Cadiz Inc: Form 10-K for the period ended Dec 31, 2021

Filed with the SEC on Mar 29, 2022 and accepted by EDGAR at Mar 29, 2022, 09:01 ET.

Share

Business

As filed, 46,157 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This Form 10-K contains forward-looking statements with regard to financial projections, proposed transactions such as those concerning the further development of our land and water assets, information or expectations about our business strategies, results of operations, products or markets, or otherwise makes statements about future events. Such forward-looking statements can be identified by the use of words such as “intends”, “anticipates”, “believes”, “estimates”, “projects”, “forecasts”, “expects”, “plans” and “proposes”. Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, the cautionary statements under the caption “Risk Factors”, as well as other cautionary language contained in this Form 10-K. These cautionary statements identify important factors that could cause actual results to differ materially from those described in the forward-looking statements. When considering forward-looking statements in this Form 10-K, you should keep in mind the cautionary statements described above.

General Development of Business

We are a water resources development company and agribusiness committed to sustainable water and farming projects in California. We are one of the largest private landowners in the state and control significant water supply, storage and conveyance assets capable of being part of the solution to California’s systemic water challenges.

Our main objective is to realize the highest and best use of our land, water, and related infrastructure assets in an environmentally responsible way. Our present activities are focused on managing our assets to meet growing long-term demand for access to sustainable water supplies and agricultural products.

We own approximately 45,000 acres of land with high-quality, naturally recharging groundwater resources in three areas of Southern California’s Mojave Desert – the Cadiz Valley (35,000 acres), Danby Dry Lake (2,000 acres), and the Piute Valley (9,000 acres) (“Cadiz Property”). Our properties represent a unique private reserve of lands with vested water rights located in a remote area of eastern San Bernardino County that is at the crossroads of major highway, rail, energy, and water infrastructure supplying and delivering necessary resources to communities in California and across the Western United States. See Item 2. Properties, below.

Our properties were primarily assembled by our founders in the early 1980s, relying on NASA imagery that identified a unique desert land position at the base of a vast and topographically diverse Southern California watershed with potential for agricultural and water development. The Cadiz Valley property (“Cadiz Property”) is underlain by extensive, high-quality, naturally recharging groundwater able to support a variety of uses (see “The Cadiz Water Project”, below).

We have farmed at the Cadiz Property since the late 1980s relying on naturally recharging fresh groundwater supplies for irrigation. Today, our farming operations at the Cadiz Property (“Cadiz Ranch”) are the largest in San Bernardino County. At the Cadiz Ranch, we are engaged in sustainable agricultural production and through lease arrangements with partners have fruit, vegetable and grain crops in production (see “Description of Business, Sustainable Agricultural Development”, below).

While we actively farm certain of our properties, we are aware that California faces systemic water challenges and is not able to safely, sustainably and reliably meet the water needs of all of its communities. We believe that the highest and best use of our assets will be realized by offering a combination of water supply, storage and conveyance projects in complement with the agricultural development at our properties and in ways that are sustainable and responsive to California’s resource needs.

We are principally focused on developing the Cadiz Valley Water Conservation, Recovery and Storage Project ("Water Project") at our Cadiz Valley property to help address California’s persistent systemic water challenges and deliver new water access to California communities that presently lack reliable water supplies and infrastructure. Through management of groundwater at the Cadiz Property, the Water Project would conserve groundwater otherwise used for agriculture to augment supply in California communities in need and utilize capacity available in the managed groundwater aquifer system at Cadiz to bank and store imported water for use in future dry years.

The Water Project has completed extensive environmental review in accordance with local, state and federal laws and has secured permits authorizing the management of the groundwater aquifer in Cadiz to make available an average of 50,000 acre-feet of water per year for 50 years to communities off of the Cadiz Property. Permitting has also authorized the storage of imported water in the aquifer system for return in future dry years. The Cadiz aquifer system has the capacity to store up to one million acre-feet of imported water (see "The Cadiz Water Project", below).

Several California water providers have expressed interest and executed contracts or option agreements to participate in the Water Project. To deliver conserved water to communities in need or to offer storage, the Water Project must provide conveyance facilities capable of delivering water to and from the Cadiz area for participating water providers (see “Conveyance Pipelines”, below). We own a retired, 30” steel natural gas pipeline (“Northern Pipeline”) that extends 220-miles from California’s Central Valley near the California Aqueduct southeast across Kern and San Bernardino Counties terminating at the Cadiz Property. Engineering and technical assessments indicate that the Northern Pipeline can safely convey 25,000 acre-feet of water in either direction. We also maintain a 99-year lease with the Arizona & California Railroad Company (“ARZC”) to co-locate and construct a 43-mile approximately 55-85” steel water conveyance pipeline (“Southern Pipeline”) within the existing, active railroad right-of-way that intersects the Colorado River Aqueduct (“CRA”), one of Southern California’s primary sources of drinking water in Southern California. The Southern Pipeline is designed to convey up to 75,000 acre-feet per year in either direction.

To utilize the Northern Pipeline for water conveyance related to the Water Project or to construct and operate the Southern Pipeline in coordination with existing water conveyance facilities, we must complete additional permitting and regulatory processes.

We expect to complete any necessary permitting in coordination with any contract to use the facility.

We believe implementation of the Water Project and increasing California's access to water conveyance, will help improve water equity for underserved communities, which is a significant challenge facing the state of California as climate change intensifies.

Successful Water Project implementation would change the cash flow structure of the Company, which has been historically dominated by agricultural lease and farming returns and debt and equity financing to support our working capital needs, including the development of the Water Project. We believe the implementation of the Water Project could provide a significant source of future cash flow for Company.

Our current and future operations also include activities that further our commitments to sustainable stewardship of our land and water resources, good governance and corporate social responsibility. We follow a holistic land management strategy, employ a rigorous environmental policy, and engage with our stakeholders and those impacted by our projects to verify alignment and accountability. More than 30,000 acres of our property are presently managed for conservation, including the reservation of 7,500 acres of our Piute property as a desert tortoise land conservation bank (see “Land Stewardship” and Item 2. Properties, below). We believe these commitments are important investments that will assist in maintenance of sustained stockholder value.

Our strategy for implementation of our projects, current status milestones and prospects are outlined in “Description of Business” below.

Description of Business

Our business is focused on the sustainable development of our land and water assets for their highest and best uses.

Our properties and assets offer opportunities for a wide array of activities that could benefit those who lack reliable access to food, water and infrastructure. At present, our development activities are focused on the Cadiz Water Project, sustainable agriculture, and land stewardship.

California and the Western U.S. face a persistent challenge in meeting the water needs of all of its residents. While the State of California has recognized a Human Right to Water, competing municipal, agricultural and environmental demands outpace the State’s available supply limiting the ability to deliver on that promise. Recent analysis from the California State Water Resources Control Board estimates that more than 1 million Californians lack reliable access to water and several communities are short of long-term reliable and affordable safe-drinking supply.

Southern California receives more than half of its water from three imported water sources: (1) the Colorado River Aqueduct (“CRA”), which delivers water from the Colorado River into California; (2) the California State Water Project (“SWP”), which provides water supplies from Northern California to the central and southern parts of the state; and (3) the Los Angeles Aqueduct, which delivers water from the eastern Sierra Nevada mountains to the City of Los Angeles. Southern California’s water providers and farmers rely on imports from these systems to meet demand, but deliveries from all three into the region are consistently below capacity, even in wet years, due to a combination of regulatory restrictions and the region’s climate variability.

Frequent swings between wet and dry years, which has been exacerbated by climate change, challenges California’s traditional supply system and creates an urgent demand for reliable storage and local supply. In 2022, California entered a third year of drought, with reservoirs sitting significantly below capacity and limits imposed on supply available for communities and farmers.

Moreover, cyclical drought, climate change, and regulatory restrictions have limited traditional water supply, which has significantly increased the cost of water and water infrastructure over the last decade.

The communities hardest hit by these challenges are California’s disadvantaged communities, where limited tax base and median household income reduce the solutions available to address supply, infrastructure or quality concerns.

To contribute solutions to California’s water challenges, we are focused on the development of the Water Project.

The Cadiz Water Project

The Water Project is a public-private partnership with California water agencies that is designed to actively manage the significant aquifer system beneath the Cadiz Property, conserve fresh, high-quality groundwater that is currently lost to high-salinity and evaporation and make available a new water supply for underserved communities in California. The active management of the aquifer system will also support storage of supplemental and imported water to provide additional relief in future dry years.

Water Project operations will follow an extensive, state-of-the-art groundwater management plan (see, “Permits & Regulatory Approvals” below) and withdrawals of groundwater will be limited to sustainable amounts that preserve the health of the aquifer system and safeguard the desert ecosystem. An average of 50,000 acre-feet of water per year will be captured and made available for beneficial use in Southern California communities, an amount of annual supply that could serve approximately 400,000 people each year.

The Water Project would utilize the managed groundwater basin to offer storage in the aquifer system for up to one-million acre-feet of fresh water that would be imported and held in storage until needed in future dry years. The total storage capacity of the aquifer system is larger than Southern California’s largest surface reservoir, Diamond Valley Lake, and the location of the Cadiz Property approximately 40 miles from the Colorado River Aqueduct make it a desirable site for storage of Colorado River water supplies, which presently are held in surface reservoirs such as Lake Havasu that suffer significant annual evaporative losses.

The Water Project was designed on a foundation of scientific study to ensure the sustainability of operations. Several comprehensive studies of the water resources at the Cadiz Property and within the surrounding topographically diverse 1,300 sq. mile watershed have been completed to better understand the extent of the unique resources in the Cadiz Valley, including basin size, capacity, water quality and geology.

In summary, scientific research and study have demonstrated the following characteristics of the resource:

1. The aquifer underlying the Cadiz Property contains between 17 – 34 million acre-feet of groundwater in storage, a quantity on par with Lake Mead, the U.S.’s largest surface reservoir.

2. The aquifer system is composed of highly porous sands and rock allowing groundwater to easily flow. At the Cadiz Property, the groundwater table is reached at approximately 150 feet below ground surface, and fresh water extends over 1,000 feet below ground surface. Agricultural use of groundwater at the Cadiz Property has not resulted in any significant, sustained drawdown of the water table in the Cadiz Valley.

3. Groundwater enters the watershed as precipitation in the high elevations of the surrounding mountain system, percolates slowly over time downgradient to the Cadiz and Fenner Valleys and exits the system at large dry lake playas (Cadiz & Bristol Dry Lakes) south of the Cadiz Property. Natural recharge is estimated at approximately 32,500 acre-feet per year and physical measurements of evaporation from the dry lake playas are consistent with the recharge estimate.

A combination of existing and new facilities will be required for implementation and operation of the Water Project. Facilities include a wellfield, which would integrate with our existing agricultural wells, a pipeline manifold system, and power facilities to support operation of the wellfield. The Water Project may also include a water treatment facility to meet water quality requirements of our partner agencies. Further, to deliver water to participants in the Water Project or import water for storage at the Project area, at least one water conveyance pipeline would be required either via new construction or conversion of existing pipeline facilities in the area. We currently contemplate the use of two potential pipeline routes for the Water Project; one would extend southwards from the Cadiz Property to the Colorado River Aqueduct in Rice, California (the “Southern Pipeline”) and the other extends northwards from the Cadiz Property to Wheeler Ridge, California (the “Northern Pipeline”).

Construction of the Water Project facilities that would allow for conservation, storage and delivery of groundwater to public water providers is estimated to cost approximately $450 - $550 million. We expect these capital costs to require either infrastructure debt financing secured by the Company in the private markets, capital financing traditionally available to public agencies at a lower cost of capital, or other public funding available to public agencies.

We have secured permits required to construct and operate the main Project facilities at the Cadiz Property (see “Permits & Regulatory Approvals”, below).

Prior to implementation of the Water Project, we will require final contracts (see “Contracts with Agencies”, below) that will include conveyance arrangements to move water between the Cadiz Property and the service areas of participating water agencies (see “Conveyance Pipelines”, below). The contracts and conveyance arrangements are subject to environmental review and regulatory approval.

Permits & Regulatory Approvals

To ensure the safety and sustainability of operations, the Water Project requires environmental and regulatory permits prior to construction and implementation. Following a multi-year permitting process, the Water Project received permits that allow the capture and conservation of 2.5 million acre-feet of groundwater over 50 years, on average 50,000 acre-feet per year, and the storage of water in the managed aquifer system, in accordance with the terms of a groundwater management plan approved by San Bernardino County.

The Water Project has completed a California Environmental Quality Act (“CEQA”) review process including the completion of a comprehensive Final Environmental Impact Report (“FEIR”). The FEIR concluded that Water Project operations would not cause any significant adverse environmental impacts. The FEIR was certified on July 31, 2012.

San Bernardino County, the local agency responsible for groundwater use at the Cadiz Property has also reviewed the Water Project and approved its Groundwater Monitoring, Management and Mitigation Plan (‘GMMMP”), which establishes a monitoring network to ensure that the Water Project will not cause harm to the environment or surrounding land uses. The GMMMP includes 100 monitoring features across the watershed and regular transparent disclosure of conditions. The FEIR and GMMMP permits allow the conservation and delivery of 50,000 acre-feet of groundwater per year for 50 years to serve beneficial uses in California communities. These permits were upheld and sustained in their entirety by judgements in California’s Superior and Appellate Courts and are no longer subject to legal challenge.

In August 2019, an Addendum to the FEIR was adopted by the Fenner Valley Water Authority, a joint powers authority comprised of the public water agencies participating in the Water Project, to address updates to the Water Project proposal, such as its water treatment program and pipeline route. The Addendum also assessed new studies published about natural springs in the Water Project watershed. The Addendum concluded that there are no significant adverse impacts associated with the minor changes to the Water Project and further summarized that the spring studies did not change the conclusions of the FEIR’s analysis. The Addendum was not challenged in court and is no longer subject to litigation.

Contracts with Water Agencies

The Water Project is a public-private partnership with California public water agencies that require supplemental water supply and storage to serve their communities

Since 2010 we have executed Letters of Intent (“LOIs”), option agreements, or contracts reserving water supply and storage for public water agencies and private water utilities (“Participating Agencies”) that serve more than one million customers in cities throughout California’s San Bernardino, Riverside, Los Angeles, Orange, Imperial and Ventura Counties. We have pledged that the benefits of the Water Project will be realized locally in San Bernardino County, where the Cadiz Property is located, and twenty percent of Water Project supplies have already been reserved for San Bernardino County-based agencies.

Generally, our existing contracts and option agreements reserve water supply from the Project at approximately $1,200 - 1,400/ acre-foot of delivered water, and reserve aquifer storage capacity at $1,500/ acre-foot of capacity.

Water supply and storage pricing in the agreements include adjustments in market pricing that have occurred since initial execution of option agreements. We also expect final pricing will include considerations for the service of state-designated disadvantaged communities (“DAC” or “DACs”) by a water provider. All current partners in the Water Project contain at least one community classified as a DAC. It is our objective for the cost of water supply and storage from the Water Project to be among the most affordable solutions in Southern California.

In addition to discussions with parties that presently hold options and contracts to water from the Project, we also are engaging in discussions with communities that have been particularly affected by the ongoing drought in California and that may benefit from the availability of supply and storage from the Water Project. Regulatory restrictions on California’s traditional supplies are accelerating these discussions as we aim to service those hardest hit by lack of safe, reliable water access.

Contracts are subject to the approval of the elected boards of the Participating Agencies, or regulatory authority of that agency, and subject to environmental review and compliance with CEQA. Participants may also complete additional study and investigation of the Water Project prior to consideration of a contract.

Conveyance Pipelines

As described above, we anticipate using two separate pipeline routes to convey water between the Cadiz Property and the service areas of Participating Agencies. The first route, or the Southern Pipeline, requires the construction of a 43-mile water conveyance pipeline within a portion of the ARZC right-of-way that crosses the Cadiz Property and intersects with the CRA in Rice, California. The CRA is owned by the Metropolitan Water District (“MWD”) and serves water providers in six southern California counties. The second route, or the Northern Pipeline, contemplates the use of an existing, idle 30” natural gas pipeline that we acquired from El Paso Natural Gas (“EPNG”) to convert for water conveyance. The Northern Pipeline extends 220-miles between Wheeler Ridge, California near Bakersfield and the Cadiz Property. Along its route it crosses main water delivery systems including the Mojave River Pipeline, the Los Angeles Aqueduct and facilities of the State Water Project.

The use of either route for conveyance of water to or from the Cadiz Property is subject to additional regulatory approval as outlined below.

1. Southern Pipeline

The Southern Pipeline is designed to be a 55-85” steel pipeline that would be constructed within ARZC's 200 ft. wide right-of-way traveling from the Cadiz Property 43 miles south-east to the CRA near Rice, California. It would have the capacity to transport up to 150,000 acre-feet per year depending on the diameter of the pipe selected, however our current permits limit the conveyance amount to 75,000 acre-feet per year. In 2008, we entered into a 99-year lease agreement with the ARZC to utilize a portion of its existing right-of-way for a conveyance pipeline and related facilities. As part of the lease arrangement, we agreed to provide necessary railroad improvements in furtherance of railroad purposes. This includes providing water and power to the railroad for fire protection and improving access roads and transloading operations, among other things. By co-locating the conveyance pipeline within this existing railroad right-of-way, Water Project construction would avoid impacts to desert habitats. The route and construction within the route were evaluated and approved during the Water Project’s CEQA permitting process.

Our proposed co-location in the right-of-way was also separately assessed by the US Bureau of Land Management (“BLM”) to determine the need for any federal permitting related to the proposed use of the ARZC railroad right-of-way, which is a federal right-of-way originally granted to the railroad in accordance with the General Railroad Right-of-Way Act of 1875 ("1875 Act"). BLM’s evaluation, which was issued in February 2020, concluded that the proposed Southern Pipeline will further railroad purposes at least in part, is within the scope of the right-of-way, and requires no additional BLM approvals. In February 2022, the US Department of the Interior’s Solicitor Office issued a new legal opinion regarding third party use of 1875 Act rights-of-way that preserved the railroad purposes assessment for third party uses. The opinion was not specific to any railroad and did not alter our 2020 evaluation.

Construction of the Southern Pipeline and related facilities will not be initiated until we obtain both (i) an agreement with Metropolitan Water District of Southern California to move water supplies from the Water Project in the CRA; and (ii) a finding by the California State Lands Commission that conveying water from the Water Project in the CRA will not adversely affect the desert environment.

  • MWD Agreement

Water supplies conserved by the Water Project would enter the CRA, which is owned by MWD, at the termination of the Southern Pipeline. The CEQA process considered a variety of options for the interconnection to the CRA and conveyance of Water Project supplies in the CRA for the benefit of Participating Agencies. Final terms and conditions for entry and conveyance will be determined by MWD in consultation with the Participating Agencies.

MWD is required to convey water for a third party subject to provisions in California Water Code sections 1810 – 1815, Joint Use of Capacity in Water Conveyance Facilities (also known as “the Wheeling Statutes”) provided that supplies entering the CRA comply with MWD’s published engineering, design and water quality standards. Water supplies conveyed in the CRA are also subject to all applicable fees and charges routinely established by MWD for the conveyance of water within its service territory. Any wheeling fees will be payable by participants in the Water Project.

Adding Cadiz groundwater to the CRA offers a water quality benefit to MWD and its member agencies that may also be considered when establishing terms and conditions for entry and conveyance in the CRA. Cadiz water presently meets all state and federal water quality requirements without treatment and total dissolved solids (“TDS”) or salts in the Cadiz water supply are substantially lower than the water in the CRA. Adding Cadiz water to the CRA could lower its TDS and provide a reduction in treatment costs. Some naturally occurring constituents at Cadiz are lower than state and federal drinking water standards, but potentially higher than the water in the CRA; however, based on extensive pilot testing, they can be lowered via treatment to ambient levels or removed entirely with use of cost-effective treatment technologies.

Cadiz aquifer system storage also offers significant benefits to MWD members agencies managing Colorado River entitlements. Water stored at Cadiz would suffer no evaporative losses, while water stored in Colorado River surface reservoirs can experience up to 20% loss due to evaporation due to their Mojave Desert environment.

Once agreement regarding terms and conditions of the Water Project’s use of the CRA to transport water to its participating agencies is reached, then the agreement will be considered by the MWD Board. We expect a formal application to MWD for consideration of terms and conditions would be filed in coordination with the completion of our contractual arrangements.

  • State Lands Commission Review under Water Code Section 1815

Water Code Section 1815, which is a component of California’s “Wheeling Statutes” referenced above, requires desert groundwater projects to apply for a review by the California State Lands Commission (“SLC”) prior to moving water in facilities like the CRA. This review must determine whether such projects would have “unreasonable effects on the environment and water dependent ecosystems in the surrounding watersheds.” The review by SLC must be conducted within 15 months of any filed application, with an option to extend for an additional 9 months upon public notice and explanation. Any application to the SLC for review of the Water Project’s plans to convey water in the CRA from the Cadiz Property will be accompanied by evidence of the Water Project’s extensive record of environmental sustainability as well as data and reports that we expect will withstand critical scrutiny. We expect a formal application with the SLC would be filed in coordination with final contractual arrangements with Participating Agencies.

2. Northern Pipeline

The Northern Pipeline is a 220-mile long, 30-inch-wide existing idle steel pipeline that extends northwest from our Cadiz Property and crosses agricultural, military, industrial and exurban communities across San Bernardino, Los Angeles, and Kern counties. The pipeline also crosses primary state water infrastructure including the Los Angeles Aqueduct and facilities of the State Water Project.

Technical engineering studies have indicated that the pipeline (a former petroleum products line that was retired in 2005) could transport approximately 25,000 acre-feet of water per year between points along the pipeline corridor. Professional water quality and structural testing of a five-mile segment conducted in 2020 determined that there were no residual gas or petroleum products in the tested segment and that the pipeline is structurally sound to transport water.

In December 2020, BLM granted to our subsidiary Cadiz Real Estate LLC two right-of-way permits that now enable us to transport water through the entire Northern Pipeline over BLM-managed lands. The first right-of-way was issued pursuant to an assignment in October 2020 of a portion of an existing right-of-way held by EPNG and renewed by BLM under the Mineral Leasing Act that enables the continued transportation of natural gas. The second right-of-way was issued under the Federal Land Policy and Management Act and authorizes the conveyance of water in the pipeline over BLM-managed lands. The two right-of-way grants are presently being challenged in federal court. See Item 3. Legal Proceedings, below.

Following receipt of the BLM grants, the Company completed the acquisition of the Northern Pipeline with final payment to EPNG of $19 million, on June 30, 2021. We now own the entire 220-mile pipeline asset in fee.

The Northern Pipeline offers California water purveyors a unique asset and corresponding opportunity to connect available supplies with rural areas of the State that are underserved. When the Northern Pipeline becomes operational for water conveyance, and the Southern Pipeline is built, the Water Project would interconnect all of Southern California’s primary water delivery systems for the first time, enabling more flexible trading among participants on these systems.

We are presently engaged in discussions with parties interested in using the Northern Pipeline for conveyance, storage and supply. The Northern Pipeline crosses a critically dry, rural and underserved part of California and it could directly augment water supply access and storage for 23 state-designated disadvantaged communities along its route.

Prior to conveyance of water through the Northern Pipeline, we must secure permits required by any definitive agreement to use the facility. All conveyance of water via the Northern Pipeline would be conducted in accordance with applicable local, state and federal laws.

The cost to convert the entire Northern Pipeline for delivery of water is estimated at approximately $100 - $125 million, described in the discussion of Water Project facilities costs above in “Description of Business, the Cadiz Water Project .“ We anticipate that these costs will be financed via infrastructure debt available in the private markets financing or funding accessible by our public agency partners.

Facility Design & Construction

Prior to final construction of the Water Project facilities, we must finalize facility design and acquire relevant construction permits from local agencies.

Together with Participating Agencies we have engaged engineering and environmental consultants to complete design plans for remaining necessary facilities. This work is ongoing and expected to proceed in coordination with the negotiation of contracts and conveyance arrangements.

Social Impact

Upon implementation, an objective of the Water Project’s safe and sustainable operations is to benefit community stakeholders. The Water Project will have the following positive social impacts:

1. Water for disadvantaged communities. All public agency participants with options to contract for water from the Water Project must serve at least one disadvantaged community within their service area.

2. Improve local water quality. The introduction of our low TDS groundwater in the CRA, which is known to be high in TDS, would provide a water softening benefit that would reduce treatment costs for the metropolitan southern California service area. Water Project partners have also established a $5 million fund for small water systems in disadvantaged communities to support local water quality improvements.

3. Repurposing carbon contributing assets. The use of the Northern Pipeline for water conveyance will convert a former oil and gas pipeline for the beneficial use of water conveyance. The recycling of an existing pipeline will reduce greenhouse gas emissions and reduce the load on the state’s current water transportation sources.

4. Creation of new renewable energy. The Cadiz Southern Pipeline and Northern Pipeline will feature in-line turbines that will generate renewable hydropower. The Water Project wells and pump stations will be powered at least in part by solar energy and natural gas.

5. Protection of habitats. All Water Project facilities will be built on private lands, disturbed public lands or within existing transportation corridors to avoid any impacts on habitats.

6. Support stable water rates. The addition of new reliable supply, groundwater storage, improved water quality and system efficiency will allow water agency participants to keep rates low in their service area.

7. Create and support good-paying jobs. The Water Project is expected to create and support nearly 6,000 jobs across the local economy during two phases of construction; 10% of jobs are reserved for veterans. We maintain a Project Labor Agreement with two building trades unions to employ their members during all construction of Project facilities.

8. Improved tax base. Improvements to the Cadiz Project resulting from the Water Project will contribute new tax revenue to local governments, including County budgets and local schools in disadvantaged communities.

Sustainable Agricultural Development

Farming began at the Cadiz Property in the 1980s and has continued sustainably since that time. Our entire 35,000-acre Cadiz Property is zoned to allow for agricultural development. A total of 9,600 acres of the property, which is also known as the Cadiz Ranch, has been permitted for agricultural use, allowing for planting, irrigation and related infrastructure. The Cadiz Ranch is the largest approved agricultural operation in San Bernardino County.

The property features worker housing and commissary for 300 people, as well as office and equipment facilities. Irrigation is currently supported by 9 wells, with capacity to deliver up to 25,000 acre-feet of water per year. All agricultural wells are expected to be integrated into any Water Project wellfield. Water quality is excellent with very low TDS and meets all state and federal requirements without treatment.

Presently, 3,100 acres are developed for farming via a combination of lease arrangements and direct farming by Cadiz as follows:

  • 2,100 acres have been leased for the farming of lemons and other crops by Fenner Valley Farms LLC. Of this total, 640 acres have been developed to lemon orchards. All farming expenses are borne by the lessee. Revenues from this lease total approximately $420,000 per year.
  • 242 acres have been leased for the farming of industrial hemp by SoCal Hemp JV LLC, our 50/50 joint venture partnership with SoCal HempCo LLC, owned by Glass House Brands, Inc. All farming expenses are borne by the joint venture. Lease revenues received from the joint venture totaled approximately $120,000. Regulatory uncertainty and access supply uncertainty in the CBD market has limited market opportunities for our hemp and the cannabinoids (CBD) derived from harvested hemp to date. Due to limited demand, in 2022 we expect to plant less than 20 acres of hemp focusing on continued hemp and hemp-derived CBD research.
  • 760 acres have been developed by the Company for alfalfa. 600 of these acres were planted in fall 2021 and the remaining 160 acres have been planted in spring 2022. Initial harvesting is expected to begin in the 2nd quarter of 2022.

To address climate change, maintain a natural environment and support habitat for local flora and fauna, we and our farming partners follow best practices that minimize water use, improve soil fertility, and reduce pesticides and other applications that could adversely impact soil, water or food quality.

All farming at the Cadiz Ranch is conducted in accordance with permits and a management plan overseen by San Bernardino County. We report our crop mix, groundwater use, water quality, well levels, and other trends annually to the County.

Efficient use of water by agriculture is critical to long-term sustainability and our agricultural operations. The Cadiz/Fenner groundwater basins, which underlie our farming operations, are classified as “low/very low” priority in accordance with the California Sustainable Groundwater Management Act (“SGMA”) demonstrating the sustainability of the groundwater basins that support our ongoing irrigation. By contrast, the Public Policy Institute of California has estimated that between 535,000 and 750,000 acres of farmland in the Central Valley will have to be permanently fallowed in order for these groundwater basins to satisfy SGMA. Given the enduring safety and sustainability of our agricultural operations, we anticipate offering a continuing option for agricultural operations in California.

All Cadiz Ranch agriculture is developed to be compatible with anticipated Water Project operations. Overlying farming demands will be coordinated with Water Project operations and existing permits to utilize available water for its highest and best use.

Land Stewardship

Our mission includes managing our desert properties for their highest and best use. Approximately 30,000 acres of our total 45,000 acres are presently managed for permanent open space.

In 2014, we permanently dedicated approximately 7,500 acres of our Piute Valley properties to conservation. These properties, which are not associated with the Cadiz Water Project or Cadiz Ranch agricultural operations, are located within terrain designated by the federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas. In February 2015, the California Department of Fish and Wildlife approved our establishment of the Fenner Valley Desert Tortoise Conservation Bank (“Fenner Bank”), a land conservation bank that makes available these properties for mitigation of impacts to tortoise and other sensitive species that would be caused by any development across the Southern California desert. Under its enabling documents, the Fenner Bank offers credits that can be acquired by entities that must mitigate or offset impacts linked to planned development. For example, this bank can service the mitigation requirements of renewable energy, military, residential and commercial development projects being considered throughout the Mojave Desert. Credits sold by the Fenner Bank are dedicated to funding the permanent preservation of the land by the San Diego Habitat Conservancy and research by San Diego Zoo Global into desert tortoise health and species protection. Any future revenues received from credits sold are expected to be reinvested into the land conservation operation.

Other Opportunities

We remain committed to the sustainable use of our land, water and infrastructure assets and will continue to explore all opportunities for sustainable development in an environmentally responsible way. We cannot estimate which of these opportunities will ultimately be realized.

Seasonality

Our water resource development activities are not seasonal in nature.

Farming operations on the leased land at the Cadiz Property include the year-round cultivation of lemons and spring and fall plantings of vegetables and grains. These operations have been subject to general seasonal trends that are characteristic of the agricultural industry.

Competition

We face competition in the acquisition, development and sale of water and land assets from a variety of parties. We also experience competition in our development of water projects and agriculture associated with our properties. Since California has scarce water resources and an increasing demand for available water, we believe that location, price and reliability of delivery are the principal competitive factors affecting transfers of water in California. We believe our projects are competitive with other sources of water and agriculture.

Human Capital Resources

As of December 31, 2021, we employed 10 full-time employees (i.e. those individuals working more than 1,000 hours per year). Our business operations also rely on third party contracted seasonal and temporary workers, as well as consultants and vendors to help augment specialized human capital and talent needs. Our full-time and third party contracted workers, as well as consultants and vendors, must follow our code of conduct and ethics policy, as well as our whistleblower and information security policies.

We appreciate the importance of retention, growth and development of our employees. The average tenure of our full-time employees is more than 10 years, reflecting our positive work environment that offers opportunities to develop new skills and advance to new positions. We believe we offer competitive compensation (including salary, incentive bonus, and equity) and benefits packages to our employees, including a 401(k) plan. Further, we urge professional development opportunities and mentorship to cultivate talent throughout the Company.

As a small workforce, we focus on skill sharing and experience diversity in the workplace. Our full-time employees have opportunity to often work with senior leadership and/or Board members in pursuit of business objectives. Management and leadership provide annual reviews of employee performance. Human capital is generally managed by our CEO and CFO, and employment policies are overseen by the Board, particularly the Compensation Committee.

We are focused on both executing on a strategy to support progress and evaluating our diversity and inclusion strengths and opportunities to ensure our workforce reflects the communities in which we operate.

COVID-19

We remained open throughout the COVID-19 pandemic as a member of the agricultural products industry. Our employees were provided opportunities to telework and flexibility to manage the unique demands of the situation. We expect to continue to support work-from-home arrangements for our employees even as the pandemic eases, as it has created new flexibility that is favored by our workforce.

Our employees are provided socially-distanced working spaces and Personal Protective Equipment (PPE). Our operations are also in compliance with all local, state and federal pandemic regulations.

Regulation

Our operations are subject to varying degrees of federal, state and local laws and regulations, as detailed throughout Item 1. As we proceed with the development of our properties, including the Water Project, we will be required to demonstrate to various regulatory authorities that we are in compliance with the laws, regulations and policies enforced by such authorities. Groundwater development, and the export of conserved groundwater for sale to entities such as public water agencies, is subject to regulation by specific existing statutes pertaining to water supply, but also general environmental statutes applicable to all forms of development. Agricultural operations are generally subject to regulation by local agencies, such as county governments, as well as state environmental and water statutes. For example, we must obtain a variety of approvals and permits from state and federal governments with respect to assessment of environmental impact, particularly given the location of our assets in the California desert and in proximity to public lands. Because of the discretionary nature of these approvals, concerns raised by governmental officials, public interest groups and/or other interested parties during both the development and the approval process may impact our ability to develop our properties in the manner we believe would fulfill their highest and best use. The realization of income from our projects, including the Water Project, could be delayed, reduced or eliminated based on regulatory restrictions and/or processes.

Access to Our Information

Our annual, quarterly and current reports, proxy statements and other information are filed with the Securities and Exchange Commission (“SEC”) and are available free of charge on the internet through our website, http://www.cadizinc.com, as soon as reasonably practical after electronic filing of such material with the SEC. Our website address provided in this Annual Report on Form 10-K is not intended to function as a hyperlink and the information on our website is not, nor should it be considered, part of this report or incorporated by reference into this report.

Our SEC filings are also available to the public on the internet at the SEC’s website http://www.sec.gov.

Risk factors

As filed, 8,533 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our business is subject to a number of risks, including those described below.

Our Development Activities Have Not Generated Significant Revenues

At present, our development activities include water resource and agricultural development at our San Bernardino County properties. We have not received significant revenues from our development activities to date and we do not know when, if ever, we will receive operating revenues sufficient to offset the costs of our development activities. As a result, we continue to incur a net loss from operations.

We May Never Generate Significant Revenues or Become Profitable Unless We Are Able to Successfully Implement Programs to Develop Our Land Assets and Related Water Resources

We do not know the terms, if any, upon which we may be able to proceed with our water and other development programs or successfully implement our agricultural plans. Regardless of the form of our development programs, the circumstances under which supplies or storage of water and agriculture can be developed and the profitability of any such project are subject to significant uncertainties, including the risk of variable water supplies and changing water allocation priorities. Additional risks include our ability to obtain all necessary regulatory approvals and permits, litigation by environmental or other groups, unforeseen technical difficulties, general market conditions for agricultural and water supplies, and the time needed to generate significant operating revenues from such programs after operations commence.

The Development of Our Properties Is Heavily Regulated, Requires Governmental Approvals and Permits That Could Be Denied, and May Have Competing Governmental Interests and Objectives

In developing our land assets and related water resources, we are subject to local, state, and federal statutes, ordinances, rules and regulations concerning zoning, resource protection, environmental impacts, infrastructure design, subdivision of land, construction and similar matters. Our development activities are subject to the risk of adverse interpretations of such U.S. federal, state and local laws, regulations and policies and/or the adoption of new and amended laws, regulations and policies that prohibits, restrict, modify or delay our development activities.

Further, our development activities require governmental approvals and permits. If such permits were to be denied or granted subject to unfavorable conditions or restrictions, our ability to successfully implement our development programs as planned would be adversely impacted and could delay returns on our investments in the development of our assets.

Current regulation that could impact our water resources development activities are generally related to water conveyance functions, particularly the conversion of existing pipelines and construction of new pipelines and related facilities necessary to move water to and from Cadiz, or between points along these pipelines for the benefit of California water users. In this regard, we will need to obtain certain permits and approvals from public water agencies in California, the California State Lands Commission, and agencies of the federal government, such as the US Department of the Interior. Such regulatory requirements will be determined by any contractual obligation to transport water between parties via Cadiz pipeline infrastructure.

Generally, opposition from third parties expressed at any regulatory venue can cause delays and increase the costs of our development efforts or preclude such development entirely. While we have worked with representatives of various environmental and third-party stakeholders to address any concerns about our projects, certain groups may remain opposed to our development plans regardless of our engagement and pursue legal and other actions.

Governmental approvals and permits granted authorizing our development activities may be challenged in court and such litigation could adversely impact our timelines, development plans, and ultimately the return on our investments. Currently, our permits granted by the US Bureau of Land Management (“BLM”) in December 2020 that assigned an existing right-of-way and granted a new right-of-way to us to enable the conveyance of water in our Northern Pipeline are being challenged in federal court in two lawsuits. See Item 3. Legal Proceedings, below.

Our Failure to Make Timely Payments of Principal and Interest on Our Indebtedness or To Obtain Additional Financing Will Impact our Ability to Implement Our Asset Development Programs

As of December 31, 2021, we had total indebtedness outstanding to our lenders of approximately $50.2 million which is secured by our assets. $50.0 million of our indebtedness matures in July 2024 with interest payable quarterly in cash at a 7% annual rate. To the extent that we do not make principal and interest payments on the indebtedness when due, or if we otherwise fail to comply with the terms of agreements governing our indebtedness, we may default on our obligations.

We will continue to require additional working capital to meet our cash resource needs until such time as our asset development programs, including the Water Project, produce revenues sufficient to fund operations. If we cannot raise funds if and when needed, we might be forced to make substantial reductions in our operating expenses, which could adversely affect our ability to implement our current business plan and ultimately our viability as a company. We cannot assure you that our current lenders, or any other lenders, will give us additional credit should we seek it. If we are unable to obtain additional credit, we may engage in further financings. Our ability to obtain financing will depend, among other things, on the status of our asset development programs and general conditions in the capital markets at the time funding is sought. Any further equity or convertible debt financings would result in the dilution of ownership interests of our current stockholders.

The Issuance of Equity Securities and Management Equity Incentive Plans Will Cause Dilution

We have and may continue to issue equity securities pursuant to at the market issuance sales agreements or direct placements. Further, our compensation programs for management emphasize long-term incentives, primarily through the issuance of equity securities and options to purchase equity securities. It is expected that plans involving the issuance of shares, options, or both will be submitted from time to time to our stockholders for approval. In the event that any such plans are approved and implemented, the issuance of shares and options under such plans may result in the dilution of the ownership interest of other stockholders and will, under currently applicable accounting rules, result in a charge to earnings based on the value of our common stock at the time of issue and the fair value of options at the time of their award. The expense would be recorded over the vesting period of each stock and option grant.

The Volatility of the Stock Price of our Equity Securities Could Adversely Affect Current and Future Stockholders

The market price of our common stock and depositary shares is volatile and fluctuates in response to various factors which are beyond our control. Such fluctuations are particularly common in companies such as ours, which have not generated significant revenues. The following factors, in addition to other risk factors described in this section, could cause the market price of our common stock to fluctuate substantially:

  • developments involving the execution of our business plan;
  • disclosure of any adverse results in litigation;
  • regulatory developments affecting our ability to develop our properties;
  • disruptions to the market and industry as a result of the global COVID-19 pandemic and related events;
  • the dilutive effect or perceived dilutive effect of additional debt or equity financings;
  • perceptions in the marketplace of our company and the industry in which we operate; and
  • general economic, political and market conditions.

In addition, the stock markets, from time to time, experience extreme price and volume fluctuations that may be unrelated or disproportionate to the operating performance of companies. These broad fluctuations may adversely affect the market price of our common stock. Price volatility could be worse if the trading volume of our common stock is low.

Properties

As filed, 4,312 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Following is a description of our significant properties.

The Cadiz Valley Property

We own approximately 35,000 acres of largely contiguous desert land in the Cadiz and Fenner valleys of eastern San Bernardino County, California (the “Cadiz Property”). This area is located approximately 80 miles east of Barstow, California and 30 miles north of the Colorado River Aqueduct (“CRA”), and 110 miles north-east of Palm Springs. The Cadiz Property, which is at the base of a topographically diverse1,300 square mile watershed, is the principal location of our business operations, including our agricultural operations and ongoing water supply and storage project development.

Independent geotechnical and engineering studies conducted since initial acquisition have confirmed that the Cadiz Property overlies a significant aquifer system that can support agricultural development and is ideally suited for the conservation of groundwater for water supply projects, as well as the storage of imported water, as contemplated by the Water Project. See Item 1, “Description of Business – The Cadiz Water Project”.

Additional Eastern Mojave Properties

In addition to the Cadiz Property, we also own approximately 11,000 additional acres in the eastern Mojave Desert portion of San Bernardino County, California at two separate properties.

Piute: We own approximately 9,000 acres in the Piute Valley. This landholding is located 15 miles from the resort community of Laughlin, Nevada, and about 12 miles from the Colorado River town of Needles, California. Extensive hydrological studies, including the drilling and testing of a full-scale production well, have demonstrated that this landholding is underlain by high-quality groundwater and could be suitable for agricultural development or solar energy production. The Piute properties are private inholdings in the Mojave Trails National Monument, and are proximate to or border areas designated by the state and federal government as Critical Desert Tortoise Habitat and/or Desert Wilderness Areas and are therefore ideally suited for preservation and conservation. Approximately 7,500 acres of our Piute Valley properties are reserved in our Fenner Valley Desert Tortoise Conservation Bank, which is the largest land bank in California dedicated to protecting the desert tortoise. The Bank offers credits that can be acquired by public and private entities required to mitigate or offset impacts to the desert tortoise linked to planned development. We are presently marketing these credits to a variety of planned developments in the region.

Danby: We own nearly 2,000 acres near Danby Dry Lake in Ward Valley, approximately 30 miles southeast of the Cadiz Property. Our Danby Dry Lake property is located approximately 10 miles north of the Colorado River Aqueduct. Initial hydrological studies indicate that it has excellent potential for a water supply project. Certain of the properties in this area may also be suitable for agricultural development, renewable energy and/or preservation and conservation lands. The Danby properties are currently managed for open space purposes.

Executive Offices

We lease approximately 3,800 square feet of office space in Los Angeles, California for our executive offices. This lease is month-to month. Current base rent under the lease is approximately $8,500 per month.

Cadiz Real Estate

The title to all of our real estate assets is held by Cadiz Real Estate LLC (“Cadiz Real Estate”), a wholly owned subsidiary of Cadiz Inc. The Board of Managers of Cadiz Real Estate currently consists of two managers appointed by us. As the ownership of the real estate held by Cadiz Real Estate has no effect on our ultimate beneficial ownership of these assets, we refer throughout this Report to assets owned of record either by Cadiz Real Estate or by us as “our” properties.

Cadiz Real Estate is a co-obligor under our senior secured term loan, for which assets of Cadiz Real Estate have been pledged as security.

Debt Secured by Properties

Our assets have been pledged as collateral for $50.0 million of senior secured debt outstanding as of December 31, 2021. Information regarding interest rates and principal maturities is provided in Note 6 to the Consolidated Financial Statements, “Long-Term Debt”.

As filed, 2,333 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

As noted under Item 1A, Risk Factors, third parties have the ability to file litigation challenging government approvals related to our property. On March 23, 2021, two lawsuits were filed by The Native American Land Conservancy/National Park Conservation Association and Center for Biological Diversity/Defenders of Wildlife/Sierra Club against the United States Department of the Interior, Bureau of Land Management (“BLM”) and agency decision makers in United States District Court for the Central District of California (the “Court”). The lawsuits allege violations by BLM of various regulations in its issuance to our subsidiary, Cadiz Real Estate LLC, of two right-of-way permits that now enable us to transport water through the Northern Pipeline over BLM-managed lands and seek to vacate the permits and require additional federal review. We were not a named party to these lawsuits, but in June 2021 we filed motions to intervene in each lawsuit to join the defense of these right-of-way permits. In August 2021, our motions were granted, and we were recognized by the Court as an Intervening Defendant.

In December 2021, counsel for BLM filed a Motion for Voluntary Remand seeking to vacate the permits and require additional environmental review. We believe the record reflects that the permits were lawfully issued to us and that our conversion of this pipeline to water conveyance will not cause any disturbance to the public lands or harm to the environment.

In March 2022, we filed our opposition to the motion for voluntary remand with the Court. The Court will hold a hearing on the motion in early May 2022.

While we continue to believe the lawsuits are without merit, we cannot reasonably predict the outcome of the motion or the cases at this time.

Additionally, from time to time we are involved in various lawsuits and legal proceedings that arise in the ordinary course of business. At this time, the Company is not aware of any other pending or threatened litigation that it expects will have a material adverse effect on its business, financial condition, liquidity, or operating results. Legal claims are inherently uncertain, however, and it is possible that the Company’s business, financial condition, liquidity and/or operating results could be adversely affected in the future by legal proceedings.

Management's discussion and analysis

As filed, 23,116 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In connection with the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as "intends", "anticipates", "believes", "estimates", "projects", "forecasts", "expects", "plans" and "proposes". Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our land and water resources and our ability to obtain new financings as needed to meet our ongoing working capital needs. See additional discussion under the heading "Risk Factors” above. Our forward-looking statements are made only as of the date hereof. We assume no duty to update these forward-looking statements to reflect new, changed or unanticipated events or circumstances, other than as may be required by law.

We are a water resources development company and agribusiness committed to sustainable water and farming projects in California. We are one of the largest private landowners in the state and control significant water supply, storage and conveyance assets capable of being part of the solution to California’s systemic water challenges.

We own approximately 45,000 acres of land with high-quality, naturally recharging groundwater resources in three areas of Southern California’s Mojave Desert – the Cadiz Valley (35,000 acres), Danby Dry Lake (2,000 acres), and the Piute Valley (9,000 acres) (“Cadiz Property”). Our properties represent a unique private reserve of lands with vested water rights located in a remote area of eastern San Bernardino County that is at the crossroads of major highway, rail, energy, and water infrastructure supplying and delivering necessary resources to communities in California and across the Western United States.

California and the Western U.S. face a persistent challenge in meeting the water needs of all of its residents. While the State of California has recognized a Human Right to Water, competing municipal, agricultural and environmental demands outpace the State’s available supply limiting the ability to deliver on that promise. Recent analysis from the California State Water Resources Control Board estimates that more than 1 million Californians lack reliable access to water and several communities are short of long-term reliable and affordable safe-drinking supply.

We are principally focused on developing the Cadiz Valley Water Conservation, Recovery and Storage Project (“Water Project”) at our Cadiz Valley property that can help address California’s persistent systemic water challenges and deliver new water access to California communities that presently lack reliable water supplies and infrastructure. Through management of groundwater at the Cadiz Property, the Water Project would conserve groundwater otherwise used for agriculture to augment supply in California communities in need and utilize capacity available in the managed groundwater aquifer system at Cadiz to bank and store imported water for use in future dry years.

The Water Project has completed extensive environmental review in accordance with local, state and federal law and has secured permits to manage the groundwater aquifer in Cadiz to make available an average of 50,000 acre-feet of water per year for 50 years to communities off of the Cadiz Property. Permitting has also authorized the storage of imported water in the aquifer system to return in future dry years. The Cadiz aquifer system has the capacity to store one million acre-feet of imported water.

To deliver conserved water to communities in need or to offer storage, the Water Project must provide conveyance facilities capable of delivering water to and from the Cadiz area for participating water providers. We own a retired, 30” steel natural gas pipeline (“Northern Pipeline”) that extends 220-miles from California’s Central Valley near the California Aqueduct southeast across Kern and San Bernardino Counties terminating in Cadiz. Engineering and technical assessments indicate that the Northern Pipeline can safely convey 25,000 acre-feet of water in either direction. We also maintain a 99-year lease with the Arizona & California Railroad Company (“ARZC”) to co-locate and construct a 43-mile approximately 55-85” steel water conveyance pipeline (“Southern Pipeline”) within the existing, active railroad right-of-way that intersects the Colorado River Aqueduct (“CRA”), one of Southern California’s primary sources of drinking water in Southern California. The Southern Pipeline is designed to convey up to 75,000 acre-feet per year in either direction.

To utilize the Northern Pipeline for water conveyance related to the Water Project or to construct and operate the Southern Pipeline in coordination with existing water conveyance facilities, we must complete additional permitting and regulatory processes.

We expect to complete any necessary permitting in coordination with any contract to use the facility.

Our agricultural operations provide the Company’s current principal source of revenue, although our working capital needs are not fully supported by our agricultural lease and farming returns at this time. We believe that the ultimate implementation of the Water Project will provide a significant source of future cash flow for the business and our stockholders. We presently rely upon debt and equity financing to support our working capital needs and development of the Water Project (see “Liquidity and Capital Resources”, below).

Our current and future operations also include activities that further our commitments to sustainable stewardship of our land and water resources, good governance and corporate social responsibility. We believe these commitments are important investments that will assist in maintenance of sustained stockholder value.

Results of Operations

Year Ended December 31, 2021 Compared to Year Ended December 31, 2020

We have not received significant revenues from our water resource and real estate development activities to date. Our revenues have been limited to rental income from our agricultural leases (see “Sustainable Agricultural Development”, above). As a result, we have historically incurred a net loss from operations. The net loss totaled $31.2 million for the year ended December 31, 2021, compared with a net loss of $37.8 million for the year ended December 31, 2020. The higher loss in 2020 was primarily due to a loss on early extinguishment of debt in the amount of $12.4 million, which was a non-cash charge, reflecting the excess of the fair value of the new preferred stock issued over the historical book value of the related convertible debt retire pursuant to certain conversion and exchange Agreements entered into in March 2020, offset by higher compensation costs in 2021 related to stock-based non-cash bonus awards to employees.

Our primary expenses are our ongoing overhead costs associated with the development of the Water Project (i.e., general and administrative expense) and our interest expense. We will continue to incur non-cash expense in connection with our management and director equity incentive compensation plans.

Revenues. Revenue totaled $564 thousand during the year ended December 31, 2021, compared to $541 thousand during the year ended December 31, 2020. The revenue is primarily related to rental income from our agricultural leases (see “Sustainable Agricultural Development”, above).

General and Administrative Expenses. General and administrative expenses during the year ended December 31, 2021, exclusive of stock-based compensation costs, totaled $12.9 million compared with $9.8 million for the year ended December 31, 2020. The higher general and administrative expenses in 2021 primarily related to legal fees and technical studies related to putting the Northern Pipeline into use.

Compensation costs from stock and option awards for the year ended December 31, 2021, totaled $4.7 million compared with $2.1 million for the year ended December 31, 2020. The higher 2021 expense was primarily due to stock-based non-cash bonus awards to employees.

Depreciation. Depreciation expense totaled $423 thousand for the year ended December 31, 2021, and $381 thousand for the year ended December 31, 2020.

Interest Expense. Interest expense totaled $11.4 million during the year ended December 31, 2021, compared to $11.5 million during the year ended December 31, 2020. The following table summarizes the components of net interest expense for the two periods (in thousands):

Year Ended December 31, 2021 2020
Interest on outstanding debt $8,485 $10,604
Unrealized gains on warrants (573) (139)
Amortization of debt discount 1,110 295
Amortization of deferred loan costs 2,364 766
$11,386 $11,526

Other Income. Other income totaled $0 during the year ended December 31, 2021, and $33 thousand for the year ended December 31, 2020.

Loss from Equity-Method Investments. Loss from equity-method investments related to our 50% ownership in the SoCal Hemp JV LLC totaled $942 thousand during the year ended December 31, 2021, compared to $2.2 million during the year ended December 31, 2020 resulting from a reduction in acres planted in 2021 to 50 acres from 242 acres in 2020 and continued market price pressures on hemp biomass in 2021.

Liquidity and Capital Resources

(a) Current Financing Arrangements

As we have not received significant revenues from our development activities to date, we have been required to obtain financing to bridge the gap between the time water resource and other development expenses are incurred and the time that revenue will commence. Historically, we have addressed these needs primarily through secured debt financing arrangements and private equity placements.

In July 2020, we entered into an At Market Issuance Sales Agreement under which the Company could issue and sell shares of its common stock having an aggregate offering price of up to $30 million from time to time in an “at-the-market” offering (the “July 2020 ATM Offering”) for further development of our land and agricultural assets, and for working capital purposes. The Company completed the offering in July 2021, having issued a total of 2,748,339 shares of common stock in the July 2020 ATM Offering for gross proceeds of $30 million and aggregate net proceeds of approximately 29.2 million.

On June 7, 2021, we completed the sale and issuance of 1,219,512 shares of the Company’s common stock to certain institutional investors under a placement agent agreement with B. Riley Securities, Inc. (“BRS”). The shares of common stock were sold at a purchase price of $12.30 per share, for aggregate gross proceeds of $15 million and aggregate net proceeds of approximately $14.1 million. We used the net proceeds from this offering, together with cash on hand, to fund the $19 million payment made on June 30, 2021 to complete the acquisition of a 124-mile extension of the Northern Pipeline.

On June 29, 2021, we entered into an Underwriting Agreement with BRS as representative of the several underwriters named therein, to issue and sell an aggregate of 2,000,000 depositary shares (the “Depositary Shares”), as well as up to 300,000 Depositary Shares that may be sold pursuant to the exercise of an option to purchase additional Depositary Shares, each representing 1/1000th of a share of Series A Preferred Stock (“Depositary Share Offering”). The liquidation preference of each of each share of Series A Preferred Stock is $25,000 ($25.00 per Depositary Share). The Depositary Share Offering was completed on July 2, 2021 for net proceeds of approximately $54 million.

On July 2, 2021, we entered into a $50 million new credit agreement (“Credit Agreement”) (see Note 6 to the Condensed Consolidated Financial Statements – “Long-Term Debt”). The proceeds of the Credit Agreement, together with the proceeds from the Depositary Share Offering, were used to (a) to repay all our outstanding obligations under the Prior Senior Secured Debt in the amount of approximately $77.5 million (b) to deposit approximately $10.2 million into a segregated account, representing an amount sufficient to pre-fund eight quarterly dividend payments on the Series A Preferred Stock underlying the Depositary Shares issued in the Depositary Share Offering, and (c) to pay transaction related expenses. The remaining proceeds will be used for working capital needs and for general corporate purposes.

On March 23, 2022, the Company completed the sale and issuance of 6,857,140 shares of the Company’s common stock to certain institutional and individual investors in a registered direct offering. The shares of common stock were sold at a purchase price of $1.75 per share, for aggregate gross proceeds of $12 million and aggregate net proceeds of approximately $11.8 million. The proceeds will be used for working capital needs and for general corporate purposes. See Note 14 to the Consolidated Financial Statements – “Subsequent Events”.

Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. To the extent additional capital is required, we may increase liquidity through a variety of means, including equity or debt placements, through the lease, sale or other disposition of assets or reductions in operating costs. If additional capital is required, no assurances can be given as to the availability and terms of any new financing.

As we continue to actively pursue our business strategy, additional financing will continue to be required (see “Outlook”, below). The covenants in the Credit Agreement do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any common equity financing. We do not expect the loan covenants to materially limit our ability to finance our water and agricultural development activities.

Cash Used for Operating Activities. Cash used for operating activities totaled $15.3 million for the year ended December 31, 2021, and $13.4 million for the year ended December 31, 2020. The cash was primarily used to fund general and administrative expenses related to our water development efforts and agricultural development efforts.

Cash Used for Investing Activities. Cash used for investing activities in the year ended December 31, 2021, was $23.5 million, compared with $9.8 million for the year ended December 31, 2020. The cash used in the 2021 period primarily related to the Northern Pipeline acquisition totaling $19 million and development costs for the initial planting of 760 acres of alfalfa. The 2020 period included additions to our interests in SoCal Hemp JV LLC, well development costs for three new wells and professional water quality and structural testing of a five-mile segment of pipeline.

Cash Provided by Financing Activities. Cash provided by financing activities totaled $51.2 million for the year ended December 31, 2021, compared with cash provided by financing activities of $14.9 million for the year ended December 31, 2020. Proceeds from financing activities for the 2021 period are related to the completion of the Depositary Share Offering, issuance of shares under at-the market and direct offerings and refinancing of the Company’s Prior Senior Secured Debt. Proceeds from financing activities for the 2020 period are related to the issuance of shares under at-the-market offerings.

(b) Outlook

Short-Term Outlook. The completion of both the Depositary Share Offering and the Credit Agreement (see Note 6 and Note 8 to the Consolidated Financial Statement – “Long-Term Debt” and “Common and Preferred Stock”) in July 2021, provided the Company with net cash proceeds of approximately $21 million. In March 2022, the registered direct offering of common stock (see Note 14 to the Consolidated Financial Statements – “Subsequent Events”) provided additional net cash proceeds of approximately $11.8 million. These net cash proceeds, together with cash on hand, provide us with sufficient funds to meet our short-term working capital needs.

Long-Term Outlook. In the longer term, we will need to raise additional capital to finance working capital needs and capital expenditures (see “Current Financing Arrangements”, above). Our future working capital needs will depend upon the specific measures we pursue in the entitlement and development of our water resources and other developments. Future capital expenditures will depend on the progress of the Water Project and further expansion of our agricultural assets.

We are evaluating the amount of cash needed, and the manner in which such cash will be raised, on an ongoing basis. We may meet any future cash requirements through a variety of means, including equity or debt placements, or through the sale or other disposition of assets. Equity placements would be undertaken only to the extent necessary, so as to minimize the dilution effect of any such placements upon our existing stockholders. No assurances can be given, however, as to the availability or terms of any new financing. Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities.

(c) Critical Accounting Policies

As discussed in Note 2 to our Consolidated Financial Statements, “Summary of Significant Accounting Policies”, the preparation of financial statements in conformity with accounting principles generally accepted in the United States requires management to make estimates and assumptions that affect amounts reported in the accompanying consolidated financial statements and related footnotes. In preparing these financial statements, management has made its best estimates and judgments of certain amounts included in the financial statements based on all relevant information available at the time and giving due consideration to materiality. However, application of these policies involves the exercise of judgment and use of assumptions as to future uncertainties and, as a result, actual results could differ from these estimates. Management has concluded that the following critical accounting policies described below affect the most significant judgments and estimates used in the preparation of the consolidated financial statements.

(1) Intangible and Other Long-Lived Assets. Property, plant and equipment, intangible and certain other long-lived assets are depreciated or amortized over their useful lives. Useful lives are based on management’s estimates of the period over which the assets will generate revenue.

(2) Valuation of Goodwill and Long-Lived Assets. The Company assesses long-lived assets for recoverability whenever events or changes in circumstances indicate that their carrying value may not be recoverable through the estimated undiscounted future cash flows resulting from the use of the assets. If it is determined that the carrying value of long-lived assets may not be recoverable, the impairment is measured by using the projected discounted cash-flow method. No impairment charge was recorded during the current fiscal year.

The Company performs an annual impairment test to identify potential goodwill impairment and measure the amount of a goodwill impairment loss to be recognized (if any). In performing the impairment test, we have the option to first assess qualitative factors to determine whether it is necessary to perform a quantitative assessment for goodwill impairment. If the qualitative assessment indicates that it is more-likely-than-not that the fair value of the reporting unit is less than its carrying value, we perform a quantitative assessment.

This impairment assessment is performed at least annually in the fourth quarter. An impairment loss will be recognized for the amount by which the reporting unit’s carrying amount exceeds its fair value, not to exceed the carrying amount of goodwill in that reporting unit. In our annual impairment analysis for the fourth quarter 2021, the goodwill was evaluated utilizing a qualitative assessment. Based on this assessment, we determined that the fair value of the reporting unit was more-likely-than-not greater than its respective carrying value; therefore, no impairment charge was recorded during the current fiscal year.

(3) Accounting for Debt and Equity Instruments. Amendments and changes to debt and equity instruments are analyzed for correct accounting application based upon our financial condition and the changes in the debt or equity instrument features and terms. Accounting guidance used in the analysis includes ASC 470-60 Troubled Debt Restructuring, ASC 470-50 Modifications and Extinguishments and ASC 470-20 Accounting for Debt with Conversion or Other Options.

On July 2 2021 (the “Original Issue Date”), the Company entered into a new $50 million senior secured credit agreement with lenders party thereto from time to time (“Lenders”) and BRS, as administrative agent for the Lenders (“Current Senior Secured Debt”) (see Note 2 to the Consolidated Financial Statements – “Long-Term Debt”). In connection with the issuance of the Current Senior Secured Debt, on the Original Issue Date the Company issued to the Lenders two warrants (“A Warrants” and “B Warrants”), each granting an option to purchase 500,000 shares of our common stock (collectively, the “Warrants”). As a result of the issuance of the Warrants, the Company recorded additional paid-in capital in the amount of $1.9 million which was the fair value of the Warrants on the issuance date. In addition, the fair value of the Warrants was recorded as debt discount and is being amortized over the term of the Current Senior Secured Debt.

(4) Liquidity. Management assesses whether the Company has sufficient liquidity to fund its costs for the next twelve months from the financial statement issuance date. Management evaluates the Company’s liquidity to determine if there is a substantial doubt about the Company’s ability to continue as a going concern. In the preparation of this liquidity assessment, management applies judgement to estimate the projected cash flows of the Company including the following: (i) projected cash outflows (ii) projected cash inflows and (iii) categorization of expenditures as discretionary versus non-discretionary. The cash flow projections are based on known or planned cash requirements for operating costs as well as planned costs for project development.

(d) New Accounting Pronouncements

See Note 2 to the Consolidated Financial Statements, “Summary of Significant Accounting Policies”.

Market risk

As filed, 171 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We are a smaller reporting company as defined by Reg. 240.12b-2 of the Securities and Exchange Act of 1934 and are not required to provide the information under this item.

Controls and procedures

As filed, 2,422 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

We have established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including Chief Executive Officer (the “Principal Executive Officer”) and Chief Financial Officer (the “Principal Financial Officer”) and to our Board of Directors. Based on their evaluation as of December 31, 2021, our Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.

Management’s Report on Internal Control Over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rule 13a-15(f). Under the supervision and with the participation of our management, including our Principal Executive Officer and Principal Financial Officer, we evaluated the effectiveness of our internal control over financial reporting based on the criteria in the Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on our evaluation under that framework, our management concluded that our internal control over financial reporting was effective as of December 31, 2021.

Changes in Internal Control Over Financial Reporting

In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal control over financial reporting that occurred during the last fiscal quarter ended December 31, 2021, that has materially affected, or is reasonably likely to materially affect, the Company's internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2021-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2021-01-01 to 2021-12-31$564.0kus-gaap:Revenues
Operating income12 months2021-01-01 to 2021-12-31−$17.5mus-gaap:OperatingIncomeLoss
Interest expense12 months2021-01-01 to 2021-12-31$11.4mus-gaap:InterestExpense
Income tax12 months2021-01-01 to 2021-12-31$10.0kus-gaap:IncomeTaxExpenseBenefit
Net income12 months2021-01-01 to 2021-12-31−$31.2mus-gaap:NetIncomeLoss
Diluted EPS12 months2021-01-01 to 2021-12-31−$0.84us-gaap:EarningsPerShareBasicAndDiluted
Operating cash flow12 months2021-01-01 to 2021-12-31−$15.3mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2021-01-01 to 2021-12-31$22.9mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid12 months2021-01-01 to 2021-12-31$1.4mus-gaap:PaymentsOfDividends
Cash and equivalentsAt period end2021-12-31$11.0mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2021-12-31$13.2mus-gaap:AssetsCurrent
Total assetsAt period end2021-12-31$112.5mus-gaap:Assets
Current liabilitiesAt period end2021-12-31$2.5mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2021-12-31$71.9mus-gaap:Liabilities
Long-term debtAt period end2021-12-31$46.5mus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2021-12-31$107.0kus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2021-12-31$40.6mus-gaap:StockholdersEquity