American Resources Corp: Form 10-Q/A for the period ended Mar 31, 2025
Filed with the SEC on Oct 24, 2025 and accepted by EDGAR at Oct 24, 2025, 20:08 ET.
Management's discussion and analysis
As filed, 42,650 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
This Form 10-Q/A and other reports filed by Registrant from time to time with the Securities and Exchange Commission (collectively the “Filings”) contain or may contain forward looking statements and information that are based upon beliefs of, and information currently available to, Registrant’s management as well as estimates and assumptions made by Registrant’s management. When used in the filings the words “anticipate”, “believe”, “estimate”, “expect”, “future”, “intend”, “plan” or the negative of these terms and similar expressions as they relate to Registrant or Registrant’s management identify forward looking statements. Such statements reflect the current view of Registrant with respect to future events and are subject to risks, uncertainties, assumptions and other factors relating to Registrant’s industry, Registrant’s operations and results of operations and any businesses that may be acquired by Registrant. Should one or more of these risks or uncertainties materialize, or should the underlying assumptions prove incorrect, actual results may differ significantly from those anticipated, believed, estimated, expected, intended or planned.
Although Registrant believes that the expectations reflected in the forward-looking statements are reasonable, Registrant cannot guarantee future results, levels of activity, performance or achievements. Except as required by applicable law, including the securities laws of the United States, Registrant does not intend to update any of the forward-looking statements to conform these statements to actual results.
Overview
When we formed our company, our focus was to (i) construct and/or purchase and manage a chain of combined gasoline, diesel and natural gas (NG) fueling and service stations (initially, in the Miami, FL area); (ii) construct conversion factories to convert NG to liquefied natural gas (LNG) and compressed natural gas (CNG); and (iii) construct conversion factories to retrofit vehicles currently using gasoline or diesel fuel to also run on NG in the United States and also to build a convenience store to serve our customers in each of our locations.
On January 5, 2017, American Resources Corporation (ARC) executed a Share Exchange Agreement between the Company and Quest Energy Inc. (“Quest Energy”), a private company incorporated in the State of Indiana on May 2015 with offices at 12115 Visionary Way, Fishers, IN 46038, and due to the fulfillment of various conditions precedent to closing of the transaction, the control of the Company was transferred to the Quest Energy shareholders on February 7, 2017. This transaction resulted in Quest Energy becoming a wholly-owned subsidiary of ARC. Through Quest Energy, ARC was able to acquire coal mining and coal processing operations, substantially all located in eastern Kentucky and western West Virginia. On November 25, 2020, Quest Energy changed its name to American Carbon Corp. On December 27, 2024, American Carbon changed its name to American Infrastructure Corporation (American Infrastructure Corporation).
American Infrastructure Corporation currently has six coal mining and processing operating subsidiaries: McCoy Elkhorn Coal LLC (doing business as McCoy Elkhorn Coal Company) (McCoy Elkhorn), Knott County Coal LLC (Knott County Coal), Deane Mining, LLC (Deane Mining), Wyoming County Coal LLC (Wyoming County), Perry County Resources (Perry County) located in eastern Kentucky and western West Virginia within the Central Appalachian coal basin, and ERC Mining Indiana Corporation (ERC) located in southwest Indiana within the Illinois coal basin. The coal deposits under control by the Company are generally comprise of metallurgical coal (used for steel making), pulverized coal injections (used in the steel making process) and high-BTU, low sulfur, low moisture bituminous coal used for a variety of uses within several industries, including industrial customers and specialty products.
Efforts to diversify revenue streams have led to the establishment of additional subsidiaries; Electrified Materials Corporation (EMC) which is focused on the aggregation, recovery and sale of recovered metal and steel and American Rare Earth LLC (ARE) which is focused on the purification and monetization of critical and rare earth element deposits and end of life magnets and batteries. During 2024, American Rare Earth LLC changed its name to ReElement Technologies LLC (ReElement). During 2024, ReElement filed and changed from a limited liability company to a corporation. During 2025, the Company gave up majority stake in American Infrastructure, ReElements, and Electrified Materials. The Company maintained contractual and financial interests in each of these entities that provide it with the power to direct key activities and accordingly these entities continue to be consolidated as variable interest entities.
We have not classified, and as a result, do not have any “proven” or “probable” reserves as defined in United States Securities and Exchange Commission Items 1300 through 1305 of Regulation S-K, and as a result, our company and its business activities are deemed to be in the exploration stage until mineral reserves are defined on our properties.
Since mid-2019, we have not mined or sold coal which is sold into the thermal coal markets. Due to adverse market conditions all mining operations are currently idled. Should mining operations commence, all production and future investment will be for the mining of metallurgical coal. The following table is presented for historical purposes.
35
Table of Contents
McCoy Elkhorn Coal LLC
General:
Located primarily within Pike County, Kentucky, McCoy Elkhorn is currently comprised of three mines in “idle” status (Mine #15 and the Carnegie 1 and Carnegie 2 Mines), two coal preparation facilities (Bevins #1 and Bevins #2), and other mines and permits in various stages of development or reclamation. The address for the Bevins #1 and #2 preparation facilities is 2069 Highway 194 E Meta, KY 41501.
When operating, McCoy Elkhorn has historically sold its coal to a variety of customers, both domestically and internationally, primarily to the steel making industry as a high-vol “B” coal or blended coal. Due to adverse market conditions, Mine #15 was in idle status during 2023 and 2024 and the mining operations at Carnegie 1 and 2 were idled during 2023.
Mines:
Mine #15 is an underground mine in the Millard (also known as Glamorgan) coal seam and located near Meta, Kentucky. When operating, coal is mined via room-and-pillar mining methods using continuous miners and belted directly from the stockpile to McCoy Elkhorn’s coal preparation facility. Mine #15 has the estimated capacity to produce up to approximately 40,000 tons per month of coal. The mineral available is leased from various 3rd party mineral holders. Coal mined from the lease requires a payment of greater of $2.50 per ton or 5% of gross sales price.
Within the McCoy Elkhorn subsidiary, Carnegie 1 is deemed material under Items 1304 of Regulation S-K. The Carnegie 1 is an underground mine in the Alma and Upper Alma coal seams and located near Kimper, Kentucky. When operating, coal is mined via room-and-pillar mining methods utilizing a continuous miner with the estimated capacity to produce up to approximately 10,000 tons per month of coal. The coal is stockpiled on-site and trucked approximately 7 miles to McCoy Elkhorn’s preparation facilities. In 2023, Carnegie 1 produced approximately 41,400 tons and sold at an average of $122 per ton. The mineral mined is leased from a 3rd party professional mineral company with lease payments based on the greater of $1.75 per ton or 6% of gross sales price.
Carnegie 2 is also an underground mine in the Alma and Upper Alma coal seams and located near Kimper, Kentucky. When operating, coal is mined via room-and-pillar mining methods utilizing a continuous miner with the estimated capacity to produce up to approximately 10,000 tons per month of coal. The coal is stockpiled on-site and trucked approximately 7 miles to McCoy Elkhorn’s preparation facilities. In 2023, the Carnegie 2 Mine produced approximately 13,000 tons and sold at an average of $157 per ton. The mineral being mined is leased from a 3rd party professional mineral company with lease payments based on the greater of $1.75 per ton or 6% of gross sales price.
Processing & Transportation:
The Bevins #1 Preparation Plant is an 800 ton-per hour coal preparation facility located near Meta, Kentucky, across the road from Mine #15. Bevins #1 has raw coal stockpile storage of approximately 25,000 tons and clean coal stockpile storage of 100,000 tons of coal. The Bevins #1 facility has a fine coal circuit and a stoker circuit that allows for enhance coal recovery and various coal sizing options depending on the needs of the customer.
The Bevins #2 Preparation Plant is on the same permit site as Bevins #1 and is a 500 ton-per-hour processing facility with fine coal recovery and a stoker circuit for coal sizing options. Bevins #2 has raw coal stockpile storage of 25,000 tons of coal and a clean coal stockpile storage of 45,000 tons of coal.
Both Bevins #1 and Bevins #2 have a batch-weight loadout and rail spur for loading coal into trains for rail shipments. The spur has storage for 110 rail cars and is serviced by CSX Transportation and is located on CSX’s Big Sandy, Coal Run Subdivision. Both Bevins #1 and Bevins #2 have coarse refuse and slurry impoundments called Big Groundhog and Lick Branch. While the Big Groundhog impoundment is nearing the end of its useful life, the Lick Branch impoundment has significant operating life and will be able to provide for coarse refuse and slurry storage for the foreseeable future at Bevins #1 and Bevins #2. Coarse refuse from Bevins #1 and Bevins #2 is belted to the impoundments. Both Bevins #1 and Bevins #2 are facilities owned by McCoy Elkhorn, subject to certain restrictions present in the agreement between McCoy Elkhorn and the surface land owner.
36
Table of Contents
Although currently idle, Bevins #1 and Bevins #2, as well as the rail loadout no work is required beyond routine maintenance to recommence operations. The 2017 purchase price allocated to the McCoy Elkhorn properties was approximately $95,000.
Due to the processing storage capacity at Bevins #1 and Bevins #2 Preparation Plants, McCoy Elkhorn has the capacity to process, store, and load coal for other regional coal producers for agreed to fees.
Additional Permits:
In addition to the above mines, McCoy Elkhorn holds 11 additional coal mining permits that are idled operations or in various stages of reclamation. For the idled coal mining operations, McCoy Elkhorn will determine which coal mines to bring back into production, if any, as the coal market changes, and there are currently no other idled mines within McCoy Elkhorn that are slated to go into production in the foreseeable future. Any idled mines that are brought into production would require significant upfront capital investment, and there is no assurance of the feasibility of any such new operations.
Knott County Coal LLC
General:
Located primarily within Knott County, Kentucky (but with additional idled permits in Leslie County, Perry County, and Breathitt County, Kentucky), Knott County Coal is comprised of one idled mine (the Wayland Surface Mine) and 22 idled mining permits (or permits in reclamation), including the permits associated with the idled Supreme Energy Preparation Plant. The idled mining permits are either in various stages of planning, idle status or reclamation. The idled mines at are primarily underground mines that utilize room-and-pillar mining. Approximate coal deposits owned and leased are 0 tons and 3,207,000 tons, respectively. The current leases contain production royalty payments based on the greater of $1.50 per clean ton or 6% of gross sales price.
Mines:
The Wayland Surface Mine is a surface waste-rock reprocessing mine in a variety of coal seams (primarily the Upper Elkhorn 1 coal seam) located near Wayland, Kentucky. When operating, coal is mined via area mining through the reprocessing of previously processed coal, and the coal is trucked approximately 22 miles to the Mill Creek Preparation Plant at Deane Mining, where it is processed and sold. The mine has an estimated capacity to produce up to approximately 15,000 tons per month of coal and started production in mid-2018 with nominal coal extracted and sold as thermal coal. Since 2022, mining operations have been idle due to the company's focus on the metallurgical and industrial markets and adverse market conditions.
Other potential customers of Knott County Coal include industrial customers, specialty customers and utilities for electricity generation, although no definitive sales have been identified yet.
Processing & Transportation:
The idled Supreme Energy Preparation Plant is a 400 ton-per-hour coal preparation facility with a fine coal circuit located in Kite, Kentucky. The Bates Branch rail loadout associated with the Supreme Energy Preparation Plant is a batch-weigh rail loadout with 220 rail car storage capacity and serviced by CSX Transportation in their Big Sandy rate district. When operating, coarse refuse is trucked to the Kings Branch impoundment, which is approximately one mile from the Supreme Energy facility, and slurry is piped from the Supreme Energy facility to the Kings Branch impoundment.
37
Table of Contents
The Supreme Energy Preparation Plant is owned by Knott County Coal, subject to certain restrictions present in the agreement between Knott County Coal and the surface landowner, Land Resources & Royalties LLC. During 2024 components of the Supreme Energy Preparation Plant have been transferred as part of the WCC development.
The Company acquired the Supreme Energy Preparation Plants as an idled facility, and since acquisition, no work has been performed at the facility other than minor maintenance. Both the Supreme Energy Preparation Plant and the rail loadout are idled and would require an undetermined amount of work and capital to bring them into operation. The purchase price allocated of the Knott County Coal property was approximately $286,000.
Additional Permits:
In addition to the above mines, Knott County Coal holds 20 additional coal mining permits, idled or in various stages of reclamation. Any idled mines that are brought into production would require significant upfront capital investment and there is no assurance of the feasibility of any such new operations.
Deane Mining LLC
General:
Located within Letcher County and Knott County, Kentucky, Deane Mining is comprised of one idled underground coal mine (the Access Energy Mine), one idled surface mine (Razorblade Surface) and one idled coal preparation facility called Mill Creek Preparation Plant, along with 12 additional idled mining permits (or permits in reclamation). The idled mining permits are either in various stages of development, reclamation or being maintained as idled, pending any changes to the coal market that may warrant re-starting production. The coal controlled at Deane Mining (along with our other subsidiaries) has not been classified as either “proven” or “probable” as defined in the United States Securities and Exchange Commission Items 1300 through 1305 of Regulation S-K, and as a result, do not have any “proven” or “probable” reserves under such definition and are classified as an “Exploration Stage” pursuant to Items 1300 through 1305 of Regulation S-K.
Mines:
Access Energy is an underground mine in the Elkhorn 3 coal seam and located in Deane, Kentucky. Access Energy is mined via room-and-pillar mining methods using continuous miners, and the coal is belted directly from the mine to the raw coal stockpile at the Mill Creek Preparation Plant across the road from Access Energy. Access Energy is currently a “company run” mine, whereby the Company manages the workforce at the mine and pays all expenses of the mine. During 2019, the permit related to the Access Energy mine was idled and is not expected to produce again under the Company’s control due to the continued focused on the metallurgical and industrial markets.
Razorblade Surface is a surface mine targeting the Hazard 4 and Hazard 4 Rider coal seams and located in Deane, Kentucky. Deane Mining commenced mining activity at Razorblade Surface during the spring of 2018. Coal produced from Razorblade Surface is trucked approximately one mile to the Mill Creek Preparation Plant. Razorblade Surface is currently run as a contractor model for which the contractor is paid a fixed per-ton fee for the coal produced. During 2019, the permit related to the Access Energy mine was idled and is not expected to produce again under the Company’s control due to the continued focused on the metallurgical and industrial markets.
Processing & Transportation:
The Mill Creek Preparation Plant is an 800 ton-per-hour coal preparation facility located in Deane, Kentucky. The associated Rapid Loader rail loadout is a batch-weight rail loadout with 110 car storage capacity and services by CSX Transportation in their Big Sandy and Elkhorn rate districts. The Mill Creek Preparation Plant is owned by Deane Mining, subject to certain restrictions present in the agreement between Deane Mining and the surface landowner, Land Resources & Royalties LLC. We are currently utilizing less than 10% of the available processing capacity of the Mill Creek Preparation Plant.
Both the Mill Creek Preparation Plant and the rail loadout are operational, and any work required on any of the plant or loadouts would be routine maintenance. The allocated cost of the property at Deane Mining paid by the Company is $1,569,641.
38
Table of Contents
Additional Permits:
In addition to the above mines and preparation facility, Deane Mining holds 12 additional coal mining permits that are in development, idled or in various stages of reclamation. Any idled mines that are brought into production would require significant upfront capital investment and there is no assurance of the feasibility of any such new operations.
Wyoming County Coal LLC
General:
Located within Wyoming County, West Virginia, Wyoming County Coal (WCC) is comprised of two idled underground mining permits and the three permits associated with the idled Pioneer Preparation Plant, the Hatcher rail loadout, and Simmons Fork Refuse Impoundment. The two idled mining permits are undisturbed underground mines that are anticipated to utilize room-and-pillar mining. Approximate coal deposits owned and leased are 5,668,00 tons and 0 tons, respectively.
Mines:
The mining permits held by Wyoming County Coal are in various stages of planning with no mines currently in production.
Potential customers of Wyoming County Coal would include steel mills in the United States or international marketplace although no definitive sales have been identified yet.
Processing & Transportation:
The idled Pioneer Preparation Plant is a 350 ton-per-hour coal preparation facility located near Oceana, West Virginia. The Hatcher rail loadout associated with the Pioneer Preparation Plant is a rail loadout serviced by Norfolk Southern Corporation. The refuse from the preparation facility is trucked to the Simmons Fork Refuse Impoundment, which is approximately 1.0 mile from the Pioneer Preparation facility. The preparation plant utilizes a belt press technology which eliminates the need for pumping slurry into a slurry pond for storage within an impoundment.
In June 2023, WCC closed on an Industrial Development Bond in the amount of $45,000,000 for the purpose of financing the development of the permits and infrastructure. As of December 31, 2024 and 2023, approximately $32,500,000 and $9,500,000 of the $36,500,000 initial project fund have been expended, respectively. Due to a delay in government approvals and the expansion of rare earth concentrations it is undeterminable as to when meaningful operations will commence and the additional capital expenditures required.
In connection with the Industrial Development Bond financing, the Company is in the process of upgrading and redeveloping the preparation facility to a modern 350 ton per hour preparation facility and upgrading the rail load out facility to a modern batch weight load out system.
The Company acquired the Pioneer Preparation Plant as an idled facility. The purchase price allocated to the Wyoming County Coal property was approximately $22,300,000 of which approximately $22,100,000 was settled with shares of the Company’s Class A Common stock. The remaining portion was satisfied in the form of a convertible note which was converted to Company common stock in December 2020.
Permits:
Wyoming County Coal holds two coal mining permits that are in the development phase including faceup and infrastructure work and three permits associated with the idled Pioneer Preparation Plant, the Hatcher rail loadout, and Simmons Fork Refuse Impoundment.
39
Table of Contents
Perry County Resources LLC
General:
Located primarily within Perry County, Kentucky, Perry County Resources LLC is comprised of one idled underground mine (the E4-2 mine) and one idled coal processing facility called the Davidson Branch Preparation Plant, along with two additional idled underground mining permits. The E4-2 mine and Davidson Branch Preparation Plan are located at 1845 KY-15 Hazard, KY 41701.
The two idled mining permits are for underground mines and have been actively mined in the past and being maintained as idled, pending any changes to the coal market that may warrant re-starting production. Approximate coal deposits owned and leased are 0 tons and 58,100,000 tons. The current leases contain minimum annual payments of $12,000 and production royalty payments ranging from 6% to 7% of gross sales price.
Mines:
Within the Perry County subsidiary, E4-2 mine is deemed material under Items 1304 of Regulation S-K. The E4-2 mine is an underground mine in the Elkhorn 4 (aka the Amburgy) coal seam located near the town of Hazard, Kentucky. When operating, coal is mined via room-and-pillar mining methods using both continuous miners and continuous haulage systems, and the coal is belted directly from the mine to the raw coal stockpile at the Davidson Branch Preparation Plant less than a mile away. The E4-2 mine has the estimated capacity to produce up to approximately 80,000 tons per month of coal. The mineral available is partially owned by the Company and partially leased from various mineral holders. The lease terms are the greater of $1.50 per ton or 6% of gross sales price.
In 2022, the E4-2 mine produced approximately 106,000 tons and sold the coal at an average price of $153 per ton. During the period of ownership by the Company, 100% of the coal sold was sold as industrial stoker and PCI. Since the end of 2022, the mine has been idle due to adverse market conditions.
Processing and Transportation:
The Davidson Branch Preparation Plant is a 1,300 ton-per-hour coal preparation facility located near Hazard, Kentucky. The associated “Bluegrass 4” rail loadout is a batch-weight rail loadout with 135 car storage capacity and services by CSX Transportation in their Hazard/Elkhorn rate district. The Davidson Branch Preparation Plant is owned by Perry County Resources. With mining operations currently idle, the preparation plan is not currently operating.
Both the Davidson Branch Preparation Plant and the rail loadout have been maintained should operations commence in a future period. The purchase price allocated to Perry County Resources property was approximately $1,551,000.
Additional Permits:
In addition to the above mine, preparation facility, and related permits, Perry County Resources had four additional coal mining permits that are idled or in development stage. Any idled mines that are brought into production would require significant upfront capital investment and there is no assurance of the feasibility of any such new operations. Three of the idled permits were sold to an unrelated entity on March 4, 2020 for $700,000 cash and $300,000 of value for equipment.
The transfer of any new permits to the Company is subject to regulatory approval. This approval is subject to the review of both unabated or uncorrected violations that are listed on the Applicator Violator List. The Company, to include several of its subsidiaries, does have unabated and/or uncorrected violations that are listed on the Applicator Violator List. Should the state regulators believe that the Company is not in the process of abating or correcting the currently outstanding issues associated with their currently held permits they may choose not to issue the Company any new permits until such issues are properly rectified.
ERC Mining Indiana Corporation (the Gold Star Mine)
General:
Located primarily within Greene and Sullivan Counties, Indiana, ERC Mining Indiana Corporation (“ERC”) is currently comprised of one idled underground mine (the Gold Star Mine), one idled coal preparation plant and rail loadout. ERC sold its coal in the past as thermal coal to utilities. The Company does not plan to mine the property and purchased it for monetization of infrastructure assets and to reclaim the property which has been ongoing through 2024. The Company is facilitating the full reclamation and remediation of the former mine site.
Approximate coal deposits owned and leased are 0 tons and 4,383,298 tons, respectively. All of the deposits are in reclamation.
Mines:
The Gold Star Mine is an underground mine in the Indiana IV (aka the Survant) coal seam located near the town of Jasonville, Indiana. Currently idled, the Gold Star Mine has been mined in the past via room-and-pillar mining methods using continuous miners, and the coal is belted directly from the mine to the raw coal stockpile at the preparation plant less than a mile away.
Processing and Transportation:
The idled preparation plant is a 165 ton-per-hour coal preparation facility located near the underground mine portal. The rail loadout associated with the preparation plant is a rail loadout serviced by the Indiana Rail Road. The preparation plant has a coarse refuse and slurry impoundment. There was no purchase price allocated to the Gold Star property.
Permits:
ERC holds one permit that covers the Gold Star Mine, processing plant, rail loadout, and related infrastructure which are in reclamation status.
40
Table of Contents
Mineral and Surface Leases
Coal mining and processing involves the extraction of coal (mineral) and the use of surface property incidental to such extraction and processing. All of the mineral and surface related to the Company’s coal mining operations is leased from various mineral and surface owners (the “Leases”). The Company’s operating subsidiaries, collectively, are parties to approximately 200 various Leases and other agreements required for the Company’s coal mining and processing operations. The Leases are with a variety of Lessors, from individuals to professional land management firms such as the Roadrunner Land Company. In some instances, the Company has leases with Land Resources & Royalties LLC (LRR), a professional leasing firm that is an entity wholly owned by Wabash Enterprises Inc, an entity owned by members of Quest Energy Inc.’s management.
Coal Sales
ARC sells its coal to domestic and international customers, some which blend ARC’s coal at east coast ports with other qualities of coal for export. The Company may, at times, purchase coal from other regional producers to sell on its contracts.
Competition
The coal industry is intensely competitive. The most important factors on which the Company competes are coal quality, delivered costs to the customer and reliability of supply. Our principal domestic competitors will include Corsa Coal Corporation, Ramaco Resources, Blackhawk Mining, Coronado Coal, Arch Resources, Contura Energy, and Warrior Met Coal. Many of these coal producers may have greater financial resources and larger coal deposit bases than we do. We also compete in international markets directly with domestic companies and with companies that produce coal from one or more foreign countries, such as China, Australia, Colombia, Indonesia and South Africa.
Legal Proceedings
From time to time, we are subject to ordinary routine litigation incidental to our normal business operations.
Please see the financial statement’s contingencies footnote.
Environmental, Governmental, and Other Regulatory Matters
Our operations are subject to federal, state, and local laws and regulations, such as those relating to matters such as permitting and licensing, employee health and safety, reclamation and restoration of mining properties, water discharges, air emissions, plant and wildlife protection, the storage, treatment and disposal of wastes, remediation of contaminants, surface subsidence from underground mining and the effects of mining on surface water and groundwater conditions. In addition, we may become subject to additional costs for benefits for current and retired coal miners. These environmental laws and regulations include, but are not limited to, the Surface Mining Control and Reclamation Act of 1977 (SMCRA) with respect to coal mining activities and ancillary activities; the Clean Air Act (CAA) with respect to air emissions; the Clean Water Act (CWA) with respect to water discharges and the permitting of key operational infrastructure such as impoundments; Resource Conservation and Recovery RCRA with respect to solid and hazardous waste management and disposal, as well as the regulation of underground storage tanks; the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA or Superfund) with respect to releases, threatened releases and remediation of hazardous substances; the Endangered Species Act of 1973 (ESA) with respect to threatened and endangered species; and the National Environmental Policy Act of 1969 (NEPA) with respect to the evaluation of environmental impacts related to any federally issued permit or license. Many of these federal laws have state and local counterparts which also impose requirements and potential liability on our operations.
41
Table of Contents
Compliance with these laws and regulations may be costly and time-consuming and may delay commencement, continuation or expansion of exploration or production at our facilities. They may also depress demand for our products by imposing more stringent requirements and limits on our customers’ operations. Moreover, these laws are constantly evolving and are becoming increasingly complex and stringent over time. These laws and regulations, particularly new legislative or administrative proposals, or judicial interpretations of existing laws and regulations related to the protection of the environment could result in substantially increased capital, operating and compliance costs. Individually and collectively, these developments could have a material adverse effect on our operations directly and/or indirectly, through our customers’ inability to use our products.
Certain implementing regulations for these environmental laws are undergoing revision or have not yet been promulgated. As a result, we cannot always determine the ultimate impact of complying with existing laws and regulations.
Due in part to these extensive and comprehensive regulatory requirements and ever-changing interpretations of these requirements, violations of these laws can occur from time to time in our industry and also in our operations. Expenditures relating to environmental compliance are a major cost consideration for our operations and safety and compliance is a significant factor in mine design, both to meet regulatory requirements and to minimize long-term environmental liabilities. To the extent that these expenditures, as with all costs, are not ultimately reflected in the prices of our products and services, operating results will be reduced.
In addition, our customers are subject to extensive regulation regarding the environmental impacts associated with the combustion or other use of coal, which may affect demand for our coal. Changes in applicable laws or the adoption of new laws relating to energy production, greenhouse gas emissions and other emissions from use of coal products may cause coal to become a less attractive source of energy, which may adversely affect our mining operations, the cost structure and, the demand for coal.
We believe that our competitors with operations in the United States are confronted by substantially similar conditions. However, foreign producers and operators may not be subject to similar requirements and may not be required to undertake equivalent costs in or be subject to similar limitations on their operations. As a result, the costs and operating restrictions necessary for compliance with United States environmental laws and regulations may have an adverse effect on our competitive position with regard to those foreign competitors. The specific impact on each competitor may vary depending on a number of factors, including the age and location of its operating facilities, applicable legislation and its production methods.
Employees
ARC and its operating subsidiaries, employ a combination of company employees and contract labor. The Company is continually evaluating the use of company employees and contract labor to determine the optimal mix of each, given the needs of the Company.
The Company currently has approximately 23 direct employees. The Company is headquartered in Fishers, Indiana with four members of the Company’s executive team based at this location.
42
Table of Contents
Results of Operations
The following table summarizes our results of operations for the three months ended March 31, 2025 and 2024:
| Revenue | For the Three Months Ended March 31, 2025 | 2024 | Change |
|---|---|---|---|
| Coal sales | $- | $- | $- |
| Metal recovery and sales | 1,050 | 29,352 | (28,302) |
| Service fee revenue | 30,305 | - | 30,305 |
| RareEarth oxide revenue | 572 | - | 572 |
| Royalty income | - | 64,667 | (64,667) |
| Total revenue | 31,927 | 94,019 | (62,092) |
| Operating expenses (income) | |||
| Coal production and holdings costs | 181,995 | 976,452 | (794,457) |
| Accretion | 248,291 | 249,016 | (725) |
| Depreciation | 512,332 | 550,640 | (38,308) |
| Amortization of mining rights | 303,918 | 307,294 | (3,376) |
| General and administrative | 3,207,512 | 3,722,671 | (515,159) |
| Professional fees | 172,326 | 946,352 | (774,026) |
| Litigation expense | 59,178 | 59,836 | (658) |
| Production taxes and royalties | 4,305 | 9,555 | (5,250) |
| Development | 325,503 | 402,388 | (76,885) |
| Gain on sale of equipment | - | (400,000) | 400,000 |
| Total operating expenses | 5,015,360 | 6,824,204 | (1,808,844) |
| Net loss from operations | (4,983,433) | (6,730,185) | 1,746,752 |
| Other income (expense) | |||
| Earnings from equity method investees | (10,866) | (214,975) | 204,109 |
| Other income and (expense) | 86,583 | 96,913 | (10,330) |
| Interest income | 4,173 | 489,803 | (485,630) |
| Interest expense | (1,752,496) | (662,679) | (1,089,817) |
| Total other income (expenses) | (1,672,606) | (290,938) | (1,381,668) |
| Net loss | (6,656,039) | (7,021,123) | 365,084 |
| Less: Non-controlling interest | 3,276 | 79,760 | (76,484) |
| Net loss attributable to AREC shareholders | $(6,652,763) | $(6,941,363) | $288,600 |
Revenue decreased by $62,092 for the three months ended March 31, 2025 compared to 2024. The primary driver of the decrease was a reduction of $64,667 in royalty income for the three months ended March 31, 2025 as compared to 2024.
43
Table of Contents
The following table summarizes the period over period changes in operating expenses (income) for the three months ended March 31, 2025 and 2024:
| Operating expenses (income) | For the Three Months Ended March 31, 2025 | 2024 | Change |
|---|---|---|---|
| Coal production and holdings costs | $181,995 | $976,452 | (794,457) |
| Accretion | 248,291 | 249,016 | (725) |
| Depreciation | 512,332 | 550,640 | (38,308) |
| Amortization of mining rights | 303,918 | 307,294 | (3,376) |
| General and administrative | 3,207,512 | 3,722,671 | (515,159) |
| Professional fees | 172,326 | 946,352 | (774,026) |
| Litigation expense | 59,178 | 59,836 | (658) |
| Production taxes and royalties | 4,305 | 9,555 | (5,250) |
| Development | 325,503 | 402,388 | (76,885) |
| Gain on sale of equipment | - | (400,000) | 400,000 |
| Total operating expenses | $5,015,360 | $6,824,204 | (1,808,844) |
Total operating expenses decreased by $1,808,844 for the three months ending March 31, 2025 as compared to 2024. This decrease was primarily driven by lower coal production related costs due to idled mining operations, lower holding costs of $794,457 due to concentrated efforts to lower payroll costs, and professional fees of $774,460 due to the decrease in legal fees.
The following table summarizes the period over period changes in other income (expense) for the three months ended March 31, 2025 and 2024:
| Other income (expense) | For the Three Months Ended March 31, 2025 | 2024 | Change |
|---|---|---|---|
| Earnings from equity method investees | $(10,866) | $(214,975) | 204,109 |
| Other income and (expense) | 86,583 | 96,913 | (10,330) |
| Interest income | 4,173 | 489,803 | (485,630) |
| Interest expense | (1,752,496) | (662,679) | (1,089,817) |
| Total other income (expenses) | $(1,672,606) | $(290,938) | (1,381,668) |
The increase in other income (expense) increased by $1,381,668, compared to the three months ended March 31, 2024. The increase is primarily attributable to the net decrease in interest income of $485,630 and the increase in interest expense of $1,089,817due to the Company receiving additional proceeds from convertible notes and bond fund income driven by the WCC bonds.
44
Table of Contents
Liquidity and Capital Resources
Our primary sources of liquidity are derived from existing unrestricted cash, reimbursements from bond funds and other debt and capital proceeds. With the suspension of our coal production activities beginning in 2023 and the development stage of our new ReElement and Electrified Materials businesses through 2024, our sources of revenue in 2024 were limited. We anticipate our ReElement and Electrified Materials new businesses to achieve increasing revenues in 2025; however, we will continue to require cash flows from financing activities to support operations and the continued development of our new business models.
As of March 31, 2025, the company has a cash balance of $24,623 and a working deficit of $77,339,153. We expect to fund our liquidity requirements over the next 12 months primarily with cash on hand and additional debt and equity financing transactions. If future cash flows are insufficient to meet our liquidity needs or capital requirements, we may be required to rationalize our expenditures or slow down efforts to further develop our new business models. We do not have any credit lines currently available to fund our liquidity requirements. Maintaining future liquidity is subject to significant uncertainties primarily related to the generation of revenues from our new business models at levels that surpass breakeven and the ability to obtain additional debt and equity financing.
Cash Flows
Three Months Ended March 31, 2025 and 2024
| Consolidated statement of cash flow data: | Three months ended March 31, 2025 | 2024 |
|---|---|---|
| Cash used in operating activities | $(1,434,850) | $(4,750,471) |
| Cash used in investing activities | (151,647,764) | (143,804,697) |
| Cash provided by financing activities | 76,799 | 148,233,077 |
| Net change in cash and restricted cash | $(150,289,713) | $(322,091) |
The $3,315,621decrease in cash used for operating activities was primarily due to a $365,084 decrease in net loss and a $3,200,491increase in changes in working capital offset by an decrease of $249,955 in non-cash charges.
Cash used in investing activities for the three months ended March 31, 2025 was $151,647,764 compared to $143,804,697 for the three months ended March 31, 2024. The change was primarily due an increase in purchase of property and equipment, net of $1,040,924, restricted investments sold of $151,205,321 and increase from proceeds from short-term investments of $479,458 offset by decrease in restricted investments purchased of $143,126,757 and decrease in sale of equipment of $400,000.
Cash provided by financing activities for the three months ended 2025 was $76,799 compared to $148,233,077 for the three months ended 2024. The change was due to proceeds from tax exempt bonds, net of $149,719,203 that was received in March 31, 2024 and no bonds issued in 2025, repayment of other financing obligation of $1,373,201, offset by proceeds from convertible promissory note of $1,450,000.
45
Table of Contents
Capital Resources
We had no material commitments for capital expenditures as of March 31, 2025.
Off Balance Sheet Arrangements
As of March 31, 2025, we had no off-balance sheet arrangements.
Critical Accounting Policies
The preparation of financial statements requires management to utilize estimates and make judgments that affect the reported amounts of assets, liabilities, revenues and expenses and related disclosure of contingent assets and liabilities. These estimates are based on historical experience and on various other assumptions that management believes to be reasonable under the circumstances. The estimates are evaluated by management on an ongoing basis, and the results of these evaluations form a basis for making decisions about the carrying value of assets and liabilities that are not readily apparent from other sources. Although actual results may differ from these estimates under different assumptions or conditions, management believes that the estimates used in the preparation of our financial statements are reasonable. The critical accounting policies affecting our financial reporting are summarized in Note 1 to the financial statements included elsewhere in this report.
Recent Accounting Pronouncements
None.
Market risk
As filed, 132 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Because we are a smaller reporting company, we are not required to include any disclosure under this item.
46
Table of Contents
Controls and procedures
As filed, 2,665 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
(a) Management’s Conclusions Regarding Effectiveness of Disclosure Controls and Procedures.
The management of the Company is responsible for establishing and maintaining adequate internal control over financial reporting. The Company’s internal control over financial reporting is a process designed under the supervision of the Company’s Chief Executive Officer and Chief Financial Officer to provide reasonable assurance regarding the reliability of financial reporting and the preparation of the Company’s financial statements for external purposes in accordance with U.S. generally accepted accounting principles.
With respect to the period ending March 31, 2025, under the supervision and with the participation of our management, we conducted an evaluation of the effectiveness of the design and operations of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) promulgated under the Securities Exchange Act of 1934.
Based upon our evaluation regarding the period ending March 31, 2025, the Company’s management, including its Chief Executive Officer and Chief Financial Officer, has concluded that its disclosure controls and procedures were not effective due to the Company’s insufficient number of staff performing accounting and reporting functions and lack of timely reconciliations. Through the use of external consultants and the review process, management believes that the financial statements and other information presented herewith are materially correct.
The Company’s disclosure controls and procedures are designed to provide reasonable assurance of achieving their objectives. However, the Company’s management, including its Chief Executive Officer and Chief Financial Officer, does not expect that its disclosure controls and procedures will prevent all error and all fraud. A control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Further, the design of a control system must reflect the fact that there are resource constraints, and the benefit of controls must be considered relative to their costs. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within the Company have been detected.
(b) Changes in Internal Controls.
There have been no changes in the Company’s internal control over financial reporting during the period ended March 31, 2025 that have materially affected the Company’s internal controls over financial reporting.
47
Table of Contents
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2025-01-01 to 2025-03-31 | $31.9k | us-gaap:Revenues |
| Cost of revenue | 3 months2025-01-01 to 2025-03-31 | $182.0k | us-gaap:CostOfGoodsAndServicesSold |
| Operating income | 3 months2025-01-01 to 2025-03-31 | −$5.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2025-01-01 to 2025-03-31 | $1.8m | us-gaap:InterestExpense |
| Net income | 3 months2025-01-01 to 2025-03-31 | −$6.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2025-01-01 to 2025-03-31 | −$0.08 | us-gaap:EarningsPerShareDiluted |
| Diluted shares (weighted) | 3 months2025-01-01 to 2025-03-31 | 78,952,630 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2025-01-01 to 2025-03-31 | −$1.4m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2025-03-31 | $24.6k | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-03-31 | $8.6m | us-gaap:AssetsCurrent |
| Total assets | At period end2025-03-31 | $203.6m | us-gaap:Assets |
| Current liabilities | At period end2025-03-31 | $86.0m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2025-03-31 | $289.3m | us-gaap:Liabilities |
| Current portion of debt | At period end2025-03-31 | $2.1m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2025-03-31 | −$84.1m | us-gaap:StockholdersEquity |