American Resources Corp: Form 10-Q for the period ended Mar 31, 2017

Filed with the SEC on Feb 20, 2018 and accepted by EDGAR at Feb 20, 2018, 19:40 ET.

Share

Management's discussion and analysis

As filed, 25,262 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This Form 10-Q and other reports filed by Registrant from time to time with the Securities and Exchange Commission (collectively the “Filings”) contain or may contain forward looking statements and information that are based upon beliefs of, and information currently available to, Registrant’s management as well as estimates and assumptions made by Registrant’s management. When used in the filings the words “anticipate”, “believe”, “estimate”, “expect”, “future”, “intend”, “plan” or the negative of these terms and similar expressions as they relate to Registrant or Registrant’s management identify forward looking statements. Such statements reflect the current view of Registrant with respect to future events and are subject to risks, uncertainties, assumptions and other factors relating to Registrant’s industry, Registrant’s operations and results of operations and any businesses that may be acquired by Registrant. Should one or more of these risks or uncertainties materialize, or should the underlying assumptions prove incorrect, actual results may differ significantly from those anticipated, believed, estimated, expected, intended or planned.

Although Registrant believes that the expectations reflected in the forward-looking statements are reasonable, Registrant cannot guarantee future results, levels of activity, performance or achievements. Except as required by applicable law, including the securities laws of the United States, Registrant does not intend to update any of the forward-looking statements to conform these statements to actual results.

Overview

Company was engaged in organizational efforts and obtaining initial financing. When we formed our company our focus was to (i) construct and/or purchase and manage a chain of combined gasoline, diesel and natural gas (NG) fueling and service stations (initially, in the Miami, FL area); (ii) construct conversion factories to convert NG to liquefied natural gas (LNG) and compressed natural gas (CNG); and (iii) construct conversion factories to retrofit vehicles currently using gasoline or diesel fuel to also run on NG in the United States and also to build a convenience store to serve our customers in each of our locations.

On January 5, 2017, American Resources Corporation (ARC) executed a Share Exchange Agreement between the Company and Quest Energy Inc. (Quest Energy), a private company incorporated in the State of Indiana on May 2015 with offices at 9002 Technology Lane, Fishers IN 46038, and due to the fulfillment of various conditions precedent to closing of the transaction, the control of the Company was transferred to the Quest Energy shareholders on February 7, 2017. This resulted in Quest Energy becoming a wholly-owned subsidiary of ARC. Through Quest Energy, ARC was able to acquire coal mining and coal processing operations, substantially all located in eastern Kentucky.

Quest Energy currently has five coal mining and processing operating subsidiaries: McCoy Elkhorn Coal LLC (doing business as McCoy Elkhorn Coal Company) (McCoy Elkhorn), Knott County Coal LLC (Knott County Coal), Deane Mining LLC (Deane Mining) and Quest Processing LLC (Quest Processing) located in eastern Kentucky within the Central Appalachian coal basin, and ERC Mining Indiana Corporation (ERC) located in southwest Indiana within the Illinois coal basin. The coal reserves under control by the Company are generally comprise of metallurgical coal (used for steel making), pulverized coal injections (used in the steel making process) and high-BTU, low sulfur, low moisture bituminous coal used for a variety of uses within several industries, including industrial customers, specialty products and thermal coal used for electricity generation.

McCoy Elkhorn Coal LLC

Located primarily within Pike County, Kentucky, McCoy Elkhorn is currently comprised of two active mines (Mine #15 and the Carnegie Mine), two coal preparation facilities (Bevins #1 and Bevins #2), and other mines in various stages of development or reclamation. McCoy Elkhorn sells its coal to a variety of customers, both domestically and internationally, primarily to the steel making industry as a high-vol “B” coal or blended coal, and high-grade thermal coal to utilities.

14

Table of Contents

Mine #15 is an underground mine in the Millard (also known as Glamorgan) coal seam and located near Meta, Kentucky. Mine #15 is mined via room-and-pillar mining methods using continuous miners, and the coal is belted directly from the stockpile to McCoy Elkhorn’s coal preparation facility. Mine #15 is currently a “company run” mine, whereby the Company manages the workforce at the mine. The coal from Mine #15 is stockpiled at the mine site and belted directly to the Company’s nearby coal preparation facilities. Production at Mine #15 re-commenced under Quest Energy’s ownership in September 2016.

The Carnegie Mine is an underground mine in the Alma and Upper Alma coal seams and located near Kimper, Kentucky. In 2011, coal production from the Carnegie Mine commenced and then subsequently the mine was idled. Production at the Carnegie Mine was reinitiated in early 2017 under Quest Energy’s ownership and is currently being mined via room-and-pillar mining methods utilizing a continuous miner. The coal is stockpiled on-site and trucked approximately 7 miles to McCoy Elkhorn’s preparation facilities. The Carnegie Mine is currently operated as a contractor mine.

There are two coal preparation facilities at McCoy Elkhorn: the Bevins #1 Preparation Plant, an 800 ton-per hour coal preparation facility, and the Bevins #2 Preparation Plant, located on the same permit site as Bevins #1, and a 500 ton-per-hour processing facility. Both coal preparation plants have fine coal recovery and a stoker circuits for enhanced coal recovery and coal sizing options.

Both Bevins #1 and Bevins #2 have a batch-weight loadout and rail spur for loading coal into trains for rail shipments. The spur has storage for 110 rail cars and is serviced by CSX Transportation and is located on CSX’s Big Sandy, Coal Run Subdivision. Both Bevins #1 and Bevins #2 have coarse refuse and slurry impoundments called Big Groundhog and Lick Branch Impoundments.

Knott County Coal LLC

Located primarily within Knott County, Kentucky (but with additional idled permits in Leslie County, Perry County, and Breathitt County, Kentucky), Knott County Coal is comprised of 17 idled mining permits (or permits in reclamation) and permits for two preparation facilities: the Supreme Energy Preparation Plant and the Raven Preparation Plant, both of which are also idled. The idled mining permits are either in various stages of reclamation or being maintained as idled, pending any changes to the coal market that may warrant reinitiating production. The idled mines at Knott County Coal are primarily underground mines that utilize room-and-pillar mining.

The idled Supreme Energy Preparation Plant is a 450 ton-per-hour coal preparation facility located in Kite, Kentucky. The Bates Branch rail loadout associated with the Supreme Energy Preparation Plant is a batch-weigh rail loadout with 110 rail car storage capacity and serviced by CSX Transportation in their Big Sandy rate district. The Supreme Energy Preparation Plant has a coarse refuse and slurry impoundment called the King Branch Impoundment.

Knott County Coal is also owner of the permits to the idled Raven Preparation Plant, an 800 ton-per-hour coal preparation facility with a fine coal circuit, located in Raven, Kentucky. The Raven rail loadout is a batch-weight rail loadout with 110 car storage capacity and services by CSX Transportation in their Big Sandy rate district. The Raven Preparation Plant has a coarse refuse and slurry impoundment called the Big Branch Impoundment.

Deane Mining LLC

Located within Knott County and Letcher County, Kentucky, Deane Mining LLC is currently comprised of one active underground mine called Access Energy and other mines in various stages of development or reclamation. Deane Mining sells its coal primarily to an electricity generation utility located in southern United States, but also sells to other customers, both domestically and internationally.

Access Energy is an underground mine in the Elkhorn #3 coal seam and located near Deane, Kentucky. Access Energy is mined via room-and-pillar mining methods using a continuous miner, and the coal is belted directly from the mine to Deane Mining’s coal preparation facility. Access Energy is currently a contractor mine, whereby the Company owns the equipment, infrastructure, and permits at Access Energy and employs a contractor to manage and pay for the workforce and supplies at the mine for a per-ton fee. The coal from Access Energy is stockpiled at the preparation plant site. Production at Access Energy re-commenced under Quest Energy’s ownership in September 2017.

15

Table of Contents

Coal from Access Energy is processed at Deane Mining’s Mill Creek Preparation Plant, an 800 ton-per hour coal preparation facility with a batch-weight loadout and rail spur for loading coal into trains for rail shipments. The spur has storage for 110 rail cars and is serviced by CSX Transportation and is located on both CSX’s Big Sandy rate district and CSX’s Elkhorn rate district. The Mill Creek Preparation Plant has a coarse refuse and slurry impoundment called Razorblade Impoundment.

Quest Processing LLC

Quest Energy’s wholly-owned subsidiary, Quest Processing LLC, manages the assets, operations, and personnel of the certain coal processing and transportation facilities of Quest Energy’s various other subsidiaries, namely the Supreme Energy Preparation Facility (of Knott County Coal LLC), the Raven Preparation Facility (of Knott County Coal LLC), and Mill Creek Preparation Facility (of Deane Mining LLC). Quest Processing LLC was the recipient of a New Markets Tax Credit loan that allowed for the payment of certain expenses of these preparation facilities. As part of that financing transaction, Quest Energy loaned Quest MGMT LLC, an entity owned by members of Quest Energy, Inc.’s management, $4,120,000 to facilitate the New Markets Tax Credit loan, of which is all outstanding as of March 31, 2017.

ERC Mining Indiana Corporation (the Gold Star Mine)

Quest Energy, through its wholly-owned subsidiary, ERC Mining Indiana Corporation (“ERC”), has a management agreement with an unrelated entity, LC Energy Operations LLC to manage an underground coal mine, clean coal processing facility and rail loadout located in Greene County, Indiana (referred to as the “Gold Star Mine”) for a monthly cash and per-ton fee. As part of that management agreement, ERC manages the operations of the Gold Star Mine, is the holder of the mining permit, provides the reclamation bonding, is the owner of some of the equipment located at the Gold Star Mine, and provides the employment for the personnel located at the Gold Star Mine. LC Energy Operations LLC owns the remaining equipment and infrastructure, is the lessee of the mineral (and the owner of some of the mineral and surface), and provides funding for the operations. Currently the coal mining operations at the Gold Star Mine are idled.

In addition to the current owned permits and controlled reserves, ARC may, from time to time, and frequently, acquire additional coal mining permits or reserves, or dispose of coal mining permits or reserves currently held by ARC, as management of the Company deems appropriate.

Mineral and Surface Leases

Coal mining and processing involves the extraction of coal (mineral) and the use of surface property incidental to such extraction and processing. All of the mineral and surface related to the Company’s coal mining operations is leased from various mineral and surface owners (the “Leases”). The Company’s operating subsidiaries, collectively, are parties to approximately 200 various Leases and other agreements required for the Company’s coal mining and processing operations. The Leases are with a variety of Lessors, from individuals to professional land management firms such as Elk Horn Coal Company LLC and Penn Virginia Operating Company, LLC. In some instances, the Company has leases with Land Resources & Royalties LLC (“LRR”), a professional leasing firm that is an entity wholly owned by Quest MGMT LLC an entity owned by members of Quest Energy Inc.’s management.

Coal Sales

ARC sells its coal to domestic and international customers, some which blend ARC’s coal at east coast ports with other qualities of coal for export. Coal sales currently come from the Company’s McCoy Elkhorn’s Mine #15, McCoy Elkhorn’s Carnegie Mine, and Deane Mining’s Access Energy Mine.

Coal sales at the Company is primarily outsource to third party intermediaries who act on the Company’s behalf to source potential coal sales and contracts. The third-party intermediaries have no ability to bind the Company to any contracts, and all coal sales are approved by management of the Company.

16

Table of Contents

Competition

The coal industry is intensely competitive. The most important factors on which the Company competes are coal quality, delivered costs to the customer and reliability of supply. Our principal domestic competitors will include Alpha Natural Resources, Ramaco Resources, Blackhawk Mining, Coronado Coal, Arch Coal, Contura Energy, Warrior Met Coal, Alliance Resource Partners, and ERP Compliance Fuels. Many of these coal producers may have greater financial resources and larger reserve bases than we do. We also compete in international markets directly with domestic companies and with companies that produce coal from one or more foreign countries, such as Australia, Colombia, Indonesia and South Africa.

Legal Proceedings

From time to time, we are subject to ordinary routine litigation incidental to our normal business operations. We are not currently a party to, and our property is not subject to, any material legal proceedings.

Environmental, Governmental, and Other Regulatory Matters

Our operations are subject to federal, state, and local laws and regulations, such as those relating to matters such as permitting and licensing, employee health and safety, reclamation and restoration of mining properties, water discharges, air emissions, plant and wildlife protection, the storage, treatment and disposal of wastes, remediation of contaminants, surface subsidence from underground mining and the effects of mining on surface water and groundwater conditions. In addition, we may become subject to additional costs for benefits for current and retired coal miners. These environmental laws and regulations include, but are not limited to, SMCRA with respect to coal mining activities and ancillary activities; the CAA with respect to air emissions; the CWA with respect to water discharges and the permitting of key operational infrastructure such as impoundments; RCRA with respect to solid and hazardous waste management and disposal, as well as the regulation of underground storage tanks; the Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA” or “Superfund”) with respect to releases, threatened releases and remediation of hazardous substances; the Endangered Species Act of 1973 (“ESA”) with respect to threatened and endangered species; and the National Environmental Policy Act of 1969 (“NEPA”) with respect to the evaluation of environmental impacts related to any federally issued permit or license. Many of these federal laws have state and local counterparts which also impose requirements and potential liability on our operations.

Compliance with these laws and regulations may be costly and time-consuming and may delay commencement, continuation or expansion of exploration or production at our facilities. They may also depress demand for our products by imposing more stringent requirements and limits on our customers’ operations. Moreover, these laws are constantly evolving and are becoming increasingly complex and stringent over time. These laws and regulations, particularly new legislative or administrative proposals, or judicial interpretations of existing laws and regulations related to the protection of the environment could result in substantially increased capital, operating and compliance costs. Individually and collectively, these developments could have a material adverse effect on our operations directly and/or indirectly, through our customers’ inability to use our products.

Certain implementing regulations for these environmental laws are undergoing revision or have not yet been promulgated. As a result, we cannot always determine the ultimate impact of complying with existing laws and regulations.

Due in part to these extensive and comprehensive regulatory requirements and ever- changing interpretations of these requirements, violations of these laws can occur from time to time in our industry and also in our operations. Expenditures relating to environmental compliance are a major cost consideration for our operations and safety and compliance is a significant factor in mine design, both to meet regulatory requirements and to minimize long-term environmental liabilities. To the extent that these expenditures, as with all costs, are not ultimately reflected in the prices of our products and services, operating results will be reduced.

In addition, our customers are subject to extensive regulation regarding the environmental impacts associated with the combustion or other use of coal, which may affect demand for our coal. Changes in applicable laws or the adoption of new laws relating to energy production, greenhouse gas emissions and other emissions from use of coal products may cause coal to become a less attractive source of energy, which may adversely affect our mining operations, the cost structure and, the demand for coal.

17

Table of Contents

We believe that our competitors with operations in the United States are confronted by substantially similar conditions. However, foreign producers and operators may not be subject to similar requirements and may not be required to undertake equivalent costs in or be subject to similar limitations on their operations. As a result, the costs and operating restrictions necessary for compliance with United States environmental laws and regulations may have an adverse effect on our competitive position with regard to those foreign competitors. The specific impact on each competitor may vary depending on a number of factors, including the age and location of its operating facilities, applicable legislation and its production methods.

The Mine Act and the MINER Act, and regulations issued under these federal statutes, impose stringent health and safety standards on mining operations. The regulations that have been adopted under the Mine Act and the MINER Act are comprehensive and affect numerous aspects of mining operations, including training of mine personnel, mining procedures, roof control, ventilation, blasting, use and maintenance of mining equipment, dust and noise control, communications, emergency response procedures, and other matters. MSHA regularly inspects mines to ensure compliance with regulations promulgated under the Mine Act and MINER Act.

Due to the large number of mining permits held by the Company that have been previously mined and operated, there is a significant amount of environmental reclamation and remediation required by the Company to comply with local, state, and federal regulations for coal mining companies.

Further discussion regarding the required environmental remediation of the Company and associated risks to the Company are discussed in the Risk Factors section.

Property

Our principal offices are located at 9002 Technology Lane, Fishers, Indiana 46038. We pay $2,500 per month in rent for the office space and the rental lease expires in December 2018. We also rent office space at 11000 Highway 7 South, Kite, Kentucky 41828 and pay $500 per month rent and the rental lease expires October 30, 2021.

The Company also utilizes various office spaces on-site at its coal mining operations and coal preparation plant locations in eastern Kentucky, with such rental payments covered under any surface lease contracts with any of the surface land owners.

Employees

ARC, through its operating subsidiaries, employs a combination of company employees and contract labor to mine coal, process coal, and related functions. The Company is continually evaluating the use of company employees and contract labor to determine the optimal mix of each, given the needs of the Company. Currently, McCoy Elkhorn’s Mine #15 is primarily run by company employees, McCoy Elkhorn’s Carnegie Mine is primarily run by contract labor, and the Company’s various coal preparation facilities are run by company employees.

The Company currently has approximately 120 employees, with a substantial majority based in eastern Kentucky. The Company is headquartered in Fishers, Indiana with six members of the Company’s executive team based at this location.

Results of Operations

Our consolidated operations had operating revenues of $6,612,081 for the three-months ended March 31, 2017 and $746,779 operating revenue for the three-months ended March 31, 2016. We have incurred net loss in the amount of $3,117,588 and a net loss of $8,824,626 respectively for the same periods.

The primary driver for increased revenue was the commencement of underground mining operations in September 2016. The primary driver for decreased net loss was the consulting fees incurred during the period ended March 31, 2016 that were not incurred during the period ended March 31, 2017.

18

Table of Contents

From our inception to-date our activities have been primarily financed from the proceeds of our acquisitions, series B equity investments and loans.

For the three months ended March 31, 2017 and 2016, coal sales and processing expenses were $4,851,572 and $735,146 respectively, development costs, including loss on settlement of ARO, were $1,951,127 and $1,356,111, respectively, and production taxes and royalties $1,672,240 and $63,508, respectively. Depreciation expense for the same periods ended March 31, 2016 and 2015 were $459,644 and $484,188 respectively.

Liquidity and Capital Resources

For the three months ending March 31, 2017 our net cash flow used in operating activities was $25,715 and for the period ending March 31, 2016 the net cash flow used in operating activities was $874,736.

For the three months ending March 31, 2017 and 2016 net cash used in investing activities were $62,245 and $3,690,271 respectively.

For the three months ending March 31, 2017 and 2016 net cash proceeds from financing activities were $59,595 and $4,667,863 respectively.

As a public company, we will be subject to certain reporting and other compliance requirements of a publicly reporting company. We will be subject to certain costs for such compliance which private companies may not choose to make. We have identified such costs as being primarily for audits, legal services, filing expenses, financial and reporting controls and shareholder communications and estimate the cost to be approximately $10,000 monthly if the activities of our Company remain somewhat the same for the next few months. We have included such costs in our monthly cash flow needs and expect to pay such costs from a combination of cash from operations.

Off Balance Sheet Arrangements

We do not have any off-balance sheet arrangements that we are required to disclose pursuant to these regulations. In the ordinary course of business, we enter into operating lease commitments, purchase commitments and other contractual obligations. These transactions are recognized in our financial statements in accordance with generally accepted accounting principles in the United States.

Critical Accounting Policies

The preparation of financial statements requires management to utilize estimates and make judgments that affect the reported amounts of assets, liabilities, revenues and expenses and related disclosure of contingent assets and liabilities. These estimates are based on historical experience and on various other assumptions that management believes to be reasonable under the circumstances. The estimates are evaluated by management on an ongoing basis, and the results of these evaluations form a basis for making decisions about the carrying value of assets and liabilities that are not readily apparent from other sources. Although actual results may differ from these estimates under different assumptions or conditions, management believes that the estimates used in the preparation of our financial statements are reasonable. The critical accounting policies affecting our financial reporting are summarized in Note 1 to the financial statements included elsewhere in this report.

Recent Accounting Pronouncements

We determined that all other issued, but not yet effective accounting pronouncements are inapplicable or insignificant to us and once adopted are not expected to have a material impact on our financial position.

Market risk

As filed, 131 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Because we are a smaller reporting company we are not required to include any disclosure under this item.

19

Table of Contents

Controls and procedures

As filed, 3,046 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

(a) Management’s Conclusions Regarding Effectiveness of Disclosure Controls and Procedures.

The management of the Company is responsible for establishing and maintaining adequate internal control over financial reporting. The Company’s internal control over financial reporting is a process designed under the supervision of the Company’s Chief Executive Officer and Chief Financial Officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s financial statements for external purposes in accordance with U.S. generally accepted accounting principles.

With respect to the period ending March 31, 2017, under the supervision and with the participation of our management, we conducted an evaluation of the effectiveness of the design and operations of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934.

Based upon our evaluation regarding the period ending March 31, 2017, the Company’s management, including its Chief Executive Officer and Chief Financial Officer, has concluded that its disclosure controls and procedures were not effective due to the Company’s insufficient number of staff performing accounting and reporting functions and lack of timely reconciliations. Through the use of external consultants and the review process, management believes that the financial statements and other information presented herewith are materially correct.

The Company’s disclosure controls and procedures are designed to provide reasonable assurance of achieving their objectives. However, the Company’s management, including its Chief Executive Officer and Chief Financial Officer, does not expect that its disclosure controls and procedures will prevent all error and all fraud. A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefit of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been detected.

(b) Changes in Internal Controls.

There have been changes in the Company’s internal control over financial reporting during the period ended March 31, 2017 that have materially affected the Company’s internal controls over financial reporting.

The company has hired a Chief Financial Officer, President, Chief Executive Officer and General Counsel, all of whom work in conjunction on risk assessment and segregation of duties. Management has identified material weaknesses as described above. Management has hired outside consultants as described above to mitigate the risk though we still deem the controls to be ineffective.

20

Table of Contents

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2017-03-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue3 months2017-01-01 to 2017-03-31$6.6mus-gaap:Revenues
Operating income3 months2017-01-01 to 2017-03-31−$3.1mus-gaap:OperatingIncomeLoss
Interest expense3 months2017-01-01 to 2017-03-31$128.5kus-gaap:InterestExpense
Net income3 months2017-01-01 to 2017-03-31−$3.0mus-gaap:NetIncomeLoss
Diluted EPS3 months2017-01-01 to 2017-03-31−$6.00us-gaap:EarningsPerShareBasicAndDiluted
Operating cash flow3 months2017-01-01 to 2017-03-31−$25.7kus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure3 months2017-01-01 to 2017-03-31$34.8kus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2017-03-31$756.2kus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2017-03-31$2.4mus-gaap:AssetsCurrent
Total assetsAt period end2017-03-31$18.6mus-gaap:Assets
Current liabilitiesAt period end2017-03-31$27.4mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2017-03-31$48.5mus-gaap:Liabilities
Current portion of debtAt period end2017-03-31$4.0mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2017-03-31−$29.9mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001477932-18-000940. Last ingested by Listed: Oct 24, 2026, 15:14 ET. Listed shows no prices and gives no investment advice.