The following discussion should be read in conjunction with the unaudited condensed consolidated financial statements and the related notes that appear elsewhere within this report. Certain statements we make under this Item 2 constitute “forward-looking statements” under the Private Securities Litigation Reform Act of 1995. See “Forward-Looking Statements” in “Part I” preceding “Item 1 – Financial Statements.” You should consider our forward-looking statements in light of the risks discussed under the heading “Risk Factors” in Item 1A of Part I of our Annual Report on Form 10-K for the year ended December 31, 2023, as well as our unaudited condensed consolidated financial statements, related notes and other financial information appearing elsewhere in this report and our other filings with the Securities and Exchange Commission.
Overview
Business Operations
We are an environmental services and technologies company developing and delivering patented and proprietary solutions to the global power industry, specializing in mercury emissions removal technologies. We provide mercury capture solutions driven by our patented two-part Sorbent Enhancement Additive (“SEA”) technology. Our leading-edge services have been shown to achieve mercury emissions removal at a significantly lower cost and with less operational impact to coal-fired power plants than currently used methods, while maintaining and/or increasing power plant output and preserving the marketability of byproducts for beneficial use.
North America is currently the largest market for our technology. The U.S. EPA MATS (Mercury and Air Toxics Standards) rule requires that all coal and oil-fired power plants in the U.S., larger than 25MWs, must limit mercury in its emissions to below certain specified levels, according to the type of coal burned. Power plants were required to begin complying with MATS on April 16, 2015, unless they were granted a one-year extension to begin to comply. MATS, along with many state and provincial regulations, form the basis for mercury emission capture at coal fired plants across North America. Under the MATS regulation, Electric Generating Units (“EGUs”) are required to remove about 90% of the mercury from their emissions. We believe that we continue to meet the requirements of the industry as a whole and our technologies have been shown to achieve mercury removal levels compliant with all state, provincial and federal regulations at a lower cost and with less plant impact than our competition.
As is typical in this market, we are paid by the EGU based on how much of our material is injected to achieve the needed level of mercury removal. Our current clients pay us as material is delivered to their facilities. Clients will use our material whenever their EGUs operate, although EGUs are not always in operation. EGUs typically may not be in operation due to maintenance reasons or when the price of power in the market is less than their cost to produce power. Thus, our revenues from EGU clients will not typically be a consistent stream but will fluctuate, especially seasonally as the market demand for power fluctuates.
The MATS regulation has been subject to legal challenge since being enacted. In June 2015, the U.S. Supreme Court, in Michigan v. EPA, held that the EPA unreasonably failed to consider costs in determining whether it is “appropriate and necessary” to regulate hazardous air pollutants, including mercury, from power plants, but left the rule in place. In April 2016, the EPA issued a supplemental finding in response to the Michigan decision and found that, after consideration of costs, it remained appropriate and necessary to regulate such emissions from coal- and oil-fired power plants. In May 2020, the EPA, then under the Trump Administration, reversed the determination, finding that, after weighing the costs of compliance against certain benefits of the regulation, the 2016 supplemental finding was erroneous but left the MATS rule in place. Upon taking office, the Biden Administration in January 2021 directed the EPA to review the previous Administration’s actions on various environmental matters including the withdrawal of the May 2020 “appropriate and necessary” determination, for conformity with Biden Administration environmental policy. On February 9, 2022, the EPA proposed to revoke the May 2020 finding and reaffirm the EPA’s 2016 finding. On February 15, 2023, the EPA reaffirmed that it remains appropriate and necessary to regulate hazardous air pollutants, including mercury, from power plants after considering cost, and revoked the May 2020 finding. On April 3, 2023, the EPA issued a proposal to strengthen and update MATS. Such proposal was finalized on April 25, 2024 which, among other things, strengthens emissions monitoring and compliance and tightens the emission standard for mercury for existing lignite-fired power plants to a level that is aligned with the mercury standard that other coal-fired power plants have been achieving under MATS. Nevertheless, legal challenges may continue in the future with respect to the MATS regulation.
We remain focused on positioning the Company for short and long-term growth, including focusing on execution at our customer sites and on continual operation improvement. We continue to make refinements to all of our key products, as we continue to focus on the customer and its operations. As part of our overall strategy, we have a number of initiatives which we believe will be able to drive our short and long-term growth.
25
Table of Contents
We continue to seek new utility customers for our technology in order for them to meet the MATS requirements as well as maintaining our contractual arrangements with our current customers. We also seek license agreements with utilities while allowing them to use our SEA® technologies without our supply of products. Since 2021, we have announced various supply contract extensions, new supply business and license agreements. We expect additional supply business and license agreements during 2024 and thereafter, including converting certain licensees to supply customers.
Patent Litigation
On July 17, 2019, we initiated patent litigation against certain defendants in the U.S. District Court for the District of Delaware for infringement of certain United States patents owned by the Company. These patents relate to our two-part Sorbent Enhancement Additive (SEA®) process for mercury removal from coal-fired power plants. Between July 2020 and January 2021, we entered into agreements with each of the four major utility defendants in such action which included certain monetary arrangements and pursuant to which we have dismissed all claims brought against each of them and their affiliates, and such parties have withdrawn from petitions for Inter Partes Review with the United States Patent and Trademark Office. Such agreements entered into with such parties provide each of them and their affiliates with a non-exclusive license to certain Company patents (related to the Company’s two-part Sorbent Enhancement Additive (SEA®) process) for use in connection with such parties’ coal-fired power plants.
In May 2021, a U.S. District Court Magistrate Judge issued a report and recommendation which was approved by the District Judge in September 2021 that such litigation should be permitted to proceed against various refined coal defendants named in the action directly involved in the refined coal program and operations, and be dismissed against certain other defendants, primarily affiliated entities of the refined coal operators.
Prior to the jury trial which was scheduled for November 13, 2023, we entered into a confidential binding term sheet on November 9, 2023 with Arthur J. Gallagher & Co., and various of its affiliated entities (collectively “AJG”), and DTE Energy Resources LLC and various of its affiliated entities (collectively “DTE”), to resolve the patent litigation against these two groups of defendants. Pursuant to the term sheet, all claims and counterclaims asserted by the parties in such patent litigation have been dismissed with prejudice, although such term sheet does not affect any other claim brought against the remaining CERT defendants. The financial aspects of the term sheet remain confidential pursuant to its terms.
In addition, effective November 9, 2023, Alistar Enterprises, LLC (“Alistar”), one of the remaining CERT defendants, entered into a settlement agreement with us which provided that all claims and counterclaims asserted in the action between the Company and Alistar be dismissed with prejudice. The financial terms of such settlement remain confidential.
Effective as of December 28, 2023, and in connection with the term sheet described above, we entered into a paid license with (a) Chem-Mod LLC (“Chem-Mod”), (b) Arthur J. Gallagher & Co. and AJG Coal, LLC, and (c) DTE Energy Co. and DTE Energy Resources, LLC, relating to U.S. Patent No. 8,168,147, U.S. Patent No. 10,343,114, U.S. Patent No. 10,589,225, U.S. Patent No. 10,596,517 and U.S. Patent No. 10,668,430 and their foreign equivalents and related patent applications and patents, which licenses the use of refined coal or the Chem-Mod Solution in conjunction with activated carbon. This license applies to Chem-Mod and certain of its licensees, sub-licensees, and their customers, for the remaining term of such patents. By its terms, the license does not cover the use of activated carbon with coal that is not either refined coal or coal made by or for use with the Chem-Mod Solution in a manner authorized by the license. The parties to the license have mutually released all claims that any past use of the Chem-Mod Solution in connection with the production or use of refined coal with activated carbon by entities other than the CERT defendants and their customers infringes the asserted patents and related intellectual property, and all claims that could have been brought challenging the validity of such patents.
The remaining CERT defendants and their customers (for activities relating to the CERT defendants) were not included within the scope of the license. The Court rescheduled the trial as to the claims against the remaining CERT defendants to begin on February 26, 2024.
26
Table of Contents
Following a five-day trial, on March 1, 2024, a federal jury in the U.S. District Court for the District of Delaware awarded a $57.1 million patent infringement verdict in favor of the Company against the remaining group of CERT defendants. Such group of affiliated defendants included multiple limited liability companies with refined coal industry operations, including CERT Operations II LLC, CERT Operations IV LLC, CERT Operations V LLC, and CERT Operations RCB LLC. The jury determined that these defendants infringed our patented technologies for mercury emissions and were liable for willful infringement, along with inducing and contributory infringement. Post-trial motions and applications are currently ongoing.
AC Midwest Energy
On February 27, 2024, we entered into an Unsecured Debt Restructuring Agreement (the “Debt Restructuring Agreement”) with AC Midwest Energy LLC (“AC Midwest”) which replaced and superseded the Unsecured Note Financing Agreement and Reaffirmation of Guaranty entered into with AC Midwest on February 25, 2019, as amended on October 28, 2022 (the “Unsecured Note Financing Agreement”).
Pursuant to the Unsecured Note Financing Agreement, prior to February 27, 2024, AC Midwest was the holder of an unsecured note with a principal amount outstanding of $13,154,931 which was issued on February 25, 2019 (the “Unsecured Note”). The Unsecured Note was scheduled to mature on August 25, 2025 and bears a zero cash interest rate. Pursuant to the Unsecured Note Financing Agreement, AC Midwest was also entitled to a “non-recourse” profit participation preference equal to $17,654,931 (the “Profit Share”). Prior to maturity, the outstanding principal, as well as the Profit Share, were to be paid from Net Litigation Proceeds from claims relating to the Company’s intellectual property, Net Revenue Share, Adjusted Free Cash Flow and Equity Offering Net Proceeds (as such terms are defined in the Unsecured Note Financing Agreement). Any remaining principal balance due on the Unsecured Note would be due and payable in full on the maturity date. The Profit Share, however, if not paid in full on or before the maturity date would remain subject to the Unsecured Note Financing Agreement until full and final payment.
Prior to February 27, 2024, there also remained outstanding to AC Midwest a principal balance of $271,686 due under a secured noted of the Company issued on November 29, 2016 in the original principal amount of $9,646,686, which had a maturity date of August 25, 2025 (the “Secured Note”). The Secured Note had been issued pursuant to an Amended and Restated Financing Agreement and Reaffirmation of Guaranty, dated as of November 1, 2016, as amended on June 14, 2018, September 12, 2019, February 25, 2019 and October 28, 2022 (the “Restated Financing Agreement”).
Pursuant to the Debt Restructuring Agreement, on February 27, 2024, we (i) paid AC Midwest $9,040,000 as a reduction in the outstanding principal balance of the Unsecured Note, (ii) issued to AC Midwest a new unsecured replacement note representing the remaining outstanding principal balance of the Unsecured Note in the principal amount of $4,114,931 (the “New Note”), and (iii) paid AC Midwest $275,626 representing the remaining principal balance under the Secured Note of $271,686 plus interest of $3,939. In addition, within 30 days, we would either facilitate the private sale to third parties of certain shares of common stock of the Company held by AC Midwest for a purchase price of no less than $960,000, which amount shall be applied as a credit against the principal balance due on the New Note dollar for dollar, or pay AC Midwest $960,000 toward the principal balance due on the New Note. The private sale of shares for the purchase price of $960,000 was completed on March 11, 2024. Any remaining principal balance on the New Note shall be due August 27, 2024 (the “Maturity Date”), which is six months from February 27, 2024. Until repaid in full, the New Note shall accrue interest at a rate equal to SOFR plus 2.0% per annum. The New Note completely replaces and supersedes the Unsecured Note, which shall be of no further force and effect.
In addition, pursuant to the Debt Restructuring Agreement, AC Midwest shall be entitled to a profit participation preference equal to $7,900,000 (the “Restructured Profit Share”). The Restructured Profit Share is “non-recourse” and shall only be paid from Net Litigation Proceeds (as defined in the Debt Restructuring Agreement) from claims relating to our intellectual property. Following the receipt of any Net Litigation Proceeds, we shall prepay any remaining principal balance of the New Note and pay the Restructured Profit Share in an amount equal to 75.0% of such Net Litigation Proceeds until the New Note and Restructured Profit Share have been paid in full. The Restructured Profit Share completely replaces and supersedes the terms and conditions of the Profit Share in the amount of $17,654,931 provided for in the Unsecured Note Financing Agreement, which shall be of no further force and effect. The Restructured Profit Share, if not paid in full on or before the Maturity Date, shall remain subject to the terms of the Debt Restructuring Agreement.
27
Table of Contents
In addition to facilitating the private sale to third parties as described above, AC Midwest has granted the Company the exclusive right until December 31, 2024 to facilitate the sale of all or a portion of the remaining balance of the shares of common stock of the Company held by AC Midwest, which proceeds above a certain amount will be applied as a credit against the Restructured Profit Share dollar for dollar.
As a result of the repayment of the remaining principal balance under the Secured Debt, we and AC Midwest executed a Satisfaction and Discharge of Secured Debt confirming the cancellation of the Secured Note and that all of the obligations under the Restated Financing Agreement have been fully satisfied and discharged.
Other Developments
We are in the process of developing and testing other business opportunities which include the extracting and processing of rare earth elements (REEs) in North America, remediation technologies for wastewater and coal ash from coal-fired power plants, as well as drinking water treatment technologies. We believe the market for water treatment is large and significantly growing both in the United States and abroad. This expansion in water treatment and wastewater remediation will allow us to support the growing needs of the energy sector, as well as provide vital technologies for considerable environmental concerns. There can be no assurance that we will be successful in the development of these technologies.
On April 20, 2023, we received conditional approval to list our shares of common stock on the TSX Venture Exchange (the “TSX-V”). The listing was subject to our fulfilling certain requirements of the TSX-V in accordance with the terms of the conditional approval letter. On July 6, 2023, the Company received final approval from the TSX-V. The Company’s shares commenced trading on the TSX-V on July 10, 2023 under the symbol “MEEC”. The Company is listed as a Tier 1 Industrial, Technology, or Life Sciences Issuer.
Results of Operations
Revenues
We generated revenues of approximately $3,557,000 and $3,013,000 for the three months ended March 31, 2024 and 2023, respectively. Such revenues were primarily derived from sorbent product sales which were approximately $3,084,000 and $2,516,000 for the three months ended March 31, 2024 and 2023, respectively. The increase in revenues from prior year period is primarily due to the mix of plants running in 2024 resulting in increased revenues.
Licensing revenues were approximately $456,000 and $456,000 for the three months ended March 31, 2024 and 2023, respectively. Licensing revenues were comparable for both periods.
Equipment sales and other revenues for the three months ended March 31, 2024 and 2023 were approximately $17,000 and $40,000, respectively. This decrease was primarily due to random fluctuations of these sales which make up an immaterial portion of the Company’s revenues.
Costs and Expenses
Total costs and expenses were approximately $6,151,000 and $4,440,000 during the three months ended March 31, 2024 and 2023, respectively. The increase in total costs and expenses for the three months ended March 31, 2024 is primarily attributable to the increase in cost of sales and general and administrative expenses.
Cost of sales were approximately $2,113,000 and $1,995,000 for the three months ended March 31, 2024 and 2023, respectively. This increase in cost of sales of approximately $118,000 is primarily attributable to an increase in sales offset by a decrease in the Company’s cost of carbon in the first quarter compared to the prior year period.
Selling, general and administrative expenses were approximately $3,527,000 and $1,918,000 for the three months ended March 31, 2024 and 2023, respectively. Such increase was primarily due to an increase in salaries and wages and stock-based compensation.
28
Table of Contents
Interest expense related to the financing of capital was approximately $246,000 and $336,000 for the three months ended March 31, 2024 and 2023, respectively. The breakdown of interest expense for the three months ended March 2024 and 2023 is as follows:
(In thousands)
| Three Months Ended March 31, 2024 | 2023 | |
|---|---|---|
| Interest expense on notes payable | $4 | $6 |
| Amortization of discount of notes payable | 242 | 330 |
| Other interest | - | - |
| $246 | $336 |
Loss on change in fair value of profit share liability and unsecured note was approximately $265,000 and $191,000 for the three months ended March 31, 2024 and 2023, respectively. The change is primarily attributed to the modification of the terms of the profit share liability (see Note 7 to the condensed consolidated financial statements).
Net Loss
For the three months ended March 31, 2024, we had a net loss of approximately $2,559,000 compared to a net loss of $1,447,000 for the three months ended March 31, 2023. Such change was primarily due to the increase in selling, general and administrative expenses and an increase in the change in value of the profit share liability, offset by an increase in gross profit.
Liquidity and Capital Resources
We had approximately $11,189,000 in cash on our balance sheet at March 31, 2024 compared to approximately $20,940,000 at December 31, 2023. Total current assets were approximately $13,670,000 and total current liabilities were approximately $5,434,000 at March 31, 2024, resulting in working capital of approximately $8,236,000. This compares to total current assets of approximately $24,152,000 and total current liabilities of approximately $2,183,000 at December 31, 2023, resulting in working capital of approximately $21,969,000. Our accumulated deficit was approximately $65.4 million at March 31, 2024 compared to approximately $62.8 million at December 31, 2023. Additionally, we had a net loss in the amount of approximately $2,559,000 and cash used in operating activities of approximately $439,000 for the three months ended March 31, 2024.
Total Assets
Total assets were approximately $17,084,000 at March 31, 2024 versus approximately $27,468,000 at December 31, 2023. The change in total assets is primarily attributable to a decrease in cash and accounts receivable.
Total Liabilities
Total liabilities were approximately $8,828,000 at March 31, 2024 versus approximately $28,250,000 at December 31, 2023. The decrease is primarily attributable to a decrease in outstanding debt as a result of the modification of the terms of the profit share liability, the repayment of the secured note and the repayment of a substantial portion of the unsecured note.
Operating Activities
Net cash provided by operating activities consists of net loss, adjusted by certain non-cash items, and changes in operating assets and liabilities.
Net cash used by operating activities was approximately $439,000 for the three months ended March 31, 2024 compared to net cash provided by operating activities of approximately $778,000 for the three months ended March 31, 2023.
29
Table of Contents
Investing Activities
There was no net cash provided or used in investing activities for the three months ended March 31, 2024 and March 31, 2023.
Financing Activities
Net cash utilized in financing activities was approximately $9,312,000 for the three months ended March 31, 2024 compared to approximately $210,000 provided by financing activities for the three months ended March 31, 2023. During the three months ended March 31, 2024, we repaid $272,000 of the AC Midwest secured note and $9,040,000 of the AC Midwest unsecured note.
Critical Accounting Policies and Estimates
Our critical accounting policies and estimated are discussed in our Annual Report on Form 10-K for the year ended December 31, 2023, and there have been no material changes to such policies or estimates during the three months ended March 31, 2024.
Non-GAAP Financial Measures
Adjusted EBITDA
To supplement our unaudited condensed consolidated financial statements presented in accordance with GAAP and to provide investors with additional information regarding our financial results, we consider and are including herein Adjusted EBITDA, a Non-GAAP financial measure. We view Adjusted EBITDA as an operating performance measure and, as such, we believe that the GAAP financial measure most directly comparable to it is net income (loss). We define Adjusted EBITDA as net income adjusted for interest and financing fees, income taxes, depreciation, amortization, stock-based compensation, and other non-cash income and expenses. We believe that Adjusted EBITDA provides us an important measure of operating performance because it allows management, investors, debtholders and others to evaluate and compare ongoing operating results from period to period by removing the impact of our asset base, any asset disposals or impairments, stock based compensation and other non-cash income and expense items associated with our reliance on issuing equity-linked debt securities to fund our working capital.
Our use of Adjusted EBITDA has limitations as an analytical tool, and this measure should not be considered in isolation or as a substitute for an analysis of our results as reported under GAAP, as the excluded items may have significant effects on our operating results and financial condition. Additionally, our measure of Adjusted EBITDA may differ from other companies’ measure of Adjusted EBITDA. When evaluating our performance, Adjusted EBITDA should be considered with other financial performance measures, including various cash flow metrics, net income and other GAAP results. In the future, we may disclose different non-GAAP financial measures in order to help our investors and others more meaningfully evaluate and compare our future results of operations to our previously reported results of operations.
The following table shows our reconciliation of net loss to adjusted EBITDA for the three months ended March 31, 2024 and 2023, respectively:
(In thousands)
| For the Year Ended March 31, 2024 | March 31, 2023 | |
|---|---|---|
| Net loss | $(2,559) | $(1,447) |
| Non-GAAP adjustments: | ||
| Depreciation and amortization | 62 | 62 |
| Interest | 246 | 336 |
| Change in fair value of profit share and unsecured note | 265 | 191 |
| Income Taxes | - | 20 |
| Stock based compensation | 770 | 162 |
| Adjusted EBITDA | $(1,216) | $(676) |
30
Table of Contents
Market risk
As filed, 163 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We are a smaller reporting company as defined by Rule 12b-2 of the Securities Exchange Act of 1934 and are not required to provide the information under this item.
Controls and procedures
As filed, 2,366 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Under the supervision and with the participation of our management, including our principal executive officer and principal financial officer, we have evaluated the effectiveness of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) of the Exchange Act) as of the end of the period covered by this report. Disclosure controls and procedures are designed to ensure that information required to be disclosed in reports filed or submitted under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the Securities and Exchange Commission’s rules and forms, and that such information is accumulated and communicated to management, including our principal executive officer and principal financial officer, to allow timely decisions regarding required disclosure. Based on that evaluation, our principal executive officer and principal financial officer concluded, as of the end of the period covered by this report, that the Company’s disclosure controls and procedures were not effective as a result of material weaknesses in our internal control over financial reporting. The ineffectiveness of our disclosure controls and procedures was due to the following material weaknesses in our internal control over financial reporting: (i) lack of a sufficient complement of personnel commensurate with the Company’s reporting requirements; and (ii) insufficient written documentation or training of our internal control policies and procedures which provide staff with guidance or framework for accounting and disclosing financial transactions.
Despite the existence of the material weaknesses above, we believe that the consolidated financial statements contained in this Form 10-Q fairly present our financial position, results of operations and cash flows as of and for the periods presented in all material respects.
Changes in Internal Control over Financial Reporting
There have been no changes in our internal control over financial reporting (as such term is defined in Rules 13a-15(f) and 15d-15 (f) under the Exchange Act) during the fiscal quarter covered by this report that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
31
Table of Contents
Risk factors
As filed, 163 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We are a smaller reporting company as defined by Rule 12b-2 of the Securities Exchange Act of 1934 and are not required to provide the information under this item.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2024-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2024-01-01 to 2024-03-31 | $3.6m | us-gaap:Revenues |
| Gross profit | 3 months2024-01-01 to 2024-03-31 | $1.4m | us-gaap:GrossProfit |
| Selling, general and administrative | 3 months2024-01-01 to 2024-03-31 | $3.5m | us-gaap:SellingGeneralAndAdministrativeExpense |
| Operating income | 3 months2024-01-01 to 2024-03-31 | −$2.1m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2024-01-01 to 2024-03-31 | $245.8k | us-gaap:InterestExpense |
| Income tax | 3 months2024-01-01 to 2024-03-31 | $0 | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2024-01-01 to 2024-03-31 | −$2.6m | us-gaap:NetIncomeLoss |
| Operating cash flow | 3 months2024-01-01 to 2024-03-31 | −$439.2k | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2024-03-31 | $11.2m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2024-03-31 | $13.7m | us-gaap:AssetsCurrent |
| Total assets | At period end2024-03-31 | $17.1m | us-gaap:Assets |
| Current liabilities | At period end2024-03-31 | $5.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2024-03-31 | $8.8m | us-gaap:Liabilities |
| Shareholders' equity | At period end2024-03-31 | $8.3m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001477932-24-003003. Last ingested by Listed: Oct 24, 2026, 14:55 ET. Listed shows no prices and gives no investment advice.