As filed, 57,657 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

When used in this Annual Report on Form 10-K, the terms “Lightbridge”, the “Company”, “we”, “our”, and “us” refer to Lightbridge Corporation together with its wholly-owned subsidiaries Lightbridge International Holding LLC and Thorium Power Inc.

Company Overview

Lightbridge is a leading nuclear fuel technology company. Our goal is to produce the next generation of nuclear fuel that could significantly improve the economics, safety, and proliferation resistance of existing and new reactors, with a meaningful impact on addressing climate change and air pollution. We project that the world’s energy and climate needs can only be met if nuclear power’s share of the energy-generating mix grows substantially.

Our primary focus is the development and commercialization of metallic fuel rods that will replace the uranium oxide ceramic pellets that have traditionally fueled nuclear reactors. We believe our metallic fuel offers significant economic and safety benefits over traditional fuel, primarily because of the superior heat transfer properties of all-metal fuel and the resulting lower operating temperature of the reactor. We also believe that uprating a reactor with Lightbridge fuel will add incremental electricity at a lower levelized cost than any other means of generating baseload electric power, including any renewable, fossil, or hydroelectric energy source.

We have built a significant portfolio of patents reflecting years of research and development, and we anticipate substantial completion of our research efforts and the testing of our fuel over the next few years. We expect the first purchase orders for our metallic fuel as soon as 2028, with final deployment of our fuel in commercial reactors as soon as 2030.

From 2008 to 2018, we also had a nuclear consulting business segment, which provided early funding for our metallic nuclear fuel development efforts. We discontinued our consulting business segment in 2018; however, we may opportunistically provide nuclear power consulting and strategic advisory services to commercial and governmental entities worldwide.

Enfission, LLC

On January 24, 2018 we formed Enfission, LLC (“Enfission”), a 50/50 joint venture with Framatome Inc., to develop, license, manufacture, and sell nuclear fuel assemblies based on Lightbridge-designed metallic fuel technology and other advanced nuclear fuel intellectual property. Framatome Inc. is a wholly-owned US subsidiary of Framatome, which we refer to individually or collectively in this Annual Report on Form 10-K, together with their affiliates, as Framatome. Framatome is a global leader in designing, manufacturing, and installing components and fuel for nuclear power plants, and Framatome offers a full range of reactor services.

We currently conduct our fuel development activities principally through Enfission. Enfission serves as the exclusive vehicle through which the Company and Framatome are researching, developing, obtaining regulatory approvals, manufacturing and will be using, marketing and selling nuclear fuel assemblies based on the Lightbridge metallic fuel technology comprising uranium-zirconium (U-Zr) multi-lobe, helically twisted fuel rods and associated manufacturing processes and other advanced nuclear fuel intellectual property contributed by both Lightbridge and Framatome within the operating domain. The operating domain of Enfission includes pressurized water reactors (excluding water-cooled water-moderated energetic reactor (Russian VVER) types) and boiling water reactors, which collectively constitute most of the power reactors in the world, as well as water-cooled small modular reactors and water-cooled research reactors. While we expect our focus to be on Enfission for the foreseeable future, Lightbridge maintains the rights to develop fuel for VVER reactors outside Enfission, and Lightbridge also maintains the right to develop fuel for pressurized heavy water reactors (including CANDU reactors) outside Enfission.

4

Table of Contents

In addition to distributions from Enfission based on our ownership interest in the joint venture, we anticipate receiving future licensing revenues in connection with sales by Enfission of nuclear fuel incorporating our intellectual property.

Lightbridge and Enfission’s principal executive offices are located at 11710 Plaza America Drive, Suite 2000, Reston, Virginia 20190 USA.

Nuclear Power as Clean and Low Carbon Emissions Energy Source

Nuclear power provides clean, reliable baseload electricity generation source. According to the World Nuclear Association (WNA), nuclear power plants produce no greenhouse gas emissions during operation, and over the course of its life-cycle, nuclear produces about the same amount of CO2 equivalent emissions per unit of electricity as wind. The WNA further notes that almost all proposed pathways to achieving significant decarbonization suggest an increased role for nuclear power, including those published by the International Energy Agency, Massachusetts Institute of Technology Energy Initiative, US Energy Information Administration, and World Energy Council.

We believe that deep cuts to CO2 emissions are only possible with electrification of most of the transportation and industrial sectors globally and powering them and the current electricity needs of the world with non-emitting or low-emitting power. We believe this can be done only with a large increase in nuclear power, several times the amount that is generated globally today. We believe that our nuclear fuel technology will be an essential element of reaching this goal.

Overview of Our Next Generation Nuclear Fuel

Nuclear Fuel Development

Since 2008, we have been engaged in the design and development of proprietary, innovative nuclear fuels to improve the cost competitiveness, safety, proliferation resistance and performance of nuclear power generation. In 2010, we announced the concept of all-metal fuel (i.e., non-oxide fuel) for currently operating as well as new-build reactors. Our focus on metallic fuel is based on listening to the voices of prospective customers, as nuclear utilities have expressed interest in the improved economics and enhanced safety that we believe metallic fuel can provide.

The fuel in a nuclear reactor generates heat energy. That heat is then converted through steam into electricity that is sold. We have designed our innovative, proprietary metallic fuels to be capable of significantly higher burnup and power density compared to conventional oxide nuclear fuels. Burnup is the total amount of electricity generated per unit mass of nuclear fuel and is a function of the power density of a nuclear fuel and the amount of time the fuel operates in the reactor. Power density is the amount of heat power generated per unit volume of nuclear fuel. Conventional oxide fuel used in existing commercial reactors is just about at the limit of its burnup and power density capability. As a result, further optimization to increase power output from the same core size and improve the economics and safety of nuclear power generation using conventional oxide fuel technologies is limited. A new fuel is needed to bring enhanced performance to reactors; we are developing that new fuel.

5

Table of Contents

As the nuclear industry prepares to meet the increasing global demand for electricity production, longer operating cycles and higher reactor power outputs have become a much sought-after solution for the current and future reactor fleet. We believe our proprietary nuclear fuel designs have the potential to improve the nuclear power industry’s economics by:

  • providing an increase in power output of potentially up to 10% while simultaneously extending the operating cycle length from 18 to 24 months in existing pressurized water reactors (PWRs), including in Westinghouse-type four-loop PWR plants which are currently constrained to an 18-month operating cycle by oxide fuel, or increasing the power potentially up to 17% while retaining an 18-month operating cycle;
  • enabling increased reactor power output via a power uprate (potentially up to a 30% increase) or a longer operating cycle (instead of a power uprate) without changing the core size in new build PWRs; and
  • reducing the volume of spent fuel per unit of electricity generated as well as enhancing proliferation resistance of spent fuel.

We believe our fuel designs will allow current and new build nuclear reactors to safely increase power production and reduce operations and maintenance costs on a per kilowatt-hour basis. New build nuclear reactors could also benefit from the reduced upfront capital investment per kilowatt of generating capacity in case of implementing a power uprate. In addition to the projected electricity production cost savings, we believe that our technology can result in utilities or countries needing to deploy fewer new reactors to generate the same amount of electricity (in case of a power uprate), resulting in significant capital cost savings. For utilities or countries that already have operating reactors, our technology could be utilized to increase the power output of those reactors as opposed to building new reactors.

Due to the significantly lower fuel operating temperature, our metallic nuclear fuel rods are also expected to provide major improvements to safety margins during off-normal events. US Nuclear Regulatory Commission licensing processes require engineering analysis of a large break loss-of-coolant accident (LOCA), as well as many other scenarios. The LOCA scenario assumes failure of a large water pipe in the reactor coolant system. Under LOCA conditions, the fuel and cladding temperatures rise due to reduced cooling capacity. Preliminary analytical modeling shows that under a design-basis LOCA scenario, unlike conventional uranium dioxide fuel, the cladding of the Lightbridge-designed metallic fuel rods would stay at least 200 degrees below the 850-900 degrees Celsius temperature at which steam begins to react with the zirconium cladding to generate hydrogen gas. Build-up of hydrogen gas in a nuclear power plant can lead to the hydrogen exploding, which is what happened at the Fukushima Daiichi nuclear power plant in Japan in 2011. Lightbridge fuel is designed to prevent hydrogen gas generation in design-basis LOCA situations, which is a major safety benefit.

Anticipated advantages of Lightbridge’s metallic fuel over the conventional uranium dioxide fuels used now

  • Has better heat transfer (due to higher thermal conductivity and greater surface area of fuel rods) and therefore increases power output from nuclear reactors
  • Operates at lower operating temperatures than current conventional nuclear fuel, contributing to lower stored energy
  • Can reach higher burnups and extend the cycle length
  • Has the ability to maneuver more quickly (load follow)

6

Table of Contents

  • Under design basis accidents when there is a loss of coolant in the reactor, does not generate hydrogen gas, which can explode
  • Buys more time to restore active cooling in the reactor during off-normal events
  • Improves non-proliferation benefits of spent nuclear fuel
  • Enhances structural integrity of the nuclear fuel
  • Lighter and stiffer fuel assembly with likely improved seismic performance

Lightbridge Spent Fuel – Proliferation Resistance

The April 2018 issue of Nuclear Engineering and Design, a technical journal affiliated with the European Nuclear Society, included an article stating that after analyzing Lightbridge’s fuel, the authors concluded that any plutonium extracted from Lightbridge’s spent fuel would not be useable for weapon purposes. We anticipate the following proliferation resistance advantages for our metallic fuel:

  • ½ of the amount of plutonium produced and remaining in the spent fuel as compared to conventional uranium oxide fuels
  • Lower Plutonium-239 fraction compared to uranium oxide fuel, therefore our spent fuel would be unsuitable as a source for weapon purposes

Nuclear Utility Fuel Advisory Board (“NUFAB”)

Our NUFAB, formed in 2011, comprises senior fuel managers from electric utilities that account for approximately 50% of installed US nuclear capacity. NUFAB members represent the “voice of the customer” in Lightbridge’s nuclear fuel development and commercialization activities. These members include the following:

  • Exelon Generation;
  • Dominion Generation;
  • Duke Energy; and
  • Southern Company.

Research and Development Advancements in 2018

1. Fabrication:

  • Identified a US-based pilot facility located at a Framatome-operated fuel fabrication site in Richland, WA to develop the fabrication process and produce partial-length and full-length fuel rods.
  • Completed the following key fabrication process activities:
i. Developed coextrusion models for process evaluation and optimization;
ii. Developed equipment functional specifications; and
iii. Initiated fabrication of samples to select the most optimal alloy forming process.
  • Identified supply chain for key equipment and began procurement process.
  • Researched material properties and prepared material data manual.

7

Table of Contents

2. Fuel Design:

  • Prepared product requirements document and data sheet.
  • Completed initial phase of neutronics code modifications to model Lightbridge Fuel™ geometry.
  • Developed 3D model for Computational Fluid Dynamics (CFD) analysis.
  • Launched Critical Heat Flux (CHF) test program and completed the following key milestones:

i. Developed fuel assembly CFD model to investigate CHF performance; and

ii. Evaluated and selected the most suitable CHF heater rod design for CHF testing.

  • Devised and evaluated lead test rod (LTR) design options.
  • Due to unforeseen early closure of the Halden research reactor, assessed alternative options for irradiation testing and identified suitable pathway.

3. Regulatory Licensing:

  • Established interaction with the US Nuclear Regulatory Commission (NRC), with the first Enfission project kick-off meeting held with NRC staff in August 2018.
  • Initiated development of fuel design limits in support of licensing activities.

Near-term fuel development milestones:

  • 2019: Demonstrate fabrication of full length co-extruded rods using surrogate materials.
  • 2019: Enter into an agreement to manufacture material samples for test reactor irradiation.
  • 2019-2020: Enter into a Lead Test Rod agreement with a US electric utility.
  • 2019-2020: Place purchase orders for procurement of long lead time equipment items.

Anticipated Schedule for Development and Sale of Nuclear Fuel Assemblies

Set forth below is our anticipated schedule for Enfission’s development and sale of nuclear fuel assemblies. Please see Item 1A, Risk Factors in this Annual Report, for a discussion of certain risks that may delay or impair the commercialization of nuclear fuel assemblies incorporating our nuclear fuel technology. Based on our current expectations, we anticipate that, either directly or through Enfission, we will:

  • Enter into a Lead Test Assembly agreement with a host reactor in 2020-2022;
  • Start test reactor irradiation of material samples in 2020-2022;
  • Perform out-of-reactor corrosion experiments in 2020-2022;
  • Start Lead Test Rod operation in a United States commercial reactor in 2022-2024;
  • Establish a pilot-scale fuel fabrication facility for Lead Test Assemblies in 2022-2024; and
  • Begin Lead Test Assembly operation in a commercial nuclear power plant in 2024-2026.

Accordingly, based on our current expected schedule, a purchase order for an initial reload batch placed by a utility is expected as soon as 2028-2030, with final qualification (i.e., deployment of fuel in the first reload batch) in a commercial reactor expected as soon as 2030-2032. We are seeking development funding contributions or other financing arrangements with utilities and the US Department of Energy.

Our earlier plan was to begin irradiation of metallic fuel samples in the Halden research reactor in 2020-2021. The Halden research reactor was operated by the Institute for Energy Technology (IFE) in Norway. In June 2018, IFE’s board of directors announced its decision not to seek renewal of the Halden reactor operating license beyond 2020, and to permanently shut down the reactor immediately.

In lieu of the Halden Reactor in Norway, the Company now plans to conduct the initial testing and demonstration of its advanced metallic nuclear fuel in the United States.

8

Table of Contents

Ownership and Management of Enfission

Lightbridge owns 50 percent of Enfission’s Class A voting membership units and Framatome owns the other 50 percent. Any distributions will be first allocated to cause the capital accounts of the initial members to be equal, then allocated on a 50/50 basis. Lightbridge and Framatome each provided certain licensed intellectual property to Enfission. Certain additional capital contributions made by Lightbridge and Framatome will partly be in the form of exclusive license rights to intellectual property developed pursuant to a research and development service agreement with Enfission.

Seth Grae, our Chief Executive Officer, also serves as Chief Executive Officer of Enfission. Enfission is managed by a board of directors composed of six directors, half of whom are appointed by Lightbridge and the other half are appointed by Framatome. The Enfission board acts by majority vote, provided that at least one director appointed by each of Lightbridge and Framatome votes in favor of the action. Certain major decisions require the approval of at least two-thirds of the directors, and certain fundamental decisions, including amending the Enfission operating agreement and issuing additional membership units, require the approval of two-thirds of the Class A members.

Agreements with Enfission and Framatome

Enfission has entered into several agreements with Lightbridge and Framatome relating to intellectual property, the provision of personnel and administrative support to Enfission, and research and development efforts.

Lightbridge and Framatome have also directly entered into binding agreements forming the foundation for Enfission, including the following agreements in November 2017, which govern joint research and development activities and the treatment of all related existing and future intellectual property:

  • R&D Services Agreement (“RDSA”) — The RDSA defines the terms and conditions for joint research and development activities between Framatome and Lightbridge. Enfission is a party to the RDSA. Key terms and conditions of the RDSA include: (i) designating a 17x17 fuel assembly as the first joint project of the parties; (ii) establishing a framework for future work release orders relating to research and development activities of the parties; and (iii) granting rights to the use of background and foreground intellectual property needed to perform research and development activities.
  • Co-Ownership Agreement (“COA”) — The COA governs the co-ownership between Framatome and Lightbridge of the foreground information developed by and between Framatome and Lightbridge, with one another and through Enfission. The COA will survive the life of Enfission. The COA is limited to a domain consisting of the metallic fuel developed by Enfission for the following types of commercial light water reactors and research reactors: (i) pressurized water reactors, excluding water-cooled water-moderated energetic reactor (VVER) types, (ii) boiling water reactors, (iii) light water-cooled small and medium size reactors, and (iv) water-cooled research reactors. The domain expressly excludes maritime, naval, and military applications.
  • Intellectual Property Annex (“IP Annex”) — The IP Annex is a higher-level reference document attached to the Enfission operating agreement and summarizes the parties’ understanding regarding intellectual property matters. The IP Annex will remain in force only during the life of Enfission.

9

Table of Contents

Other Commercial Applications for Our Nuclear Fuel Technology

We retain the right to commercialize our nuclear fuel technology outside of the domain encompassed by Enfission, most notably in VVERs and Heavy Water Reactors (HWRs), including Canada Deuterium Uranium (CANDU) reactors. We anticipate most of our efforts for the foreseeable future will be directed towards Enfission.

Competition

To our knowledge, our nuclear fuel technology is the only technology that could be commercially viable in the foreseeable future to increase, in a safe and economically attractive way, power output potentially by up to 17% in existing PWRs and up to 30% in new build PWRs. Due to long product development timelines, significant nuclear regulatory requirements, and our intellectual property, we believe that the barriers to entry are very high for a competitor to our nuclear fuel technology.

Currently competition with respect to the design of commercially viable nuclear fuel products is limited to conventional uranium oxide fuels, which are reaching the limits in terms of their capability to provide increased power output or longer fuel cycles. We believe that the industry needs fuel products that can provide these benefits. While we believe conventional uranium oxide fuel may be capable of achieving power uprates of up to 10% in existing PWRs, doing so would require uranium-235 enrichment levels above 5% (as is also the case with our metallic fuel), higher reload batch sizes, or a combination thereof. The alternative route of increasing reload batch sizes while keeping uranium enrichment levels below 5% for power uprates up to 10% using conventional uranium oxide fuel raises the cost of each fuel reload, resulting in a significant fuel cycle cost penalty to the nuclear utility. The cost penalty could have a dramatic adverse impact on the economics of existing plants whose original capital cost has already been written off, which includes most US nuclear power plants.

Nuclear power faces competition from other sources of electricity, including natural gas, which is currently the cheapest option for power generation in the US and has resulted in some utilities abandoning nuclear power. Other sources of electricity may also be viewed as safer than nuclear power, although we believe that generating nuclear energy with Lightbridge fuel is the safest way to produce baseload electricity in suitable power reactors. To the extent demand for electricity generated by nuclear power decreases, the potential market for our nuclear fuel technology will decline.

In addition to conventional uranium dioxide fuel, potential competition to our metallic fuel technology can come from so-called Accident Tolerant Fuels (ATF). After the accident at the Fukushima Daiichi nuclear power plant in March 2011, the US Congress directed the US Department of Energy (DOE) to investigate every aspect of nuclear plant operation including the existing uranium dioxide fuel pellets enveloped by zirconium‐based alloy tubes (cladding). According to the February 2019 Nuclear Energy Institute technical report on ATF titled “Safety and Economic Benefits of Accident Tolerant Fuel”, advanced fuel design concepts (such as ATF) were accelerated by combining recent operating experience with worldwide research and development. Over the past several years, the ATF program has received significant DOE funding support and initial interest from utility customers in ATF demonstration programs in their operating reactors. However, we believe that the ATF concepts may only offer incremental safety and operating improvements over conventional uranium dioxide fuel that could not effectively compete with the safety and economic benefits of our metallic fuel. In addition, some of the ATF concepts may be used in combination with our metallic fuel for additional safety and operating improvements.

10

Table of Contents

Raw Materials

We do not plan to utilize any raw materials directly in the conduct of our operations. The fuel fabricators which will ultimately fabricate fuel products incorporating our nuclear fuel technology will require zirconium and uranium, and additional raw materials that are required for the production of nuclear fuel assemblies that go into the reactor core. Uranium and zirconium are available from various suppliers at market prices. Our plan is that utilities will contract with Enfission to order nuclear fuel assemblies, and Enfission will subcontract manufacturing of fuel assemblies to Framatome, which will physically produce and then ship the completed nuclear fuel assemblies to the reactor sites on behalf of Enfission.

Government Support/Approvals and Relationships with Critical Development Partners/Vendors

The sales and marketing of our services and technology internationally may be subject to US export control regulations and the export control laws of other countries. Governmental authorizations may be required before we can export our services or technology or collaborate with foreign entities. If authorizations are required and not granted, our international business plans could be materially affected. Furthermore, the export authorization process is often time consuming. Violation of export control regulations could subject us to fines and other penalties, such as losing the ability to export for a period of years, which would limit our revenue growth opportunities and significantly hinder our attempts to expand our business internationally.

In 2015-2016, we received our export controls authorization from the US Department of Energy for all of our planned work outside the United States, specifically in France, Germany, Norway, Sweden, and Canada.

The testing, fabrication and use of nuclear fuels by Enfission and our future partners, licensees and nuclear power generators will be heavily regulated. The test facilities and other locations where our fuel designs may be tested before commercial use require governmental approvals from the host country’s nuclear regulatory authority. The responsibility for obtaining the necessary regulatory approvals will lie with our research and development contractors that conduct such tests and experiments. Nuclear fuel fabricators, which will ultimately fabricate fuel using our technology under commercial licenses from us, are similarly regulated. Utilities that operate nuclear power plants that may utilize the fuel produced by these fuel fabricators require specific licenses relating to possession and use of nuclear materials as well as numerous other governmental approvals for the ownership and operation of nuclear power plants.

Certain Challenges

The ability to fabricate the lead test assemblies (LTAs) and a nuclear utility that is willing to accept the LTAs, is required for LTA demonstration in a commercial reactor. In the US, the fabricator and the utility will be primarily responsible for securing necessary regulatory licensing approvals for the LTA operation. To this end, in 2011, we established a Nuclear Utility Fuel Advisory Board (NUFAB) to further strengthen dialogue with global nuclear utilities. Separately, we formed Enfission with the fabricator Framatome to complete the development, demonstration, regulatory licensing, and commercial deployment of our metallic nuclear fuel in most types of reactors that are currently in operation, under construction, and planned around the world.

Establishment of required supply chain infrastructure to support high assay low enriched uranium (HALEU) metallic fuel. Existing commercial nuclear infrastructure, including conversion facilities, enrichment facilities, fabrication facilities, fuel storage facilities, fuel handling procedures, fuel operation at reactor sites, used fuel storage facilities and shipping containers, were designed and are currently licensed to handle uranium in oxide form with enrichment up to 5%. Our fuel designs are expected to use uranium metal with uranium enrichment levels up to 19.75% and would therefore require certain modifications to existing commercial nuclear infrastructure to enable commercial nuclear facilities to handle our fuels. Those nuclear facilities will need to go through a regulatory licensing process and obtain regulatory approvals to be able to process, handle, or ship uranium metal with enrichment levels up to 19.75% and operate commercial reactors and spent fuel storage facilities using our metallic fuel.

11

Table of Contents

There is a lack of publicly available experimental data on our metallic fuel. We will need to conduct various irradiation experiments to confirm fuel performance under normal and off-normal events. Loop irradiation in a test reactor environment prototypic of commercial reactor operating conditions and other experiments on unirradiated and irradiated metallic fuel samples will be essential to demonstrate the performance and advantages of our metallic fuel. We are currently planning loop irradiation testing of our metallic fuel samples in a research reactor as part of this effort.

Existing analytical models may be inadequate. New analytical models, capable of accurately predicting the behavior of our metallic fuel during normal operation and off-normal events, may be required. Experimental data measured from our planned irradiation demonstrations will help to identify areas where new analytical models or modifications to existing ones may be required.

Demonstration of a fabrication process both for semi-scale irradiation fuel samples and subsequently for full-length (12-14 feet) metallic fuel rods for PWR LTAs is required. Past operating experience with differently shaped fuel rods with a similar metallic fuel composition involved fabrication of metallic fuel rods up to 3 feet in length in Russia. Fabrication of full-length (approximately 3.5 to 4.5 meters) PWR metallic fuel rods has yet to be demonstrated. We plan to demonstrate fabrication of full-length rods using surrogate materials in 2019.

Overview of the Nuclear Power Industry

Presently, nuclear power provides approximately 7% of the world’s energy, including approximately 11% of the world’s electricity. According to the World Nuclear Association, as of March 1, 2019 there were 450 operable nuclear power plants worldwide, mostly light water reactors, with the most common types being PWRs, boiling-water reactors (BWRs), and VVER reactors. Nuclear power provides a non-fossil fuel, low-carbon energy solution that can meet baseload electricity needs.

Due to substantial project risks and the significant upfront capital commitment associated with building new reactors, many nuclear utilities in deregulated markets choose to optimize their existing generating capacity through increasing their capacity utilization factor, power uprates and plant life extensions. We expect this trend to continue, particularly in the mature nuclear markets with significant existing nuclear capacity. We expect most of the new build activity to occur in emerging nuclear markets.

Of the world’s existing reactors currently in operation, PWRs (including Russian-designed VVERs) account for more than half of the net operating capacity, with BWRs being the second most prevalent and accounting for another 15-20%.

Of the nuclear reactors currently under construction, we estimate over 80% are either PWRs or VVERs with a rated electric power output of 1,000 megawatts (“MWe”) or greater.

Utilities have embraced power uprates as a cost-effective way to increase their generation capacity. While the efforts thus far have occurred mostly in the United States, we believe there is a large, untapped worldwide market for power uprates. The incentive to proceed with longer operating cycles and/or power uprates of up to 10% level is significant since there are few changes required to implement the power uprate, and the changes that are required are relatively inexpensive. The limiting factor at the moment is the fuel.

In some instances, utilities will modify and/or replace components in order to accommodate a higher power level. Technical analyses must demonstrate that the proposed plant configuration remains safe and that measures to protect the health and safety of the public continue to be effective. These analyses, which span many technical disciplines, are reviewed and approved by the regulator before a power uprate can be performed.

12

Table of Contents

The utility will conduct an economic analysis to evaluate the potential financial benefits of the proposed uprate. Typically, power uprates enable utilities to increase their generating capacity at a cost significantly less than the cost of building a new plant. In many cases, power uprates can be completed in months as opposed to the several years required for new build, thus the invested dollars begin producing revenue shortly after they are spent. Power uprates, therefore, represent an efficient use of capital.

Most nuclear power plants originally had a licensed lifetime of 25 to 40 years, but engineering assessments have established that many can operate much longer. In the US, approximately 60 reactors have been granted license extensions to continue operating for a total of 60 years. Most of the plants that have not already requested a license extension are expected to apply in the near future. A license extension at about the 30-year mark requires additional capital expenditure for the replacement of worn equipment and outdated control systems. Multiple utilities have stated plans to apply to the NRC for additional 20 years of licensed lifetime, up to a total of 80 years per reactor.

The technical and economic feasibility of replacing major reactor components, such as steam generators in PWRs, has been demonstrated. The increased revenue generated from extending the lifetime of existing plants is attractive to utilities, especially in view of the difficulties in obtaining public acceptance of constructing replacement nuclear capacity.

Almost all of the new build reactor designs are either Generation III or Generation III+ type reactors. The primary difference from second-generation designs is that many incorporate passive or inherent safety features which require no active controls or operational intervention to avoid accidents in the event of malfunction. Many of these passive systems rely on gravity, natural convection, or resistance to high temperatures.

Influence of the Accident at Fukushima, Japan and New International Nuclear Build

The nuclear accident at the Fukushima nuclear power plant in Japan following the strong earthquake and massive tsunami that occurred on March 11, 2011 increased public opposition to nuclear power, resulting in a slowdown in, or, in some cases, a complete halt to, new construction of nuclear power plants and an early shut down of existing power plants in certain countries. As a result, some countries that were considering launching new domestic nuclear power programs before the Fukushima accident have delayed or cancelled preparatory activities they were planning to undertake as part of such programs. This has diminished the number of consulting opportunities that we could compete for globally, at least in the near-term. In addition, the Fukushima accident appears to have shrunk the projected size of the global nuclear power market in 2025-2030 as reflected in the most recent reference case projections published by the World Nuclear Association. At the same time, the event has brought a greater emphasis on safety to the forefront that may be beneficial to us because our metallic fuel provides improved safety and fuel performance during normal operation and design-basis accidents.

Our Intellectual Property

Our nuclear fuel technologies are protected by multiple US and international patents. Set forth below are the patents, which we consider material to our business based on our current plans, all of which we have licensed to Enfission:

13

Table of Contents

Country Application Date Registration Date Title Case Status
Fabrication method using the casting route
United States of America 2/20/2018 FUEL ASSEMBLY Pending
Belgium 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Bulgaria 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Czech Republic 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
European Patent Office 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Hungary 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
United Kingdom 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
China 5/11/2011 03/27/2018 FUEL ASSEMBLY Registered
Japan 5/11/2011 4/13/2018 FUEL ASSEMBLY Registered
Republic of Korea 5/11/2011 FUEL ASSEMBLY Pending
Fabrication method using the powder metallurgy route
United States of America 5/11/2011 7/31/2018 FUEL ASSEMBLY Registered
United States of America 2/20/2018 FUEL ASSEMBLY Pending
Australia 5/11/2011 7/2/2015 FUEL ASSEMBLY Registered
Belgium 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Bulgaria 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Czech Republic 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
European Patent Office 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Hungary 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
United Kingdom 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Bulgaria 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Czech Republic 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
European Patent Office 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Finland 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
France 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Germany 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Hungary 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Sweden 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Turkey 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
China 5/11/2011 5/18/2016 FUEL ASSEMBLY Registered
Japan 5/11/2011 9/9/2016 FUEL ASSEMBLY Registered
Republic of Korea 5/11/2011 8/30/2017 FUEL ASSEMBLY Pending
Australia 5/11/2011 FUEL ASSEMBLY Pending
Canada 5/11/2011 FUEL ASSEMBLY Pending
China 5/11/2011 3/27/2018 FUEL ASSEMBLY Registered
India 5/11/2011 FUEL ASSEMBLY Pending

14

Table of Contents

All-metal fuel assembly design and a mixed grid pattern of metallic fuel rods

United States of America 11/15/2013 1/1/2019 FUEL ASSEMBLY Registered
Belgium 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Bulgaria 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Czech Republic 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
European Patent Office 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Finland 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
France 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Germany 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Hungary 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Spain 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Sweden 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
Turkey 5/1/2014 1/31/2018 FUEL ASSEMBLY Registered
China 5/1/2014 11/24/2017 FUEL ASSEMBLY Registered
Australia 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Canada 5/1/2014 FUEL ASSEMBLY Pending
Canada 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
China 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Eurasian Patent Organization 5/1/2014 FUEL ASSEMBLY Pending
Eurasian Patent Organization 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
European Patent Office 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Japan 5/1/2014 7/13/2018 FUEL ASSEMBLY Registered
Japan 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Republic of Korea 5/1/2014 FUEL ASSEMBLY Pending
Republic of Korea 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
India 5/1/2014 FUEL ASSEMBLY Pending
All-metal fuel assembly design (i.e., no oxide rods in the outer row)
United States of America 5/11/2011 7/31/2018 FUEL ASSEMBLY Registered
United States of America 11/15/2013 1/1/2019 FUEL ASSEMBLY Registered
Australia 5/11/2011 7/2/2015 FUEL ASSEMBLY Registered
Canada 12/26/2007 4/26/2016 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
India 12/26/2007 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Pending

15

Table of Contents

Multi-lobe metallic fuel rod design

United States of America 12/25/2008 5/31/2016 LIGHT-WATER REACTOR FUEL ASSEMBLY (ALTERNATIVES), A LIGHT-WATER REACTOR, AND A FUEL ELEMENT OF FUEL ASSEMBLY Registered
United States of America 12/26/2007 2/18/2014 NUCLEAR REACTOR (ALTERNATIVES), FUEL ASSEMBLY OF SEED-BLANKET SUBASSEMBLIES FOR NUCLEAR REACTOR (ALTERNATIVES), AND FUEL ELEMENT FOR FUEL ASSEMBLY Registered
United States of America 5/11/2011 7/31/2018 FUEL ASSEMBLY Registered
United States of America 11/15/2013 1/1/2019 FUEL ASSEMBLY Registered
United States of America 9/16/2015 1/29/2019 FUEL ASSEMBLY Registered
United States of America 2/20/2018 FUEL ASSEMBLY Pending
Australia 5/11/2011 7/2/2015 FUEL ASSEMBLY Registered
Australia 12/25/2008 9/3/2015 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Australia 12/26/2007 8/4/2016 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
Australia 12/26/2007 5/24/2014 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
Belgium 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Bulgaria 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Czech Republic 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
European Patent Office 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Finland 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
France 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Germany 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Hungary 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Sweden 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Turkey 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
United Kingdom 12/26/2007 5/18/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Belgium 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Bulgaria 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Czech Republic 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
European Patent Office 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Finland 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
France 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Germany 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Hungary 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Spain 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Sweden 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Turkey 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
United Kingdom 12/23/2008 9/21/2016 A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY Registered
Belgium 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Bulgaria 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Czech Republic 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
European Patent Office 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Hungary 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
United Kingdom 5/11/2011 10/25/2017 FUEL ASSEMBLY Registered
Bulgaria 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered

16

Table of Contents

Czech Republic 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
European Patent Office 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Finland 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
France 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Germany 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Hungary 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Sweden 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Turkey 5/11/2011 4/6/2016 FUEL ASSEMBLY Registered
Bulgaria 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Czech Republic 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
European Patent Office 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Finland 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
France 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Germany 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Hungary 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Sweden 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Turkey 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
United Kingdom 12/25/2008 4/13/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Canada 12/25/2008 11/29/2016 A LIGHT-WATER REACTOR FUEL ASSEMBLY (ALTERNATIVES), A LIGHT-WATER REACTOR, AND A FUEL ELEMENT OF FUEL ASSEMBLY Registered
Canada 12/26/2007 4/26/2016 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
China 5/11/2011 5/18/2016 FUEL ASSEMBLY Registered
China 12/25/2008 6/29/2016 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
China 12/26/2007 6/23/2017 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
Japan 5/11/2011 9/9/2016 FUEL ASSEMBLY Registered
Japan 5/11/2011 9/9/2016 FUEL ASSEMBLY Registered

17

Table of Contents

Japan 12/25/2008 6/5/2015 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Japan 12/26/2007 4/22/2016 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
Republic of Korea 5/11/2011 8/30/2017 FUEL ASSEMBLY Pending
Republic of Korea 12/25/2008 8/18/2015 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Registered
Republic of Korea 12/26/2007 4/20/2015 NUCLEAR REACTOR(ALTERNATIVES), FUEL ASSEMBLY OF SEED-BLANKET SUBASSEMBLIES FOR NUCLEAR REACTOR(ALTERNATIVES), AND FUEL ELEMENT FOR FUEL ASSEMBLY Registered
Republic of Korea 12/26/2007 12/15/2014 NUCLEAR REATION (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
Australia 5/1/2014 10/11/2018 FUEL ASSEMBLY Registered
Australia 5/11/2011 FUEL ASSEMBLY Pending
Australia 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Canada 12/25/2008 A LIGHT-WATER REACTOR FUEL ASSEMBLY AND FUEL ELEMENT THEREOF Pending
Canada 5/1/2014 FUEL ASSEMBLY Pending
Canada 5/11/2011 FUEL ASSEMBLY Pending
Canada 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
China 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Eurasian Patent Organization 5/1/2014 FUEL ASSEMBLY Pending
Eurasian Patent Organization 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
European Patent Office 12/25/2008 FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Pending
European Patent Office 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Japan 5/1/2014 7/13/2018 FUEL ASSEMBLY Registered
Japan 5/11/2011 4/13/2018 FUEL ASSEMBLY Registered
Japan 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
Republic of Korea 5/11/2011 FUEL ASSEMBLY Pending
Republic of Korea 5/1/2014 FUEL ASSEMBLY Pending
Republic of Korea 9/16/2015 NUCLEAR FUEL ASSEMBLY Pending
China 12/26/2007 2/12/2014 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
Japan 12/26/2007 8/1/2014 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Registered
India 5/11/2011 FUEL ASSEMBLY Pending
India 5/1/2014 FUEL ASSEMBLY Pending
India 12/25/2008 FUEL ASSEMBLY FOR A LIGHT-WATER, NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY Pending
India 12/26/2007 NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY Pending
Australia 5/1/2014 FUEL ASSEMBLY Pending
United States of America 12/28/2018 FUEL ASSEMBLY Pending
United States of America 1/7/2019 FUEL ASSEMBLY Pending
None of the above
United States of America 12/22/2008 2/14/2012 NUCLEAR REACTOR (ALTERNATIVES), FUEL ASSEMBLY OF SEED-BLANKET SUBASSEMBLIES FOR NUCLEAR REACTOR (ALTERNATIVES), AND FUEL ELEMENT FOR FUEL ASSEMBLY Registered

18

Table of Contents

We also own a number of US and international patents associated with fuel assembly designs for all-uranium seed and blanket fuel for existing plants and new build reactors and thorium-based seed and blanket fuel for both existing and new build reactors, which we do not consider material, individually or collectively, based on our current business plan. In addition to our patent portfolio, we also own trademarks to Lightbridge and Thorium Power corporate names and the Lightbridge logo.

Our Consulting Business

Although we discontinued our consulting business segment in 2018, we may opportunistically provide nuclear power consulting and strategic advisory services to commercial and governmental entities worldwide. Our consulting business in the past was primarily engaged in the business of assisting commercial and governmental entities globally with developing and expanding their nuclear industry capabilities and infrastructure. We can provide integrated strategic advice across a range of expertise areas including, for example, regulatory development, nuclear reactor site selection, procurement and deployment, reactor and fuel technology, international relations, program management and infrastructure development.

We only engage with commercial entities and governments that are dedicated to non-proliferative and transparent nuclear programs.

Our consulting services are expert and relationship based, with particular emphasis on key decision makers in senior positions within governments or companies, as well as focus on overall management of nuclear energy programs. We believe that our independence, experience, expertise, reputation and segment focus enable us to compete effectively as a strategic advisor for governments wishing to develop a new civil nuclear program.

Our major challenge in pursuing our consulting business is that the decision-making process for nuclear power programs typically involves careful consideration by many parties and therefore requires significant time. Many of the potential clients that could benefit from our services are in regions of the world where tensions surrounding nuclear energy are high, or in countries where public opinion plays an important role.

Financial information about our nuclear fuel technology and consulting is incorporated by reference from Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, and Note 11 of the notes to the consolidated financial statements appearing elsewhere in this Annual Report on Form 10-K.

Employees

Our business model is to limit the number of our full-time employees and to rely on individual independent contractors, outside agencies and technical facilities with specific skills to assist with various business functions including, but not limited to, corporate overhead, personnel, research and development, and government relations. This model limits overhead costs and allows us to draw upon resources that are specifically tailored to our internal and external (client) needs. As of December 31, 2018, we had eleven full-time employees. We utilize a network of independent contractors available for deployment for specialized consulting assignments. We believe that our relationship with our employees and contractors is satisfactory.

19

Table of Contents

Available Information

Our internet address is www.ltbridge.com (http://www.ltbridge.com). We make available free of charge on our website our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, including exhibits, and amendments to those reports filed or furnished pursuant to Sections 13(a) and 15(d) of the Securities Exchange Act of 1934, as amended, as soon as reasonably practicable after such reports are electronically filed with, or furnished to, the Securities and Exchange Commission (“SEC”). Copies of these reports may also be obtained free of charge by sending written requests to Investor Relations, Lightbridge Corporation, 11710 Plaza America Drive, Suite 2000, Reston, Virginia 20190 USA. The SEC also maintains an internet site that contains reports, proxy and information statements and other information regarding issuers that file electronically with the SEC at www.sec.gov (http://www.sec.gov). The information posted on our website is not incorporated into this Annual Report on Form 10-K, and any reference to our website is intended to be inactive textual references only.

Risk factors

As filed, 44,891 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Risks Related to the Company

We will need to raise significant additional capital in the future to expand our operations and continue our research and development and we may be unable to raise such funds when needed or on acceptable terms, and any capital raises may cause significant dilution to our shareholders.

As of December 31, 2018, we had $24.6 million in cash and equivalents, and as of March 1, 2019, we had approximately $23 million in cash and equivalents. We will need to raise significant additional capital in order to continue our research and development activities and fund our operations through commercialization of our nuclear fuel technology, including funding Enfission for 2019 and beyond. Our current plan is to maximize external funding from third party sources to support the remaining development, testing and demonstration activities relating to our metallic nuclear fuel technology.

When we elect to raise additional funds or additional funds are required, we may raise such funds from time to time through public or private equity offerings, debt financings or other financing alternatives. Additional equity or debt financing or other alternative sources of capital may not be available to us on acceptable terms, if at all. In addition, if we are unable to demonstrate meaningful progress in our Enfission joint venture with Framatome to further the development of our fuel products, it may be difficult for us to raise additional capital on terms acceptable to us or at all.

If we raise additional funds by issuing equity securities, our stockholders will experience dilution. Sales of substantial amounts of our common stock may cause the trading price of our common stock to decline in the future. New investors may have rights superior to existing securityholders. Debt financing, if available, would result in substantial fixed payment obligations and may involve agreements that include covenants limiting or restricting our ability to take specific actions, such as incurring additional debt, making capital expenditures, or declaring dividends. Any debt financing or additional equity that we raise may contain terms, such as liquidation and other preferences, which are not favorable to us or our stockholders. If we are unable to raise additional capital in sufficient amounts or on terms acceptable to us, we may not be able to fully develop our nuclear fuel designs, our future operations will be limited, and our ability to generate revenues and achieve or sustain future profitability will be substantially harmed. In particular, we may be required to delay, reduce the scope of or terminate one or more of our research projects, sell rights to our nuclear fuel technology or license the rights to such technologies on terms that are less favorable to us than might otherwise be available. If we raise additional funds by issuing equity or securities convertible into equity, further dilution to stockholders may result and new investors could have rights superior to existing stockholders.

20

Table of Contents

We are dependent upon a joint venture for substantially all of our anticipated future income.

In January 2018, we entered into the Enfission joint venture with Framatome. We anticipate that distributions from Enfission and licensing revenue from nuclear fuel sold by Enfission will constitute substantially all of our income in the future. We are dependent upon the success or failure of Enfission, and if Enfission is not successful or Enfission does not perform its research and development activities as expected, our future financial performance will be negatively impacted.

Our Enfission joint venture could be adversely affected by our lack of sole decision-making authority, any disputes that may arise between us and our joint venture partner and our exposure to potential losses from the joint venture.

Joint ventures involve risks not present in investments or operations in which a third party is not involved, including the possibility that a joint venture partner may at any time have other business interests and investments other than the joint venture with us, may have economic or business goals different from ours, and may be in a position to take actions contrary to our policies or objectives. Conflicts of interest may cause a joint venture partner to take actions that could harm the joint venture or the Company, such as seeking undue benefit from the joint venture or its assets or operations, acting in bad faith to undermine the joint venture or its operations, or causing unnecessary expense or delay. A joint venture partner may also become bankrupt or fail to fund its required capital contributions. Consequently, actions by or disputes with a joint venture partner might result in subjecting our business to additional risk.

Under the Enfission operating agreement, neither we nor Framatome are in a position to unilaterally control the joint venture, and deadlocks may occur. Such deadlocks could adversely impact the operations and profitability of Enfission, including delaying the commercialization of nuclear fuel incorporating our technology. Disputes between us and Framatome may result in litigation or arbitration that would increase our expenses and prevent our officers and directors from focusing their time and effort on our business.

Neither Framatome nor Enfission is a publicly reporting entity in the United States, and as such they are not subject to the internal control requirements of the Sarbanes-Oxley Act or other SEC rules and regulations applicable to the Company. If Framatome or Enfission does not comply with the information and notice provisions set forth in the Enfission operating agreement and/or Research and Development Services Agreement, the Company may not be able to satisfy its reporting obligations under the Exchange Act or maintain adequate internal control over financial reporting, and our business, the market value of our securities and our access to capital markets could be materially adversely affected. Non-compliance by Framatome or Enfission could also adversely impact the operations and profitability of Enfission, including delaying the commercialization of nuclear fuel incorporating our technology.

In addition, the Enfission joint venture may result in other difficulties including, among other things, diversion of our management’s attention from other business concerns and managing regulatory compliance and corporate governance matters.

21

Table of Contents

Our interest in Enfission exposes us to risks related to the manufacturing of nuclear fuel.

Historically, we anticipated licensing our nuclear fuel technology to third parties that would undertake the manufacturing and sale of nuclear fuel incorporating our technology. With our entry into the Enfission joint venture, we will be indirectly exposed to certain risks in connection with the manufacturing of nuclear fuel, including procurement, quality assurance, regulatory, environmental and litigation risks. If such risks or other anticipated or unanticipated liabilities were to materialize, any desired benefits of our entry into the joint venture may not be fully realized, if at all, and our future financial performance may be negatively impacted.

If the price of non-nuclear energy sources falls, whether as the result of government policy or otherwise, there could be an adverse impact on nuclear energy, which would have a material adverse effect on our operations.

In certain markets with a diversified energy base, decisions on new build power plants are largely affected by the economics of various energy sources. If prices of non-nuclear energy sources fall, it could limit the deployment of new build nuclear power plants in such markets. This could reduce the size of the potential markets for both our fuel technology and our consulting services.

In addition, many states and the federal government have adopted a variety of government subsidies and utility incentives to allow renewable energy sources, such as biofuels, wind and solar energy, to compete with conventional sources of energy that have historically been less expensive, such as fossil fuels and nuclear power. We may face additional competition from providers of renewable energy sources, particularly in wind and solar energy, if government subsidies and utility incentives for those sources of energy remain or increase or if such sources of energy are mandated. Additionally, the availability of subsidies and other incentives from utilities or government agencies to install alternative renewable energy sources may negatively impact our potential customers’ desire to purchase our products and services, or may be utilized by our existing or new competitors to develop a competing business model or products or services that may be potentially more attractive to customers than ours, any of which could have a material adverse effect on our results of operations or financial condition.

We may be adversely affected by uncertainty in the global financial markets and worldwide economic downturn.

Our future results may be adversely affected by the worldwide economic downturn, continued volatility or further deterioration in the debt and equity capital markets, inflation, deflation, or other adverse economic conditions that may negatively affect us. At present, it is likely that we will require additional capital in the near future in order to fund our operations. Due to the above listed factors, we cannot be certain that additional funding will be available on terms that are acceptable to us, or at all.

Our limited operating history with our joint venture with Framatome makes it difficult to judge our prospects.

The success of our research and development activities, like other competing research and development projects similar to ours, is uncertain. If such efforts are not successful, we will be unable to generate revenues from our operations and we may have to cease doing business. Similarly, our fuel design patents and technology have not been commercially used and we have not received any royalty or sales revenue from this area of our business. We are subject to the risks, expenses and problems frequently encountered by companies in the early stages of development.

22

Table of Contents

We rely upon certain members of our senior management, including Seth Grae, Andrey Mushakov, and Larry Goldman and the loss of any of Mr. Grae, Mr. Mushakov, or Mr. Goldman or any of our management team would have an adverse effect on the Company.

Our success depends upon certain members of our senior management, including Seth Grae, our Chief Executive Officer, Mr. Andrey Mushakov, our Executive Vice President - Nuclear Operations, and Larry Goldman, our Chief Financial Officer. Mr. Grae’s and Mr. Mushakov’s knowledge of the nuclear power industry, their network of key contacts within that industry and in governments and, in particular, their expertise in the potential markets for our technologies, are critical to the implementation of our business model. Mr. Grae, Mr. Mushakov, or Mr. Goldman are likely to be significant factors in our future growth and success. The loss of services by either Mr. Grae, Mr. Mushakov, or Mr. Goldman could have a material adverse effect on our business, results of operations or financial condition. Also, we rely heavily on other members of our management team and our inability to hire, retain and motivate adequate numbers of consultants and managers could adversely affect our ability to meet client needs and to continue the development of our fuel designs.

Competition for highly qualified technical personnel is intense in our industry.

Our future success depends in part on our ability to contract with, hire, integrate and retain engineers and scientists, and other qualified personnel with a focus in our nuclear fuel technology and products. Competition for these skilled professionals is intense. If we are unable to adequately anticipate our needs for certain key competences and implement human resource solutions to recruit or improve these competences, our business, results of operations and financial condition would suffer. In addition, a loss of the service of any of our existing skilled employees or contractors could have a significant negative effect on our ability to operate.

Successful execution of our business model is dependent upon public support for nuclear power and overcoming public opposition to nuclear energy as a result of the major nuclear accident at Fukushima.

Successful execution of our business model is dependent upon public support for nuclear power in the United States and other countries. Nuclear power faces strong opposition from certain competitive energy sources, individuals, and organizations. The major nuclear accident that occurred at the Fukushima nuclear power plant in Japan beginning on March 11, 2011 increased public opposition to nuclear power in some countries, resulting in a slowdown in, or, in some cases, a complete halt to, new construction of nuclear power plants, an early shut down of existing power plants, or a dampening of the favorable regulatory climate needed to introduce new nuclear technologies. In addition, the Fukushima accident appears to have shrunk the projected size of the global nuclear power market in 2025-2030 as reflected in the most recent reference case projections published by the World Nuclear Association. As a result of the Fukushima accident, some countries that were considering launching new domestic nuclear power programs have delayed or cancelled preparatory activities they were planning to undertake as part of such programs. This has diminished the number of consulting opportunities that we could compete on globally, at least in the near-term. Furthermore, nuclear fuel fabrication and the use of new nuclear fuels in reactors must be licensed by the US Nuclear Regulatory Commission and equivalent governmental authorities around the world. In many countries, the licensing process includes public hearings in which opponents of the use of nuclear power might be able to cause the issuance of required licenses to be delayed or denied.

23

Table of Contents

We may not be able to receive or retain authorizations that may be required for us to sell our services or license our technology internationally.

The sales and marketing of our services and technology internationally may be subject to US and France export control regulations and the export control laws of other countries. Governmental authorizations may be required before we can export our services or technology. If authorizations are required and not granted, our international business plans could be materially affected. The export authorization process is often time consuming. Violation of export control regulations could subject us to fines and other penalties, such as losing the ability to export for a period of years, which would limit our revenue growth opportunities and significantly hinder our attempts to expand our business internationally.

Our fuel designs have never been tested in an existing commercial reactor and actual fuel performance, as well as the willingness of commercial reactor operators and fuel fabricators to adopt a new design, is uncertain.

Nuclear power research and development entails significant technological risk. New designs must undergo extensive development and testing necessary for regulatory approval. Our fuel designs are still in the research and development stage and while certain testing on our fuel technologies has been completed, further testing and experiments will be required in test facilities. For example, our proposed metallic fuel uses a helical cruciform form to increase its surface area and shorten the distance for heat generated in the fuel rod to reach water and improve the coolability of the fuel. However, this proposed shape may also result in non-uniform distribution of azimuthal heat flux that may have an adverse impact on the critical heat flux and limit power uprate capabilities of our metallic fuel resulting from an increased surface area of the cruciform fuel rod compared to a conventional cylindrical fuel rod. Additional testing and development may result in changes to the design of our proposed metallic fuel, which could decrease its realizable benefits and impair the ability of nuclear utilities to utilize nuclear fuel incorporating our technology.

Furthermore, the fuel technology has yet to be demonstrated in operating conditions equivalent to those found in an existing commercial reactor. Until we are able to successfully demonstrate operation of our fuel designs in commercial reactor conditions, we cannot confirm the ability of our fuel to perform as expected, including its ability to enable a power uprate or a longer operating cycle. In addition, there is also a risk that suitable testing or manufacturing facilities may not be available to us on a timely basis or at a reasonable cost, which could cause development program schedule delays.

If our fuel designs do not perform as anticipated in commercial reactor conditions, we will not realize revenues from licensing or other use of our fuel designs.

The amount of time and funding needed to bring our nuclear fuel to market may greatly exceed our projections.

The development of our nuclear fuel will take a significant amount of time and funding, and any delay in procuring equipment or in achieving development milestones, regulatory licensing timelines uncertainty could result in significant delays and cost overruns. We have come to the point where certain manufacturing equipment and a manufacturing facility are necessary for the development of our fuel; however, we cannot at this stage accurately predict the amount of funding or the time required to successfully manufacture and sell our fuel in the future. The actual cost and time required to commercialize our fuel technology may vary significantly depending on, among other things, the results of our research and product development efforts; the cost of developing or licensing our fuel; changes in the focus and direction of our research and product development programs; competitive and technological advances; the cost of filing, prosecuting, defending and enforcing claims with respect to patents; the regulatory approval process; fuel manufacturing process; and marketing and other costs associated with commercialization of these technologies. Because of this uncertainty, even if financing is available to us, we may need significantly more capital than anticipated, which may not be available on terms acceptable to us or at all, and the expected revenues and other benefits from our nuclear fuel technology may be delayed or never realized.

24

Table of Contents

Our current economic model for selling our fuel may prove to be inaccurate and our nuclear fuel technology products may not be cost effective.

Although our economic model concludes that our fuel technology can provide a significant payback to utilities, it is based upon a number of assumptions that may not prove accurate. If such model is inaccurate, our nuclear fuel product may not provide nuclear utility customers with sufficient economic incentive to switch from existing nuclear fuels, and we would lose or fail to develop customers.

Development of our nuclear fuel technology is dependent upon the availability of a test reactor.

Our fuel designs are still in the research and development stage and further testing and experiments will be required in test facilities. We intended to conduct further testing of our fuel designs at the Halden research reactor located in Halden, Norway. However, the Halden research reactor, which became operative in 1958, has closed and will not reopen, so it will not be available for further testing of our fuel designs. The Company has identified alternative options to generate the irradiation data we need to support regulatory licensing of our lead test assembly operation in a commercial reactor but pursuing such alternatives to the Halden research reactor may delay further testing of our fuel designs. We may not be able to contractually secure another reactor in which to test our fuel designs. As a result, commercialization of our nuclear fuel technology may be delayed, perhaps indefinitely, which would adversely affect our business, financial condition and results of operations.

Potential competitors could limit opportunities to license our technology.

Other companies may develop new nuclear fuel designs that can be used in the same types of reactors as those that we target. Some of these companies have existing long-term commercial contracts with nuclear power utilities that we do not have. If another company were to successfully develop a new nuclear fuel that competes with our nuclear fuel design technology, opportunities to commercialize our technology would be limited, and our business would suffer.

Moreover, many of these other companies have substantially greater financial, technological, managerial and research and development resources and experience than we do. These larger companies may be better able to handle the corresponding long-term financial requirements to successfully develop new nuclear fuel and bring it to market.

We serve the nuclear power industry, which is highly regulated. Our fuel designs differ from fuels currently licensed and used by commercial nuclear power plants. The regulatory licensing and approval process for nuclear power plants to use our fuels may be delayed and made more costly, and industry acceptance of our fuels may be hampered.

The nuclear power industry is a highly regulated industry. All entities that operate nuclear facilities and transport nuclear materials are subject to the jurisdiction of the US Nuclear Regulatory Commission, or its counterparts around the world.

Our fuel designs differ significantly in some aspects from the fuel used today by commercial nuclear power plants. These differences will likely result in more prolonged and extensive review by the US Nuclear Regulatory Commission or its counterparts around the world that could cause development program schedule delays. Entities within the nuclear industry may be hesitant to be the first to use our fuel, which has little or no history of successful commercial use. Furthermore, our fuel development timeline relies on the relevant nuclear regulator to accept and approve technical information and documentation about our fuel that is generated during the research and development program. There is a risk that regulators may require additional information regarding the fuel’s behavior or performance that necessitates additional, unplanned analytical and/or experimental work which could cause program schedule delays and require more research and development funding.

25

Table of Contents

Existing commercial nuclear infrastructure in many countries is limited to uranium material in an oxide form with enrichments up to 5%. Our fuel is in metallic form and is enriched to higher levels which would require modifications to existing commercial nuclear infrastructure and could impede commercialization of our technology.

Existing commercial nuclear infrastructure, including conversion facilities, enrichment facilities, fabrication facilities, fuel storage facilities, fuel handling procedures, fuel operation at reactor sites, used fuel storage facilities and shipping containers, were designed and are currently licensed to handle uranium in oxide form with enrichment up to 5%. Our fuel designs are expected to use uranium metal with uranium enrichment levels up to 19.75% and would therefore require certain modifications to existing commercial nuclear infrastructure to enable commercial nuclear facilities to handle our fuels. Those nuclear facilities will need to go through a regulatory licensing process and obtain regulatory approvals to be able to process, handle, or ship uranium metal with enrichment levels up to 19.75% and operate commercial reactors using our metallic fuel. There is a risk that some relevant entities within the nuclear power industry may be slow in making any required facility infrastructure modifications or obtaining required licenses or approvals to enable enrichment to 19.75%, conversion to metallic uranium, fabrication of metallic fuel rods and assemblies, shipment of fresh and irradiated metallic fuel assemblies, interim storage of fresh and irradiated fuel assemblies in spent fuel pools or dry cask storage facilities at reactor sites, and permanent disposal of spent metallic fuel at a high-level repository. There is also a risk associated with possible negative perception of uranium enrichment greater than 5% that could potentially delay or hinder regulatory approval of our nuclear fuel designs.

Our nuclear fuel designs rely on fabrication technologies that in certain material ways are different from the fabrication techniques presently utilized by existing commercial fuel fabricators. In particular, our metallic fuel rods must be produced using a co-extrusion fabrication process. Presently, most commercial nuclear fuel is produced using a pellet fabrication technology, whereby uranium oxide is packed into small pellets that are stacked and sealed inside metallic tubes. Our co-extrusion fabrication technology involves extrusion of a single-piece solid fuel rod from a metallic matrix containing uranium and zirconium alloy. Fabrication of full-length (approximately 3.5 to 4.5 meters) PWR metallic fuel rods has yet to be demonstrated. There is a risk that the fuel fabrication process utilized to produce one meter long metallic fuel rods may not be adaptable to the fabrication of full-length metallic fuel rods used in commercial reactors.

If the US Department of Energy (“DOE”) were to successfully assert that an invention claimed within our 2007 or 2008 Patent Cooperation Treaty, or PCT, patent applications was first conceived or actually reduced to practice under a contract with the DOE, then our intellectual property rights in that invention could become compromised and our business model could become significantly impeded.

Work on finite aspects and/or testing of some subject matter disclosed in our 2007 and 2008 Russian PCT patent applications was done under a government contract with the DOE. If the DOE asserted that an invention claimed in the 2007 and/or 2008 Russian PCT applications was first conceived or actually reduced to practice under such a contract, and a US court agreed, the DOE could gain an ownership interest in such an invention outside of the Russian Federation and our intellectual property rights in that claimed invention could become compromised and our business model may then be significantly impeded.

26

Table of Contents

If we are unable to obtain or maintain intellectual property rights and trade secrets relating to our technology, the commercial value of our technology may be adversely affected, which could in turn adversely affect our business, financial condition and results of operations.

Our success and ability to compete depends in part upon our ability to obtain protection in the United States and other countries for our nuclear fuel designs by establishing and maintaining intellectual property rights relating to or incorporated into our fuel technologies and products. We own a variety of patents and patent applications in the United States, as well as corresponding patents and patent applications in several other jurisdictions. We have not obtained patent protection in each market in which we plan to compete. We do not know how successful we would be should we choose to assert our patents against suspected infringers. Our pending and future patent applications may not issue as patents or, if issued, may not issue in a form that will be advantageous to us. Even if issued, patents may be challenged, narrowed, invalidated, or circumvented, which could limit our ability to stop competitors from marketing similar products or limit the length of term of patent protection we may have for our products. Changes in either patent laws or in interpretations of patent laws in the United States and other countries may diminish the value of our intellectual property or narrow the scope of our patent protection, which could in turn adversely affect our business, financial condition and results of operations.

We intend to apply for additional patents for our nuclear fuel technologies and fuel, as we deem appropriate. We may, however, fail to apply for patents on important technologies or products in a timely fashion, if at all. Our existing patents and any future patents we obtain may not be sufficiently broad to prevent others from practicing our technologies or from developing competing products and technologies. In addition, in general the patent positions of energy technology companies are highly uncertain and involve complex legal and factual questions for which important legal principles remain unresolved. As a result, the validity and enforceability of our patents cannot be predicted with certainty.

We also rely on trade secrets to protect some of our technology, especially where it is believed that patent protection is undesirable for the Company or unobtainable. We generally require our employees, consultants, advisors and collaborators to execute appropriate agreements with us recently regarding the safeguarding of confidential information. If any of these agreements are violated, or if any of our employees, consultants, advisors or collaborators unintentionally or willfully disclose our proprietary information to competitors, we may not be able to fully perfect our rights to the technologies in question, and in some instances, we may not have an appropriate remedy available for the damages that we may incur as a result of any such violation. Enforcement of claims that a third party has illegally obtained and is using trade secrets is expensive, time consuming and uncertain. In addition, non-US courts are sometimes less willing than US courts to protect trade secrets. If our competitors independently develop equivalent knowledge, methods and know-how, we would not be able to assert our trade secrets against them and our business could be harmed.

If we infringe or are alleged to infringe intellectual property rights of third parties, our business, financial condition and results of operations could be adversely affected.

Our nuclear fuel designs may infringe, or be claimed to infringe, patents or patent applications under which we do not hold licenses or other rights. Third parties may own or control these patents and patent applications in the United States and elsewhere. Third parties could bring claims against us that would cause us to incur substantial expenses and, if successfully asserted against us, could cause us to pay substantial damages. If a patent infringement suit were brought against us, we could be forced to stop or delay commercialization of the fuel design or a component thereof that is the subject of the suit. As a result of patent infringement claims, or in order to avoid potential claims, we may choose or be required to seek a license from the third party and be required to pay license fees, royalties, or both. These licenses may not be available on acceptable terms, or at all. Even if we were able to obtain a license, the rights may be nonexclusive, which could result in our competitors gaining access to the same intellectual property. Ultimately, we could be forced to cease some aspect of our business operations if, as a result of actual or threatened patent infringement claims, we are unable to enter into licenses on acceptable terms. This could significantly and adversely affect our business, financial condition, and results of operations. In addition to infringement claims against us, we may become a party to other types of patent litigation and other proceedings, including interference proceedings declared by the United States Patent and Trademark Office regarding intellectual property rights with respect to our nuclear fuel designs. The cost to us of any patent litigation or other proceeding, even if resolved in our favor, could be substantial. Some of our competitors may be able to sustain the costs of such litigation or proceedings more effectively than we can because of their greater financial resources. Uncertainties resulting from the initiation and continuation of patent litigation or other proceedings could have a material adverse effect on our ability to compete in the marketplace. Patent litigation and other proceedings may also absorb significant management time.

27

Table of Contents

Applicable Russian intellectual property law may be inadequate to protect some of our intellectual property, which could have a material adverse effect on our business.

Intellectual property rights are evolving in Russia, and are trending towards international norms, but are by no means fully developed. We have worked closely with employees in Russia and other Russian contractors and entities to develop some of our material intellectual property. Some of our earlier intellectual property rights originate from our patent filings in Russia. Our worldwide rights in some of this intellectual property, therefore, may be affected by Russian intellectual property laws. If the application of Russian laws to some of our intellectual property rights proves inadequate, then we may not be able to fully avail ourselves of all of our intellectual property, and our business model may be impeded.

The laws of certain foreign jurisdictions do not protect intellectual property rights to the same extent as the laws of the United States, and many companies have encountered significant challenges in protecting and defending such rights in such foreign jurisdictions. The legal systems of certain countries, particularly developing countries, do not favor the enforcement of patents and other intellectual property protection, which could make it difficult for us to stop the infringement of our patents. Proceedings to enforce our patent rights in foreign jurisdictions could result in substantial cost and divert our efforts and attention from other aspects of our business.

Our nuclear fuel process is dependent on outside suppliers of nuclear and other materials and any difficulty by a fuel fabricator in obtaining these materials could be detrimental to our ability to eventually market our fuel through a fuel fabricator.

Production of fuel assemblies using our nuclear fuel designs is dependent on the ability of fuel fabricators to obtain supplies of nuclear material utilized in our fuel assembly design. Our proposed fuel products require high-assay low enriched uranium in the metallic form, enriched between 5% to 19.75% (HALEU), with presently no commercial supply of HALEU available in the US. Currently HALEU can only be sourced in limited quantities from the DOE.

Recently, major commercial enrichment companies, such as Urenco facilities have expressed interest in supplying HALEU. Several Urenco enrichment facilities are already licensed to produce at enrichments above 5% U235, in line with today’s nuclear industry market requirements. Urenco is now exploring the construction of a dedicated HALEU unit at the Urenco USA facility. Urenco is progressing the design engineering and related licensing activities to support this project.

Fabricators will also need to obtain metal for components, particularly zirconium or its alloys. These materials are regulated and can be difficult to obtain or may have unfavorable pricing terms. Any difficulties in obtaining these materials by fuel fabricators could have a material adverse effect on their ability to market fuel based on our technology.

28

Table of Contents

We are exposed to risks related to cybersecurity and protection of confidential information.

We retain highly confidential information in our systems and databases on third party network providers. Although we maintain security features in our systems designed to protect proprietary information and prevent data loss and other security breaches, such measures cannot provide absolute security and our operations may be susceptible to breaches on our third party networks, including from circumvention of security systems, denial of service attacks or other cyber-attacks, hacking, computer viruses or malware, technical malfunction, employee error, malfeasance, physical breaches, system disruptions or other disruptions. We outsource certain functions, including IT functions, and these relationships allow for the storage and processing of our information, as well as customer, counterparty and employee information. While we engage in actions to reduce our exposure resulting from outsourcing, ongoing threats may result in unauthorized access, loss, exposure or destruction of data, or other cybersecurity incidents, with increased costs and other consequences, including those described below.

Disruptions from cybersecurity events may jeopardize the security of information stored in and transmitted through our systems or the systems of outsourcing parties. An increasing number of websites, including those owned by several other large Internet and offline companies, have disclosed breaches of their security, some of which have involved sophisticated and highly targeted attacks on portions of their websites or infrastructure. The techniques used to obtain unauthorized access, disable, or degrade service, or sabotage systems, change frequently, may be difficult to detect for a long time, and often are not recognized until launched against a target. Certain efforts may be state sponsored and supported by significant financial and technological resources and therefore may be even more difficult to detect. We may not anticipate these techniques or implement adequate preventive measures. We currently expend, and may be required to expend significant additional capital and other resources to protect against such security breaches or to alleviate problems caused by such breaches. Our insurance coverage may be inadequate to compensate us for any related losses we incur.

These issues are likely to become more difficult as we expand our operations. Any breach of our security measures, or even a perceived breach of our security measures, could cause us to lose potential customers and governmental approvals; suffer material harm to our business, financial condition, operating results and reputation; or be subject to regulatory actions, litigation, sanctions or other statutory penalties.

Technological changes could render our technology and products uncompetitive or obsolete, which could prevent us from achieving market share and sales.

Our failure to refine or advance our fuel technologies could cause our nuclear fuel to become uncompetitive or obsolete, which could prevent us from achieving market share and sales. We may need to invest significant financial resources in research and product development to keep pace with technological advances in the industry and to compete in the future; we may be unable to secure such financing. We believe that a variety of competing alternative technologies may be in development by other companies that could result in lower manufacturing costs and/or higher fuel performance than those expected for our fuel products. Our development efforts may be rendered obsolete by the technological advances of others, and other technologies may prove more advantageous for commercialization.

29

Table of Contents

Risks related to the ownership of our common stock

We have issued preferred stock with rights senior to our common stock.

Approximately 3.5 million shares of our Series A and Series B preferred stock were issued and outstanding at December 31, 2018. We can issue additional shares of preferred stock in one or more series and can set the terms of the preferred stock without seeking any further approval from the holders of our common stock. Any preferred stock that we issue may rank ahead of our common stock in terms of dividend priority or liquidation premiums, may have greater voting rights than our common stock, and may have consent rights over certain fundamental transactions. The interests of the holders of the preferred stock may as a consequence be different from the interests of the holders of our common stock, including in certain fundamental transactions in which the preferred stockholders would receive distributions before any distributions may be made to our common stockholders. In addition, such preferred stock may contain provisions allowing it to be converted into shares of common stock, which could dilute the value of our common stock to then current stockholders and could adversely affect the market price of our common stock.

There may be volatility in our stock price, which could negatively affect investments, and our stockholders may not be able to resell their shares at or above the value they originally purchased such shares.

The market price of our common stock may fluctuate significantly in response to a number of factors, some of which are beyond our control, including:

  • trading volume of our common stock;
  • quarterly variations in operating results;
  • actual or anticipated variations in our results of operations or those of our competitors;
  • failure to obtain or maintain analyst coverage of our common stock, changes in earnings estimates or recommendations by securities analysts, or our failure to achieve analyst earnings estimates;
  • future sales of our common stock or other securities by us or our stockholders;
  • general market conditions and other factors unrelated to our operating performance or the operating performance of our competitors; and
  • the risks discussed elsewhere in this Annual Report on Form 10-K.

The stock market may experience extreme volatility that is often unrelated to the performance of particular companies. These market fluctuations may cause our stock price to fall regardless of its performance.

Our inability to comply with the listing requirements of the Nasdaq Capital Market will result in our common stock being delisted, which could affect its market price and liquidity and reduce our ability to raise capital.

We have received notice from the Nasdaq Stock Market (“Nasdaq”) that we are not in compliance with certain requirements for continued listing of our common stock on the Nasdaq Capital Market. On November 5, 2018, we received a letter from the Nasdaq Listing Qualifications staff notifying us that for the preceding 30 consecutive business days, our common stock did not maintain a minimum closing bid price of at least $1.00 per share as required by Nasdaq Listing Rule 5550(a)(2). If we are not able to regain compliance with such requirements within the timeframe set by Nasdaq, or if we otherwise fail to comply with continued listing requirements, our common stock may be delisted.

30

Table of Contents

In accordance with Nasdaq Listing Rule 5810(c)(3)(A), we have a grace period of 180 calendar days, or until May 6, 2019, to regain compliance with the minimum closing bid price requirement for continued listing. In order to regain compliance, the closing bid price of our common stock must be at least $1.00 per share for a minimum of ten consecutive business days. In the event we do not regain compliance by May 6, 2019, we may be provided an additional 180-day compliance period, if we demonstrate that we meet the applicable market value of publicly held shares requirement for continued listing and all other applicable standards for initial listing on the Nasdaq Capital Market, with the exception of the bid price requirement, and provides written notice of our intention to cure the minimum bid price deficiency during the second grace period, including by implementation of a reverse stock split, if necessary.

If we fail to regain compliance with, or otherwise fail to comply with, all applicable continued requirements, Nasdaq may determine to delist our common stock, which could substantially decrease trading in our common stock and adversely affect the market liquidity of our common stock and cause the market price of our common stock to decline. In addition, our ability to raise additional capital, including through future at-the-market offerings and other offerings utilizing short-form registration statements on Form S-3, would be substantially impaired.

Properties

As filed, 450 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our office space is located at 11710 Plaza America Drive, Suite 2000 Reston, VA 20190 USA. The term of the lease extends through December 31, 2019. We are obligated to pay approximately $15,000 per month for office rent. This space is used by our executives, employees, and contractors for administrative purposes, consulting work, and research and development activities. Our joint venture company Enfission has a virtual office at the same address.

As filed, 606 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

From time to time, we may become involved in various lawsuits and legal proceedings, which arise in the ordinary course of business. However, litigation is subject to inherent uncertainties, and an adverse result in these or other matters may arise from time to time that may harm our business. For a description of legal proceedings involving the Company, see the information set forth under “Litigation” in Note 6, “Commitments and Contingencies,” of the Notes to our consolidated financial statements in Part II, Item 8, Financial Statements and Supplementary Data, of this Annual Report on Form 10-K.

Management's discussion and analysis

As filed, 37,614 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations, or MD&A, is intended to help the reader understand Lightbridge Corporation, our operations and our present business environment. MD&A is provided as a supplement to, and should be read in conjunction with, our consolidated financial statements and the accompanying Notes thereto, which are contained in Item 8, Financial Statements and Supplementary Data, of this report. This MD&A consists of the following sections:

  • Overview of Our Business and recent developments — a general overview of our business and updates;
  • Critical Accounting Policies and Estimates — a discussion of accounting policies that require critical judgments and estimates;

32

Table of Contents

  • Operations Review — an analysis of our consolidated results of operations for the two years presented in our consolidated financial statements. Except to the extent that differences among our operating segments are material to an understanding of our business as a whole, we present the discussion in the MD&A on a consolidated basis; and
  • Liquidity, Capital Resources, and Financial Position — an analysis of our cash flows, and an overview of our financial position.

As discussed in more detail at the beginning of this Annual Report, the following discussion contains forward-looking statements that involve risks, uncertainties, and assumptions such as statements of our plans, objectives, expectations, and intentions. Our actual results may differ materially from those discussed in these forward-looking statements because of the risks and uncertainties inherent in future events.

OVERVIEW OF OUR BUSINESS

Lightbridge is a leading nuclear fuel technology company. Our goal is to produce the next generation of nuclear fuel that could significantly improve the economics, safety, and proliferation resistance of existing and new reactors, with a meaningful impact on addressing climate change and air pollution. We project that the world’s energy and climate needs can only be met if nuclear power’s share of the energy-generating mix grows substantially.

Our primary focus is the development and commercialization of metallic fuel rods that will replace the uranium oxide ceramic pellets that have traditionally fueled nuclear reactors. We believe our metallic fuel offers significant economic and safety benefits over traditional fuel, primarily because of the superior heat transfer properties of all-metal fuel and the resulting lower operating temperature of the reactor. We also believe that uprating a reactor with Lightbridge fuel will add incremental electricity at a lower levelized cost than any other means of generating baseload electric power, including any renewable, fossil, or hydroelectric energy source.

We have built a significant portfolio of patents reflecting years of research and development, and we anticipate substantial completion of our research efforts and the testing of our fuel over the next few years. We expect the first purchase orders for our metallic fuel as soon as 2028, with final deployment of our fuel in commercial reactors as soon as 2030.

We conduct our business principally through Enfission, our 50/50 joint venture with Framatome formed on January 24, 2018. Enfission serves as the exclusive vehicle through which the Company and Framatome are researching, developing, obtaining regulatory approvals, manufacturing and will be using, marketing and selling nuclear fuel assemblies based on the Lightbridge metallic fuel technology comprising U-Zr multi-lobe, helically twisted fuel rods and associated manufacturing processes and other advanced nuclear fuel intellectual property contributed by both Lightbridge and Framatome within the operating domain. The operating domain of Enfission includes pressurized water reactors (excluding water-cooled water-moderated energetic reactor (VVER) types) and boiling water reactors, which collectively constitute most of the power reactors in the world, as well as water-cooled small modular reactors and water-cooled research reactors.

Within the operating domain of Enfission, in addition to distributions from Enfission based on our ownership interest in the joint venture, we anticipate receiving future licensing revenues in connection with sales by Enfission of nuclear fuel incorporating our background intellectual property as well as jointly owned foreground intellectual property co-owned on a 50-50 basis with Framatome SAS. Outside the domain of Enfission, such as future fuel sales to utility customers operating CANDU or VVER reactors, we expect to enter into separate technology licensing or other types of commercial arrangements to monetize our intellectual property.

33

Table of Contents

In addition to our nuclear fuel technology business, we may also opportunistically provide nuclear power consulting and strategic advisory services to commercial and governmental entities worldwide. We are not currently seeking consulting engagements and have no dedicated resources for that purpose and have discontinued this business segment, however we are open to opportunistically providing nuclear power consulting and strategic advisory services through reassignment of resources from our core business and employment of outside resources from our industry contacts, to commercial and governmental entities worldwide in the future.

We have included the audited financial results of the Enfission joint venture with Framatome as an exhibit to this Annual Report on Form 10-K, as we believe Enfission’s financial results are significant to our operations and our financial results.

We were incorporated under the laws of the State of Nevada on February 2, 1999. Lightbridge and Enfission’s principal executive offices are located at 11710 Plaza America Drive, Suite 2000, Reston, Virginia 20190 USA.

Refer to Part I, Item 1, Business, for additional information. Financial information about our business is included in Part II, Item 8, Financial Statements and Supplementary Data, of this Annual Report on Form 10-K.

Nuclear Power as Clean and Low Carbon Emissions Energy Source

Nuclear power provides clean, reliable baseload electricity generation source. According to the World Nuclear Association (WNA), nuclear power plants produce no greenhouse gas emissions during operation, and over the course of its life-cycle, nuclear produces about the same amount of CO2 equivalent emissions per unit of electricity as wind. The WNA further states that almost all proposed pathways to achieving significant decarbonization suggest an increased role for nuclear power, including those published by the International Energy Agency, Massachusetts Institute of Technology Energy Initiative, US Energy Information Administration, and World Energy Council.

We believe that deep cuts to CO2 emissions are only possible with electrification of most of the transportation and industrial sectors globally and powering them and the current electricity needs of the world with non-emitting or low-emitting power. We believe this can be done only with a large increase in nuclear power, several times the amount that is generated globally today. We believe that our nuclear fuel technology can be an essential element of reaching this goal.

Operations Review

Financial information is included in Part II, Item 8, Financial Statements and Supplementary Data, of this Annual Report on Form 10-K.

We have provided a discussion of our results of operations on a consolidated basis and have also provided certain detailed segment information for each of our business segments below for the year ended December 31, 2017. In 2017, we had organized our operations into two principal segments (1) the technology business segment and (2) the consulting business segment. We presented our financial information along the same lines that our chief executives reviewed our operating results in assessing performance and allocating resources. For the year ended December, 31, 2018, we focused our efforts on our technology business segment and commercialization of metallic nuclear fuel, resulting in just one segment, and consequently segment analysis is not applicable this year.

34

Table of Contents

Technology Business

Our goal is to develop and commercialize innovative, proprietary nuclear fuel designs, which we expect will significantly enhance the nuclear power industry’s economics due to higher power output and improved safety margins.

We are focusing our technology development efforts on the metallic fuel with a potential power uprate of up to 10% and an operating cycle extended from 18 to 24 months in existing Westinghouse-type four-loop pressurized water reactors. Those reactors represent the largest segment of our global target market. The metallic fuel could also be adapted for use in other types of water-cooled commercial power reactors, such as boiling water reactors, Russian-type VVER reactors, CANDU heavy water reactors, water-cooled small and modular reactors, as well as water-cooled research reactors.

We have obtained and will continue to seek patent validation in key countries that either currently operate or are expected to build and operate a large number of suitable nuclear power reactors.

We expect to invest a total of $15 million to $20 million in the development of our nuclear fuel products, including corporate research and development expenditures, over the next 12 to 15 months.

Consulting Business

The Company’s business model expanded with consulting revenue in 2008, where we have provided consulting and strategic advisory services to companies and governments planning to create or expand electricity generation capabilities using nuclear power plants. As of January 1, 2018, we no longer had a consulting business segment and there was no consulting revenue for the year ended December 31, 2018 as we focused our efforts on our technology business segment and commercialization of our metallic nuclear fuel. We presently do not have any consulting clients, or operations as of the date of this filing. We may from time to time opportunistically provide nuclear power consulting and strategic advisory services through reassignment of resources from our core business and employment of outside resources from our industry contacts, to commercial and governmental entities worldwide in the future.

Consolidated Results of Operations

The following table presents our historical operating results as a percentage of revenues for the years indicated:

Year Ended December 31, 2018 2017 Changes 2018 vs 2017 $%
Consulting Revenues $- $175,446 $(175,446) (100)%
Cost of Services Provided
Consulting expenses $- $107,091 $(107,091) (100)%
Gross Margin $- $68,355 $(68,355) (100)%
Operating Expenses
General and administrative $6,715,378 $4,383,066 $2,332,312 53%
Research and development expenses $3,458,377 $2,282,938 $1,175,439 51%
Total Operating Expenses $10,173,755 $6,666,004 $3,507,751 53%
Other Operating Income and (Loss)
Other income from joint venture $1,056,551 $- $1,056,551 100%
Equity in loss from joint venture $(5,835,263) $- $(5,835,263) (100)%
Total Other Operating and (Loss) $(4,778,712) $- $(4,778,712) (100)%
Operating Loss $(14,952,467) $(6,597,649) $(8,354,818) (127)%
Other Income and (Expenses) $(723,641) $(507,248) $(216,393) (43)%
Net Loss Before Income Taxes $(15,676,108) $(7,104,897) $(8,571,211) (121)%

35

Table of Contents

Revenue

The market for nuclear industry consulting services is competitive, fragmented, and subject to rapid change. Our main business is developing our nuclear fuel. We may pursue some consulting services opportunities in the future, but we have further increased the focus and resources of the Company to the fuel division and away from consulting. There was no revenue for the year ended December 31, 2018 as compared to approximately $0.2 million for the year ended December 31, 2017.

Cost of Services Provided

Because we have shifted the focus and resources of the Company to the fuel division and away from consulting, we have not incurred costs related to consulting in 2018. Cost of services provided in 2017 was comprised of expenses related to the consulting, professional, administrative, and other support costs and stock-based compensation allocated to our consulting projects labor, which were incurred to perform and support the work done for our consulting projects.

Total stock-based compensation included in cost of services provided was approximately $0.02 million for the year ended December 31, 2017.

Research and Development

Research and development expenses consist primarily of compensation and related fringe benefits including stock-based compensation and related allocable overhead costs for the research and development of our fuel, including work performed and billed to our Enfission joint venture. Total research and development expenses increased by approximately $1.2 million for the year ended December 31, 2018, as compared to the year ended December 31, 2017.

There was an increase in the number of employees, an increase in employee compensation and employee benefits in supporting research and development activities for Enfission of approximately $0.7 million, which was offset by service income charged to Enfission for employee support services provided to Enfission of $0.2 million. There was an increase in stock-based compensation of approximately $0.5 million due to the vesting of performance-based stock options issued in 2017 and the issuance of performance-based stock options in August 2018, an increase in legal fees related to our Enfission joint venture of approximately $0.4 million. These increases were offset by a decrease in outside research and development work performed by outside entities in 2017 of approximately $0.2 million.

Total stock-based compensation included in research and development expenses was approximately $1.0 million and $0.5 million for the year ended December 31, 2018 and 2017, respectively.

Primarily all of our above reported research and development activities were conducted in the United States and France. We expense research and development costs as they are incurred. Research and development expenses may increase in dollar amount because we expect to invest $15 million to $20 million in the development of our nuclear fuel products over the next 12 to 15 months. Due to the research and development nature of these expenditures, cost and schedule estimates are inherently uncertain and can vary significantly as new information and the outcome of these research and development activities become available.

36

Table of Contents

General and Administrative Expenses

General and administrative expenses consist mostly of compensation and related costs for personnel and facilities, stock-based compensation, finance, human resources, information technology, and fees for consulting and other professional services. Professional services are principally comprised of outside legal, audit, strategic advisory services, and outsourcing services.

Total general and administrative expenses increased by approximately $2.3 million for the year ended December 31, 2018, as compared to the year ended December 31, 2017.

There was an increase in professional fees of approximately $0.8 million, which was due to the increased legal and professional work in negotiating and forming the Enfission joint venture, an increase in accounting support regarding the implementation of our new project management and time and expense software and other services, and an increase in other professional and consulting fees regarding engaging a consulting firm to assist in preparing the application for a grant from the US Department of Energy (“DOE”). There was also an increase in employee wages and benefits of approximately $0.7 million due to an increase in the number of employees and an increase in employee compensation and employee benefits, offset by service income charged to Enfission for employee support services to Enfission of $0.2 million, an increase in stock-based compensation of approximately $0.8 million, due to the vesting of performance-based stock options issued in 2017 and the issuance of performance-based options in August 2018, and an increase in corporate travel expenses of approximately $0.1 million.

Total stock-based compensation included in general and administrative expenses was approximately $1.4 million and $0.7 million for the year ended December 31, 2018 and 2017, respectively.

See Note 9. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Consolidated Financial Statements included in this Annual Report on Form 10-K for more information regarding our stock-based compensation.

Other Operating Income and (Loss) – Related Party

Reported in other operating income is other income for activities performed by our employees and consultants billed to the Enfission joint venture for research and development work. Total other income from these activities was approximately $1.1 million for the year ended December 31, 2018. In 2018, approximately 77% of the total Enfission cash inflow or capital contributions into Enfission were funded by Lightbridge and the remaining 23% was funded as capital contributions into Enfission from Framatome. Equity in loss from joint venture consists of our share of the allocated loss in Enfission.

Other Income (Expenses)

There was a net increase in other income and (expenses) of approximately $(0.2) million. This change was due to an increase in amortization of deferred financing costs of approximately $0.5 million due to the write-off of the deferred financing costs in the first quarter of 2018 for the expired equity line option agreement, partially offset by an increase of $0.3 million in interest income generated from the interest earned from the purchase of treasury bills and from our bank savings account for the year ended December 31, 2018 as compared to the year ended December 31, 2017.

37

Table of Contents

Provision for Income Taxes

We incurred a pre-tax net loss for both 2018 and 2017. We reviewed all sources of income for purposes of recognizing the deferred tax assets and concluded a full valuation allowance for 2018 and 2017 was necessary. Therefore, we did not have a provision for taxes for both years ended December 31, 2018 and 2017.

See Note 8 of the Notes to our Consolidated Financial Statements included in this Annual Report on Form 10-K for information regarding our income taxes.

LIQUIDITY, CAPITAL RESOURCES AND FINANCIAL POSITION

At December 31, 2018, we had cash and cash equivalents of approximately $24.6 million, as compared to approximately $4.5 million at December 31, 2017. The $20.1 million increase in cash and cash equivalents resulted from net proceeds from the sale of approximately $29.5 million of common stock and net proceeds from the issuance of approximately $3.9 million of preferred stock during the year ended December 31, 2018. This amount of cash inflow was partially offset by net cash used in operating activities of approximately $7.4 million and our capital contributions for our capital investment in Enfission of approximately $5.6 million. We used cash during the year ended December 31, 2018 primarily to fund our research and development expenses and general and administrative expenses. We did not have any consulting revenue for the year ended December 31, 2018 and presently do not expect to have consulting revenue for the next 12 months.

We currently project a cash flow shortfall averaging approximately $0.8 million per month for our general and administrative and corporate research and development expenses for total expected expenditures of approximately $9.3 million for the next 12 months. We currently anticipate the amount of cash outlays to Enfission and third parties for research and development expenditures and equipment purchases of approximately $10.7 million, for the next 12 months. Total cash budget for the next 12 months is approximately $20 million. The Company believes that its current financial resources, as of the date of the issuance of these financial statements, are sufficient to fund its current 12 month operating budget, alleviating the substantial doubt raised by our historical operating results and satisfying our estimated liquidity needs 12 months from the issuance of these financial statements.

We can provide no assurances about meeting our budgeted expenditures regarding our future research and development efforts to meet our desired fuel development milestones for the next 12 months and beyond, as well as predicting future market trends in nuclear that can affect the future sale of our nuclear fuel. Furthermore, any negative results from our research and development may require us to increase our research and development spending to achieve our desired milestones in developing our nuclear fuel. Presently, we fund substantially all of the cash that is required for the research and development activities to be conducted in Enfission. These additional capital needs relate to the development, manufacturing, and commercialization of our nuclear fuel assemblies. We have the ability to delay incurring certain operating expenses in the next 12 to 15 months, which could reduce our cash flow shortfall, if needed.

The current primary future potential sources of cash available to us in 2019 are potential funding from equity investments and potential grants that we are actively seeking from DOE. We anticipate that current cash on hand and additional equity investments in 2019 will help us meet the DOE minimum cost-sharing requirements that typically range from 20% to 50% of the total project cost (i.e., a 25% to 100% match in Company’s cost-sharing contributions is required for each dollar of DOE funding) or even higher in some cases. We have no debt or debt credit lines and we have financed our operations to date through our prior years’ consulting revenue and the sale of our preferred stock and common stock. Management believes that public or private equity investments will be available as needed, however adverse market conditions in our common stock price and trading volume could substantially impair our ability to raise capital in the future.

38

Table of Contents

Short-Term and Long-Term Liquidity Sources

As discussed above, we may seek new financing or additional sources of capital, depending on the capital market conditions, over the next 12 months. There can be no assurance that some of these additional sources of capital will be made available to us. The primary potential sources of cash that may be available to us are as follows:

  • Equity investment from third party investors in Lightbridge or Enfission; and
  • Strategic investment or cost-sharing contributions through funding from the Department of Energy, and/or other strategic parties, to support the remaining research and development activities required to further enhance and complete the development of our fuel products to a commercial stage.

In support of our long-term business plan with respect to our fuel technology business, we endeavor to create strategic alliances with other strategic parties during the next three years, to support the remaining research and development activities through Enfission that is required to further enhance and complete the development of our fuel products to a commercial stage. We may be unable to form such strategic alliances on terms acceptable to us or at all.

We will need to raise additional capital to fund our overall corporate and research and development activities for future operations in 2020 and beyond, which may involve offerings of equity or debt securities, securing financing through one or more banks or entering into strategic alliances with other parties.

See Note 9. Stockholders’ Equity and Stock-Based Compensation of the Notes to our financial statements included in Part II Item 8, Financial Statements and Supplementary Data, of this Annual Report on Form 10-K for information regarding our prior financings.

The following table provides detailed information about our net cash flows for the years ended December 31, 2018 and 2017.

Cash Flow (rounded in millions)

Year Ended December 31, 2018 2017
Net cash used in operating activities $(7.4) $(5.0)
Net cash used in investing activities $(5.8) $(0.2)
Net cash provided by financing activities $33.3 $6.1
Net cash inflow $20.1 $0.9

Operating Activities

The increase in our cash used in operating activities in 2018 of approximately $2.4 million was primarily due to an increase in our operating expenses and net loss and the change in working capital items as explained below.

Cash used in operating activities in the year ended December 31, 2018 consisted of net loss adjusted for non-cash (income) expense items such as stock-based compensation, amortization of deferred financing costs and others, as well as the effect of changes in working capital. Cash used in operating activities in the year ended December 31, 2018 consisted of a net loss of approximately $15.7 million and net adjustments to net loss for non-cash income items or a negative cash flow offset (decrease to cash flow used in operating activities) totaling approximately $9.2 million, consisting of non-cash adjustments for stock-based compensation of approximately $2.4 million, write-off of deferred financing costs of approximately $1.0 million and equity in loss from joint venture of approximately $5.8 million. Total cash used in operating working capital totaled approximately $0.9 million which was due to a decrease in accounts payable and other accrued liabilities and an increase in other receivables from joint venture of $0.1 million.

39

Table of Contents

Investing Activities

Net cash used by our investing activities for the year ended December 31, 2018, as compared to net cash used by our investing activities in 2017, was increased by approximately $5.6 million. The increase was due primarily to the spending for investment in our Enfission joint venture for the amount of approximately $5.6 million. The spending for patent application costs are primarily the same for the year ended December 31, 2018. These applications are filed for the new developments resulting from our research and development activities in our technology business segment. We anticipate these patent costs to increase in the future periods due to the continuing research and development work we plan to perform on our all-metal fuel design.

Financing Activities

Net cash provided by our financing activities for the year ended December 31, 2018, as compared to net cash provided by our financing activities for the year ended December 31, 2017 was an increase by approximately $27.2 million.

The increase was primarily due to the increase in the proceeds from the issuance of our Series A Preferred Stock of approximately $3.9 million, an increase in the net proceeds from the issuance of our common stock through our equity purchase agreements and our ATM agreements of approximately $29.4 million in 2018 as compared to $6.0 million raised in 2017.

Critical Accounting Policies and Estimates

The SEC issued Financial Reporting Release No. 60, “Cautionary Advice Regarding Disclosure About Critical Accounting Policies” suggesting that companies provide additional disclosure and commentary on their most critical accounting policies. In Financial Reporting Release No. 60, the SEC has defined the most critical accounting policies as the ones that are most important to the portrayal of a company’s financial condition and operating results and require management to make its most difficult and subjective judgments, often as a result of the need to make estimates of matters that are inherently uncertain. Based on this definition, we have identified the following significant policies as critical to the understanding of our financial statements.

The preparation of financial statements and related disclosures in conformity with US generally accepted accounting principles (“GAAP”) and the Company’s discussion and analysis of its financial condition and operating results require the Company’s management to make judgments, assumptions and estimates that affect the amounts reported in its consolidated financial statements and accompanying notes. Note 1, “Summary of Significant Accounting Policies,” of the Notes to Consolidated Financial Statements in Part II, Item 8 Financial Statements and Supplementary Data, of this Form 10-K describes the significant accounting policies and methods used in the preparation of the Company’s consolidated financial statements.

Our management expects to make judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operation and/or financial condition. We have identified certain accounting policies that we believe are most important to the understanding of our current financial condition and results of operations.

40

Table of Contents

Accounting for Stock-Based Compensation, Stock Options and Stock Granted to Employees and Non-employees

We adopted the requirements for stock-based compensation, where all forms of share-based payments to employees or non-employees, including stock options and stock purchase plans, are treated the same as any other form of compensation by recognizing the related cost in the statement of operations.

Under these requirements, stock-based compensation expense for employees is measured at the grant date based on the fair value of the award, and the expense is recognized ratably over the award’s vesting period.

The stock-based compensation expense incurred by Lightbridge in connection with its employees is based on the employee model of ASC 718. Under ASC 718 employee is defined as “An individual over whom the grantor of a share-based compensation award exercises or has the right to exercise sufficient control to establish an employer-employee relationship based on common law as illustrated in case law and currently under US tax regulations.” Our consultants do not meet the employer-employee relationship as defined by the IRS and therefore stock-based compensation associated to them is accounted for under ASC 505-50. Under these requirements, stock-based compensation expense for non-employees is based on the fair value of the award on the measurement date which is the earlier of the date at which a commitment for performance by the counterparty to earn the equity instruments is reached (a performance commitment), or the date at which the counterparty’s performance is complete. For all service-based grants made, we recognize compensation cost under the straight-line method.

We measure the fair value of service-based stock options on the measurement date using the Black-Scholes option-pricing model which requires the use of several estimates, including:

  • the volatility of our stock price;
  • the expected life of the option;
  • risk free interest rates; and
  • expected dividend yield.

We use the historical volatility of our stock price over the number of years that matches the expected life of our stock option grants or we use the historical volatility of our stock price since January 5, 2006, the date we announced that we were becoming a public company, to estimate the future volatility of our stock. At this time, we do not believe that there is a better objective method to predict the future volatility of our stock. The expected life of options is based on internal studies of historical experience and projected exercise behavior. We estimate expected forfeitures of stock-based awards at the grant date and recognize compensation cost only for those awards expected to vest. The forfeiture assumption is ultimately adjusted to the actual forfeiture rate. Estimated forfeitures are reassessed in subsequent periods and may change based on new facts and circumstances. We utilize a risk-free interest rate, which is based on the yield of US treasury securities with a maturity equal to the expected life of the options. We have not and do not expect to pay dividends on our common shares for the foreseeable future.

We use the Monte Carlo valuation model to determine the fair value of market-based and performance-based stock options at the date of grant, which requires us to make assumptions, including:

  • expected term;
  • volatility;
  • dividend yield;
  • risk-free interest rate; and
  • forfeiture rates.

41

Table of Contents

These assumptions are based on historical information and judgment regarding market factors and trends. If actual results differ from our assumptions and judgments used in estimating these factors, future adjustments to these estimates may be required.

Investment in Enfission – Equity Method

As of January 24, 2018, the Company owns a 50% interest in Enfission – accounted for using the equity method of accounting. Enfission is deemed to be a variable interest entity (“VIE”) under the VIE model of consolidation because it currently does not have sufficient funds to finance its operations and will require significant additional equity or subordinated debt financing. The Company has determined that it is not the primary beneficiary of the VIE since it does not have the power to direct the activities that most significantly impact the VIE’s performance.

In determining whether the Company is the primary beneficiary and whether it has the right to receive benefits or the obligation to absorb losses that could potentially be significant to the VIE, the Company evaluates all its economic interests in the entity, regardless of form. This evaluation considers all relevant factors of the entity’s structure including the entity’s capital structure, contractual rights to earnings (losses) as well as other contractual arrangements that have potential to be economically significant. Although the Company has the obligation to absorb the losses as of this reporting period, it has concluded that it is not the primary beneficiary since the major decision making for all significant economic activities require the approval of both the Company and Framatome. Changes in the operating agreement may affect the evaluation of who is a primary beneficiary of the VIE.

Intangibles

As presented on the accompanying balance sheet, we had patents with a net book value of approximately $1.6 million and $1.4 million as of December 31, 2018 and December 31, 2017, respectively. There are many assumptions and estimates that may directly impact the results of impairment testing, including an estimate of future expected revenues, earnings, and cash flows, and discount rates applied to such expected cash flows to estimate fair value. We have the ability to influence the outcome and ultimate results based on the assumptions and estimates we choose for testing. To mitigate undue influence, we set criteria that are reviewed and approved by various levels of management. The determination of whether or not intangible assets have become impaired involves a significant level of judgment in the assumptions.

Changes in our strategy or market conditions could significantly impact these judgments and require adjustments to recorded amounts of intangible assets.

Research and development expenses

Research expenses are recognized as expenses when incurred. Costs incurred on development projects are recognized as intangible assets as of the date as of which it can be established that it is probable that future economic benefits attributable to the asset will flow to us considering its commercial feasibility. This is generally the case when regulatory approval for commercialization is achieved and costs can be measured reliably. Given the current stage of the development of our products, no development expenditures have yet been capitalized.

42

Table of Contents

Loss Contingency

Our loss contingency analysis contains uncertainties because it requires management to assess the degree of probability of an unfavorable outcome and to make a reasonable estimate of the amount of potential loss.

Recent Accounting Standards and Pronouncements

Refer to Note 1 of the Notes to our Consolidated Financial Statements for a discussion of recent accounting standards and pronouncements.

Off Balance Sheet Arrangements

We do not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity or capital expenditures or capital resources that is material to an investor in our securities.

Controls and procedures

As filed, 4,234 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

As of the end of the period covered by this report, our management, under the supervision and with the participation of our principal executive officer and principal financial officer, evaluated the effectiveness of the design and operation of our disclosure controls and procedures, as such term is defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act. Based on this evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective at the reasonable assurance level as of December 31, 2018 to ensure that information required to be disclosed by the Company in the reports that it files or submits under the Exchange Act is (a) recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms, and (b) accumulated and communicated to our management, including our principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required disclosure.

43

Table of Contents

Management’s Report on Internal Control over Financial Reporting

Management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f). Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of our internal control over financial reporting based on the framework in the Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

Our internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles in the United States of America. Our internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the Company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Management assessed the effectiveness of our internal control over financial reporting as of December 31, 2018. Based on this assessment, management, with the participation of our Chief Executive Officer and Chief Financial Officer, determined that as of December 31, 2018, the Company’s internal control over financial reporting was effective.

This Annual Report on Form 10-K does not include an attestation report of the Company’s independent public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s independent public accounting firm pursuant to rules of the Securities and Exchange Commission that permit the Company to provide only management’s report in this Annual Report on Form 10-K.

Changes in Internal Controls

There were no changes in the Company’s internal control over financial reporting during the fourth quarter of 2018 that have materially affected, or are reasonably likely to materially affect, the Company's internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2018-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Research and development12 months2018-01-01 to 2018-12-31$3.5mus-gaap:ResearchAndDevelopmentExpense
Operating income12 months2018-01-01 to 2018-12-31−$15.0mus-gaap:OperatingIncomeLoss
Net income12 months2018-01-01 to 2018-12-31−$15.7mus-gaap:NetIncomeLoss
Diluted EPS12 months2018-01-01 to 2018-12-31−$0.71us-gaap:EarningsPerShareBasicAndDiluted
Diluted shares (weighted)12 months2018-01-01 to 2018-12-3126,636,250 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2018-01-01 to 2018-12-31−$7.4mus-gaap:NetCashProvidedByUsedInOperatingActivities
Cash and equivalentsAt period end2018-12-31$24.6mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2018-12-31$24.8mus-gaap:AssetsCurrent
Total assetsAt period end2018-12-31$26.3mus-gaap:Assets
Current liabilitiesAt period end2018-12-31$476.3kus-gaap:LiabilitiesCurrent
Shareholders' equityAt period end2018-12-31$25.9mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001477932-19-001284. Last ingested by Listed: Nov 25, 2026, 01:21 ET. Listed shows no prices and gives no investment advice.