Business
As filed, 62,620 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
When used in this Annual Report on Form 10-K, the terms “Lightbridge”, the “Company”, “we”, “our”, and “us” refer to Lightbridge Corporation together with its wholly-owned subsidiaries Lightbridge International Holding LLC and Thorium Power Inc. Lightbridge’s principal executive offices are located at 11710 Plaza America Drive, Suite 2000, Reston, Virginia 20190 USA.
Overview
We are an innovative nuclear fuel technology company. Our goal is to develop and commercialize the next generation of nuclear fuel that could significantly improve the economics, safety, and proliferation resistance of nuclear fuel in existing and new nuclear reactors, large and small, with a meaningful impact on addressing climate change and air pollution. We project that the world’s energy and climate needs can only be met if nuclear power’s share of the energy-generating mix grows substantially.
We believe our metallic fuel offers significant economic and safety benefits over traditional fuel, primarily because of the superior heat transfer properties of all-metal fuel and the resulting lower operating temperature of the fuel. We also believe that uprating a reactor with Lightbridge Fuel™ will add incremental electricity at a lower levelized cost than any other means of generating baseload electric power, including any renewable, fossil, or hydroelectric energy source, or with any other nuclear fuel.
We have built a significant portfolio of patents reflecting years of research and development, and we anticipate substantial completion of our research efforts in the coming years and the testing of our fuel through third party vendors and others, including United States national laboratories.
Our Nuclear Fuel
Since 2008, we have been engaged in the design and development of proprietary, innovative nuclear fuels to improve the cost competitiveness, safety, proliferation resistance and performance of nuclear power generation. In 2010, we announced the concept of all-metal fuel (i.e., non-oxide fuel) for currently operating as well as new-build reactors. Our focus on metallic fuel is based on listening to the voices of prospective customers, as nuclear utilities have expressed interest in the improved economics and enhanced safety that we believe metallic fuel will provide.
The fuel in a nuclear reactor generates heat energy. That heat is then converted through steam into electricity that is sold. We have designed our innovative, proprietary metallic fuels to be capable of significantly higher burnup and power density compared to conventional oxide nuclear fuels. Burnup is the total amount of electricity generated per unit mass of nuclear fuel and is a function of the power density of a nuclear fuel and the amount of time the fuel operates in the reactor. Power density is the amount of heat power generated per unit volume of nuclear fuel. Conventional oxide fuel used in existing commercial reactors is nearing the limit of its burnup and power density capability. As a result, further optimization to increase power output from the same core size and improve the economics and safety of nuclear power generation using conventional oxide fuel technologies is limited. A new fuel is needed to bring enhanced performance to reactors; we are developing that new fuel.
4
Table of Contents
As the nuclear industry prepares to meet the increasing global demand for electricity production, longer operating cycles and higher reactor power outputs have become a much sought-after solution for the current and future reactor fleet. We believe our proprietary nuclear fuel designs have the potential to improve the nuclear power industry’s economics by:
- providing an increase in power output of potentially up to 10% while simultaneously extending the operating cycle length from 18 to 24 months in existing pressurized water reactors (PWRs), including in Westinghouse-type four-loop PWR plants which are currently constrained to an 18-month operating cycle by oxide fuel enriched up to 5%, or increasing the power potentially up to 17% while retaining an 18-month operating cycle; and
- enabling increased reactor power output via a power uprate (potentially up to a 30% increase) or a longer operating cycle (instead of a power uprate) without changing the core size in new build PWRs.
We believe our fuel designs will allow current and new build nuclear reactors to safely increase power production and reduce operations and maintenance costs on a per kilowatt-hour basis. New build nuclear reactors could also benefit from the reduced upfront capital investment per kilowatt of generating capacity in the case of implementing a power uprate. In addition to projected electricity production cost savings, we believe our technology can result in utilities or countries needing to deploy fewer new reactors to generate the same amount of electricity (in the case of a power uprate), resulting in significant capital cost savings. For utilities or countries that already have operating reactors, our technology could be utilized to both increase the power output of those reactors as well as enable them to load follow with electric grid demands, which have become increasingly variable with large additions of intermittent renewable generation.
Nuclear Industry and Addressable Market
Overview of the Nuclear Power Industry
Presently, nuclear power provides approximately 4.5% of the world’s total energy from all sources, including approximately 10% of the world’s electricity. According to the World Nuclear Association, as of March 2020 there were 441 operable nuclear power reactors worldwide, mostly light water reactors, with the most common types being PWRs, including Russian-designed water-water energetic reactors (VVERs), and boiling-water reactors (BWRs). Nuclear power provides a non-fossil fuel, low-carbon energy solution that can meet baseload electricity needs.
Due to substantial project risks and the significant upfront capital commitment associated with building new reactors, many nuclear utilities in deregulated markets choose to optimize their existing generating capacity through increasing their capacity utilization factor, power uprates and plant life extensions. We expect this trend to continue, particularly in the mature nuclear markets with significant existing nuclear capacity. We expect most of the new build activity to occur in emerging nuclear markets.
Of the world’s existing reactors currently in operation, PWRs (including Russian-designed VVERs) account for more than 60% of the net operating capacity, with BWRs being the second most prevalent and accounting for approximately 15%. Of the nuclear reactors currently under construction, approximately 80% are PWRs (including VVERs) with a rated electric power output of 1,000 megawatts (“MWe”) or greater.
Utilities have embraced power uprates as a cost-effective way to increase their generation capacity. While the efforts thus far have occurred mostly in the United States, we believe there is a large, untapped worldwide market for power uprates. The incentive to proceed with longer operating cycles and/or power uprates of up to 10% is significant since there are few changes required to implement the power uprate, and the changes that are required are relatively inexpensive. The limiting factor at the moment is the fuel.
5
Table of Contents
In some instances, utilities will modify and/or replace components in order to accommodate a higher power level. Technical analyses must demonstrate that the proposed plant configuration remains safe and that measures to protect the health and safety of the public continue to be effective. These analyses, which span many technical disciplines, are reviewed and approved by the regulator before a power uprate can be performed.
The utility will conduct an economic analysis to evaluate the potential financial benefits of the proposed uprate. Typically, power uprates enable utilities to increase their generating capacity at a cost significantly less than the cost of building a new plant. In many cases, power uprates can be completed in months as opposed to the several years required for new build, thus the invested dollars begin producing revenue shortly after they are spent. Power uprates, therefore, represent an efficient use of capital.
Most nuclear power plants originally had a licensed lifetime of 25 to 40 years, but engineering assessments have established that many can operate much longer. In the US, approximately 80 reactors have been granted license extensions to continue operating for a total of 59-60 years. Most of the plants that have not already requested a license extension are expected to apply in the near future. A license extension at about the 30-year mark requires additional capital expenditure for the replacement of worn equipment and outdated control systems. Multiple utilities in the United States have stated plans to apply to the NRC for additional 20 years of licensed lifetime, up to a total of 80 years per reactor.
The technical and economic feasibility of replacing major reactor components, such as steam generators in PWRs, has been demonstrated. The increased revenue generated from extending the lifetime of existing plants is attractive to utilities, especially in view of the difficulties in obtaining public acceptance of constructing replacement nuclear capacity.
Almost all of the new build reactor designs are either Generation III or Generation III+ type reactors. The primary difference from second-generation designs is that many incorporate passive or inherent safety features, which require no active controls or operational intervention to avoid accidents in the event of malfunction. Many of these passive systems rely on gravity, natural convection, or resistance to high temperatures.
Target Market for Lightbridge Fuel™
Our target market segments include water-cooled commercial power reactors, such as pressurized water reactors, boiling water reactors, Russian-type VVER reactors, CANDU heavy water reactors, water-cooled small modular reactors, as well as water-cooled research reactors.
Nuclear Power as Clean and Low Carbon Emissions Energy Source
Nuclear power provides clean, reliable baseload electricity. According to the World Nuclear Association (WNA), nuclear power plants produce no greenhouse gas emissions during operation, and over the course of its lifecycle, nuclear produces about the same amount of CO2 equivalent emissions per unit of electricity as wind. The WNA further notes that almost all proposed pathways to achieving significant decarbonization suggest an increased role for nuclear power, including those published by the International Energy Agency, Massachusetts Institute of Technology Energy Initiative, US Energy Information Administration, and World Energy Council.
We believe that deep cuts to CO2 emissions are only possible with electrification of most of the transportation and industrial sectors globally and powering them and the current electricity needs of the world with non-emitting or low-emitting power. We believe this can be done only with a large increase in nuclear power, several times the amount that is generated globally today. We believe that our nuclear fuel technology will be an essential element of reaching this goal.
6
Table of Contents
Influence of the Accident at Fukushima, Japan and New International Nuclear Build
The nuclear accident at the Fukushima nuclear power plant in Japan following the strong earthquake and massive tsunami that occurred on March 11, 2011 increased public opposition to nuclear power, resulting in a slowdown in, or, in some cases, a complete halt to, new construction of nuclear power plants and an early shut down of existing power plants in certain countries. As a result, some countries that were considering launching new domestic nuclear power programs before the Fukushima accident have delayed or cancelled preparatory activities they were planning to undertake as part of such programs. The Fukushima accident appears to have shrunk the projected size of the global nuclear power market in 2025-2030 as reflected in the most recent reference case projections published by the World Nuclear Association. At the same time, the event has brought a greater emphasis on safety to the forefront that may be beneficial to us because our metallic fuel provides improved safety and fuel performance during normal operation and design-basis accidents.
Anticipated Safety Benefits of Lightbridge Fuel™
The expected safety benefits of Lightbridge Fuel™ are as follows:
- Operates at lower operating temperatures than current conventional nuclear fuel, contributing to lower stored energy in the fuel rods;
- Under design basis accidents when there is a loss of coolant in the reactor, does not generate hydrogen gas, which can explode;
- Buys more time to restore active cooling in the reactor during off-normal events;
- Enhances structural integrity of the nuclear fuel; and
- Has lighter and stiffer fuel assembly, which may contribute to improved seismic performance.
Due to the significantly lower fuel operating temperature and higher thermal conductivity, our metallic nuclear fuel rods are also expected to provide major improvements to safety margins during off-normal events. US Nuclear Regulatory Commission licensing processes require engineering analysis of a large break loss-of-coolant accident (LOCA), as well as many other scenarios. The LOCA scenario assumes failure of a large water pipe in the reactor coolant system. Under LOCA conditions, the fuel and cladding temperatures rise due to reduced cooling capacity. Preliminary analytical modeling shows that under a design-basis LOCA scenario, unlike conventional uranium dioxide fuel, the cladding of the Lightbridge-designed metallic fuel rods would stay at least 200 degrees below the 850-900 degrees Celsius temperature at which steam begins to react with the zirconium cladding to generate hydrogen gas. Build-up of hydrogen gas in a nuclear power plant can lead to the hydrogen exploding, which is what happened at the Fukushima Daiichi nuclear power plant in Japan in 2011. Lightbridge Fuel™ is designed to prevent hydrogen gas generation in design-basis LOCA situations, which is a major safety benefit.
7
Table of Contents
Lightbridge Spent Fuel – Proliferation Resistance
The April 2018 issue of Nuclear Engineering and Design, a technical journal affiliated with the European Nuclear Society, included an article stating that after analyzing Lightbridge’s fuel, the authors concluded that any plutonium extracted from Lightbridge’s spent fuel would not be useable for weapon purposes. We anticipate the following proliferation resistance advantages for our metallic fuel:
- One-half of the amount of plutonium produced and remaining in the spent fuel as compared to conventional uranium dioxide fuels; and
- Lower Plutonium-239 fraction compared to uranium dioxide fuel; therefore, our spent fuel would be unsuitable as a source for weapon purposes.
The Company plans to conduct the initial testing and demonstration of its advanced metallic nuclear fuel in the United States.
Nuclear Utility Fuel Advisory Board (“NUFAB”)
Our NUFAB, formed in 2011, comprises senior fuel managers from electric utilities that account for approximately 50% of installed US nuclear capacity. NUFAB members represent the “voice of the customer” in Lightbridge’s nuclear fuel development and commercialization activities. These members include the following:
- Exelon Generation;
- Dominion Generation;
- Duke Energy; and
- Southern Company.
Development of Lightbridge Fuel™
Recent Developments
- Awarded a voucher from the U.S. Department of Energy’s (DOE) Gateway for Accelerated Innovation in Nuclear (GAIN) program to support development of Lightbridge Fuel™ in collaboration with Idaho National Laboratory (INL). The scope of the project includes experiment design for irradiation of Lightbridge metallic fuel material samples in the Advanced Test Reactor (ATR) at INL. The project is anticipated to commence in the first half of 2020. The total project value is approximately $846,000, with three-quarters of this amount funded by DOE for the scope performed by INL.
- Demonstrated co-extrusion manufacturing process using surrogate materials to full commercial length for large light water reactors (12-ft long), as well as for small modular reactors (6-ft long). The surrogate materials were designed to simulate the flow stresses, temperatures and extrusion pressures expected in the manufacture of the Lightbridge Fuel™ rods utilizing a uranium-zirconium alloy.
- Expanded our patent portfolio by successfully obtaining 20 new patents in 2019 and as of the filing date an additional 12 patents in the United States and other key foreign countries. The new patents will help safeguard the Company’s intellectual property, which is an integral element of the Company’s plans to monetize Lightbridge Fuel™.
8
Table of Contents
Future Steps Toward the Development and Sale of Nuclear Fuel Assemblies
We anticipate near-term fuel development milestones for Lightbridge Fuel™ over the next 12-24 months will consist of the following:
- Complete the scope of work relating to the recent GAIN Voucher award in collaboration with Idaho National Laboratory;
- Enter into an agreement to manufacture our nuclear fuel material samples for test reactor irradiation;
- Begin the initial demonstration of our manufacturing technology using depleted or natural uranium, and
- Evaluation of our fuel for use in the CANDU reactor market.
The long-term milestones towards development and sale of nuclear fuel assemblies include, among other things, irradiating material samples and/or prototype fuel rods in test reactors, conducting post-irradiation examination of irradiated material samples and/or prototype fuel rods, performing thermal-hydraulic experiments, performing seismic and other out-of-reactor experiments, entering into a lead test rod/assembly agreement with a host reactor, demonstrating the production of lead test rods and/or lead test assemblies at a pilot-scale fuel fabrication facility and demonstrating the operation of lead test rods and/or lead test assemblies in commercial reactors. There are inherent uncertainties in the cost and outcomes of the many steps needed for successful deployment of our fuel in commercial nuclear reactors, which makes it difficult to predict the timing of the commercialization of our nuclear fuel technology with any accuracy. Accordingly, based on our anticipated schedule, we expect to begin receiving purchase orders for initial reload batches from utilities in about 8 to 10 years, with final qualification (i.e., deployment of fuel in the first reload batch) in a commercial reactor taking place approximately two years thereafter. We will continue to seek development funding contributions or other financing arrangements with utilities and the DOE.
Please see Item 1A. Risk Factors in this Annual Report on Form 10-K for a discussion of certain risks that may delay or impair such developments including without limitation the availability of financing, events related to the dissolution of our joint venture with Framatome, and the many risks inherent in developing a new type of nuclear fuel.
Future Potential Collaborations and Other Opportunities
In the ordinary course of business, we engage in periodic reviews of opportunities to acquire companies or units within companies to establish new streams of revenue. We will be opportunistic and may also partner or contract with entities that could be synergistic to our fuel business; including doing an acquisition as only one of the ways of lining up what we need to develop, license, and commercialize the fuel.
Competition
To our knowledge, our nuclear fuel technology is the only technology that could be commercially viable in the foreseeable future to increase, in a safe and economically attractive way, power output potentially by up to 17% in existing PWRs and up to 30% in new build PWRs. Due to long product development timelines, significant nuclear regulatory requirements, and our intellectual property, we believe that the barriers to entry are very high for a competitor to our nuclear fuel technology.
9
Table of Contents
Currently competition with respect to the design of commercially viable nuclear fuel products is limited to conventional uranium dioxide fuels, which are reaching the limits in terms of their capability to provide increased power output or longer fuel cycles. We believe that the industry needs fuel products that can provide these benefits. While we believe conventional uranium dioxide fuel may be capable of achieving power uprates of up to 10% in existing PWRs or extending the fuel cycle length from 18 to 24 months, doing so would require uranium-235 enrichment levels above 5% (as is also the case with our metallic fuel), higher reload batch sizes, or a combination thereof. The alternative route of increasing reload batch sizes while keeping uranium enrichment levels below 5% for power uprates up to 10% using conventional uranium dioxide fuel would raise the cost of each fuel reload, resulting in a significant fuel cycle cost penalty to the nuclear utility. The cost penalty could have a dramatic adverse impact on the economics of existing plants whose original capital cost has already been written off, which includes most US nuclear power plants.
In addition to conventional uranium dioxide fuel, potential competition to our metallic fuel technology can come from so-called Accident Tolerant Fuels (ATF). After the accident at the Fukushima Daiichi nuclear power plant in March 2011, the US Congress directed the DOE to investigate every aspect of nuclear plant operation including the existing uranium dioxide fuel pellets enveloped by zirconium-based alloy tubes (cladding). According to the February 2019 Nuclear Energy Institute technical report on ATF titled “Safety and Economic Benefits of Accident Tolerant Fuel”, advanced fuel design concepts (such as ATF) were accelerated by combining recent operating experience with worldwide research and development. Over the past several years, the ATF program has received significant DOE funding support and initial interest from utility customers in ATF demonstration programs in their operating reactors. However, we believe that the ATF concepts may only offer incremental safety and operating improvements over conventional uranium dioxide fuel that could not effectively compete with the safety and economic benefits of our metallic fuel. In addition, some of the ATF concepts may be used in combination with our metallic fuel for additional safety and operating improvements.
Nuclear power faces competition from other sources of electricity, including natural gas, which is currently the cheapest option for power generation in the US and has resulted in some utilities abandoning nuclear power. Other sources of electricity may also be viewed as safer than nuclear power, although we believe that generating nuclear energy with Lightbridge Fuel™ is the safest way to produce baseload electricity in suitable power reactors. To the extent demand for electricity generated by nuclear power decreases, the potential market for our nuclear fuel technology will decline.
Raw Materials
We do not plan to utilize any raw materials directly in the conduct of our operations. The fuel fabricators which will ultimately fabricate fuel products incorporating our nuclear fuel technology will require zirconium and uranium, and additional raw materials that are required for the production of nuclear fuel assemblies that go into the reactor core. Uranium and zirconium are available from various suppliers at market prices. However, the availability of uranium metal enriched to 19.75% is currently limited to small quantities sufficient only for research and testing purposes. Deployment of our fuel will necessitate increasing enrichment level from 5% to 19.75% at enrichment facilities as well as deployment of de-conversion/metallization capability at a commercial scale. We expect that utilities will contract with nuclear fuel fabricators to order nuclear fuel assemblies, and then ship the completed nuclear fuel assemblies to the reactor sites.
10
Table of Contents
Government Support/Approvals and Relationships with Critical Development Partners/Vendors
The sales and marketing of our services and technology internationally may be subject to US export control regulations and the export control laws of other countries. Governmental authorizations may be required before we can export our services or technology or collaborate with foreign entities. If authorizations are required and not granted, our international business could be materially affected. Furthermore, the export authorization process is often time consuming. Violation of export control regulations could subject us to fines and other penalties, such as losing the ability to export for a period of years, which would limit our revenue growth opportunities and significantly hinder our attempts to expand our business internationally.
In 2015-2016, we received our export controls authorization from the DOE for all of our planned work outside the United States, specifically in France, Germany, Norway, Sweden, and Canada.
The testing, fabrication and use of nuclear fuels by our future partners, licensees and nuclear power generators will be heavily regulated. The test facilities and other locations where our fuel designs may be tested before commercial use require governmental approvals from the host country’s nuclear regulatory authority. The responsibility for obtaining the necessary regulatory approvals will lie with our research and development contractors that conduct such tests and experiments. Nuclear fuel fabricators, which will ultimately fabricate fuel using our technology under commercial licenses from us, are similarly regulated. Utilities that operate nuclear power plants that may utilize the fuel produced by these fuel fabricators require specific licenses relating to possession and use of nuclear materials as well as numerous other governmental approvals for the ownership and operation of nuclear power plants.
Certain Challenges
The ability to unwind our partnership with Framatome in an expeditious manner while minimizing the cost and risk to our intellectual property represents a significant challenge. On November 18, 2019, the Company delivered a notice of termination of the R&D Services Agreement (as amended by Amendment Number One, dated January 25, 2018, and Amendment Number Two, dated June 20, 2018, the “RDSA”) to Framatome, thereby terminating the RDSA, due to the Company’s assertion of Framatome’s uncured material breach of certain material terms of the RDSA. These asserted material breaches relate to Framatome’s invoicing obligations, as well as a failure of the escalation process under the RDSA to agree to a budget commitment for 2019-2020. Framatome has contested the Company’s right to terminate the RDSA, raised questions as to the Company’s rights relating to their co-owned intellectual property and the Company’s right to conduct certain research and development activities, and reserved its right to seek compensation from the Company. On this basis and based on the Company’s assertion that the conduct of Framatome prevented Enfission from functioning and progressing towards its goals, the Company filed a request for arbitration against Framatome on February 7, 2020. Lightbridge has reduced its research and development activities as it is no longer conducting research and development activities with Framatome and Enfission, and it is currently evaluating various research and development options.
The ability to fabricate the lead test assemblies (LTAs) and a nuclear utility that is willing to accept the LTAs, is required for LTA demonstration in a commercial reactor. In the US, the fabricator and the utility will be primarily responsible for securing necessary regulatory licensing approvals for the LTA operation. To this end, in 2011, we established our NUFAB, as more fully described above, to further strengthen dialogue with nuclear utilities.
Establishment of required supply chain infrastructure to support high assay low enriched uranium (HALEU) metallic fuel. Existing commercial nuclear infrastructure, including conversion facilities, enrichment facilities, de-conversion facilities, fabrication facilities, fuel storage facilities, fuel handling procedures, fuel operation at reactor sites, used fuel storage facilities and shipping containers, were designed and are currently licensed to handle uranium in oxide form with enrichment up to 5%. Our fuel designs are expected to use uranium metal with uranium enrichment levels up to 19.75% and would therefore require certain modifications to existing commercial nuclear infrastructure to enable commercial nuclear facilities to handle our fuels. Those nuclear facilities will need to go through a regulatory licensing process and obtain regulatory approvals to be able to process, handle, or ship uranium metal with enrichment levels up to 19.75% and operate commercial reactors and spent fuel storage facilities using our metallic fuel.
11
Table of Contents
There is a lack of publicly available experimental data on our metallic fuel. We will need to conduct various irradiation experiments to confirm fuel performance under normal and off-normal events. Loop irradiation in a test reactor environment prototypic of commercial reactor operating conditions and other experiments on unirradiated and irradiated metallic fuel samples will be essential to demonstrate the performance and advantages of our metallic fuel. We are currently planning loop irradiation testing of our metallic fuel samples in a research reactor as part of this effort.
Existing analytical models may be inadequate. New analytical models, capable of accurately predicting the behavior of our metallic fuel during normal operation and off-normal events, may be required. Experimental data measured from our planned irradiation demonstrations will help to identify areas where new analytical models or modifications to existing ones may be required.
Demonstration of a fabrication process both for semi-scale irradiation fuel samples and subsequently for full-length (12-14 feet) metallic fuel rods for PWR LTAs is required. Past operating experience in icebreaker reactors with differently shaped fuel rods with a similar metallic fuel composition involved fabrication of metallic fuel rods up to 3 feet in length. Fabrication of full-length (approximately 3.5 to 4.5 meters) PWR metallic fuel rods has yet to be demonstrated. In 2019, we demonstrated co-extrusion of full-length rods using surrogate materials (i.e. without uranium in the rods).
Enfission, LLC
On January 24, 2018 we formed Enfission, a 50/50 joint venture with Framatome Inc., to develop, license, manufacture, and sell nuclear fuel assemblies based on Lightbridge-designed metallic fuel technology and other advanced nuclear fuel intellectual property. Framatome Inc. is a wholly-owned US subsidiary of Framatome SAS, which we refer to individually or collectively in this report, together with their affiliates, as Framatome. Lightbridge owns 50 percent of Enfission’s Class A voting membership units and Framatome owns the other 50 percent. Any distributions will be first allocated to cause the capital accounts of the initial members to be equal, then allocated on a 50/50 basis. Enfission is managed by a board of directors composed of six directors, half of whom are appointed by Lightbridge and the other half are appointed by Framatome. The Enfission board acts by majority vote, provided that at least one director appointed by each of Lightbridge and Framatome votes in favor of the action.
Lightbridge was a party to the RDSA, by and among Framatome, Enfission, and the Company. The RDSA, among other things, defines the terms and conditions for joint research and development activities among Framatome, Enfission, and the Company. Section 13.3 of the RDSA provides that any party may terminate the RDSA, by written notice of termination to the other parties to the RDSA, if another party materially breaches a material term or condition of the RDSA and fails to cure such breach within thirty days, or any other mutually agreed upon cure period, of such party’s receipt of written notice specifying the breach. Section 5.1(b) of the RDSA, among other things, sets forth a process for the establishment by the Company and Framatome of a yearly budget and provides that if no agreement on the budget is ultimately reached within the specified timelines, the resolution of the budget shall be escalated to the CEO of each party. Section 13.4 of the RDSA provides that any party may terminate the RDSA following a failure of the escalation process under Section 5.1(b) of the RDSA upon ten days’ written notice to the other party.
12
Table of Contents
On October 2, 2019, pursuant to the terms of Section 13.3 of the RDSA, the Company delivered written notice to Framatome, notifying Framatome that the Company asserted that Framatome had materially breached certain material terms of the RDSA, relating to its invoicing obligations under the RDSA, which breach was not cured within the thirty-day cure period. On October 7, 2019, the Company delivered written notice to Framatome formally initiating the escalation process under Section 5.1(b) of the RDSA. The Company and Framatome continued negotiations as the Company sought to resolve issues related to Framatome’s compliance with the RDSA and agreement on budget commitments. On October 22, 2019, the Company and Framatome held a CEO-to-CEO meeting as part of the escalation process under Section 5.1(b) of the RDSA, subsequent to which the escalation process failed. As a result, the Board of Directors and the management of the Company determined that it was advisable and in the best interest of the Company and its shareholders to terminate the RDSA in accordance with the termination rights set forth therein. On November 18, 2019, the Company delivered a notice of termination of the RDSA to Framatome, thereby terminating the RDSA, effective immediately. The Company intends to fully avail itself of its rights under the RDSA with respect to the issues that were pending between the Company and Framatome prior to the termination, as well as any issues that arise as a result of the termination of the RDSA. Pursuant to the terms of the RDSA, the Company does not expect to incur any material early termination penalties in connection with the termination of the RDSA. Following the termination of the RDSA, the Company intends to continue to pursue the development of the Lightbridge-designed metallic fuel technology.
On November 23, 2019, in connection with the termination of the RDSA, the Board of Directors and the management of Lightbridge determined that it was advisable and in the best interest of the Company and its shareholders to take the necessary steps to dissolve Enfission. Various corporate and operational matters relating to Enfission are governed pursuant to that certain Operating Agreement by and between Framatome Inc. and the Company, dated January 25, 2018, (as amended by Amendment Number One, dated May 7, 2018, and Amendment Number Two, dated September 13, 2018, the “Joint Venture Operating Agreement”). The Company intends to take the necessary steps to dissolve Enfission pursuant to the terms of the Joint Venture Operating Agreement.
On February 7, 2020, the Company filed a request for arbitration (the “Arbitration Request”) in the International Court of Arbitration of the International Chamber of Commerce against Framatome SAS. The Company has undertaken this action in order to obtain, among other things, a declaration that the RDSA was validly terminated and is no longer in force, and to obtain compensation for the damages incurred.
Our Intellectual Property
Our nuclear fuel technologies are protected by multiple US and international patents. Set forth below are the patents, which we consider material to our business based on our current plans. We have previously licensed relevant patents to Enfission for use within its scope of operations.
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Fabrication Method Using the Casting Route | ||||
| Belgium | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Bulgaria | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| China | May 11, 2011 | March 27, 2018 | FUEL ASSEMBLY | Registered |
| Czech Republic | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Europe | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Hungary | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
13
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Korea | May 11, 2011 | November 12, 2019 | FUEL ASSEMBLY | Registered |
| United Kingdom | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| United States of America | February 20, 2018 | FUEL ASSEMBLY | Pending | |
| Korea | November 12, 2019 | FUEL ASSEMBLY | Pending | |
| Fabrication Method Using the Powder Metallurge Route | ||||
| Australia | May 11, 2011 | July 2, 2015 | FUEL ASSEMBLY | Registered |
| Belgium | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Bulgaria | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Bulgaria | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Canada | May 11, 2011 | FUEL ASSEMBLY | Pending | |
| China | May 11, 2011 | May 18, 2016 | FUEL ASSEMBLY | Registered |
| China | May 11, 2011 | March 27, 2018 | FUEL ASSEMBLY | Registered |
| Czech Republic | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Czech Republic | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Europe | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Europe | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Finland | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| France | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Germany | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Hungary | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Hungary | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| India | May 11, 2011 | FUEL ASSEMBLY | Pending | |
| Japan | May 11, 2011 | September 9, 2016 | FUEL ASSEMBLY | Registered |
| Sweden | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Turkey | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| United Kingdom | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| United States of America | May 11, 2011 | July 31, 2018 | FUEL ASSEMBLY | Registered |
| United States of America | February 20, 2018 | FUEL ASSEMBLY | Pending | |
| All-Metal Fuel Assembly Design and A Mixed Grid Pattern of Metallic Fuel Rods | ||||
| United States of America | November 15, 2013 | January 1, 2019 | FUEL ASSEMBLY | Registered |
| Belgium | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Bulgaria | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Canada | May 1, 2014 | FUEL ASSEMBLY | Pending | |
| China | May 1, 2014 | November 24, 2017 | FUEL ASSEMBLY | Registered |
| Czech Republic | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Eurasian Patent Organization | May 1, 2014 | October 31, 2019 | FUEL ASSEMBLY | Registered |
14
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Europe | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Finland | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| France | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Germany | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Hungary | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| India | May 1, 2014 | FUEL ASSEMBLY | Pending | |
| Japan | May 1, 2014 | July 13, 2018 | FUEL ASSEMBLY | Registered |
| Korea | May 1, 2014 | FUEL ASSEMBLY | Pending | |
| Spain | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Sweden | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Turkey | May 1, 2014 | January 31, 2018 | FUEL ASSEMBLY | Registered |
| Australia | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Belgium | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Bulgaria | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Czech Republic | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Canada | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| China | September 16, 2015 | April 2, 2019 | NUCLEAR FUEL ASSEMBLY | Registered |
| Eurasian Patent Organization | September 16, 2015 | December 13, 2019 | NUCLEAR FUEL ASSEMBLY | Registered |
| Europe | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Finland | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| France | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Germany | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Hungary | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Japan | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Korea | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Spain | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Sweden | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Turkey | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| United Kingdom | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| All-Metal Fuel Assembly Design (i.e., No Oxide Rods in The Outer Row) | ||||
| Canada | December 26, 2007 | April 26, 2016 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| United States of America | December 22, 2008 | February 14, 2012 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
15
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| India | December 26, 2007 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Pending | |
| Australia | May 11, 2011 | July 2, 2015 | FUEL ASSEMBLY | Registered |
| United States of America | May 11, 2011 | July 31, 2018 | FUEL ASSEMBLY | Registered |
| United States of America | November 15, 2013 | January 1, 2019 | FUEL ASSEMBLY | Registered |
| Multi-Lobe Metallic Fuel Rod Design | ||||
| Australia | December 26, 2007 | May 24, 2014 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Australia | December 26, 2007 | August 4, 2016 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Belgium | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Bulgaria | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Canada | December 26, 2007 | April 26, 2016 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| China | December 26, 2007 | February 12, 2014 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| China | December 26, 2007 | June 23, 2017 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Czech Republic | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Europe | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Finland | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| France | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
16
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Germany | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Hungary | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| India | December 26, 2007 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Pending | |
| Japan | December 26, 2007 | August 1, 2014 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Japan | December 26, 2007 | April 22, 2016 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Korea | December 26, 2007 | December 15, 2014 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Korea | December 26, 2007 | April 20, 2015 | NUCLEAR REACTOR (VARIANTS), FUEL ASSEMBLY CONSISTING OF DRIVER-BREEDING MODULES FOR A NUCLEAR REACTOR (VARIANTS) AND A FUEL CELL FOR A FUEL ASSEMBLY | Registered |
| Sweden | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Turkey | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| United Kingdom | December 26, 2007 | May 18, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| United States of America | December 22, 2008 | February 14, 2012 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Belgium | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Bulgaria | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Czech Republic | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Europe | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
17
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Finland | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| France | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Germany | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Hungary | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Spain | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Sweden | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Turkey | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| United Kingdom | December 23, 2008 | September 21, 2016 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| United States of America | March 14, 2011 | February 18, 2014 | A FUEL ELEMENT, A FUEL ASSEMBLY AND A METHOD OF USING A FUEL ASSEMBLY | Registered |
| Australia | December 25, 2008 | September 3, 2015 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Belgium | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Bulgaria | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Bulgaria | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Canada | December 25, 2008 | November 29, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Canada | December 25, 2008 | February 12, 2019 | A LIGHT-WATER REACTOR FUEL ASSEMBLY AND FUEL ELEMENT THEREOF | Registered |
| China | December 25, 2008 | June 29, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
18
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Czech Republic | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Czech Republic | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Europe | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Europe | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Europe | December 25, 2008 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Pending | |
| Finland | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Finland | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| France | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| France | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Germany | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Germany | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Hungary | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Hungary | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| India | December 25, 2008 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Pending |
19
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Japan | December 25, 2008 | June 5, 2015 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Korea | December 25, 2008 | August 18, 2015 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Spain | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Sweden | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Sweden | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Turkey | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Turkey | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| United Kingdom | December 25, 2008 | April 13, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| United Kingdom | December 25, 2008 | February 20, 2019 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| United States of America | December 25, 2008 | May 31, 2016 | FUEL ASSEMBLY FOR A LIGHT-WATER NUCLEAR REACTOR (EMBODIMENTS), LIGHT-WATER NUCLEAR REACTOR AND FUEL ELEMENT OF THE FUEL ASSEMBLY | Registered |
| Australia | May 11, 2011 | July 2, 2015 | FUEL ASSEMBLY | Registered |
| Australia | May 11, 2011 | March 21, 2019 | FUEL ASSEMBLY | Registered |
| Australia | May 11, 2011 | FUEL ASSEMBLY | Pending | |
| Belgium | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Bulgaria | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Bulgaria | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Canada | May 11, 2011 | FUEL ASSEMBLY | Pending | |
| Canada | May 11, 2011 | FUEL ASSEMBLY | Pending | |
| China | May 11, 2011 | May 18, 2016 | FUEL ASSEMBLY | Registered |
| Czech Republic | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
20
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Czech Republic | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Europe | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Europe | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| Finland | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| France | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Germany | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Hungary | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Hungary | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| India | May 11, 2011 | FUEL ASSEMBLY | Pending | |
| Japan | May 11, 2011 | September 9, 2016 | FUEL ASSEMBLY | Registered |
| Japan | May 11, 2011 | September 9, 2016 | FUEL ASSEMBLY | Registered |
| Japan | May 11, 2011 | April 13, 2018 | FUEL ASSEMBLY | Registered |
| Korea | May 11, 2011 | November 12, 2019 | FUEL ASSEMBLY | Registered |
| Sweden | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| Turkey | May 11, 2011 | April 6, 2016 | FUEL ASSEMBLY | Registered |
| United Kingdom | May 11, 2011 | October 25, 2017 | FUEL ASSEMBLY | Registered |
| United States of America | May 11, 2011 | July 31, 2018 | FUEL ASSEMBLY | Registered |
| United States of America | February 20, 2018 | FUEL ASSEMBLY | Pending | |
| Korea | November 12, 2019 | FUEL ASSEMBLY | Pending | |
| United States of America | November 15, 2013 | January 1, 2019 | FUEL ASSEMBLY | Registered |
| Australia | May 1, 2014 | October 11, 2018 | FUEL ASSEMBLY | Registered |
| Australia | May 1, 2014 | October 11, 2018 | FUEL ASSEMBLY | Registered |
| Canada | May 1, 2014 | FUEL ASSEMBLY | Pending | |
| Eurasian Patent Organization | May 1, 2014 | October 31, 2019 | FUEL ASSEMBLY | Registered |
| India | May 1, 2014 | FUEL ASSEMBLY | Pending | |
| Japan | May 1, 2014 | July 13, 2018 | FUEL ASSEMBLY | Registered |
| Korea | May 1, 2014 | FUEL ASSEMBLY | Pending | |
| Australia | December 5, 2019 | FUEL ASSEMBLY | Pending | |
| Australia | May 7, 2018 | FUEL ASSEMBLY | Pending | |
| Australia | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Canada | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| China | September 16, 2015 | April 2, 2019 | NUCLEAR FUEL ASSEMBLY | Registered |
| China | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Eurasian Patent Organization | September 16, 2015 | December 13, 2019 | NUCLEAR FUEL ASSEMBLY | Registered |
| Eurasian Patent Organization | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Europe | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Belgium | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Belgium |
21
Table of Contents
| Country | Application Date | Registration Date | Title | Case Status |
|---|---|---|---|---|
| Bulgaria | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Czech Republic | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Finland | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| France | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Germany | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Hungary | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Japan | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Korea | September 16, 2015 | NUCLEAR FUEL ASSEMBLY | Pending | |
| Belgium | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Belgium |
| Bulgaria | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Czech Republic | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| Finland | September 16, 2015 | February 19, 2020 | NUCLEAR FUEL ASSEMBLY | Registered |
| United States of America | September 16, 2015 | January 29, 2019 | NUCLEAR FUEL ASSEMBLY | Registered |
| United States of America | January 7, 2019 | NUCLEAR FUEL ASSEMBLY | Pending | |
| United States of America | December 28, 2018 | FUEL ASSEMBIY | Pending |
In addition to our patent portfolio, we also own trademarks to Lightbridge and Thorium Power corporate names and the Lightbridge logo.
Employees
Our business model is to limit the number of our full-time employees and to rely on individual independent contractors, outside agencies and technical facilities with specific skills to assist with various business functions including, but not limited to, corporate overhead, personnel, research and development, and government relations. This model limits overhead costs and allows us to draw upon resources that are specifically tailored to our internal and external (client) needs. As of December 31, 2019, we had thirteen full-time employees. We utilize a network of independent contractors available for deployment for specialized consulting assignments. We believe that our relationship with our employees and contractors is satisfactory.
Available Information
Our internet address is www.ltbridge.com (http://www.ltbridge.com). We make available free of charge on our website our Annual Reports on Form 10-K, Quarterly Reports on Form 10-Q, Current Reports on Form 8-K, including exhibits, and amendments to those reports filed or furnished pursuant to Sections 13(a) and 15(d) of the Securities Exchange Act of 1934, as amended, as soon as reasonably practicable after such reports are electronically filed with, or furnished to, the Securities and Exchange Commission (“SEC”). Copies of these reports may also be obtained free of charge by sending written requests to Investor Relations, Lightbridge Corporation, 11710 Plaza America Drive, Suite 2000, Reston, Virginia 20190 USA. The SEC also maintains an internet site that contains reports, proxy and information statements and other information regarding issuers that file electronically with the SEC at www.sec.gov (http://www.sec.gov). The information posted on our website is not incorporated into this Annual Report on Form 10-K, and any reference to our website is intended to be inactive textual references only.
22
Table of Contents
Risk factors
As filed, 43,035 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our business faces significant risks. You should carefully consider all of the information set forth in this annual report and in our other filings with the SEC, including the following risk factors, which we face, and which are faced by our industry. Our business, financial condition, and results of operations could be materially and adversely affected by any of these risks. In that event, the trading price of our ordinary shares would likely decline and you might lose all or part of your investment. This report also contains forward-looking statements that involve risks and uncertainties. Our results could materially differ from those anticipated in these forward-looking statements, as a result of certain factors including the risks described below and elsewhere in this report and our other SEC filings. See also “Forward-Looking Statements”.
Risks Related to the Company
Substantial doubt exists as to our ability to continue as a going concern.
As described in Note 1 of our accompanying consolidated financial statements, our auditors have issued a going concern opinion regarding the Company. This means there is substantial doubt we can continue as an ongoing business for the next twelve months. Our financial statements have been prepared assuming we will continue as a going concern. We have experienced substantial and recurring losses from operations, which losses have caused an accumulated deficit of $114.1 million as of December 31, 2019.
At December 31, 2019, the Company had approximately $18.0 million in cash and had a working capital surplus of approximately $18.1 million. The Company’s net cash used in operating activities during the year ended December 31, 2019 was approximately $6.7 million, and current projections indicate that the Company will have continued negative cash flows for the foreseeable future. Net losses incurred for the years ended December 31, 2019 and 2018 amounted to approximately $(10.6) million, $(15.7) million, respectively.
Our ability to successfully raise sufficient funds, primarily through the sale of equity securities, is uncertain and subject to market conditions generally, the market for our common stock and other risks. There can be no assurances as to the availability or terms upon which capital might be available. These factors, among others, raise substantial doubt about our ability to continue as a going concern. If we are unable to meet our financial obligations, we could be forced to delay, reduce, or cease our operations, including substantially decrease our research and development activities, or otherwise impede our ongoing business efforts, which could have a material adverse effect on our business, operating results, financial condition, and long-term prospects, and, investors may lose their entire investment in the Company. Our financial statements do not include any adjustments that might result from the outcome of this uncertainty.
We will need to raise significant additional capital in the future to expand our operations and continue our research and development activities and we may be unable to raise such funds when needed or on acceptable terms, and any capital raises may cause significant dilution to our shareholders.
As of December 31, 2019, we had $18.0 million in cash and equivalents, and as of the date of this filing, we had approximately $16.5 million in cash and equivalents. We will need to raise significant additional capital in order to continue our research and development activities and fund our operations through commercialization of our nuclear fuel technology. Our current plan is to maximize external funding from third party sources to support the remaining development, testing and demonstration activities relating to our metallic nuclear fuel technology.
23
Table of Contents
When we elect to raise additional funds or additional funds are required, we may raise such funds from time to time through public or private equity offerings, debt financings or other financing alternatives. Additional equity or debt financing or other alternative sources of capital may not be available to us on acceptable terms, if at all. In addition, if we are unable to demonstrate meaningful progress to further the development of our fuel products, it may be difficult for us to raise additional capital on terms acceptable to us or at all.
If we raise additional funds by issuing equity securities, our stockholders will experience dilution. Sales of substantial amounts of our common stock may cause the trading price of our common stock to decline in the future. New investors may have rights superior to existing securityholders. Debt financing, if available, would result in substantial fixed payment obligations and may involve agreements that include covenants limiting or restricting our ability to take specific actions, such as incurring additional debt, making capital expenditures, or declaring dividends. Any debt financing or additional equity that we raise may contain terms, such as liquidation and other preferences, which are not favorable to us or our stockholders. If we are unable to raise additional capital in sufficient amounts or on terms acceptable to us, we may not be able to fully develop our nuclear fuel designs, our future operations will be limited, and our ability to generate revenues and achieve or sustain future profitability will be substantially harmed. In particular, we may be required to delay, reduce the scope of or terminate one or more of our research projects, sell rights to our nuclear fuel technology or license the rights to such technologies on terms that are less favorable to us than might otherwise be available. If we raise additional funds by issuing equity or securities convertible into equity, further dilution to stockholders may result and new investors could have rights superior to existing stockholders.
The amount of time and funding needed to bring our nuclear fuel to market may greatly exceed our projections.
The development of our nuclear fuel will take a significant amount of time and funding, and any delay in procuring equipment or in achieving development milestones, or uncertainty in regulatory licensing timelines could result in significant delays and cost overruns. We have come to the point where certain manufacturing equipment and a manufacturing facility are necessary for further development of our fuel; however, we cannot at this stage accurately predict the amount of funding or the time required to successfully manufacture and sell our fuel in the future. The actual cost and time required to commercialize our fuel technology may vary significantly depending on, among other things, the results of our research and product development efforts; the cost of developing or licensing our fuel; changes in the focus and direction of our research and product development programs; competitive and technological advances; the cost of filing, prosecuting, defending and enforcing claims with respect to patents; the regulatory approval process; fuel manufacturing process; availability of metallic high assay low enriched uranium, and marketing and other costs associated with commercialization of these technologies. Because of this uncertainty, even if financing is available to us, we may need significantly more capital than anticipated, which may not be available on terms acceptable to us or at all, and the expected revenues and other benefits from our nuclear fuel technology may be delayed or never realized.
Our current economic model for selling our fuel may prove to be inaccurate and our nuclear fuel technology products may not be cost effective.
Although our economic model concludes that our fuel technology can provide a significant payback to utilities, it is based upon a number of assumptions that may not prove accurate. If such model is inaccurate, our nuclear fuel product may not provide nuclear utility customers with sufficient economic incentive to switch from existing nuclear fuels, and we would lose or fail to develop customers.
Our fuel designs have never been tested in an existing commercial reactor and actual fuel performance, as well as the willingness of commercial reactor operators and fuel fabricators to adopt a new design, is uncertain.
Nuclear power research and development entails significant technological risk. New designs must undergo extensive development and testing necessary for regulatory approval. Our fuel designs are still in the research and development stage and, while certain testing on our fuel technologies has been completed, further testing and experiments will be required in test facilities. For example, our proposed metallic fuel uses a helical cruciform form to increase its surface area and shorten the distance for heat generated in the fuel rod to reach water and improve the coolability of the fuel. However, this proposed shape may also result in non-uniform distribution of heat flux that may have an adverse impact on the critical heat flux and limit power uprate capabilities of our metallic fuel. Additional testing and development may result in changes to the design of our proposed metallic fuel, which could decrease its realizable benefits and impair the ability of nuclear utilities to utilize nuclear fuel incorporating our technology.
24
Table of Contents
Furthermore, the fuel technology has yet to be demonstrated in operating conditions equivalent to those found in an existing commercial reactor. Until we are able to successfully demonstrate operation of our fuel designs in commercial reactor conditions, we cannot confirm the ability of our fuel to perform as expected, including its ability to enable a power uprate, a longer operating cycle, or other anticipated performance and safety benefits. In addition, there is also a risk that suitable testing or manufacturing facilities may not be available to us on a timely basis or at a reasonable cost, which could cause development program schedule delays.
If our fuel designs do not perform as anticipated in commercial reactor conditions, we will not realize revenues from licensing or other use of our fuel designs.
Existing commercial nuclear infrastructure in many countries is limited to uranium material in dioxide form with enrichments up to 5%. Our fuel is in metallic form and is enriched to higher levels which would require modifications to existing commercial nuclear infrastructure and could impede commercialization of our technology.
Existing commercial nuclear infrastructure, including conversion facilities, enrichment facilities, fabrication facilities, fuel storage facilities, fuel handling procedures, fuel operation at reactor sites, used fuel storage facilities and shipping containers, were designed and are currently licensed to handle uranium in oxide form with enrichment up to 5%. Our fuel designs are expected to use uranium metal with uranium enrichment levels up to 19.75% and would therefore require certain modifications to existing commercial nuclear infrastructure to enable commercial nuclear facilities to handle our fuels. Those nuclear facilities will need to go through a regulatory licensing process and obtain regulatory approvals to be able to process, handle, or ship uranium metal with enrichment levels up to 19.75% and operate commercial reactors using our metallic fuel. There is a risk that some relevant entities within the nuclear power industry may be slow in making any required facility infrastructure modifications or obtaining required licenses or approvals to enable enrichment to 19.75%, conversion to metallic uranium, fabrication of metallic fuel rods and assemblies, shipment of fresh and irradiated metallic fuel assemblies, interim storage of fresh and irradiated fuel assemblies in spent fuel pools or dry cask storage facilities at reactor sites, and permanent disposal of spent metallic fuel at a high-level repository. There is also a risk associated with possible negative perception of uranium enrichment greater than 5% that could potentially delay or hinder regulatory approval of our nuclear fuel designs.
Our nuclear fuel designs rely on fabrication technologies that in certain material ways are different from the fabrication techniques presently utilized by existing commercial fuel fabricators. In particular, our metallic fuel rods must be produced using a co-extrusion fabrication process. Presently, most commercial nuclear fuel is produced using a pellet fabrication technology, whereby uranium dioxide is formed into small pellets which are stacked and sealed inside metallic tubes. Our co-extrusion fabrication technology involves extrusion of a composite solid fuel rod from a metallic matrix containing uranium and zirconium alloy. Fabrication of full-length (approximately 3.5 to 4.5 meters) PWR metallic fuel rods has yet to be demonstrated with our uranium-zirconium metal. There is a risk that the fuel fabrication process utilized to produce one meter long metallic fuel rods may not be adaptable to the fabrication of full-length metallic fuel rods used in commercial reactors.
25
Table of Contents
We serve the nuclear power industry, which is highly regulated. Our fuel designs differ from fuels currently licensed and used by commercial nuclear power plants. The regulatory licensing and approval process for nuclear power plants to use our fuels may be delayed and made more costly, and industry acceptance of our fuels may be hampered.
The nuclear power industry is a highly regulated industry. All entities that operate nuclear facilities and transport nuclear materials are subject to the jurisdiction of the US Nuclear Regulatory Commission, or its counterparts around the world.
Our fuel designs differ significantly in some aspects from the fuel used today by commercial nuclear power plants. These differences will likely result in more prolonged and extensive review by the US Nuclear Regulatory Commission or its counterparts around the world that could cause development program schedule delays. Entities within the nuclear industry may be hesitant to be the first to use our fuel, which has little or no history of successful commercial use. Furthermore, our fuel development timeline relies on the relevant nuclear regulator to accept and approve technical information and documentation about our fuel that is generated during the research and development program. There is a risk that regulators may require additional information regarding the fuel’s behavior or performance which necessitates additional, unplanned analytical and/or experimental work which could cause program schedule delays and require more research and development funding.
Events related to our Enfission joint venture could adversely affect our future operations.
The Enfission joint venture is currently inactive and we intend to dissolve this joint venture as soon as practical. Under the Joint Venture Operating Agreement, neither we nor Framatome are in a position to unilaterally control or dissolve the joint venture, and our ability to engage in research activities within the scope of operations of the joint venture may be impaired until such time as the joint venture is dissolved. Our inability to dissolve the joint venture or resolve the continuing deadlock could adversely impact the operations and future profitability of Lightbridge, including the Company’s ability to conduct research and development activities within the scope of operations of Enfission in the near term or at all, as well as delaying the commercialization of the nuclear fuel incorporating our technology for certain markets. See “Certain Challenges – The ability to unwind our partnership with Framatome in an expeditious manner while minimizing the cost and risk to our intellectual property represents a significant challenge.” under Part I. Item 1. Business.
On February 7, 2020, we filed an Arbitration Request in the International Court of Arbitration of the International Chamber of Commerce against Framatome SAS to resolve issues arising out of our assertion that there are material breaches on the part of Framatome under the RSDA. This arbitration may increase our expenses and prevent our officers and directors from focusing their time and effort entirely on our business, which could have a material adverse effect on our financial statements. Additionally, a ruling by the arbitrator adverse to our position could have a material negative impact on our future business and financial statements.
26
Table of Contents
Successful execution of our business model is dependent upon public support for nuclear power and overcoming public opposition to nuclear energy.
Successful execution of our business model is dependent upon public support for nuclear power in the United States and other countries. Nuclear power faces strong opposition from certain competitive energy sources, individuals, and organizations. The major nuclear accident that occurred at the Fukushima nuclear power plant in Japan beginning on March 11, 2011 increased public opposition to nuclear power in some countries, resulting in a slowdown in, or, in some cases, a complete halt to, new construction of nuclear power plants, an early shut down of existing power plants, or a dampening of the favorable regulatory climate needed to introduce new nuclear technologies. In addition, the Fukushima accident appears to have shrunk the projected size of the global nuclear power market in 2025-2030 as reflected in the most recent reference case projections published by the World Nuclear Association. As a result of the Fukushima accident, some countries that were considering launching new domestic nuclear power programs have delayed or cancelled preparatory activities they were planning to undertake as part of such programs. This has diminished the number of consulting opportunities that we could compete on globally, at least in the near-term. Furthermore, nuclear fuel fabrication and the use of new nuclear fuels in reactors must be licensed by the US Nuclear Regulatory Commission and equivalent governmental authorities around the world. In many countries, the licensing process includes public hearings in which opponents of the use of nuclear power might be able to cause the issuance of required licenses to be delayed or denied.
If the price of non-nuclear energy sources falls, whether as the result of government policy or otherwise, there could be an adverse impact on nuclear energy, which would have a material adverse effect on our operations.
In certain markets with a diversified energy base, decisions on new build power plants are largely affected by the economics of various energy sources. If prices of non-nuclear energy sources fall, it could limit the deployment of new build nuclear power plants in such markets. This could reduce the size of the potential markets for both our fuel technology and our consulting services.
In addition, many states and the federal government have adopted a variety of government subsidies and utility incentives to allow renewable energy sources, such as biofuels, wind and solar energy, to compete with conventional sources of energy that have historically been less expensive, such as fossil fuels and nuclear power. We may face additional indirect competition from providers of renewable energy sources, particularly in wind and solar energy, if government subsidies and utility incentives for those sources of energy remain or increase or if such sources of energy are mandated. Additionally, the availability of subsidies and other incentives from utilities or government agencies to install alternative renewable energy sources may negatively impact our potential customers’ desire to purchase our products and services, or may be utilized by our existing or new competitors to develop a competing business model or products or services that may be potentially more attractive to customers than ours, any of which could have a material adverse effect on our results of operations or financial condition.
We may be adversely affected by uncertainty in the global financial markets and worldwide economic downturn.
Our future results may be adversely affected by the worldwide economic downturn, continued volatility or further deterioration in the debt and equity capital markets, inflation, deflation, or other adverse economic conditions that may negatively affect us. At present, it is likely that we will require additional capital in the near future in order to fund our operations. Due to the above listed factors, we cannot be certain that additional funding will be available on terms that are acceptable to us, or at all.
We rely upon certain members of our senior management, including Seth Grae, Andrey Mushakov, and Larry Goldman and the loss of any of Mr. Grae, Mr. Mushakov, or Mr. Goldman or any of our management team would have an adverse effect on the Company.
Our success depends upon certain members of our senior management, including Seth Grae, our Chief Executive Officer, Mr. Andrey Mushakov, our Executive Vice President - Nuclear Operations, and Larry Goldman, our Chief Financial Officer. Mr. Grae’s and Mr. Mushakov’s knowledge of the nuclear power industry, their network of key contacts within that industry and in governments and, in particular, their expertise in the potential markets for our technologies, are critical to the implementation of our business model. Mr. Grae, Mr. Mushakov, or Mr. Goldman are likely to be significant factors in our future growth and success. The loss of services by either Mr. Grae, Mr. Mushakov, or Mr. Goldman could have a material adverse effect on our business, results of operations or financial condition. Also, we rely heavily on other members of our management team and our inability to hire, retain, and motivate adequate numbers of consultants and managers could adversely affect our ability to meet client needs and to continue the development of our fuel designs.
27
Table of Contents
Competition for highly qualified technical personnel is intense in our industry.
Our future success depends in part on our ability to contract with, hire, integrate, and retain engineers and scientists, and other qualified personnel with a focus in our nuclear fuel technology and products. Competition for these skilled professionals is intense. If we are unable to adequately anticipate our needs for certain key competences and implement human resource solutions to recruit or improve these competences, our business, results of operations and financial condition would suffer. In addition, a loss of the service of any of our existing skilled employees or contractors could have a significant negative effect on our ability to operate.
We may not be able to receive or retain authorizations that may be required for us to sell our services or license our technology internationally.
The sales and marketing of our services and technology internationally may be subject to US and France export control regulations and the export control laws of other countries. Governmental authorizations may be required before we can export our services or technology. If authorizations are required and not granted, our international business could be materially affected. The export authorization process is often time consuming. Violation of export control regulations could subject us to fines and other penalties, such as losing the ability to export for a period of years, which would limit our revenue growth opportunities and significantly hinder our attempts to expand our business internationally.
Development of our nuclear fuel technology is dependent upon the availability of a test reactor.
Our fuel designs are still in the research and development stage and further research, development, and demonstration will be required in test facilities. We intended to conduct further testing of our fuel designs at the Halden research reactor located in Halden, Norway. However, the Halden research reactor, which became operative in 1958, has closed and will not reopen, so it will not be available for further testing of our fuel designs. The Company has identified alternative options to generate the irradiation data we need to support regulatory licensing of our lead test assembly operation in a commercial reactor but pursuing such alternatives to the Halden research reactor may delay further testing of our fuel designs. We may not be able to contractually secure another reactor in which to test our fuel designs. As a result, commercialization of our nuclear fuel technology may be delayed, perhaps indefinitely, which would adversely affect our business, financial condition, and results of operations.
Potential competitors could limit opportunities to license our technology.
Other companies may develop new nuclear fuel designs that can be used in the same types of reactors as those that we target. Some of these companies have existing long-term commercial contracts with nuclear power utilities that we do not have. If another company were to successfully develop a new nuclear fuel that competes with our nuclear fuel design technology, opportunities to commercialize our technology would be limited, and our business would suffer.
Moreover, many of these other companies have substantially greater financial, technological, managerial and research and development resources and experience than we do. These larger companies may be better able to handle the corresponding long-term financial requirements to successfully develop new nuclear fuel and bring it to market.
28
Table of Contents
If the US Department of Energy (“DOE”) were to successfully assert that an invention claimed within our 2007 or 2008 Patent Cooperation Treaty, or PCT, patent applications was first conceived or actually reduced to practice under a contract with the DOE, then our intellectual property rights in that invention could become compromised and our business model could become significantly impeded.
Work on finite aspects and/or testing of some subject matter disclosed in our 2007 and 2008 Russian PCT patent applications was done under a government contract with the DOE. If the DOE asserted that an invention claimed in the 2007 and/or 2008 Russian PCT applications was first conceived or actually reduced to practice under such a contract, and a US court agreed, the DOE could gain an ownership interest in such an invention outside of the Russian Federation and our intellectual property rights in that claimed invention could become compromised and our business model may then be significantly impeded.
If we are unable to obtain or maintain intellectual property rights and trade secrets relating to our technology, the commercial value of our technology may be adversely affected, which could in turn adversely affect our business, financial condition, and results of operations.
Our success and ability to compete depends in part upon our ability to obtain protection in the United States and other countries for our nuclear fuel designs by establishing and maintaining intellectual property rights relating to or incorporated into our fuel technologies and products. We own a variety of patents and patent applications in the United States, as well as corresponding patents and patent applications in several other jurisdictions. We have not obtained patent protection in each market in which we plan to compete. We do not know how successful we would be should we choose to assert our patents against suspected infringers. Our pending and future patent applications may not issue as patents or, if issued, may not issue in a form that will be advantageous to us. Even if issued, patents may be challenged, narrowed, invalidated, or circumvented, which could limit our ability to stop competitors from marketing similar products or limit the length of term of patent protection we may have for our products. Changes in either patent laws or in interpretations of patent laws in the United States and other countries may diminish the value of our intellectual property or narrow the scope of our patent protection, which could in turn adversely affect our business, financial condition, and results of operations.
We intend to apply for additional patents for our nuclear fuel technologies as we deem appropriate. We may, however, fail to apply for patents on important technologies or products in a timely fashion, if at all. Our existing patents and any future patents we obtain may not be sufficiently broad to prevent others from practicing our technologies or from developing competing products and technologies. In addition, in general the patent positions of energy technology companies are highly uncertain and involve complex legal and factual questions for which important legal principles remain unresolved. As a result, the validity and enforceability of our patents cannot be predicted with certainty.
We also rely on trade secrets to protect some of our technology, especially where it is believed that patent protection is undesirable for the Company or unobtainable. We generally require our employees, consultants, advisors, and collaborators to execute appropriate agreements with us recently regarding the safeguarding of confidential information. If any of these agreements are violated, or if any of our employees, consultants, advisors or collaborators unintentionally or willfully disclose our proprietary information to competitors, we may not be able to fully perfect our rights to the technologies in question, and in some instances, we may not have an appropriate remedy available for the damages that we may incur as a result of any such violation. Enforcement of claims that a third party has illegally obtained and is using trade secrets is expensive, time consuming and uncertain. In addition, non-US courts are sometimes less willing than US courts to protect trade secrets. If our competitors independently develop equivalent knowledge, methods, and know-how, we would not be able to assert our trade secrets against them and our business could be harmed.
29
Table of Contents
If we infringe or are alleged to infringe intellectual property rights of third parties, our business, financial condition, and results of operations could be adversely affected.
Our nuclear fuel designs may infringe, or be claimed to infringe, patents or patent applications under which we do not hold licenses or other rights. Third parties may own or control these patents and patent applications in the United States and elsewhere. Third parties could bring claims against us that would cause us to incur substantial expenses and, if successfully asserted against us, could cause us to pay substantial damages. If a patent infringement suit were brought against us, we could be forced to stop or delay commercialization of the fuel design or a component thereof that is the subject of the suit. As a result of patent infringement claims, or in order to avoid potential claims, we may choose or be required to seek a license from the third party and be required to pay license fees, royalties, or both. These licenses may not be available on acceptable terms, or at all. Even if we were able to obtain a license, the rights may be nonexclusive, which could result in our competitors gaining access to the same intellectual property. Ultimately, we could be forced to cease some aspect of our business operations if, as a result of actual or threatened patent infringement claims, we are unable to enter into licenses on acceptable terms. This could significantly and adversely affect our business, financial condition, and results of operations. In addition to infringement claims against us, we may become a party to other types of patent litigation and other proceedings, including interference proceedings declared by the United States Patent and Trademark Office regarding intellectual property rights with respect to our nuclear fuel designs. The cost to us of any patent litigation or other proceeding, even if resolved in our favor, could be substantial. Some of our competitors may be able to sustain the costs of such litigation or proceedings more effectively than we can because of their greater financial resources. Uncertainties resulting from the initiation and continuation of patent litigation or other proceedings could have a material adverse effect on our ability to compete in the marketplace. Patent litigation and other proceedings may also absorb significant management time.
Applicable Russian intellectual property law may be inadequate to protect some of our intellectual property, which could have a material adverse effect on our business.
Intellectual property rights are evolving in Russia, and are trending towards international norms, but are by no means fully developed. We have worked closely with employees in Russia and other Russian contractors and entities to develop some of our material intellectual property. Some of our earlier intellectual property rights originate from our patent filings in Russia. Our worldwide rights in some of this intellectual property, therefore, may be affected by Russian intellectual property laws. If the application of Russian laws to some of our intellectual property rights proves inadequate, then we may not be able to fully avail ourselves of all of our intellectual property, and our business model may be impeded.
The laws of certain foreign jurisdictions do not protect intellectual property rights to the same extent as the laws of the United States, and many companies have encountered significant challenges in protecting and defending such rights in such foreign jurisdictions. The legal systems of certain countries, particularly developing countries, do not favor the enforcement of patents and other intellectual property protection, which could make it difficult for us to stop the infringement of our patents. Proceedings to enforce our patent rights in foreign jurisdictions could result in substantial cost and divert our efforts and attention from other aspects of our business.
30
Table of Contents
Our nuclear fuel fabrication process is dependent on outside suppliers of nuclear and other materials and any difficulty by a fuel fabricator in obtaining these materials could be detrimental to our ability to eventually market our fuel through a fuel fabricator.
Production of fuel assemblies using our nuclear fuel designs is dependent on the ability of fuel fabricators to obtain supplies of nuclear material utilized in our fuel assembly design. Our proposed fuel products require high-assay low enriched uranium (HALEU) in metallic form, enriched between 5% and 19.75%, with presently no commercial supply of HALEU available in the US. Currently HALEU can only be sourced in limited quantities from the DOE.
Recently, major commercial enrichment companies, such as Urenco have expressed interest in supplying HALEU. Several Urenco enrichment facilities are already licensed to produce uranium at enrichments above 5% U235, in line with today’s nuclear industry market requirements. Urenco is now exploring the construction of a dedicated HALEU unit at the Urenco USA facility. Urenco is progressing the design engineering and related licensing activities to support this project.
Fabricators will also need to obtain metal for components, particularly zirconium or its alloys. These materials are regulated and can be difficult to obtain or may have unfavorable pricing terms. Any difficulties in obtaining these materials by fuel fabricators could have a material adverse effect on their ability to market fuel based on our technology.
We are exposed to risks related to cybersecurity and protection of confidential information.
We retain highly confidential information in our systems and databases on third party network providers. Although we maintain security features in our systems designed to protect proprietary information and prevent data loss and other security breaches, such measures cannot provide absolute security and our operations may be susceptible to breaches on our third party networks, including from circumvention of security systems, denial of service attacks or other cyber-attacks, hacking, computer viruses or malware, technical malfunction, employee error, malfeasance, physical breaches, system disruptions or other disruptions. We outsource certain functions, including IT functions, and these relationships allow for the storage and processing of our information, as well as customer, counterparty, and employee information. While we engage in actions to reduce our exposure resulting from outsourcing, ongoing threats may result in unauthorized access, loss, exposure or destruction of data, or other cybersecurity incidents, with increased costs and other consequences, including those described below.
Disruptions from cybersecurity events may jeopardize the security of information stored in and transmitted through our systems or the systems of outsourcing parties. An increasing number of websites, including those owned by several other large Internet and offline companies, have disclosed breaches of their security, some of which have involved sophisticated and highly targeted attacks on portions of their websites or infrastructure. The techniques used to obtain unauthorized access, disable, or degrade service, or sabotage systems, change frequently, may be difficult to detect for a long time, and often are not recognized until launched against a target. Certain efforts may be state sponsored and supported by significant financial and technological resources and therefore may be even more difficult to detect. We may not anticipate these techniques or implement adequate preventive measures. We currently expend and may be required to expend significant additional capital and other resources to protect against such security breaches or to alleviate problems caused by such breaches. Our insurance coverage may be inadequate to compensate us for any related losses we incur.
31
Table of Contents
These issues are likely to become more difficult as we expand our operations. Any breach of our security measures, or even a perceived breach of our security measures, could cause us to lose potential customers and governmental approvals; suffer material harm to our business, financial condition, operating results and reputation; or be subject to regulatory actions, litigation, sanctions or other statutory penalties.
Technological changes could render our technology and products uncompetitive or obsolete, which could prevent us from achieving market share and sales.
Our failure to refine or advance our fuel technologies could cause our nuclear fuel to become uncompetitive or obsolete, which could prevent us from achieving market share and sales. We may need to invest significant financial resources in research and product development to keep pace with technological advances in the industry and to compete in the future; we may be unable to secure such financing. We believe that a variety of competing alternative technologies may be in development by other companies that could result in lower manufacturing costs and/or higher fuel performance than those expected for our fuel products. Our development efforts may be rendered obsolete by the technological advances of others, and other technologies may prove more advantageous for commercialization.
Risks related to the ownership of our common stock
We have issued preferred stock with rights senior to our common stock.
Approximately 3.4 million shares of our Series A and Series B preferred stock were issued and outstanding at December 31, 2019. We can issue additional shares of preferred stock in one or more series and can set the terms of the preferred stock without seeking any further approval from the holders of our common stock. Any preferred stock that we issue may rank ahead of our common stock in terms of dividend priority or liquidation premiums, may have greater voting rights than our common stock, and may have consent rights over certain fundamental transactions. The interests of the holders of the preferred stock may as a consequence be different from the interests of the holders of our common stock, including in certain fundamental transactions in which the preferred stockholders would receive distributions before any distributions may be made to our common stockholders. In addition, such preferred stock may contain provisions allowing it to be converted into shares of common stock, which could dilute the value of our common stock to then current stockholders and could adversely affect the market price of our common stock.
There may be volatility in our stock price, which could negatively affect investments, and our stockholders may not be able to resell their shares at or above the value they originally purchased such shares.
The market price of our common stock may fluctuate significantly in response to a number of factors, some of which are beyond our control, including:
- trading volume of our common stock;
- quarterly variations in operating results;
- actual or anticipated variations in our results of operations or those of our competitors;
- failure to obtain or maintain analyst coverage of our common stock, changes in earnings estimates or recommendations by securities analysts, or our failure to achieve analyst earnings estimates;
- future sales of our common stock or other securities by us or our stockholders;
- general market conditions and other factors unrelated to our operating performance or the operating performance of our competitors; and
- the risks discussed elsewhere in this Annual Report on Form 10-K.
The stock market may experience extreme volatility that is often unrelated to the performance of particular companies. These market fluctuations may cause our stock price to fall regardless of its performance.
32
Table of Contents
Our inability to comply with the listing requirements of the Nasdaq Capital Market will result in our common stock being delisted, which could affect its market price and liquidity and reduce our ability to raise capital.
If we fail to maintain compliance with, or otherwise fail to comply with, all applicable continued requirements, Nasdaq may determine to delist our common stock, which could substantially decrease trading in our common stock and adversely affect the market liquidity of our common stock and cause the market price of our common stock to decline. In addition, our ability to raise additional capital, including through future at-the-market offerings and other offerings utilizing short-form registration statements on Form S-3, would be substantially impaired.
Properties
As filed, 372 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our office space is located at 11710 Plaza America Drive, Suite 2000 Reston, VA 20190 USA. The term of the lease extends through December 31, 2020. We are obligated to pay approximately $15,000 per month for office rent. This space is used by our executives, employees, and contractors for administrative purposes, consulting work, and research and development activities.
Legal proceedings
As filed, 1,492 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
From time to time, we may become involved in various lawsuits and legal proceedings, which arise in the ordinary course of business. However, litigation is subject to inherent uncertainties, and an adverse result in these or other matters may arise from time to time that may harm our business. For a description of legal proceedings involving the Company, see the information set forth below and under Litigation in Note 6. Commitments and Contingencies of the Notes to our consolidated financial statements in Part II. Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K.
Filing of Arbitration - Framatome
On February 7, 2020, we filed a request for arbitration (the “Arbitration Request”) in the International Court of Arbitration of the International Chamber of Commerce against Framatome. We took this action in order to obtain, inter alia, a declaration that the R&D Services Agreement, dated November 14, 2017, by and among Framatome, Enfission, and the Company (as amended by Amendment Number One, dated January 25, 2018, and Amendment Number Two, dated June 20, 2018, the “RDSA”) was validly terminated and is no longer in force, and to obtain compensation for the damages incurred due to Framatome’s uncured material breach of certain material terms of the RDSA. These material breaches relate to Framatome’s invoicing obligations, as well as a failure of the escalation process under the RDSA to agree to a budget commitment for 2019-2020.
Management's discussion and analysis
As filed, 29,331 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations, or MD&A, is intended to help the reader understand Lightbridge Corporation, our operations, and our present business environment. MD&A is provided as a supplement to, and should be read in conjunction with, our Consolidated Financial Statements and the accompanying Notes thereto, which are contained in Part II. Item 8. Financial Statements and Supplementary Data, of this report. This discussion contains forward-looking statements that are based on our management’s current expectations, estimates, and projections for our business, which are subject to a number of risks and uncertainties. Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors, including those set forth under “Forward-Looking Statements” and Part I. Item 1A. Risk Factors. This MD&A consists of the following sections:
- Overview of Our Business and recent developments — a general overview of our business and updates;
- Critical Accounting Policies and Estimates — a discussion of accounting policies that require critical judgments and estimates;
- Operations Review — an analysis of our consolidated results of operations for the two years presented in our consolidated financial statements. Except to the extent that differences among our operating segments are material to an understanding of our business as a whole, we present the discussion in the MD&A on a consolidated basis; and
- Liquidity, Capital Resources, and Financial Position — an analysis of our cash flows, and an overview of our financial position.
34
Table of Contents
Overview of Our Business and Recent Developments
Our Business
Financial information is included in Part II. Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K.
Our goal is to develop and commercialize innovative, proprietary nuclear fuel designs, which we expect will significantly enhance the nuclear power industry’s economics due to higher power output and improved safety margins.
Our metallic fuel can be used in different types of water-cooled commercial power reactors, such as pressurized water reactors, boiling water reactors, Russian-type VVER reactors, CANDU heavy water reactors, water-cooled small modular reactors, as well as water-cooled research reactors.
We have obtained patent validation in key countries and will continue to seek patent validation in key countries that either currently operate or are expected to build and operate a large number of suitable nuclear power reactors.
We expect to generate license revenues from nuclear fuel fabricators in the future.
We have incurred net losses and negative cash flows from operations and expect this to continue in the next several years. In 2020, we will continue to evaluate spending to reduce expenses with the overall goal of commercializing our fuel at the lowest cost, in order to maximize our shareholders’ value. Our current primary source of funding is our at-the-market (ATM) financing arrangement with Stifel, Nicolaus & Company. See Note 9. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Consolidated Financial Statements included in Part II. Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K for information regarding our ATM financing.
Recent Developments
On December 20, 2019 we announced an award voucher from the U.S. Department of Energy’s Gateway for Accelerated Innovation in Nuclear (GAIN) program to support development of Lightbridge Fuel™ in collaboration with Idaho National Laboratory (INL). The scope of the project includes experiment design for irradiation of Lightbridge metallic fuel material samples in the Advanced Test Reactor (ATR) at INL. The project is anticipated to commence in the first half of 2020. The total project value is approximately $846,000, with three-quarters of this amount funded by DOE for the scope performed by INL. This was the very first direct award to Lightbridge from the DOE, which demonstrates the DOE’s commitment to funding nuclear energy innovation from American companies.
35
Table of Contents
Filing of Arbitration - Framatome
On February 7, 2020, we filed a request for arbitration (the “Arbitration Request”) in the International Court of Arbitration of the International Chamber of Commerce against Framatome. We took this action in order to obtain, inter alia, a declaration that the R&D Services Agreement, dated November 14, 2017, by and among Framatome, Enfission, and the Company (as amended by Amendment Number One, dated January 25, 2018, and Amendment Number Two, dated June 20, 2018, the “RDSA”) was validly terminated and is no longer in force, and to obtain compensation for the damages incurred. We anticipate our general and administrative costs will increase in 2020 due to this action.
See Part I. Item 3. Legal Proceedings, for more information.
Consolidated Results of Operations
The following table presents our historical operating results as a percentage of revenues for the years indicated:
| Years Ended December 31, 2019 | 2018 | Changes 2019 vs 2018 | ||
|---|---|---|---|---|
| Revenues | $- | $- | $- | -% |
| Operating Expenses | ||||
| General and administrative | 5,697,469 | 6,715,378 | (1,017,909) | -15% |
| Research and development expenses | 2,676,156 | 3,458,377 | (782,221) | -23% |
| Total Operating Expenses | $8,373,625 | $10,173,755 | $(1,800,130) | -18% |
| Other Operating Income and (Loss) | ||||
| Other income from joint venture | $715,126 | $1,056,551 | $(341,425) | -32% |
| Equity in loss from joint venture | (3,321,737) | (5,835,263) | (2,513,526) | -43% |
| Total Other Operating Income and (Loss) | $(2,606,611) | $(4,778,712) | $(2,172,101) | -45% |
| Total Operating Loss | $(10,980,236) | $(14,952,467) | $(3,972,231) | -27% |
| Other Income and (Expenses) | $393,112 | $(723,641) | $1,116,753 | 154% |
| Net Loss Before Income Taxes | $(10,587,124) | $(15,676,108) | $(5,088,984) | -32% |
Revenue
The market for nuclear industry consulting services is competitive, fragmented, and subject to rapid change. Our main business is developing our nuclear fuel. We may pursue some consulting services opportunities in the future, but we have further increased the focus and resources of the Company to the fuel division and away from consulting. There was no revenue for the years ended December 31, 2019 and 2018.
36
Table of Contents
General and Administrative Expenses
General and administrative expenses consist mostly of compensation and related costs for personnel and facilities, stock-based compensation, finance, human resources, information technology, and fees for consulting and other professional services. Professional services are principally comprised of legal, audit, strategic advisory services, and outsourcing services.
Total general and administrative expenses decreased by approximately $1.0 million for the year ended December 31, 2019, as compared to the year ended December 31, 2018. There was a decrease in stock-based compensation of approximately $1.0 million due to the decrease in stock option expense for prior stock option awards, and a decrease in professional fees of approximately $0.2 million due to decrease in legal fees, accounting fees and other professional fees, which was offset by an increase in employee compensation and employee benefits of approximately $0.2 million due to an increase in the number of employees. Total stock-based compensation included in general and administrative expenses was approximately $0.4 million and $1.4 million for the year ended December 31, 2019 and 2018, respectively.
See Note 9. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Consolidated Financial Statements included in Part II. Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K for more information regarding our stock-based compensation.
Research and Development
Corporate research and development expenses consist primarily of compensation and related fringe benefits including stock-based compensation and related allocable overhead costs for the research and development of our fuel, including work performed and billed to our Enfission joint venture. Total research and development expenses decreased by approximately $0.8 million for the year ended December 31, 2019, as compared to the year ended December 31, 2018.
There was a decrease in professional fees of approximately $0.1 million, a decrease in stock-based compensation of approximately $0.6 million due to the decrease in stock option expense for prior stock option awards, and a decrease in employee compensation and employee benefits in supporting research and development activities for Enfission of approximately $0.2 million, which was offset by an increase in consulting fees of approximately $0.1 million. Total stock-based compensation included in research and development expenses was approximately $0.4 million and $1.0 million for the year ended December 31, 2019 and 2018, respectively.
Due to the nature of these research and development expenditures, cost and schedule estimates are inherently uncertain and can vary significantly as new information and the outcome of these research and development activities become available. For 2020, we anticipate a significant decrease of research and development activities due to budgetary constraints.
Other Operating Income and (Loss) – Related Party
Reported in other operating income is other income for activities performed by our employees and consultants billed to the Enfission joint venture for research and development work and our share of the allocated loss in Enfission. Total other operating income and (loss) decreased by approximately $2.2 million for the year ended December 31, 2019, as compared to the year ended December 31, 2018.
Other income from the Enfission joint venture for the years ended December 31, 2019 and 2018 was approximately $0.7 million and $1.1 million, respectively. Equity in loss from the Enfission joint venture for the year ended December 31, 2019 and 2018 was $3.3 million and $5.8 million, respectively, which consists of our share of the allocated loss in Enfission. The decrease in the share of loss in Enfission was due to less research and development expenses incurred by Enfission due to the Enfission board of directors not agreeing on a 2019 research and development budget, which resulted in a decrease in the loss allocated to Lightbridge for the year ended December 31, 2019.
37
Table of Contents
Other Income (Expenses)
There was a net decrease in other expenses of approximately $1.1 million. This change was due to a decrease in amortization of deferred financing costs of approximately $1.0 million due to the write-off of the deferred financing costs in the first quarter of 2018 for the expired equity line option agreement, and an increase of $0.1 million in interest income generated from the interest earned from the purchase of treasury bills and from our bank savings account for the year ended December 31, 2019, as compared to the year ended December 31, 2018.
Provision for Income Taxes
We incurred a pre-tax net loss for both 2019 and 2018. We reviewed all sources of income for purposes of recognizing the deferred tax assets and concluded a full valuation allowance for 2019 and 2018 was necessary. Therefore, we did not have a provision for taxes for both years ended December 31, 2019 and 2018.
See Note 8. Income Taxes of the Notes to our Consolidated Financial Statements included in Part II. Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K for information regarding our income taxes.
LIQUIDITY, CAPITAL RESOURCES AND FINANCIAL POSITION
At December 31, 2019, we had cash and cash equivalents of approximately $18.0 million, as compared to approximately $24.6 million at December 31, 2018, decreased by approximately $6.6 million. The cash inflow of approximately $3.8 million resulted from net proceeds from the sale of approximately 0.5 million shares of common stock during the year ended December 31, 2019. This cash inflow was offset by net cash used in operating activities of approximately $6.7 million and our cash used in investing activities for our capital investment in Enfission and patent filing costs of approximately $3.8 million. We used cash during the year ended December 31, 2019 primarily to fund our research and development expenses and general and administrative expenses. We did not have any consulting revenue for the year ended December 31, 2019 and presently do not expect to have consulting revenue for the next 12 months.
We currently project a negative cash flow from operations averaging approximately $0.8 million per month for our general and administrative and corporate research and development expenses, for total expected expenditures of approximately $9.6 million for the next 12 months. In addition, we currently anticipate the amount of cash outlays to third parties for research and development expenditures, for our nuclear fuel products to be approximately $1.5 million to $2 million over the next 12 to 15 months. We believe that while our cash at December 31, 2019 exceeds our budgeted expenditures through the first quarter of 2021 there is only a small margin for miscalculations in budget estimates in meeting our budget 12 months from the issuance of these financial statements. Accordingly, budget variances in the projection of our planned operations, plus any additional expenditures that might result from additional legal costs and unexpected fees relating to arbitration with our joint venture partner, raise substantial doubt about our ability to continue as a going concern.
We can provide no assurances about meeting our budgeted expenditures regarding our future research and development efforts for the next 12 months and beyond, as well as predicting future market trends in nuclear power that can affect the future sale of our nuclear fuel. Furthermore, any negative results from our research and development may require us to increase our research and development spending to achieve our desired milestones in developing our nuclear fuel. There can be no assurance that the Enfission arbitration will not affect our ability to continue to advance our research and development efforts. These additional capital needs relate to the development, manufacturing, and commercialization of our nuclear fuel assemblies. We have the ability to delay or reduce incurring certain operating expenses, including research and development expenses, in the next 12 to 15 months, which could reduce our cash flow shortfall, if needed.
38
Table of Contents
To maintain our Nasdaq listing, we executed a one-for-twelve reverse stock split of our issued and outstanding common stock, which became effective on October 21, 2019. On November 4, 2019, we received written notification from the Nasdaq Listing Qualifications Staff indicating that we regained compliance with the minimum bid price requirement for continued listing on the Nasdaq Capital Market. The current primary sources of cash available to us for the next 12 months are potential funding from equity investments, including our ATM financing arrangement. We have no debt or debt credit lines and we have financed our operations to date through our prior years’ consulting revenue margins and the sale of our preferred stock and common stock. Management believes that public or private equity investments will be available in the future, however adverse market conditions in our common stock price and trading volume, as well as other factors could substantially impair our ability to raise capital in the future.
Short-Term and Long-Term Liquidity Sources
As discussed above, we will seek new financing bringing us additional sources of capital, depending on the capital market conditions of our common stock, over the next 12 months. There can be no assurance that these additional sources of capital will be made available to us. The primary potential sources of cash that may be available to us are as follows:
- Equity or debt investment from third party investors in Lightbridge; and
- Strategic investment to support the remaining research and development activities required to further enhance and complete the development of our fuel products to a commercial stage.
In support of our long-term business with respect to our fuel technology business, we endeavor to create strategic alliances with other parties during the next three years, to support the remaining research and development activities that is required to further enhance and complete the development of our fuel products to a commercial stage. We may be unable to form such strategic alliances on terms acceptable to us or at all.
See Note 9. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Consolidated Financial Statements included in Part II. Item 8. Financial Statements and Supplementary Data, of this Annual Report on Form 10-K for information regarding our prior financings.
The following table provides detailed information about our net cash flows for the years ended December 31, 2019 and 2018.
39
Table of Contents
Cash Flow
(rounded in millions)
| Year Ended December 31, 2019 | 2018 | |
|---|---|---|
| Net cash used in operating activities | $(6.7) | $(7.4) |
| Net cash used in investing activities | $(3.8) | $(5.8) |
| Net cash provided by financing activities | $3.8 | $33.3 |
| Net cash (outflow) inflow | $(6.7) | $20.1 |
Operating Activities
The decrease in our cash used in operating activities in 2019 of approximately $0.7 million was primarily due to a decrease in our operating expenses and net loss and the change in working capital items as explained below.
Cash used in operating activities in the year ended December 31, 2019 consisted of net loss adjusted for non-cash (income) expense items such as stock-based compensation, amortization of deferred financing costs and equity in loss from the Enfission joint venture, as well as the effect of changes in working capital. Cash used in operating activities in the year ended December 31, 2019 consisted of a net loss of approximately $10.6 million and net adjustments to net loss for non-cash income items or a negative cash flow offset (decrease to cash flow used in operating activities) totaling approximately $4.1 million, consisting of non-cash adjustments for stock-based compensation of approximately $0.8 million and equity in loss from the Enfission joint venture of approximately $3.3 million. Total cash used in operating working capital totaled approximately $0.3 million, which was primarily due to an increase in other receivables from the Enfission joint venture.
Investing Activities
Net cash used in our investing activities for the year ended December 31, 2019, as compared to net cash used in our investing activities in 2018, decreased by approximately $2.0 million. The decrease was due primarily to reduced spending for investment in the Enfission joint venture of approximately $2.0 million. The spending for patent application costs were approximately the same for the year ended December 31, 2019. These applications are filed for new developments resulting from our research and development activities. We anticipate these patent costs to increase in the future periods due to the continuing research and development work we plan to perform on our all-metal fuel design, unless our planned research and development work is affected by the Enfission arbitration.
Financing Activities
Net cash provided by our financing activities for the year ended December 31, 2019, as compared to net cash provided by our financing activities for the year ended December 31, 2018 decreased by approximately $29.5 million. The decrease was primarily due to a decrease in the net proceeds from the issuance of our common stock of approximately $25.6 million in 2019 as compared to 2018 and a decrease in the proceeds from the issuance of our Series A Preferred Stock of approximately $3.9 million.
40
Table of Contents
Critical Accounting Policies and Estimates
The preparation of financial statements and related disclosures in conformity with US generally accepted accounting principles (“GAAP”) and the Company’s discussion and analysis of its financial condition and operating results require the Company’s management to make judgments, assumptions, and estimates that affect the amounts reported in its consolidated financial statements and accompanying notes. Note 1. Basis of Presentation, Summary of Significant Accounting Policies, and Nature of Operations of the Notes to our Consolidated Financial Statements in Part II. Item 8. Financial Statements and Supplementary Data, of this Form 10-K describes the significant accounting policies and methods used in the preparation of our consolidated financial statements.
Our management expects to make judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operation and/or financial condition. We have identified certain accounting policies that we believe are most important to the understanding of our current financial condition and results of operations.
Accounting for Stock-Based Compensation, Stock Options and Stock Granted to Employees and Non-employees
We adopted the requirements for stock-based compensation, where all forms of share-based payments to employees or non-employees, including stock options and stock purchase plans, are treated the same as any other form of compensation by recognizing the related cost in the statement of operations.
Under these requirements, stock-based compensation expense for employees is measured at the grant date based on the fair value of the award, and the expense is recognized ratably over the award’s vesting period.
The stock-based compensation expense incurred in connection with our employees is based on the employee model of ASC 718. Under ASC 718 an employee is defined as “An individual over whom the grantor of a share-based compensation award exercises or has the right to exercise sufficient control to establish an employer-employee relationship based on common law as illustrated in case law and currently under US tax regulations.” The stock-based compensation expense for our consultants is accounted for under ASU 2018-07, which allows us to account for options issued to consultants in the same manner as they are issued to our employees. For all service-based grants made, we recognize compensation cost under the straight-line method.
We measure the fair value of service-based stock options on the measurement date using the Black-Scholes option-pricing model, which requires the use of several estimates, including:
- the volatility of our stock price;
- the expected life of the option;
- risk free interest rates; and
- expected dividend yield.
41
Table of Contents
We use the historical volatility of our stock price over the number of years that matches the expected life of our stock option grants or we use the historical volatility of our stock price since January 5, 2006, the date we announced that we were becoming a public company, to estimate the future volatility of our stock. At this time, we do not believe that there is a better objective method to predict the future volatility of our stock. The expected life of options is based on internal studies of historical experience and projected exercise behavior. We estimate expected forfeitures of stock-based awards at the grant date and recognize compensation cost only for those awards expected to vest. The forfeiture assumption is ultimately adjusted to the actual forfeiture rate. Estimated forfeitures are reassessed in subsequent periods and may change based on new facts and circumstances. We utilize a risk-free interest rate, which is based on the yield of US treasury securities with a maturity equal to the expected life of the options. We have not and do not expect to pay dividends on our common shares for the foreseeable future.
We use the Monte Carlo valuation model to determine the fair value of market-based and performance-based stock options at the date of grant, which requires us to make assumptions, including:
- expected term;
- volatility;
- dividend yield;
- risk-free interest rate; and
- forfeiture rates.
These assumptions are based on historical information and judgment regarding market factors and trends. If actual results differ from our assumptions and judgments used in estimating these factors, future adjustments to these estimates may be required.
Investment in Enfission – Equity Method
As of January 24, 2018, we own a 50% interest in Enfission – accounted for using the equity method of accounting. Enfission is deemed to be a variable interest entity (“VIE”) under the VIE model of consolidation because it currently does not have sufficient funds to finance its operations and will require significant additional equity or subordinated debt financing. We have determined that we are not the primary beneficiary of the VIE since we do not have the power to direct the activities that most significantly impact the VIE’s performance.
In determining whether we are the primary beneficiary and whether we have the right to receive benefits or the obligation to absorb losses that could potentially be significant to the VIE, we evaluate all our economic interests in the entity, regardless of form. This evaluation considers all relevant factors of the entity’s structure including the entity’s capital structure, contractual rights to earnings (losses) as well as other contractual arrangements that have potential to be economically significant. We are not the primary beneficiary since the major decision making for all significant economic activities require the approval of both us and Framatome. Changes in the operating agreement may affect the evaluation of who is a primary beneficiary of the VIE.
42
Table of Contents
Intangibles
As presented on the accompanying balance sheet, we had patents with a book value of approximately $1.8 million and $1.6 million as of December 31, 2019 and 2018, respectively. There are many assumptions and estimates that may directly impact the results of impairment testing, including an estimate of future expected revenues, earnings, and cash flows, and discount rates applied to such expected cash flows to estimate fair value. We have the ability to influence the outcome and ultimate results based on the assumptions and estimates we choose for testing. To mitigate undue influence, we set criteria that are reviewed and approved by various levels of management. The determination of whether or not intangible assets have become impaired involves a significant level of judgment in the assumptions.
Changes in our strategy or market conditions could significantly impact these judgments and require adjustments to recorded amounts of intangible assets.
Research and development expenses
Research expenses are recognized as expenses when incurred. Costs incurred on development projects are recognized as intangible assets as of the date as of which it can be established that it is probable that future economic benefits attributable to the asset will flow to us considering its commercial feasibility. This is generally the case when regulatory approval for commercialization is achieved and costs can be measured reliably. Given the current stage of the development of our products, no development expenditures have yet been capitalized.
Loss Contingency
Our loss contingency analysis contains uncertainties because it requires management to assess the degree of probability of an unfavorable outcome and to make a reasonable estimate of the amount of potential loss for both Lightbridge and the outcome of the joint venture arbitration.
Recent Accounting Standards and Pronouncements
Refer to Note 1. Basis of Presentation, Summary of Significant Accounting Policies, and Nature of Operations of the Notes to our Consolidated Financial Statements in Part II. Item 8. Financial Statements and Supplementary Data, of this Form 10-K for a discussion of recent accounting standards and pronouncements.
Off Balance Sheet Arrangements
We do not have any off-balance sheet arrangements that have or are reasonably likely to have a current or future effect on our financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity or capital expenditures or capital resources that is material to an investor in our securities.
Controls and procedures
As filed, 5,466 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
The Company maintains disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) that are designed to provide reasonable assurance that information required to be disclosed by the Company in the reports that it files or submits under the Exchange Act is (a) recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms, and (b) accumulated and communicated to our management, including our principal executive officer and principal financial officer, as appropriate, to allow timely decisions regarding required disclosure. In designing and evaluating such controls and procedures, the Company recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives.
Our management, under the supervision and with the participation of our principal executive officer and principal financial officer, evaluated the effectiveness of the design and operation of our disclosure controls and procedures as of the end of the period covered by this report. Based on that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures were effective as of December 31, 2019.
Management’s Report on Internal Control over Financial Reporting
Management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f). Under the supervision and with the participation of our management, including our Chief Executive Officer and Chief Financial Officer, we conducted an evaluation of the effectiveness of our internal control over financial reporting based on the framework in the Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission.
Our internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles in the United States of America. Our internal control over financial reporting includes those policies and procedures that (i) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company; (ii) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with authorizations of management and directors of the Company; and (iii) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the Company’s assets that could have a material effect on the financial statements.
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
44
Table of Contents
Management assessed the effectiveness of our internal control over financial reporting as of December 31, 2019. Based on this assessment, management, with the participation of our Chief Executive Officer and Chief Financial Officer, determined that as of December 31, 2019, the Company’s internal control over financial reporting was effective.
This Annual Report on Form 10-K does not include an attestation report of the Company’s independent public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by the Company’s independent public accounting firm pursuant to rules of the Securities and Exchange Commission that permit the Company to provide only management’s report in this Annual Report on Form 10-K.
Remediation of Previously Identified Material Weakness
Management has concluded that the material weakness in internal control over financial reporting described in Part I, Item 4, Control and Procedures in our Quarterly Report on Form 10-Q for the period ended September 30, 2019 has been remediated as of December 31, 2019. As described in the Form 10-Q, management enhanced our existing control process that entails a detailed review of the allocation of our proportionate share of the equity loss reported in our investee's (Enfission) financial statements to the financial statement balances of our investee. Management has evaluated these enhanced controls and has concluded they are designed and operating effectively.
Changes in Internal Control Over Financial Reporting
Other than the changes resulting from the remediation activities described above, there were no changes in the Company’s internal control over financial reporting during the fourth quarter of 2019 that have materially affected, or are reasonably likely to materially affect, the Company's internal control over financial reporting.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2019-12-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Research and development | 12 months2019-01-01 to 2019-12-31 | $2.7m | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 12 months2019-01-01 to 2019-12-31 | −$11.0m | us-gaap:OperatingIncomeLoss |
| Net income | 12 months2019-01-01 to 2019-12-31 | −$10.6m | us-gaap:NetIncomeLoss |
| Diluted shares (weighted) | 12 months2019-01-01 to 2019-12-31 | 3,107,580 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months2019-01-01 to 2019-12-31 | −$6.7m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2019-12-31 | $18.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2019-12-31 | $18.4m | us-gaap:AssetsCurrent |
| Total assets | At period end2019-12-31 | $20.2m | us-gaap:Assets |
| Current liabilities | At period end2019-12-31 | $350.3k | us-gaap:LiabilitiesCurrent |
| Shareholders' equity | At period end2019-12-31 | $19.9m | us-gaap:StockholdersEquity |