025-12-31 | $22.3m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001419806-26-000004. Last ingested by Listed: Nov 4, 2026, 15:46 ET. Listed shows no prices and gives no investment advice.