Company Overview

Ameresco is a leading energy solutions provider dedicated to helping customers reduce costs, enhance resilience, and decarbonize to net zero in the global energy transition. Our comprehensive portfolio includes implementing smart energy efficiency solutions, upgrading aging infrastructure, and developing, constructing, and operating distributed energy resources.

Our core offerings include the development, design, arrangement of financing, construction, and installation of solutions that deliver measurable cost and energy savings while enhancing the operations, energy security, infrastructure, and resiliency of a facility. These solutions range from upgrades to a facility’s energy infrastructure to the development, construction, and operation of renewable energy plants. As a trusted sustainability partner, we are always on a mission to help customers lower their overall carbon footprint and reduce their environmental impact.

Our product independence coupled with our deep technical bench allows us to integrate best-in-class advanced technology solutions for the unique needs of each customer.

Drawing from decades of experience, Ameresco reduces energy use and delivers diversified generation solutions to Federal, state and local governments, utilities, educational and healthcare institutions, housing authorities, and commercial and industrial customers across the North America and Europe.

We have sourced and raised approximately $6.4 billion in project financing while delivering $16.2 billion in energy solutions since our inception. Our growth is driven by staying ahead of the curve and at the leading edge of innovation taking place in the energy sector, offering new products and services to new and existing customers.

In addition to organic growth, strategic acquisitions of complementary businesses and assets, and entering into joint venture arrangements has been, and continues to be an important component to our growth strategy. These strategies enable us to broaden our service offerings and expand our geographical reach. We have also taken steps to ensure our business is strategically aligned with our core offerings and as part of these efforts, in 2024, we divested an energy technology and advisory services company which allows us to focus on our primary business areas while actively pursuing new growth opportunities within our target markets.

To best serve our expansive customer base, as of December 31, 2024, we have approximately 60 offices located throughout North America and Europe and more than 1,500 dedicated energy and business professionals with years of proven experience and a strong commitment to customer satisfaction. We offer our customers the resources needed to successfully plan, finance, execute and operate energy programs to create sustained economic and operating benefits to fulfill their unique requirements.

Our Services

Our portfolio of service and product offerings aim to create value and provide energy efficient and renewable solutions to the organizations we serve in the pursuit of a sustainable future.

Energy Efficiency Measures & Upgrades

  • Water management, efficiency and reclamation
  • Renewable energy, storage & microgrids
  • Heating, ventilation, cooling, building envelope
  • Smart metering and controls
  • Chillers and boilers

Renewable Energy, Storage & Microgrids

  • Solar photovoltaic (“PV”)
  • Combined heat and power (“CHP”) and co-generation plants
  • Geothermal
  • Renewable natural gas (“RNG”)
  • Wind power
  • Microgrid
  • Battery storage
  • EV charging infrastructure
  • Hydrogen

Energy Infrastructure

  • Smart building modernization and retrofits
  • Design-build new construction
  • Utilize a full range of technologies related to building systems, facility infrastructure, energy- and water-consuming systems
  • Integrated project design and implementation

Energy Analytics & Supply

  • Enterprise energy management services
  • Proprietary asset management software
  • Energy procurement services

Operations & Maintenance (“O&M”)

  • End-to-end technical guidance
  • Skilled technicians to operate and maintain renewable energy systems

Our core services are the development, design, engineering, and installation of projects designed to reduce the energy and O&M costs of our customers’ facilities. These projects generally include a variety of measures that incorporate innovative technology and techniques, customized for the facility and designed to improve the efficiency of major building systems, such as heating, ventilation, cooling and lighting systems, while enhancing the comfort and usability of the buildings.

We also offer the ability to incorporate analytical tools designed to provide improved building energy management capabilities and enable customers to identify opportunities for energy cost savings. We typically commit to customers that our energy efficiency projects will satisfy agreed upon performance standards upon installation or achieve specified increases in energy efficiency. Generally, the forecasted lifetime energy and operating cost savings of the energy efficiency measures we install are designed to defray all or almost all of the cost of such measures. In many cases, we assist customers in obtaining private third-party financing, grants, or rebates for the cost of constructing the facility improvements, resulting in little or no upfront capital expenditure by the customer. After a project is complete, we may operate, maintain and repair the customer’s energy systems under a multi-year O&M contract, designed to provide us with recurring revenue and visibility into the customer’s evolving needs.

In addition, we serve certain customers by developing and building small-scale renewable energy plants located at or close to a customer’s site. Depending on the customer’s preference, we will either retain ownership of the completed plant or build it for the customer. Most of our small-scale renewable energy plants to date consist of solar PV installations and plants constructed adjacent to landfills, which use landfill gas (“LFG”) to generate energy. We also design and build, and own, operate and maintain plants that utilize biogas from wastewater treatment processes. Our largest renewable energy project that we operate for a customer uses biomass as the primary source of energy. For information on how we finance the projects that we own and operate, please see the disclosures under Note 2, “Summary of Significant Accounting Policies”, Note 9, “Debt and Financing Lease Liabilities” and Note 11, “Variable Interest Entities and Equity Method Investments” to our consolidated financial statements in Item 8 of this Report.

Our Lines of Business

Smart Energy Solutions Projects

Our Smart Energy Solutions Projects are primarily energy efficiency projects, which entail the design, engineering, and installation of an ever-increasing array of innovative technologies and techniques designed to improve the energy efficiency and control the operation, of a building’s energy- and water-consuming systems. In certain projects, we design and construct a central plant or cogeneration system providing power, heat and/or cooling to a building, or a small-scale plant that produces electricity, gas, heat or cooling from renewable sources of energy for a customer, as well as battery energy storage. Our projects generally range in size and scope from a one-month project to design and retrofit a lighting system to a more complex 36-month project to design and install a central plant or cogeneration system or other small-scale plant. Projects we have constructed or are currently working on include designing, engineering and installing energy conservation and resiliency measures across school buildings, large, complex energy conservation, and energy security projects for the federal government, and municipal-scale street lighting projects incorporating smart city controls.

O&M

After an energy efficiency or renewable energy project is completed, we often provide ongoing O&M services under multi-year contracts. These services offer end-to-end technical guidance and include operating, maintaining, and repairing facility energy systems, such as boilers, chillers, and building controls, as well as central power and small-scale plants. For larger projects, we frequently maintain staff on-site to perform these services. In addition to providing O&M services for our own projects, we also provide similar services on projects we did not construct for various customers.

Ameresco-owned Energy Assets

Ameresco-owned energy assets are small-scale power plants that we develop, design, construct, finance and own/operate and are included in our consolidated balance sheets. These assets may sell electricity, heat, cooling, processed biogas, or renewable biomethane fuel under short-or long-term contracts. We also offer Energy as a Service (“EaaS”), where we design, construct, finance and own/operate various energy conservation measures on a customer’s site and sell them the output or availability of these items under a short-or long-term contract.

We have constructed and are currently developing, designing, and constructing a wide range of renewable energy plants using:

  • biogas (generated from landfills, wastewater treatment plants, and the agricultural sector)
  • advanced biofuels
  • biomass and other bio-derived fuels
  • solar PV
  • wind and hydro sources of energy
  • battery storage

Most of our renewable energy assets to date have involved the generation and sale of:

  • electricity from solar PV or battery storage
  • electricity, thermal, renewable fuel, or biomethane using biogas as a feedstock

In the case of our biogas-fueled projects, we purchase biogas that otherwise would be combusted or vented, process it, and either use it as a renewable fuel source in our energy plants to produce and sell electricity and/or thermal, or sell it as a renewable fuel source to a third party. We also design and build and operate and maintain facilities that process biogas into biomethane (or renewable natural gas) that can be transported, primarily through the nation’s natural gas pipeline grid or in some cases through tanker trucks and sold to third parties. The rights to use the site for the plant and the purchase of raw feedstock fuel for the plant are also obtained by us under long-term agreements with terms at least as long as the associated output supply agreement. Our supply agreements typically provide for fixed prices or prices that escalate at a fixed rate or vary based on a market benchmark. See “We may assume responsibility under customer contracts for factors outside our control, including, in connection with some customer projects, the risk that fuel prices will increase” in Item 1A, Risk Factors.

As of December 31, 2024, we owned and operated 209 small-scale renewable energy plants including solar PV installations which generate electricity or deliver renewable gas fuel with a combined capacity of approximately 731 megawatt equivalents (“MWe”) and have energy assets in development and construction with a combined capacity of approximately 637 MWe.

The table below shows the type and number of plants we owned and operated as of December 31, 2024:

Plants Owned and Operated Quantity
Biogas: RNG (1) 8
Biogas: non-RNG 20
Solar and battery assets 176
Other 5
Total plants owned and operated 209
(1) Includes 1 plant co-owned with non-controlling interest holder

3

Other

Our other lines of business include photovoltaic solar energy products and systems (“integrated-PV”), consulting, and enterprise energy management services.

Customer Arrangements

Energy Savings Performance Contracts (“ESPCs”)

For our energy efficiency projects, we typically enter into ESPCs, under which we agree to develop, design, engineer and construct a project for a customer and also commit that the project will satisfy agreed upon performance standards that vary from project to project. These performance commitments are typically based on the design, capacity, efficiency, or operation of the specific equipment and systems we install. Our commitments generally fall into three categories:

  • Pre-agreed energy reduction commitment: our customer reviews the project design in advance and agrees that, upon or shortly after completion of the installation of the specified equipment comprising the project, the commitment will have been met.
  • Equipment-level commitment: we commit to a level of energy use reduction based on the difference in use measured first with the existing equipment and then with the replacement equipment.
  • Whole building-level commitment: requires demonstration of energy usage reduction for a whole building, often based on readings of the utility meter where usage is measured. Depending on the project, the measurement and demonstration may be required only once, upon installation, based on an analysis of one or more sample installations, or may be required to be repeated at agreed upon intervals generally over periods of up to 25 years. We often assist these customers in identifying and obtaining financing through rebate programs, grant programs, third-party lenders, and other sources.

Under our contracts, we typically do not take responsibility for a wide variety of factors outside of our control and exclude or adjust for such factors in commitment calculations. These factors include, among others, variations in energy prices and utility rates, weather, facility occupancy schedules, the amount of energy-using equipment in a facility, and the failure of the customer to operate or maintain the project properly. Typically, our performance commitments apply to the aggregate overall performance of a project rather than to individual energy efficiency measures. Therefore, to the extent an individual measure underperforms, it may be offset by other measures that overperform during the same period. In the event that an energy efficiency project does not perform according to the agreed upon specifications, our agreements typically allow us to satisfy our obligation by adjusting or modifying the installed equipment, installing additional measures to provide substitute energy savings or paying the customer for lost energy savings based on the assumed conditions specified in the agreement. Many of our equipment supply, local design, and installation subcontracts contain provisions that enable us to seek recourse against our vendors or subcontractors if there is a deficiency in our energy reduction commitment. See “We may have liability to our customers under our ESPCs if our projects fail to deliver the energy use reductions to which we are committed under the contract” in Item 1A, Risk Factors.

The projects that we perform for governmental agencies are governed by particular qualification and contracting regimes. Certain states require qualification with an appropriate state agency as a precondition to performing work or appearing as a qualified energy service provider for state, county, and local agencies within the state. For example, the Commonwealth of Massachusetts and the states of Colorado and Washington pre-qualify energy service providers and provide contract documents that serve as the starting point for negotiations with potential governmental customers. Most of the work that we perform for the federal government is performed under Indefinite Delivery, Indefinite Quantity (“IDIQ”) and Multiple Award Construction Contract agreements between government agencies and us. These agreements allow us to contract with the relevant agencies to implement energy and infrastructure projects, but no work may be performed unless we and the agency agree on a task order or delivery order governing the provision of a specific project. The government agencies enter into contracts for specific projects on a competitive basis. We and our affiliates are currently parties to an IDIQ agreement with the U.S. Department of Energy (“DOE”) expiring in 2026. We are also party to agreements with other federal agencies, including the U.S. Army Corps of Engineers, the Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic, and the U.S. General Services Administration.

Payments by the federal government for energy efficiency measures are based on the services provided and the products installed but are limited to the savings derived from such measures, calculated in accordance with federal regulatory guidelines and the specific contract’s terms. The savings are typically determined by comparing energy use and other costs before and after the installation of the energy efficiency measures, adjusted for changes that affect energy use and other costs but are not caused by the energy efficiency measures.

Energy Supply Contracts

For the energy assets that we own and operate, we generally enter into (i) long-term power purchase agreements (“PPAs”) to supply electricity, (ii) long-term energy supply agreements (“ESAs”) to supply medium British Thermal Unit (“BTU”) biogas or thermal energy, (iii) gas purchase agreements (“GPAs”) to supply RNG, or (iv) EaaS contracts where we sell the output or availability of various energy conservation measures to third parties.

The third parties we enter into PPAs, ESAs, or EaaS contracts with include but are not limited to municipalities, the Federal government, commercial and industrial customers, or utilities. The third parties we sell RNG to include, but are not limited to, brokers, traders, utilities, municipalities, industrial facilities, or other large purchasers of energy.

Our Business Segments

Our company is primarily organized by region, where each region may perform our key services under our various lines of business. Our reportable business segments largely follow our regional segmentation. For the year ended December 31, 2024, our reportable business segments were as follows:

  • North America Regions
  • U.S. Federal
  • All Other
  • Renewable Fuels (previously Alternative Fuels)
  • Europe

On January 1, 2024, we changed the structure of our internal organization, and our U.S. Regions and Canada are now included in North America Regions. Additionally, our Asset Sustainability Group was formerly included in Canada, but is now included in “All Other”. As a result, previously reported amounts have been reclassified for comparative purposes.

Our North America Regions, U.S. Federal, and Europe segments offer energy efficiency products and services which include the design, engineering, and installation of equipment and other measures to improve the efficiency and control the operation of a facility’s energy infrastructure, renewable energy solutions, and services and the development and construction of small-scale plants that we own or develop for customers that produce electricity, gas, heat, or cooling from renewable sources of energy and O&M services.

Our Renewable Fuels segment sells electricity and processed RNG derived from biomethane from small-scale plants that we own and operate and provides O&M services for customer owned small-scale RNG plants.

The “All Other” category offers software and consulting services and the sale of solar PV energy products and systems which we refer to as integrated-PV.

The table below shows the percentage of revenues by segment for the last three years:

% of Revenues by Segment (1) 2024 2023 2022
North America Regions 49.7% 44.8% 64.3%
U.S. Federal 21.0% 29.3% 21.5%
Renewable Fuels 9.8% 8.5% 6.3%
Europe 14.2% 10.9% 3.2%
All Other 5.3% 6.5% 4.7%
Total revenues 100.0% 100.0% 100.0%
(1) See Note 3 “Revenue from Contracts with Customers” for our disaggregated revenue and Note 20 “Business Segment Information” for additional information.

Sales and Marketing

Our sales and marketing approach is to offer customers customized and comprehensive energy efficiency solutions tailored to meet their economic, operational, and technical needs. We identify project opportunities through referrals, requests for proposals (“RFPs”), conferences and events, website, digital campaigns, telemarketing, and repeat business from existing customers. Our direct sales force develops and follows up on customer leads. As of December 31, 2024, we had 166 employees in direct sales.

In preparation for a proposal, our team typically conducts a preliminary audit of the customer’s needs and requirements and identifies areas to enhance efficiencies and reduce costs. We collect and analyze the customer’s utility bill and other data related to energy use. If the bills are complex or numerous, we often utilize our proprietary enterprise energy management software tools to scan, compile and analyze the information. Our experienced engineers visit and assess the customer’s current energy systems and infrastructure. Through our knowledge of the federal, state, and local governmental and utility environments, we assess the availability of energy, utility or environmental-based payments for usage reductions or renewable power generation, which helps us optimize the economic benefits of a proposed project for a customer. Once awarded a project, we perform a more detailed audit of the customer’s facilities, which serves as the basis for the final specifications of the project and final contract terms.

For renewable energy plants that are not built or located on a customer’s site or use sources of energy not within the customer’s control, the sales process also involves the identification of sites with attractive sources of renewable energy and obtaining necessary rights and governmental permits to develop a plant on that site. For example, for LFG projects, we start with gaining control of an LFG resource located close to the prospective customer. For solar and wind projects, we look for sites where utilities are interested in purchasing renewable energy power at rates that are sufficient to make a project feasible. Where governmental agencies control the site and resource, such as a landfill owned by a municipality, the customer may be required to issue an RFP to use the site or resource. Once we believe we are likely to obtain the rights to the site and the resource, we seek customers for the energy output of the potential project, with whom we can enter into a long-term PPA.

Customers

We strive to be a trusted sustainability partner creating valued, single-sourced, efficient energy solutions delivered with passion, expertise, teamwork, and a relentless focus on customer satisfaction.

Our customers choose to prioritize efficiency and the development of clean, green energy sources and our solutions are customized to serve the specific needs of each customer and meaningfully reduce or offset their carbon footprint. From energy conservation through a variety of measures to the generation of green, renewable power, our customers and their communities reap the benefits of reducing energy consumption, costs, and associated carbon emissions.

In 2024, we served customers throughout North America and Europe. Approximately 67.3% of our revenues were derived from federal, state, provincial, or local government entities, including public housing authorities, public universities, and municipal utilities. Our federal customers include various divisions of the U.S. federal government. The U.S. federal government is considered a single customer and segment for reporting purposes (see table above under “Our Business Segments”). For the year ended December 31, 2024, our largest 20 customers accounted for approximately 56.8% of our total revenues. Other than the U.S. federal government, no customers represented 10% or more of our revenues during this period.

See “Provisions in our government contracts may harm our business, financial condition and operating results” in Item 1A, Risk Factors for a discussion of special considerations applicable to government contracting and “The loss of one of our significant customers or our failure to perform on our contract with that customer in accordance with its terms could adversely affect us” in Item 1A, Risk Factors for further discussion.

Competition

While we face significant competition from a large number of companies, we believe that few offer the objective technical expertise and full range of services we do.

Our principal competitors include:

  • Smart Energy Solutions: McKinstry, CM3 Building Solutions, CMTA, Inc. (a Legence company), SitelogIQ, ABM Industries, Inc., Southland Industries, Energy Systems Group, LLC, Honeywell, Johnson Controls, NORESCO (a unit of Carrier Global Corporation), Schneider Electric, Siemens Building Technologies, and Trane Technologies (an Ingersoll-Rand company). We compete primarily on the basis of our comprehensive, independent offering of energy efficiency and renewable energy services and the breadth and depth of our expertise.
  • Energy Assets: In the LFG and RNG market our principal competitors primarily include large, national project developers and owners of landfills who self-develop projects using LFG from their own landfills, and other national renewable natural gas developers/owners such as Archaea Energy, Montauk Renewables, Vanguard Renewables, Opal Fuels, and divisions of large multi-national oil and gas conglomerates. In the Solar PV and Battery Storage market our principal competitors include NextEra Energy, Inc., Engie SA, Invenergy, EDF Renewables, and Clearway Energy Group LLC. We may also compete with many large independent power producers and utilities, as well as a large number of smaller developers of renewable energy projects. In EaaS, our competitors include Engie SA, Enel X, Schneider Electric SE, and Redaptive, Inc. We compete for renewable energy projects primarily on the basis of our experience, reputation, and ability to identify and complete high quality and cost-effective projects.
  • O&M Services: EMCOR Energy Services, Comfort Systems USA, Honeywell, Johnson Controls, and Veolia. In this area, we compete primarily on the basis of our expertise and quality of service.

See “We operate in a highly competitive industry, and our current or future competitors may be able to compete more effectively than we do, which could have a material adverse effect on our business, revenues, growth rates, and market share” in Item 1A, Risk Factors for further discussion of competition.

Regulatory

Various regulations affect the conduct of our business. Federal and state legislation and regulations enable us to enter into ESPCs with government agencies in the United States. The applicable regulatory requirements for ESPCs differ in each state and between agencies of the federal government. We are also subject to local regulations in the international jurisdictions where we operate, including Canada, the United Kingdom and elsewhere in Europe.

Our projects must conform to all applicable electric reliability, building and safety, and environmental regulations and codes, which vary from place to place and time to time. Various federal, state, provincial, and local permits are required to construct an energy efficiency project or renewable energy plant.

Renewable energy projects are also subject to specific governmental safety and economic regulation. States and the federal government typically do not regulate the transportation or sale of LFG unless it is combined with and distributed with natural gas, but this is not uniform among states and may change from time to time. States regulate the retail sale and distribution of natural gas to end-users, although regulatory exemptions from regulation are available in some states for limited gas delivery activities, such as sales only to a single customer. The sale and distribution of electricity at the retail level is subject to state and provincial regulation, and the sale and transmission of electricity at the wholesale level is subject to federal regulation. While we do not own or operate retail-level electric distribution systems or wholesale-level transmission systems, the prices for the products we offer can be affected by the tariffs, rules and regulations applicable to such systems, as well as the prices that the owners of such systems are able to charge. The construction of power generation projects typically is regulated at the state and provincial levels, and the operation of these projects also may be subject to state and provincial regulation as “utilities.” At the federal level, the ownership and operation of, and sale of power from, generation facilities may be subject to regulation under the Public Utility Holding Company Act of 2005 (“PUHCA”), the Federal Power Act (“FPA”), and Public Utility Regulatory Policies Act of 1978 (“PURPA”). Some of our renewable energy projects which are operating as exempt wholesale generators or operating under a special exemption from PUHCA are currently subject to rate regulation for wholesale power sales by the Federal Energy Regulatory Commission (“FERC”) under the FPA and must comply with certain FERC reporting requirements.

If we pursue projects employing different technologies or with a single project electrical capacity greater than 20 megawatts, we could become subject to some of the regulatory schemes which do not apply to our current projects. In addition, the state, provincial, and federal regulations that govern qualifying facilities and other power sellers frequently change, and the effect of these changes on our business cannot be predicted.

LFG power generation facilities require an air emissions permit, which may be difficult to obtain in certain jurisdictions. Renewable energy projects may also be eligible for certain governmental or government-related incentives from time to time, including tax credits, cash payments in lieu of tax credits, and the ability to sell associated environmental attributes, including carbon credits. Government incentives and mandates typically vary by jurisdiction.

Some of the demand reduction services we provide for utilities and institutional customers are subject to regulatory tariffs imposed under federal and state utility laws. In addition, the operation of, and electrical interconnection for, our renewable energy projects are subject to federal, state, or provincial interconnection and federal reliability standards also set forth in utility tariffs. These tariffs specify rules, business practices, and economic terms to which we are subject. The tariffs are drafted by the utilities and approved by the utilities’ state, provincial, or federal regulatory commissions.

See our section entitled “Risks related to Regulations or Governmental Actions” in Item 1A, Risk Factors.

Human Capital Management

We believe our employees are Ameresco’s greatest resource, as they come together to creatively integrate our advanced technology portfolio and develop innovative, transformative energy solutions for our customers.

The breath of our team coupled with our deep bench of technical expertise enables us to tackle the most complex energy opportunities. Supporting our employees and the communities in which we serve is paramount to our success.

We focus on team-based employee philanthropy, wellness-focused employee benefits, and donating our time to our local communities through education and training.

As of December 31, 2024, we had a total of 1,509 employees based in 43 U.S. states, including the District of Columbia, eight Canadian provinces, five locations throughout the United Kingdom, one location in Italy, and one in Greece.

Philanthropic Activities

We actively participate in philanthropic activities that support our local communities and provide an opportunity for dynamic team building. During 2024, we hosted eight volunteer initiatives sponsored by members of our executive management team. Our employees were encouraged to use paid community service days to donate time and creative energy to these events as well as organizations that touch them personally and to give back to the environment and their communities. As a result, we experienced increased participation in both the utilization of our volunteer hours and activities.

Culture and Engagement

We welcome, support, and celebrate many ways of thinking. We believe innovation demands variety of thought, and Ameresco has done well by welcoming and celebrating employees from a wide range of backgrounds. We are proud to be an employer that believes in equal opportunity for everyone.

To foster a healthy, vibrant, and innovative environment, we educate our employees on collaborative and respectful problem-solving skills and how to navigate different points of view in a positive and productive way.

Recruiting is a key element in our commitment to equal opportunity. We are keen to bring talented and qualified individuals into our company. Our talent team focuses on bringing a wide range of candidates into our pipeline and is trained in skills-based recruiting to identify qualified candidates that meet our needs.

Benefits with a Purpose

The health, safety, and well-being of our employees continues to be a top priority at Ameresco. In addition to competitive salaries, we are committed to regularly evaluating a competitive benefits portfolio, striving to provide resources to our employees that assist with work-life balance.

While employee healthcare costs and access to a wide variety of medical providers have always been at the top of our criteria list, we also continued to focus our 2024 benefit offerings on choice and our mental health and well-being offerings. We want to ensure our employees have a variety of help and resources available, offered through platforms and services they feel comfortable using, should they need it.

In addition, we offer a comprehensive Employee Assistance Plan to all Ameresco global employees and their family members should they need assistance with life planning matters. Through our benefit offerings, our employees can also take advantage of tools and benefits to enhance their physical, mental or financial health.

Career Advancement

Ameresco strives to implement creative ways for our employees to support career advancement. To facilitate our employees’ career development with a focus on retention, we have increased the frequency of career path discussions, training, and succession planning. During 2024, we also improved our performance management process and continued our mentorship program pairing employees with mentors within our leadership team focusing on established goals and guidance with various skills.

When it comes to the innovative solutions that we deliver to our customers, it is critical for the Ameresco team to be at the forefront. Every month our Corporate Marketing Team hosts a Center of Excellence in Advance Technology training session available to all employees. Each session features a different topic to cover various aspects of Ameresco’s solution portfolio and is presented by our internal subject matter experts. All employees are encouraged to attend live and participate in the Q&A.

We launched Udemy for Business as our cornerstone of digital learning and development that is available to all employees globally. In 2024, we also launched a manager development program focused on enhancing management and leadership skills for managers across all parts of the organization.

We provide a tuition reimbursement program to support career development within our organization. In addition, we support employee growth by investing in career advancing certification programs.

For more information on our initiatives noted above, please see our 2024 Impact Report to be published in 2025 which will be available at www.ameresco.com (http://www.ameresco.com).

Seasonality

See “Our business is affected by seasonal trends and construction cycles, and these trends and cycles could have an adverse effect on our operating results” in Item 1A, Risk Factors and “Overview — Effects of Seasonality” in Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations” for a discussion of seasonality in our business.

Geographic Information

Financial information about our domestic and international operations may be found in Note 16, “Geographic Information” of our consolidated financial statements included in Item 8 of this Form 10-K, which information is incorporated herein by reference.

Additional Information

Periodic reports, proxy statements, and other information are available to the public, free of charge, on our website, www.ameresco.com (http://www.ameresco.com), as soon as reasonably practicable after they have been filed with the Securities and Exchange Commission (“SEC”), and through the SEC’s website, www.sec.gov (http://www.sec.gov). We include our website address in this report only as an inactive textual reference and do not intend it to be an active link to our website. None of the material on our website is part of this Report.

Risk factors

As filed, 94,213 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We face many risks. If any of the events or circumstances described below actually occur, we and our businesses, financial condition or results of operations could suffer, and the trading price of our Class A Common Stock could decline. Our current and potential investors should consider the following risks and the information contained under the heading “Cautionary Note Regarding Forward-Looking Statements” before deciding to invest in our securities.

Risks Related to Our Business

If demand for our energy efficiency and renewable energy solutions does not develop as we expect, our revenues will suffer, and our business will be harmed.

We believe, and our growth plans assume, that the market for energy efficiency and renewable energy solutions will continue to grow, that we will increase our penetration of this market and that our revenues from selling into this market will continue to increase over time. If our expectations as to the size of this market and our ability to sell our products and services in this market are not correct, our revenues will suffer, and our business will be harmed.

In order to secure contracts for new projects, we typically face a long and variable selling cycle that requires significant resource commitments and requires a long lead time before we realize revenues.

The sales cycle for energy efficiency and renewable energy projects in general take from 18 to 42 months, with sales to federal government and housing authority customers tending to require the longest sales processes. Our sales cycle has been further lengthened as a result of macroeconomic conditions as well as uncertainly stemming from changes in regulations and policies that may be implemented by the new U.S. administration, and we cannot predict the timeline for our selling cycle in the current conditions. Our existing and potential customers generally follow extended budgeting and procurement processes and sometimes must engage in regulatory approval processes related to our services. Our customers often use outside consultants and advisors, which contributes to a longer sales cycle. Most of our potential customers issue an RFP, as part of their consideration of alternatives for their proposed project. In preparation for responding to an RFP, we typically conduct a preliminary audit of the customer’s needs and the opportunity to reduce its energy costs. For projects involving a renewable energy plant that is not located on a customer’s site or that uses sources of energy not within the customer’s control, the sales process also involves the identification of sites with attractive sources of renewable energy, such as a landfill or a favorable site for solar PV, and it may involve obtaining necessary rights and governmental permits to develop a project on that site. If we are awarded a project, we then perform a more detailed audit of the customer’s facilities, which serves as the basis for the final specifications of the project. We then must negotiate and execute a contract with the customer. In addition, we or the customer typically need to obtain financing for the project.

This extended sales process requires the dedication of significant time by our sales and management personnel and our use of significant financial resources, with no certainty of success or recovery of our related expenses. A potential customer may go through the entire sales process and not accept our proposal. All of these factors can contribute to fluctuations in our quarterly financial performance and increase the likelihood that our operating results in a particular quarter will fall below investor expectations. These factors could also adversely affect our business, financial condition and operating results due to increased spending by us that is not offset by increased revenues.

We may not recognize all revenues from our backlog or receive all payments anticipated under awarded projects and customer contracts.

As of December 31, 2024 and 2023, we had backlog of approximately $2.5 billion and $1.3 billion, respectively, in expected future revenues under signed customer contracts for the installation or construction of projects, which we sometimes refer to as fully-contracted backlog; and we also had been awarded projects for which we do not yet have signed customer contracts with estimated total future revenues of an additional $2.3 billion and $2.6 billion, respectively. As of December 31, 2024 and 2023, we had O&M backlog of approximately $1.4 billion and $1.2 billion, respectively. Our O&M backlog represents expected future revenues under signed, multi-year customer contracts for the delivery of O&M services, primarily for energy efficiency and renewable energy construction projects completed by us for our customers.

Our customers have the right under some circumstances to terminate contracts or defer the timing of our services and their payments to us. In addition, our government contracts are subject to the risks described below under “Provisions in government contracts may harm our business, financial condition and operating results.” The payment estimates for projects that have been awarded to us but for which we have not yet signed contracts have been prepared by management and are based upon a number of assumptions, including that the size and scope of the awarded projects will not change prior to the signing of customer contracts, that we or our customers will be able to obtain any necessary third-party financing for the awarded projects, and that we and our customers will reach agreement on and execute contracts for the awarded projects. We are not always able to enter into a contract for an awarded project on the terms proposed. As a result, we may not receive all of the revenues that we include in the awarded projects component of our backlog or that we estimate we will receive under awarded projects. If we do not receive all of the revenue we currently expect to receive, our future operating results will be adversely affected. In addition, a delay in the receipt of revenues, even if such revenues are eventually received, may cause our operating results for a particular quarter to fall below our expectations.

If we are not able to complete, perform or operate our projects on a profitable basis or as we have committed to our customers, we could become subject to liquidated damages, and our reputation and our results of operations could be adversely impacted.

Development, installation, and construction of our energy efficiency and renewable energy projects, and operation of our renewable energy projects, entails many risks, including:

  • failure or delays in receiving components and equipment that meet our requirements,
  • failure or delays in obtaining all necessary rights to land access and use,
  • failure or delays in receiving quality performance of contractors and other third-party service providers,
  • increases (including as a result of inflation) in the cost of labor, equipment, and commodities needed to construct or operate projects,
  • failure or delays in obtaining permitting and addressing other regulatory issues, license revocation, and changes in legal requirements,
  • failure or delays in obtaining other governmental support or approvals, or in overcoming objections from members of the public or adjoining landowners,
  • shortages of equipment or skilled labor,
  • unforeseen engineering problems,
  • failure of a customer to accept or pay for renewable energy that we supply,
  • weather interferences, catastrophic events including fires, explosions, earthquakes, droughts, and acts of terrorism; and accidents involving personal injury or the loss of life,
  • environmental, archaeological or geological conditions
  • health or similar issues, a pandemic, or epidemic,
  • labor disputes and work stoppages,
  • mishandling of hazardous substances and waste, and other events outside of our control.

Any of these factors could give rise to construction delays, costs in excess of our expectations or cause us not to meet commitments given to our customers. We have, for example, experienced disruptions in development, installation and construction as a result of continued supply chain and logistics challenges, and we may continue to experience such disruptions. In addition, the impacts of climate change have caused us to experience more frequent and severe weather interferences which has impacted our construction timelines, and this trend may continue. These factors and events could prevent us from completing construction of our projects, cause defaults under our financing agreements or under contracts that require completion of project construction by a certain time, give rise to liquidated damages or penalties, cause projects to be unprofitable for us, or otherwise impair our business, financial condition, and operating results.

For example, our Turnkey Engineering, Procurement, Construction and Maintenance Agreement and the underlying purchase orders dated as of October 21, 2021 (the “SCE Agreement”) with SCE obligated us to achieve certain substantial completion milestone dates for the facilities no later than August 1, 2022, and for at least two years thereafter meet specified availability and capacity guarantees. As previously disclosed, due to supply chain delays, weather and other events, we were unable to complete the projects by the guaranteed completion date of August 1, 2022 and made force majeure claims related to such delays. While we have reached an agreement with SCE on substantial completion of two out of three battery energy storage system projects, the resolution of our obligation to pay the liquidated damages withheld and the applicability and scope of any force majeure relief, as well as any cost recovery we may be entitled to remain subject to dispute. If we fail to come to an agreement with SCE or otherwise resolve matters related to substantial completion or related force majeure relief, or fail to meet the availability and capacity guarantees, we may be subject to liquidated damages up to the maximum amount of $89 million. This could have a material adverse effect on our reputation, business, and results of operations.

A significant decline in the fiscal health of federal, state, provincial, and local governments could reduce demand for our energy efficiency and renewable energy projects and a significant reduction of the federal workforce could delay federal contracting and adversely impact our federal business.

Historically, including for the years ended December 31, 2024 and 2023, 67% and 72%, respectively, of our revenues have been derived from sales to federal, state, provincial, or local governmental entities, including public housing authorities, public universities, and municipal utilities. We expect revenues from this market sector to continue to comprise a significant percentage of our revenues for the foreseeable future. A significant decline in the fiscal health of these existing and potential customers may make it difficult for them to enter into contracts for our services, to obtain financing necessary to fund such contracts, or may cause them to seek to renegotiate or terminate existing agreements with us. In addition, if there is a partial or full shutdown of any federal, state, provincial or local governing body this may adversely impact our financial performance. Furthermore, a significant reduction of the federal workforce could delay federal contracting and otherwise have an adverse effect on our federal projects and our financial performance.

Provisions in our government contracts may harm our business, financial condition and operating results.

A significant majority of our fully-contracted backlog and awarded projects is attributable to customers that are governmental entities. Our contracts with the federal government and its agencies, and with state, provincial, and local governments, customarily contain provisions that give the government substantial rights and remedies, many of which are not typically found in commercial contracts, including provisions that allow the government to:

  • terminate existing contracts, in whole or in part, for any reason or no reason,
  • reduce or modify contracts or subcontracts,
  • decline to award future contracts if actual or apparent organizational conflicts of interest are discovered, or to impose organizational conflict mitigation measures as a condition of eligibility for an award,
  • suspend or debar the contractor from doing business with the government or a specific government agency, and
  • pursue criminal or civil remedies under the False Claims Act, False Statements Act, and similar remedy provisions unique to government contracting.

Under general principles of government contracting law, if the government terminates a contract for convenience, the terminated company may recover only its incurred or committed costs, settlement expenses, and profit on work completed prior to the termination. If the government terminates a contract for default, the defaulting company is entitled to recover costs incurred and associated profits on accepted items only and may be liable for excess costs incurred by the government in procuring undelivered items from another source. In most of our contracts with the federal government, the government has agreed to make a payment to us in the event that it terminates the agreement early. The termination payment is designed to compensate us for the cost of construction plus financing costs and profit on the work completed.

In ESPCs for governmental entities, the methodologies for computing energy savings may be less favorable than for non-governmental customers and may be modified during the contract period. We may be liable for price reductions if the projected savings cannot be substantiated. In addition to the right of the federal government to terminate its contracts with us, federal government contracts are conditioned upon the continuing approval by Congress of the necessary spending to honor such contracts. Congress often appropriates funds for a program on a September 30 fiscal-year basis even though contract performance may take more than one year. Consequently, at the beginning of many major Governmental programs, contracts often may not be fully funded, and additional monies are then committed to the contract only if, as and when appropriations are made by Congress for future fiscal years. Similar practices are likely to also affect the availability of funding for our contracts with Canadian, as well as state, provincial, and local government entities. If one or more of our government contracts were terminated or reduced, or if appropriations for the funding of one or more of our contracts is delayed or terminated, our business, financial condition and operating results could be adversely affected. Furthermore, recent presidential executive orders directing the review and potential termination of funds appropriated through the IRA and the Infrastructure Investment and Jobs Act (“IIJA”) has resulted in delays in construction on some of our projects and may cause further delays or cancellations of projects and existing contracts, which could have an adverse affect on our financial condition and results of operations.

The projects we undertake for our customers generally require significant capital, which our customers or we may finance through third parties, and such financing may not be available to our customers or to us on favorable terms, if at all.

Our projects for customers are typically financed by third parties. For small-scale renewable energy plants that we own, as well as certain larger projects for customers, we typically rely on a combination of our working capital and debt to finance construction costs. If we or our customers are unable to raise funds on acceptable terms when needed or if we do not have sufficient working capital or availability under our existing financing arrangements, we may be unable to secure customer contracts, the size of contracts we do obtain may be smaller or we could be required to delay the development and construction of projects, reduce the scope of those projects or otherwise restrict our operations. Delays in customer projects could also subject us to claims by customers. Furthermore, the terms of financing arrangements that we may enter into, including increases in interest rates as compared to historical rates, have in the past and could in the future impact the profitability of our projects. In addition, any inability by us or our customers to raise the funds necessary to finance our projects or construction costs could materially harm our business, financial condition, and operating results.

Project development or construction activities may require us to make significant investments without first obtaining project financing or having final customer contracts, which could increase our costs and impair our ability to recover our investments.

We are at times required to spend significant sums for preliminary engineering, permitting, legal and other expenses before we can determine whether a project is feasible, economically attractive, or capable of being built or financed. We will often choose to bear the costs of such efforts prior to obtaining project financing, prior to getting final regulatory approval and prior to our final sale to a customer, if any. We have for example in the past commenced, and may in the future commence, development of certain projects, such as battery and solar projects, prior to having entered into final binding contracts with the customer or financing party.

We expect to invest a significant amount of capital to develop projects whether owned by us or by third parties. If we are unable to complete the development of a project or enter into contracts with the customer, we may write-down or write-off some or all of these capitalized investments, which would have an adverse impact on our net income in the period in which the loss is recognized and could have an adverse impact our ability to finance our operations.

We are exposed to the credit risk of some of our customers.

Most of our revenues are derived under multi-year or long-term contracts with our customers, and our revenues are therefore dependent to a large extent on the creditworthiness of our customers. During periods of economic downturn and if our customers’ risk exposure increases, e.g. as a result of catastrophic events such as the wild fires in Los Angeles and Hawaii, our exposure to credit risks from our customers’ increases, and our efforts to monitor and mitigate the associated risks may not be effective in reducing our credit risks. Our reliance on one or a few customers for a material portion of our revenue further exacerbates this risk. In the event of non-payment by one or more of our customers, our business, financial condition and operating results could be adversely affected.

Our business is affected by seasonal trends and construction cycles, and these trends and cycles could have an adverse effect on our operating results.

We are subject to seasonal fluctuations and construction cycles, particularly in areas that experience colder weather during the winter months, such as the northern United States and Canada, and other areas that experience extreme weather events, such as wildfires, storms, or flooding, or at educational institutions, where large projects are typically carried out during summer months when their facilities are unoccupied. In addition, government customers, many of which have fiscal years that do not coincide with ours, typically follow annual procurement cycles and appropriate funds on a fiscal-year basis even though contract performance may take more than one year. Further, government contracting cycles can be affected by the timing of, and delays in, the legislative process related to government programs and incentives that help drive demand for energy efficiency and renewable energy projects. As a result, our revenues and operating income in the third and fourth quarter are typically higher, and our revenues and operating income in the first quarter are typically lower, than in other quarters of the year. As a result of such fluctuations, we may occasionally experience declines in revenue or earnings as compared to the immediately preceding quarter, and comparisons of our operating results on a period-to-period basis may not be meaningful.

Failure of third parties to manufacture quality products or provide reliable services in a timely manner or at prices that are acceptable to us could cause delays in the delivery of our services and completion of our projects, which could damage our reputation, have a negative impact on our relationships with our customers and adversely affect our growth.

Our success depends on our ability to provide services and complete projects in a timely manner, which in part depends on the ability of third parties to provide us with timely and reliable products and services at acceptable prices. In providing our services and completing our projects, we rely on products that meet our design specifications and components manufactured and supplied by third parties, as well as on services performed by subcontractors. We also rely on subcontractors to perform substantially all of the construction and installation work related to our projects; and we often need to engage subcontractors with whom we have no experience for our projects. We, our subcontractors and other third parties have been impacted by the global supply chain delays and challenges. This has resulted in and may continue to result in delays in our ability to provide our services and complete our projects in a timely manner. In addition, some of the third parties we engage for our design, construction and operation projects operate internationally and our reliance on their products and services may be impacted by economic, political, and labor conditions in those regions.

If any of our subcontractors are unable to provide services that meet or exceed our customers’ expectations or satisfy our contractual commitments, our reputation, business and operating results could be harmed. In addition, if we are unable to avail ourselves of warranty and other contractual protections with providers of products and services, we may incur liability to our customers or additional costs related to the affected products and components, which could have a material adverse effect on our business, financial condition, and operating results. Moreover, any delays, malfunctions, inefficiencies, or interruptions in these products or services could adversely affect the quality and performance of our solutions and require considerable expense to establish alternate sources for such products and services. This could cause us to experience difficulty retaining current customers and attracting new customers, and could harm our brand, reputation, growth, and operating results.

We may have liability to our customers under our ESPCs if our projects fail to deliver the energy use reductions to which we are committed under the contract.

For our energy efficiency projects, we typically enter into ESPCs under which we commit that the projects will satisfy agreed-upon performance standards appropriate to the project. These commitments are typically structured as guarantees of increased energy efficiency that are based on the design, capacity, efficiency, or operation of the specific equipment and systems we install. Our commitments generally fall into three categories: pre-agreed, equipment-level and whole building-level. Under a pre-agreed efficiency commitment, our customer reviews the project design in advance and agrees that, upon or shortly after completion of installation of the specified equipment comprising the project, the pre-agreed increase in energy efficiency will have been met.

Under an equipment-level commitment, we commit to a level of increased energy efficiency based on the difference in use measured first with the existing equipment and then with the replacement equipment upon completion of installation. A whole building-level commitment requires future measurement and verification of increased energy efficiency for a whole building, often based on readings of the utility meter where usage is measured. Depending on the project, the measurement and verification may be required only once, upon installation, based on an analysis of one or more sample installations, or may be required to be repeated at agreed upon intervals generally over periods of up to 25 years.

Under our contracts, we typically do not take responsibility for a wide variety of factors outside our control and exclude or adjust for such factors in commitment calculations. These factors include variations in energy prices and utility rates, weather, facility occupancy schedules, the amount of energy-using equipment in a facility, and failure of the customer to operate or maintain the project properly. We rely in part on warranties from our equipment suppliers and subcontractors to back-stop the warranties we provide to our customers and, where appropriate, pass on the warranties to our customers. However, the warranties we provide to our customers are sometimes broader in scope or longer in duration than the corresponding warranties we receive from our suppliers and subcontractors, and we bear the risk for any differences, as well as the risk of warranty default by our suppliers and subcontractors.

Typically, our performance commitments apply to the aggregate overall performance of a project rather than to individual energy efficiency measures. Therefore, to the extent an individual measure underperforms, it may be offset by other measures that overperform during the same period. In the event that an energy efficiency project does not perform according to the agreed-upon specifications, our agreements typically allow us to satisfy our obligation by adjusting or modifying the installed equipment, installing additional measures to provide substitute energy savings, or paying the customer for lost energy savings based on the assumed conditions specified in the agreement. However, we may incur additional or increased liabilities or expenses under our ESPCs in the future. Such liabilities or expenses could be substantial, and they could materially harm our business, financial condition, or operating results. In addition, any disputes with a customer over the extent to which we bear responsibility to improve performance or make payments to the customer may diminish our prospects for future business from that customer or damage our reputation in the marketplace.

We may assume responsibility under customer contracts for factors outside our control, including, in connection with some customer projects, the risk that fuel and component prices will increase.

We typically do not take responsibility under our contracts for a wide variety of factors outside our control. We have, however, in a limited number of contracts assumed some level of risk and responsibility for certain factors — sometimes only to the extent that variations exceed specified thresholds — and may also do so under certain contracts in the future, particularly in our contracts for renewable energy projects. For example, under a contract for the construction and operation of a cogeneration facility at the U.S. Department of Energy Savannah River Site in South Carolina, a subsidiary of ours is exposed to the risk that the price of the biomass that will be used to fuel the cogeneration facility may rise during the remainder of the 18-year performance period of the contract. Several provisions in that contract mitigate the price risk. In addition, although we typically structure our contracts so that our obligation to supply a customer with biogas, electricity or steam, for example, does not exceed the quantity produced by the production facility, in some circumstances we commit to supply a customer with specified minimum quantities based on our projections of the facility’s production capacity. In such circumstances, if we are unable to meet such commitments, we may be required to incur additional costs or face penalties. We may also not be able to pass on to our customers cost increases we may experience as a result of the various tariffs that have been imposed on a variety of components needed for our projects. Despite the steps we have taken to mitigate risks under these and other contracts, such steps may not be sufficient to avoid the need to incur increased costs to satisfy our commitments, and such costs could be material. Increased costs that we are unable to pass through to our customers could have a material adverse effect on our operating results.

Our business depends on experienced and skilled personnel and substantial specialty subcontractor resources, and if we lose key personnel or if we are unable to attract and integrate additional skilled personnel, it will be more difficult for us to manage our business and complete projects.

The success of our business and construction projects depends in large part on the skill of our personnel and on trade labor resources, including with certain specialty subcontractor skills. Competition for personnel, particularly those with expertise in the energy services and renewable energy industries, is high. In the event we are unable to attract, hire and retain the requisite personnel and subcontractors, we may experience delays in completing projects in accordance with project schedules and budgets. Further, any increase in demand for personnel and specialty subcontractors may result in higher costs, causing us to exceed the budget on a project. Either of these circumstances may have an adverse effect on our business, financial condition, and operating results, harm our reputation among and relationships with our customers and cause us to curtail our pursuit of new projects.

Our future success is particularly dependent on the vision, skills, experience, and effort of our senior management team, including our executive officers and our founder, principal stockholder, president, and chief executive officer, George P. Sakellaris. If we were to lose the services of any of our executive officers or key employees, our ability to effectively manage our operations and implement our strategy could be harmed and our business may suffer.

We have been and may continue to be impacted by macroeconomic conditions such as supply chain challenges, a shortfall of certain products needed for our business, and inflationary pressures.

Global trade challenges including supply chain delays continue to persist and have been exacerbated by global unrest and wars. These conditions may have long-lasting adverse impact on us and our industries. These conditions, combined with an increased demand for certain products needed for our business, such as lithium-ion battery cells, inverters, and solar panels has created a shortfall of and increased costs for these products and has caused challenges and delays in our projects and may impact the profitability of our projects. We cannot predict the duration of these global challenges or their impact on our business. If we experience unfavorable global market conditions, our business, prospects, financial condition, and operating results may be harmed. The 'America First' trade policy has introduced a variety of tariffs and may further strain trade relations, create inflationary pressures, and cause additional supply chain disruptions. These changes may affect our ability to source materials and products, potentially leading to increased costs and operational challenges.

For example, we are dependent on the continued supply of lithium-ion battery cells for our energy storage products, and we will require substantially more cells to grow our battery storage business based on our current plans. Currently, we rely on limited number of suppliers for these cells. Any disruption in the supply of battery cells from our suppliers could limit our growth for projects involving battery energy storage. In addition, the cost and mass production of battery cells, depends in part upon the prices and availability of raw materials such as lithium, nickel, cobalt and/or other metals. The prices for these materials fluctuate and their available supply may be unstable, depending on market conditions, regulation and global demand for these materials. As a result of increased global production of energy storage products and electric vehicles, suppliers of these raw materials may be unable to meet our volume or timing needs. Any reduced availability of these materials may adversely impact our access to battery cells and our growth, and any increases in their prices may reduce our profitability if we cannot recoup such costs in our project pricing. Moreover, our inability to meet demand may harm our brand, growth, prospects and operating results.

Extreme weather events and other natural disasters, particularly those exacerbated by climate change, could materially affect our ability to complete our projects and develop our assets.

Extreme weather-related incidents and other natural disasters, including wildfires, mudslides, hurricanes, and other storms, can interfere with our ability to complete our projects and develop our assets. Furthermore, such events can impact the operation of assets we own or have provided energy and other performance commitments for. These risks are increasing, as climate change has exacerbated some of the conditions that lead to these extreme weather events and natural disasters. Such an event can result in lost revenue and increased expense thereby having a negative effect on our financial condition and business operations.

A failure of our information technology (“IT”) and data security infrastructure or cyber or other security incidents, vulnerabilities or other deficiencies, could adversely impact our business, reputation or results of operation or could cause us to default under our contractual obligations.

We rely upon the capacity, reliability, and security of our IT and data security infrastructure and our ability to expand and continually update this infrastructure in response to the changing needs of our business. Our existing systems or any new ones we implement may not perform as expected face the challenge of supporting our older systems and implementing necessary upgrades. If we experience a problem with the functioning or a security breach of our IT systems, the resulting disruptions could have an adverse effect on our business. We receive and store personal information in connection with our human resources operations and other aspects of our business. Despite our implementation of security measures, our IT systems are vulnerable to damages from computer viruses, natural disasters, unauthorized access, cyber-attacks, and other similar disruptions, and we have experienced such incidents in the past. Any system failure, accident, or security breach could result in disruptions to our operations. A material network breach in the security of our IT systems could include the theft of our intellectual property, trade secrets, customer information, human resources information, or other confidential matter.

We have been subject to and may in the future experience cybersecurity threats, including advanced and persistent cyberattacks, phishing and social engineering schemes, particularly on internet applications. This risk may increase as we implement artificial intelligence features into our operations. Such cyber and other security threats could compromise the assets we own and operate or data in our systems. In addition, cybersecurity incidents at our vendors, customers and partners may have similar negative impact on our business operations. For example, we engage third-party vendors who receive and store personal and sensitive information in connection with our operations, including our human resources functions such as background checks. We do not have control over or access to the IT infrastructure of these vendors. Our vendors have and may in the future experience network breaches and other cyberattacks. In such instances, we may not be able to fully investigate the incidents and may not be able to implement measures to defend such attacks. Furthermore, third-party vendors may not notify us of such incidents timely or at all, making it more difficult for us to identify and mitigate cybersecurity risks. Although we devote resources to our cybersecurity programs and have implemented security measures to protect our assets, systems and data, there can be no assurance that our efforts will prevent these threats. Because the techniques used to obtain unauthorized access, to disable or degrade systems, and to generate cyberattacks change frequently, have become increasingly more sophisticated, and may be difficult to detect for periods of time, we may not anticipate these acts or respond adequately or timely.

As these threats continue to evolve and increase, we may be required to devote significant additional resources in order to protect against these attacks and to identify and remediate any security vulnerabilities. To the extent that any attacks, disruptions or security breach results in a loss or damage to our data, or an inappropriate disclosure of information, or adversely impact the assets we own or operate, it could cause significant damage to our reputation, affect our relationships with our customers and employees, lead to claims against us and ultimately harm our business and operating results.

If we cannot obtain surety bonds and letters of credit, our ability to operate may be restricted.

Federal and state laws require us to secure the performance of certain long-term obligations through surety bonds and letters of credit. In addition, we are occasionally required to provide bid bonds or performance bonds to secure our performance under energy efficiency contracts. In the future, we may have difficulty procuring or maintaining surety bonds or letters of credit, and obtaining them may become more expensive, require us to post cash collateral or otherwise involve unfavorable terms. Because we are sometimes required to have performance bonds or letters of credit in place before projects can commence or continue, our failure to obtain or maintain those bonds and letters of credit would adversely affect our ability to begin and complete projects, and thus could have a material adverse effect on our business, financial condition and operating results.

We operate in a highly competitive industry, and our current or future competitors may be able to compete more effectively than we do, which could have a material adverse effect on our business, revenues, growth rates, and market share.

Our industry is highly competitive, with many companies of varying size and business models, many of which have their own proprietary technologies, competing for the same business as we do. Many of our competitors have longer operating histories and greater resources than we do and could focus their substantial financial resources to develop a competitive advantage, others may be smaller and able to adapt to the constantly changing demand of the market more quickly. The passage of the IRA and the opportunities it brings could intensify competition in our industry. Our competitors may also offer energy solutions at prices below cost, devote significant sales forces to competing with us or attempt to recruit our key personnel by increasing compensation, any of which could improve their competitive positions. Any of these competitive factors could make it more difficult for us to attract and retain customers, cause us to lower our prices in order to compete, and reduce our market share and revenues, any of which could have a material adverse effect on our financial condition and operating results. We can provide no assurance that we will continue to effectively compete against our current competitors or additional companies that may enter our markets. In addition, we may also face competition based on technological developments that reduce demand for electricity, increase power supplies through existing infrastructure or otherwise compete with our products and services. We also encounter competition in the form of potential customers electing to develop solutions or perform services internally rather than engaging an outside provider such as us.

Our small-scale renewable energy plants may not generate expected levels of output.

The small-scale renewable energy plants that we construct and own are subject to various operating risks that may cause them to generate less than expected amounts of processed biogas, electricity, or thermal energy. These risks include a failure or degradation of our, our customers’ or utilities’ equipment; an inability to find suitable replacement equipment or parts; less than expected supply of the plant’s source of renewable energy, downtime to our plants such as biogas or biomass; or a faster than expected diminishment of such supply. For example, in previous years, we had to undertake some unscheduled maintenance at some of our RNG plants impacting the energy output from such plants. Any extended interruption in the plant’s operation, or failure of the plant for any reason to generate the expected amount of output, could have a material adverse effect on our business and operating results. In addition, we have in the past and, could in the future, incur material asset impairment charges if any of our renewable energy plants incur operational issues that indicate that our expected future cash flows from the plant are less than its carrying value. Any such impairment charge could have a material adverse effect on our operating results in the period in which the charge is recorded.

We have not entered into long-term offtake agreements for a portion of the output from our small-scale renewable energy plants and a portion of the related renewable identification numbers (“RINs”) are not subject to long term contracts.

We have not entered into long-term offtake agreements for a portion of the output from our small-scale renewable energy plants, particularly RNG and non-RNG plants, and we may sell portions of the processed RNG, medium-BTU gas or electricity produced by the facility at wholesale prices, which are exposed to market fluctuations and risks. Similarly, we have not entered into long-term agreements with respect to the RINs for which the production and sale of such biofuel may qualify. The failure to sell such processed RNG, medium-BTU gas, electricity, or the related RINs at a favorable price, or at all could have a material adverse effect on our business and operating results.

We may not be able to replace expiring offtake agreements with contracts on similar terms. If we are unable to replace an expired offtake agreement with an acceptable new contract, we may be required to remove the small-scale renewable energy plant from the site or, alternatively, we may sell the assets to the customer.

We may not be able to replace an expiring offtake agreement with a contract on equivalent terms and conditions, including at prices that permit operation of the related facility on a profitable basis. If we are unable to replace an expiring offtake agreement with an acceptable new revenue contract, the affected site may temporarily or permanently cease operations, or we may be required to sell the power produced by the facility at wholesale prices which are exposed to market fluctuations and risks. In the case of a solar photovoltaic installation that ceases operations, the offtake agreement terms generally require that we remove the assets, including fixing or reimbursing the site owner for any damages caused by the assets or the removal of such assets. Alternatively, we may agree to sell the assets to the site owner, but the terms and conditions, including price, that we would receive in any sale, and the sale price may not be sufficient to replace the revenue previously generated by the small-scale renewable energy plant.

Operation of energy assets involves significant risks and hazards customary to the energy industry and may be further impacted by the effects of climate change. We may not have adequate insurance to cover these risks and hazards, or other risks beyond our control.

Hazards such as fire, explosion, structural collapse and machinery failure are inherent risks in our operations. These and other hazards can cause significant personal injury or loss of life, severe damage to and destruction of property, plant and equipment and contamination of, or damage to, the environment. The occurrence of any one of these events may result in curtailment of our operations or liability to third parties for damages, environmental cleanup costs, personal injury, property damage and fines and/or penalties, any of which could be substantial. Strategic targets, such as energy-related facilities, may also be at greater risk of hostile cyber intrusions or other security attacks, including those targeting information systems as well as electronic control systems. Such events could severely disrupt business operations and result in loss of service to customers, as well as create significant expense to repair security breaches or system damage.

Furthermore, certain of our facilities, projects and suppliers are located in or operate in locations that are susceptible to natural disasters. The frequency of weather-related natural disasters may be increasing due to climate change. The occurrence of a natural disaster, such as tornados, earthquakes, droughts, floods, wildfires or localized extended outages of critical utilities or transportation systems, or any critical resource shortages, affecting us could cause a significant interruption in our business or damage or destroy our facilities. While we maintain insurance to protect against these and other risks, some of these events may be excluded from insurance coverage or our coverage may not be sufficient against all hazards or liabilities to which we may be subject. Insurance may also not continue to be available at all or at rates or on terms similar to those presently available. Any losses not covered by insurance could have a material adverse effect on our business, financial condition, results of operations and cash flows.

We plan to expand our business in part through future acquisitions and joint ventures, but we may not be able to identify or complete suitable acquisitions.

Historically, acquisitions have been a significant part of our growth strategy. We plan to continue to use acquisitions of companies or assets and co-investments with third parties using joint ventures to expand our project skill-sets and capabilities, expand our geographic markets, add experienced management, increase our product and service offerings and add to our energy producing asset portfolio. However, we may be unable to implement this growth strategy if we cannot identify suitable acquisition or joint venture candidates or partners, reach agreement with targets on acceptable terms or arrange required financing for acquisitions or joint ventures on acceptable terms. In addition, the time and effort involved in identifying acquisition or joint venture candidates and consummate transactions may divert the attention and efforts of members of our management from the operations of our company.

We may be required to write-off or impair capitalized costs or intangible assets in the future, or we may incur restructuring costs or other charges, each of which could harm our earnings.

In accordance with generally accepted accounting principles in the United States, we capitalize certain expenditures and advances relating to our acquisitions, pending acquisitions, project development costs, interest costs related to project financing and certain energy assets. In addition, we have considerable unamortized assets. We have in the past incurred charges, and may from time to time in future periods be required to incur a charge against earnings in an amount equal to any unamortized capitalized expenditures and advances, net of any portion thereof that we estimate will be recoverable, through sale or otherwise, relating to: (i) any operation or other asset that is being sold, permanently shut down, impaired or has not generated or is not expected to generate sufficient cash flow; (ii) any pending acquisition that is not consummated; (iii) any project that is not expected to be successfully completed; and (iv) any goodwill or other intangible assets that are determined to be impaired.

In response to such charges and costs and other market factors, we may be required to implement restructuring plans in an effort to reduce the size and cost of our operations and to better match our resources with our market opportunities. As a result of such actions, we would expect to incur restructuring expenses and accounting charges which may be material. Several factors could cause a restructuring to adversely affect our business, financial condition, and results of operations. These include potential disruption to our operations, the development of our small-scale renewable energy projects and other aspects of our business. Employee morale and productivity could also suffer and result in unintended employee attrition. Any restructuring would require substantial management time and attention and may divert management from other important work. Moreover, we could encounter delays in executing any restructuring plans, which could cause further disruption and additional unanticipated expense. See also Note 2, “Summary of Significant Accounting Policies” and Note 5, “Goodwill and Intangible Assets, Net”, to our consolidated financial statements appearing in Item 8 of this Report.

Any future acquisitions that we may make could disrupt our business, cause dilution to our stockholders and harm our business, financial condition or operating results, and our joint ventures could expose us to additional risks and liabilities.

If we are successful in consummating acquisitions, those acquisitions could subject us to a number of risks, including:

  • the purchase price we pay could significantly deplete our cash reserves or result in dilution to our existing stockholders,
  • we may find that the acquired company or assets do not improve our customer offerings or market position as planned,
  • we may have difficulty integrating the operations and personnel of the acquired company,
  • key personnel and customers of the acquired company may terminate their relationships with the acquired company as a result of the acquisition,
  • we may experience additional financial and accounting challenges and complexities in areas such as tax planning and financial reporting,
  • we may incur additional costs and expenses related to complying with additional laws, rules or regulations in new jurisdictions,
  • we may assume or be held liable for risks and liabilities (including for environmental-related costs) as a result of our acquisitions, some of which we may not discover during our due diligence or adequately adjust for in our acquisition arrangements,
  • our ongoing business and management’s attention may be disrupted or diverted by transition or integration issues and the complexity of managing geographically or culturally diverse enterprises,
  • we may incur one-time write-offs or restructuring charges in connection with the acquisition,
  • we may acquire goodwill and other intangible assets that are subject to amortization or impairment tests, which could result in future charges to earnings, and
  • we may not be able to realize the cost savings or other financial benefits we anticipated.

We own, and in the future may acquire or establish, operating or development projects through joint ventures. Joint ventures inherently involve a lesser degree of control over business operations. Our joint venture partners may have economic and business interests that are inconsistent with ours, we may lack sole decision-making authority, and disputes between us and our joint venture partners could subject us to delays, litigation and increased expenses. Some of our joint venture projects may be capital intensive and if our joint venture partner does not contribute capital they are required to, this could result in delays in our development projects and increased our capital expenditures. These factors could have a material adverse effect on our business, financial condition, and operating results.

International expansion is one of our growth strategies, and international operations will expose us to additional risks that we do not face in the United States, which could have an adverse effect on our operating results.

We generate a portion of our revenues from operations outside of the United States, mainly in Canada and Europe. International expansion is one of our growth strategies, and we expect our revenues and operations outside of the United States will expand in the future. These operations will be subject to a variety of risks that we do not face in the United States, and that we may face only to a limited degree in Canada and Europe, including:

  • building and managing a highly experienced foreign workforce and overseeing and ensuring the performance of foreign subcontractors,
  • increased travel, infrastructure and legal and compliance costs associated with multiple international locations,
  • additional withholding taxes or other taxes on our foreign income, and tariffs or other restrictions on foreign trade or investment,
  • imposition of, or unexpected adverse changes in, foreign laws or regulatory requirements, many of which differ from those in the United States,
  • increased exposure to foreign currency exchange rate risk,
  • longer payment cycles for sales in some foreign countries and potential difficulties in enforcing contracts and collecting accounts receivable,
  • difficulties in repatriating overseas earnings,
  • international and regional economic, political and labor conditions in the countries in which we operate; and
  • political unrest, war, incidents of terrorism, pandemics, or responses to such events.

Our overall success in international markets will depend, in part, on our ability to succeed in differing legal, regulatory, economic, social, and political conditions. We may not be successful in developing and implementing policies and strategies that will be effective in managing these risks in each country where we do business. Our failure to manage these risks successfully could harm our international operations, reduce our international sales, and increase our costs, thus adversely affecting our business, financial condition and operating results. Some of our third-party business partners have international operations and are also subject to these risks and if our third-party business partners are unable to appropriately manage these risks, our business may be harmed.

Risks related to Regulations or Governmental Actions

Our business depends in part on federal, state, provincial and local government support for energy efficiency and renewable energy, and a decline in such support or the imposition of additional taxes, tariffs, duties, or other assessments on renewable energy or the equipment necessary to generate or deliver it, could harm our business.

We depend in part on legislation and government policies that support energy efficiency and renewable energy projects that enhance the economic feasibility of our energy efficiency services and small-scale renewable energy projects. This support includes legislation and regulations that authorize and regulate the manner in which certain governmental entities do business with us; encourage or subsidize governmental procurement of our services; encourage or in some cases require other customers to procure power from renewable or low-emission sources, to reduce their electricity use or otherwise to procure our services; and provide us with tax and other incentives that reduce our costs or increase our revenues. In addition, the U.S. government historically has not taken action to materially burden the international supply chain, which has been important to the development of renewable energy facilities at acceptable prices. Any reductions or modifications to, or the elimination of, governmental incentives or policies that support renewable energy or the imposition of additional taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate or deliver it, could result in, among other things, the lack of a satisfactory market for the development and/or financing of renewable energy projects, or adversely impact our ability to complete projects for existing customers and obtain project commitments from new customers. Recent executive orders directing the review and potential termination of funds appropriated through the IRA and the IIJA may result in delays or cancellations of our projects and existing contracts, adversely affecting our financial condition and results of operations.

There is limited Battery Energy Storage System (“BESS”) supply capacity outside of China and a significant portion of electrical equipment used in our offerings are imported from Canada and Mexico and we also use a significant amount of imported steel in our products. Import duties or other import restrictions, including the Uyghur Forced Labor Protection Act, restrict the global supply of, and raise prices for, supplies needed for our business. Such duties or restrictions has increased and may further increase the overall cost of our product offerings and reduce our ability to offer competitive pricing in certain markets or cause our suppliers to cancel their supply contracts with us. With the 'America First' trade policy tariffs have been imposed on components needed for our offerings, and additional tariffs may come into effect. These tariffs, restrictions may cause strained trade relations and affect our ability to source materials and products and result in procurement schedule delays, increased costs and operational challenges and decreased demand for our offerings. Failure to comply with trade restrictions and other governmental restrictions could subject us to fines and penalties. This could have a negative impact on our business and results of operation.

Due to the uncertainty in the regulatory and legislative processes, we cannot determine the effect any such legislation and regulation may have on our products and operations.

A substantial portion of our earnings are derived from the sale of renewable energy certificates (“RECs”) and other environmental attributes, and our failure to be able to sell such attributes could materially adversely affect our business, financial condition and results of operation.

A substantial portion of our earnings are attributable to our sale of renewable energy certificates (“RECs”) and other environmental attributes generated by our energy assets. These attributes are used as compliance purposes for state-specific or U.S. federal policy. We own and operate solar PV installations which derive a significant portion of their revenues from the sale of solar renewable energy certificates (“SRECs”), which are produced as a result of generating electricity. The value of these SRECs is determined by the supply and demand of SRECs in the states in which the solar PV installations are installed. Supply is driven by the number of installations and demand is driven by state-specific laws relating to renewable portfolio standards.

We also own and operate renewable natural gas plants that may deliver biofuels into to the nation’s natural gas pipeline grid. Such biofuel may qualify for certain environmental attribute mechanisms, such as RINs which are used for compliance purposes under the Renewable Fuel Standard (“RFS”) program. The RFS is a U.S. federal policy that requires transportation fuel to contain a minimum volume of renewable fuel. The U.S. Environmental Protection Agency (“EPA”) administers the RFS program and may periodically undertake regulatory action involving the RFS, including annual volume standards for renewable fuel. Some of our biofuel may also qualify for various state incentives, such as the Low Carbon Fuel Standard (“LCFS”), the pricing or availability of which may fluctuate.

We sometimes seek to sell forward a portion of our SRECs and other environmental attributes under contracts to fix the revenues from those attributes for financing purposes or hedge against future declines in prices of such environmental attributes. If our renewable energy facilities do not generate the amount of renewable energy attributes sold under such forward contracts or if for any reason the renewable energy we generate does not produce SRECs or other environmental attributes for a particular state, we may be required to make up the shortfall of SRECs or other environmental attributes under such forward contracts through purchases on the open market or make payments of liquidated damages. RECs are created through state law requirements for utilities to purchase a portion of their energy from renewable energy sources and changes in state laws or regulation relating to RECs may adversely affect the availability of RECs or other environmental attributes and the future prices for RECs or other environmental attributes, which could have an adverse effect on our business, financial condition, and results of operations. The current regulatory regime also creates uncertainty related to the future market for such environmental attributes and this could have an adverse effect on the earnings we generate from such attributes.

We may have exposure to additional tax liabilities and our effective tax rate may increase or fluctuate, which could increase our income tax expense and reduce our net income. We may not be able to utilize the full value of tax credits and incentives available under the IRA or may become subject to penalties if we fail to meet requirements for these credits and incentives. This may have an adverse effect on our business and operating results.

Our provision for income taxes is subject to volatility and could be adversely affected by changes in tax laws or regulations, particularly changes in tax incentives in support of energy efficiency, clean electricity and biofuel production. The IRA extended and expanded clean energy tax credits such as the Investment Tax Credit (“ITC”), the Production Tax Credit (“PTC”), and created other financial incentives designed to promote the development of certain domestic clean energy projects. In order to receive the full value of such credits and incentives, our projects must satisfy a number of requirements including prevailing wage and apprenticeship requirements. If we fail to comply with these requirements, the value of the credits may be limited, and we may become subject to financial penalties. Uncertainty remains under the IRA on which types of projects are eligible for the tax credits and incentives and how projects can demonstrate compliance with various IRA requirements. As a result, we may not receive full value of the tax credits and incentives, which could increase our income tax expense, reduce our net income and adversely impact the profitability of our projects or our ability to finance our projects. In addition, the timing of when assets are placed in service has in the past and could in the future impact our tax rate. If we experience unexpected delays in this timing, we may not be able to take advantage of the ITC as expected. The U.S. Congress may look to alter or repeal various energy tax incentives included in the IRA, which could potentially impact projects in development or future project economics. Similarly, recent presidential executive orders directing the review and potential termination of funds appropriated through the IRA and IIJA are also creating uncertainty of whether these financial incentives could be reduced or repealed in the future. If we are not able to utilize the ITC as expected, this could have an adverse effect of our financial results.

Our tax rate has historically been significantly impacted by the IRC Section 179D deduction. This deduction is related to energy efficient improvements we provide under government contracts. The Consolidated Appropriations Act, 2021 made permanent the Section 179D Energy Efficient Commercial Building Deduction. That Act, along with the IRA, also made changes to the way the deduction is calculated. If those changes or clarifying guidance issued by the IRS result in lower levels of energy efficiency improvements, it could impact the deduction available and the tax rate.

In addition, like other companies, we have and may in the future be subject to examination of our income tax returns by the U.S. Internal Revenue Service and other tax authorities; our U.S. federal tax returns for 2021 through 2024 are subject to audit by federal, state, and foreign tax authorities. Though we regularly assess the likelihood of adverse outcomes from such examinations and the adequacy of our provision for income taxes and tax reserves, there can be no assurance that such provision is sufficient and that a determination by a tax authority will not have an adverse effect on our net income.

Furthermore, the Organization for Economic Cooperation and Development (OECD) Inclusive Framework of 140 jurisdictions have joined a two-pillar plan to reform international taxation rules. The first pillar is focused on the allocation of taxing rights between countries for in-scope multinational enterprises that sell goods and services into countries with little or no local physical presence and is intended to apply to multinational enterprises with global turnover above 20 billion euros. The second pillar is focused on developing a global minimum tax rate of at least 15 percent applicable to in-scope multinational enterprises and is intended to apply to multinational enterprises with annual consolidated group revenue in excess of 750 million euro. While substantial work remains to be completed by the OECD and national governments on the implementation of these proposals, future tax reform resulting from these developments may result in changes to long-standing tax principles, which could adversely affect our effective tax rate or result in higher cash tax liabilities.

Changes in the laws and regulations governing the public procurement of ESPCs could have a material impact on our business.

We derive a significant amount of our revenue from ESPCs with our government customers. While federal, state and local government rules governing such contracts vary, such rules may, for example, permit the funding of such projects through long-term financing arrangements; permit long-term payback periods from the savings realized through such contracts; allow units of government to exclude debt related to such projects from the calculation of their statutory debt limitation; allow for award of contracts on a “best value” instead of “lowest cost” basis; and allow for the use of sole source providers. To the extent these rules become more restrictive in the future, our business could be harmed.

We need governmental approvals and permits, and we typically must meet specified qualifications, in order to undertake our energy efficiency projects and construct, own and operate our small-scale renewable energy projects, and any failure to do so would harm our business.

The design, construction, and operation of our energy efficiency and small-scale renewable energy projects require various governmental approvals and permits and may be subject to the imposition of related conditions that vary by jurisdiction. In some cases, these approvals and permits require periodic renewal. We cannot predict whether all permits required for a given project will be granted or whether the conditions associated with the permits will be achievable. The denial of a permit essential to a project or the imposition of impractical conditions would impair our ability to develop the project. In addition, we cannot predict whether the permits will attract significant opposition or whether the permitting process will be lengthened due to complexities and appeals. We have over the past few years experienced longer lead times in the permitting process for projects and such delays have and may further impair or delay our ability to develop projects. Delays could also increase the cost so substantially that the projects are no longer attractive to us. If we were to commence construction in anticipation of obtaining the final, non-appealable permits needed for a project, we would be subject to the risk of being unable to complete the project if all the permits were not obtained. If this were to occur, we would likely lose a significant portion of our investment in the project and could incur a loss as a result. Further, the continued operations of our projects require continuous compliance with permit conditions. This compliance may require capital commitments or result in reduced operations. Any failure to procure, maintain and comply with necessary permits would adversely affect ongoing development, construction and continuing operation of our projects.

In addition, the projects we perform for governmental agencies are governed by particular qualification and contracting regimes. Certain states require qualification with an appropriate state agency as a precondition to performing work or appearing as a qualified energy service provider for state, county, and local agencies within the state. For example, the Commonwealth of Massachusetts and the states of Colorado and Washington pre-qualify energy service providers and provide contract documents that serve as the starting point for negotiations with potential governmental clients. Most of the work that we perform for the federal government is performed under IDIQ agreements between a government agency and us or one of our subsidiaries. These IDIQ agreements allow us to contract with the relevant agencies to implement energy projects, but no work may be performed unless we and the agency agree on a task order or delivery order governing the provision of a specific project. The government agencies enter into contracts for specific projects on a competitive basis. We and our subsidiaries are currently party to an IDIQ agreement with the U.S. Department of Energy expiring in 2028. We are also party to similar agreements with other federal agencies, including the U.S. Army Corps of Engineers and the U.S. General Services Administration. If we are unable to maintain or renew our IDIQ qualification or similar federal or state qualification regimes, our business could be materially harmed.

Many of our small-scale renewable energy projects are, and other future projects may be, subject to or affected by U.S. federal energy regulation or other regulations that govern the operation, ownership, and sale of the facility, or the sale of electricity from the facility.

PUHCA and the FPA regulate public utility holding companies and their subsidiaries and place constraints on the conduct of their business. The FPA regulates wholesale sales of electricity and the transmission of electricity in interstate commerce by public utilities. Under PURPA, most of our current small-scale renewable energy projects are small power “qualifying facilities” (facilities meeting statutory size, fuel, and filing requirements) that are exempt from regulations under PUHCA, most provisions of the FPA and state rate and financial regulation. Some of our renewable energy projects which are operating as exempt wholesale generators or operating under a special exemption from PUHCA are currently subject to rate regulation for wholesale power sales by the Federal Energy Regulatory Commission (“FERC”) under the FPA and must comply with certain FERC reporting requirements. Also, we may acquire interests in or develop additional generating projects that are not qualifying facilities. Non-qualifying facility projects would be fully subject to FERC corporate and rate regulation and would be required to obtain FERC acceptance of their rate schedules for wholesale sales of energy, capacity, and ancillary services, which requires substantial disclosures to and discretionary approvals from FERC. FERC may revoke or revise an entity’s authorization to make wholesale sales at negotiated, or market-based, rates if FERC determines that we can exercise market power in transmission or generation, create barriers to entry or engage in abusive affiliate transactions or market manipulation. In addition, many public utilities (including any non-qualifying facility generator in which we may invest) are subject to FERC reporting requirements that impose administrative burdens and that, if violated, can expose the company to civil penalties or other risks.

All of our wholesale electric power sales are subject to certain market behavior rules. These rules change from time to time, by virtue of FERC rulemaking proceedings and FERC-ordered amendments to utilities’ or power pools’ FERC tariffs. If we are deemed to have violated these rules, we will be subject to potential disgorgement of profits associated with the violation and/or suspension or revocation of our market-based rate authority, as well as potential criminal and civil penalties. If we were to lose market-based rate authority for any non-qualifying facility project we may acquire or develop in the future, we would be required to obtain FERC’s acceptance of a cost-based rate schedule and could become subject to, among other things, the burdensome accounting, record keeping and reporting requirements that are imposed on public utilities with cost-based rate schedules. This could have an adverse effect on the rates we charge for power from our projects and our cost of regulatory compliance. Wholesale electric power sales are subject to increasing regulation. The terms and conditions for power sales, and the right to enter and remain in the wholesale electric sector, are subject to FERC oversight. Due to major regulatory restructuring initiatives at the federal and state levels, the U.S. electric industry has undergone substantial changes over the past decade. We cannot predict the future design of wholesale power markets, or the ultimate effect ongoing regulatory changes will have on our business. Other proposals to further regulate the sector may be made and legislative or other attention to the electric power market restructuring process may delay or reverse the movement towards competitive markets.

If we become subject to additional regulation under PUHCA, FPA, or other regulatory frameworks, if existing regulatory requirements become more onerous, or if other material changes to the regulation of the electric power markets take place, our business, financial condition, and operating results could be adversely affected.

Changes in utility regulation and tariffs could adversely affect our business.

Our business is affected by regulations and tariffs that govern the activities and rates of utilities. For example, utility companies are commonly allowed by regulatory authorities to charge fees to some business customers for disconnecting from the electric grid or for having the capacity to use power from the electric grid for back-up purposes. These fees could increase the cost to our customers of taking advantage of our services and make them less desirable, thereby harming our business, financial condition, and operating results. Many of our current generating projects are operated as qualifying facilities. FERC regulations under the FPA confer upon these facilities’ key rights to interconnection with local utilities and can entitle qualifying facilities to enter into power purchase agreements with local utilities, from which the qualifying facilities benefit. Changes to these federal laws and regulations could increase our regulatory burdens and costs and could reduce our revenues. State regulatory agencies could award renewable energy certificates or credits that our electric generation facilities produce to our power purchasers, thereby reducing the power sales revenues we otherwise would earn. In addition, modifications to the pricing policies of utilities could require renewable energy systems to charge lower prices in order to compete with the price of electricity from the electric grid and may reduce the economic attractiveness of certain energy efficiency measures.

Some of the demand-reduction services we provide for utilities and institutional clients are subject to regulatory tariffs imposed under federal and state utility laws. In addition, the operation of, and electrical interconnection for, our renewable energy projects are subject to federal, state, or provincial interconnection and federal reliability standards that are also set forth in utility tariffs. These tariffs specify rules, business practices, and economic terms to which we are subject. The tariffs are drafted by the utilities and approved by the utilities’ state and federal regulatory commissions. These tariffs change frequently, and it is possible that future changes will increase our administrative burden or adversely affect the terms and conditions under which we render service to our customers.

Compliance with environmental laws could adversely affect our operating results.

Costs of compliance with federal, state, provincial, local and other foreign existing and future environmental regulations could adversely affect our cash flow and profitability. We are required to comply with numerous environmental laws and regulations and to obtain numerous governmental permits in connection with energy efficiency and renewable energy projects. In addition, we may become subject to additional legislation and regulation regarding climate change, and we may incur significant additional costs to comply with existing and new requirements. If we fail to comply with these requirements, we could be subject to civil or criminal liability, damages, and fines. Existing environmental regulations could be revised or reinterpreted, and new laws and regulations could be adopted or become applicable to us or our projects, and future changes in environmental laws and regulations, including those intended to combat climate change, could occur. These factors may materially increase the amount we must invest to bring our projects into compliance and impose additional expense on our operations. In addition, private lawsuits or enforcement actions by federal, state, provincial, and/or foreign regulatory agencies may materially increase our costs. Certain environmental laws make us potentially liable on a joint and several basis for the remediation of contamination at or emanating from properties or facilities we currently or formerly owned or operated or properties to which we arranged for the disposal of hazardous substances. Such liability is not limited to the cleanup of contamination we actually caused. Although we seek to obtain indemnities against liabilities relating to historical contamination at the facilities we own or operate, we cannot provide any assurance that we will not incur liability relating to the remediation of contamination, including contamination we did not cause. We may not be able to obtain or maintain, from time to time, all required environmental regulatory approvals. A delay in obtaining any required environmental regulatory approvals or failure to obtain and comply with them could adversely affect our business and operating results.

Our activities and operations are subject to numerous health and safety laws and regulations, and if we violate such regulations, we could face penalties and fines.

We are subject to numerous health and safety laws and regulations in each of the jurisdictions in which we operate. These laws and regulations require us to obtain and maintain permits and approvals and implement health and safety programs and procedures to control risks associated with our projects. Compliance with those laws and regulations can require us to incur substantial costs. Moreover, if our compliance programs are not successful, we could be subject to penalties or to revocation of our permits, which may require us to curtail or cease operations of the affected projects. Violations of laws, regulations and permit requirements may also result in criminal sanctions or injunctions. Health and safety laws, regulations and permit requirements may change or become more stringent. Any such changes could require us to incur materially higher costs than we currently have. Our costs of complying with current and future health and safety laws, regulations and permit requirements, and any liabilities, fines or other sanctions resulting from violations of them, could adversely affect our business, financial condition, and operating results.

We are subject to various privacy and consumer protection laws.

Our privacy policy is posted on our website, and any failure by us or our vendor or other business partners to comply with it or with federal, state, or international privacy, data protection or security laws or regulations could result in regulatory or litigation-related actions against us, legal liability, fines, damages and other costs. We may also incur substantial expenses and costs in connection with maintaining compliance with such laws. Globally, laws such as the General Data Protection Regulation (“GDPR”) in Europe and new and emerging state laws in the United States on privacy, data, and related technologies, have created new compliance obligations and significantly increases fines for noncompliance. Although we take steps to protect the security of our customers’ personal information, we may be required to expend significant resources to comply with data breach requirements if third parties improperly obtain and use the personal information of our customers or we otherwise experience a data loss with respect to customers’ personal information. A major breach of our network security and systems could have negative consequences for our business and future prospects, including possible fines, penalties and damages, reduced customer demand for our services, and harm to our reputation and brand.

Risks Related to our Indebtedness

Our senior credit facility, second lien term loan, energy asset financing term loans and construction loans contain financial and operating restrictions that may limit our business activities and our access to credit, and they may not be sufficient to fund our capital needs and growth.

Provisions in our senior credit facility and term loan and second lien term loan, project financing term loans and construction loans impose customary restrictions on our and certain of our subsidiaries’ business activities and uses of cash and other collateral. These agreements also contain other customary covenants, including covenants that require us to meet specified financial ratios and financial tests.

We have a $200 million revolving senior secured credit facility and $100 million term loan that mature December 28, 2028 (collectively, the “Senior Credit Facilities”) and a $100 million second lien term loan that matures June 2029. As of December 31, 2024, the balance of our Senior Credit Facilities was $148 million. These Senior Credit Facilities and second lien term loan may not be sufficient to meet our needs as our business grows, and we may be unable to extend or replace them on acceptable terms, or at all. The Senior Credit Facilities and second lien term loan are subject to quarter end ratio covenants, including a maximum ratio of total funded debt to EBITDA and a debt service coverage ratio (each as defined in the agreement and described in more detail in this Form 10-K) as well as certain other customary operational covenants. EBITDA for purposes of the facilities excludes the results of certain renewable energy projects that we own and which we finance in separate subsidiaries through project financing and the results of our joint ventures. In addition, our project financing term loans and construction loans require us to comply with a variety of financial and operational covenants. Our failure to comply with the covenants under our project financing debt, our Senior Credit Facilities or second lien term loan may result in the declaration of an event of default and cause us to be unable to borrow under our Senior Credit Facilities. In addition to preventing additional borrowings under the Senior Credit Facilities, an event of default, if not cured or waived, may result in the acceleration of the maturity of indebtedness outstanding under our Senior Credit Facilities, senior term loan or the applicable project financing term loan, which would require us to pay all amounts outstanding. If an event of default occurs under our project financing debt, our Senior Credit Facilities or second lien term loan, we may not be able to cure it within any applicable cure period, if at all. Certain of our debt agreements, including our Senior Credit Facilities and second lien term loan, also contain subjective acceleration clauses based on a lender deeming that a “material adverse change” in our business has occurred. If these clauses are implicated, and the lender declares that an event of default has occurred, the outstanding indebtedness would likely be immediately due and owing. If the maturity of our indebtedness is accelerated, we may not have sufficient funds available for repayment or we may not have the ability to borrow or obtain sufficient funds to replace the accelerated indebtedness on terms acceptable to us or at all.

If our subsidiaries default on their obligations under their debt instruments, we may need to make payments to lenders or to prevent foreclosure on the collateral securing the debt.

We typically set up subsidiaries to own and finance our renewable energy projects. These subsidiaries incur various types of debt which can be used to finance one or more projects. This debt is typically structured as non-recourse or limited recourse debt, which means it is repayable solely from the revenues from the projects financed by the debt and is secured by such projects’ physical assets, major contracts and cash accounts and a pledge of our equity interests in the subsidiaries involved in the projects. Although our subsidiary debt is typically non-recourse to Ameresco, if a subsidiary of ours defaults on such obligations, or if one project financed by a particular subsidiary’s indebtedness encounters difficulties or is terminated, then we may from time to time determine to provide financial support to the subsidiary in order to maintain rights to the project or otherwise avoid the adverse consequences of a default. In the event a subsidiary defaults on its indebtedness, its creditors may foreclose on the collateral securing the indebtedness, which may result in our losing our ownership interest in some or all of the subsidiary’s assets. Furthermore, our $300 million construction and development loan, which we use to finance a number of our early stage development and construction projects, requires us, in the case of default under the facility, a default under our Senior Credit Facilities or a change in control of Ameresco, to make required capital contributions to the borrower entity who then would be required to use the proceeds from the capital contributions to repay the construction and development loan. The loss of our ownership interest in a subsidiary or some or all of a subsidiary’s assets or the requirement to make capital contributions under our construction and development loan could have a material adverse effect on our business, financial condition and operating results.

Risks Related to Ownership of Our Class A Common Stock

The trading price of our Class A common stock is volatile.

The trading price of our Class A common stock is volatile and could be subject to wide fluctuations, some of which are beyond our control. During the year ended December 31, 2024, our Class A common stock has traded at a low of $17.55 and a high of $39.68. The stock market in general has experienced extreme price and volume fluctuations that have often been unrelated or disproportionate to the operating performance of publicly traded companies. If the stock market in general experiences a significant decline, the trading price of our Class A common stock could decline for reasons unrelated to our business, financial condition, or operating results. As a result of this volatility, you may not be able to sell your Class A common stock at or above the price you paid for it, and you may lose some or all of your investment. Additionally, although historically there has not been a large short position in our Class A common stock, securities of certain companies have recently experienced extreme and significant volatility as a result of a large aggregate short position driving up the stock price over a short period of time, which is known as a “short squeeze.” Furthermore, some companies that have had volatile market prices for their securities have had securities class actions filed against them. If a suit were filed against us, regardless of its merits or outcome, it would likely result in substantial costs and divert management’s attention and resources. This could have a material adverse effect on our business, operating results, and financial condition.

Holders of our Class A common stock are entitled to one vote per share, and holders of our Class B common stock are entitled to five votes per share. The lower voting power of our Class A common stock may negatively affect the attractiveness of our Class A common stock to investors and, as a result, its market value.

We have two classes of common stock: Class A common stock, which is listed on the NYSE, and which is entitled to one vote per share, and Class B common stock, which is not listed on any security exchange and is entitled to five votes per share. The difference in the voting power of our Class A and Class B common stock could diminish the market value of our Class A common stock because of the superior voting rights of our Class B common stock and the power those rights confer.

For the foreseeable future, Mr. Sakellaris or his affiliates will be able to control the selection of all members of our board of directors, as well as virtually every other matter that requires stockholder approval, which will severely limit the ability of other stockholders to influence corporate matters.

Except in certain limited circumstances required by applicable law, holders of Class A and Class B common stock vote together as a single class on all matters to be voted on by our stockholders. Mr. Sakellaris, our founder, principal stockholder, president, and chief executive officer, and certain of his family members own all of our Class B common stock, which, together with their Class A common stock, represents approximately 74.5% of the combined voting power of our outstanding Class A and Class B common stock. Under our restated certificate of incorporation, holders of shares of Class B common stock may generally transfer those shares to family members, including spouses and descendants or the spouses of such descendants, as well as to affiliated entities, without having the shares automatically convert into shares of Class A common stock. Therefore, Mr. Sakellaris, his affiliates, and his family members and descendants will, for the foreseeable future, be able to control the outcome of the voting on virtually all matters requiring stockholder approval, including the election of directors and significant corporate transactions such as an acquisition of our company, even if they come to own, in the aggregate, as little as 20% of the economic interest of the outstanding shares of our Class A and Class B common stock. Moreover, these persons may take actions in their own interests that you or our other stockholders do not view as beneficial.

Though we may repurchase shares of our Class A common stock pursuant to our share repurchase program, we are not

obligated to do so and if we do, we may purchase only a limited number of shares of Class A common stock.

In 2016, we announced a stock repurchase program under which the Company is authorized to repurchase, in the aggregate, up to

$17.6 million of our Class A common stock. We are not obligated to acquire any shares of our Class A common stock, and

holders of our Class A common stock should not rely on the share repurchase program to increase their liquidity. Our utilization of the share repurchase program depends upon a variety of factors, including the trading price of our Class A common stock, liquidity, securities laws restrictions, tax and other regulatory restrictions, alternative uses of capital, and market and economic conditions. Any stock repurchase would be through open market transactions or in privately negotiated transactions, in accordance with applicable securities laws and regulatory limitations. We may reduce or eliminate our share repurchase program in the future. The reduction or elimination of our share repurchase program, particularly if we do not repurchase the full number of shares authorized under the program, could adversely affect the market price of our common stock.

Cybersecurity

As filed, 5,074 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Information Technology and Cybersecurity Risk Management

As is the case for all large companies, we are regularly subject to cyberattacks and other cyber incidents and, therefore, cybersecurity occupies a pivotal role within our risk management process. We adhere to a risk-based, multi-layered “defense in depth” approach that is dedicated to the identification, protection, detection, response, and recovery from cyber threats and incidents. We understand that a single technology, process, or business control cannot wholly prevent or mitigate all potential risks. Therefore, we employ a multitude of technologies, processes, and controls, each functioning independently but collectively forming a cohesive strategy aimed at minimizing risk. This strategy is evaluated through various means, such as frequent research and industry security briefings among our information technology group, internal and external audits, independent program assessments, control attestation reports, penetration testing, and other exercises that gauge its effectiveness. Threats and incidents connected with third party service providers are considered and managed under this process as well.

We engage external parties, including consultants, independent privacy assessors, computer security firms and risk management and governance experts, to enhance our cybersecurity oversight. For example, we have engaged an outside consulting firm with expertise in the field to help us assess our systems, monitor risk and implement best practices and to support the internal audit of our cyber security programs and we regularly consult with industry groups on emerging industry trends. In addition, as part of our overall risk mitigation strategy, we also maintain cyber insurance coverage. Our cybersecurity policies, standards and procedures include cyber and data breach response plans, which are periodically assessed against the National Institute of Standards and Technology Cybersecurity Framework.

We do not believe that there are currently any risks from cybersecurity threats that are reasonably likely to materially affect us or our business strategy, results of operations or financial condition.

Cybersecurity Governance and Oversight

The Audit Committee of our Board of Directors provides direct oversight over cybersecurity risk. The Audit Committee receives and provides feedback on periodic updates from management regarding cybersecurity. Agendas for quarterly updates are developed and adjusted throughout the year to adapt to any emerging risks or key topics and include, a wide range of information, including the prevailing cybersecurity threat landscape, investments in infrastructure, trainings programs and opportunities for bolstering the security of our company's systems and the protection of our products and operations. The full Board of Directors receives regular reports from the Audit Committee and our management on our cyber security program and the emerging threat landscape.

Our Senior Vice President of Information Technology is responsible for leading our company-wide cybersecurity strategy, policy, standards and processes and together with our whole information technology team works across relevant units of Ameresco. Our Senior Vice President of Information Technology has more than thirty years of experience in cybersecurity and information technology and based on his long career with Ameresco he has a deep understanding of our information technology and business needs and the cyber security opportunities and risks we face.

In actioning our cyber security strategy, our management together with our Senior Vice President of Information Technology evaluate the materiality of any cybersecurity threats and incidents utilizing both qualitative and quantitative considerations. Our internal audit team also provides independent testing on aspects of the operations of our cybersecurity program and the supporting control framework.

Our cybersecurity program is designed to ensure the confidentiality, integrity, and availability of data and systems as well as to ensure timely identification of and response to any incidents. This design is geared toward supporting our business objectives and the needs of our valued customers, employees, and other stakeholders. We firmly believe that cybersecurity is a collective responsibility that extends to every employee, and we prioritize it as an ongoing objective. To increase our employees' awareness of cyber threats, we provide education and share best practices through a security awareness training program. This includes receiving regular exercises, cyber-event simulations, training programs and an annual attestation to our Technology Acceptable Use Policy.

See “A failure of our information technology (“IT”) and data security infrastructure or cyber or other security incidents, vulnerabilities or other deficiencies, could adversely impact our business, reputation or results of operation or could cause us to default under our contractual obligations.” in Item 1A, Risk Factors.

Properties

As filed, 864 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our corporate headquarters is located in Framingham, Massachusetts, where we occupy approximately 14,200 square feet under a lease expiring on October 31, 2029. We occupy regional offices in Phoenix, Arizona; Oak Brook, Illinois; Portland, Maine; Columbia, Maryland; Charlotte, North Carolina; Knoxville, Tennessee; Richmond Hill, Ontario; London, England; and Milan, Italy each less than 20,000 square feet, under lease agreements. In addition, we lease space, typically of lesser size, for 50 field offices throughout North America and Europe. We also own 207 small-scale renewable energy plants throughout North America and two in Ireland, which are located on sites we own or lease, or sites provided by customers. We expect to add new facilities and expand existing facilities as we continue to add employees and expand our business into new geographic areas.

As filed, 659 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In the ordinary conduct of our business, we are subject to periodic lawsuits, investigations, and claims. Although we cannot predict with certainty the ultimate resolution of such lawsuits, investigations, and claims against us, we do not believe that any currently pending or threatened legal proceedings to which we are a party will have a material adverse effect on our business, results of operations, or financial condition.

For additional information about certain proceedings, please refer to Note 15, “Commitments and Contingencies”, to our consolidated financial statements included in this Report, which is incorporated into this item by reference.

Management's discussion and analysis

As filed, 59,267 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

You should read the following discussion and analysis of our financial condition and results of operations together with our consolidated financial statements and the related notes and other financial information included in Item 8 of this Report. Some of the information contained in this discussion and analysis are set forth elsewhere in this Report, including information with respect to our plans and strategy for our business and related financing, and includes forward-looking statements that involve risks and uncertainties. You should review the “Risk Factors” included in Item 1A of this Report for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.

Overview

Ameresco is a leading energy solutions provider dedicated to helping customers navigate the energy transition. Our comprehensive portfolio includes implementing smart energy efficiency solutions, upgrading aging infrastructure, and developing, constructing, and operating distributed energy resources.

Drawing from decades of experience, Ameresco reduces energy use and delivers diversified generation solutions to Federal, state and local governments, utilities, educational and healthcare institutions, housing authorities, and commercial and industrial customers.

We provide solutions primarily throughout North America and Europe, and our revenues are derived principally from energy efficiency projects, which entail the design, engineering, and installation of equipment and other measures that incorporate a range of innovative technology and techniques to improve the efficiency and control the operation of a facility’s energy infrastructure; this can include designing and constructing a central plant or cogeneration system for a customer providing power, heat and/or cooling to a building, or other small-scale plant that produces electricity, gas, heat or cooling from renewable sources of energy. We also derive revenue from long-term O&M contracts, energy supply contracts for renewable energy operating assets that we own, integrated-PV, and consulting and enterprise energy management services.

In addition to organic growth, strategic acquisitions of complementary businesses and assets, and joint venture arrangements have been an important part of our growth enabling us to broaden our service offerings and expand our geographical reach.

Key Factors and Trends

Regulatory Environment and Federal Policies

Federal policies play an important role in our business and our business benefits from regulatory measures and various tax credits, such as the Investment Tax Credit (“ITC”) and the Production Tax Credit (“PTC”) and funds appropriated through the IRA and the IIJA. The scope of these tax credits and the availability of funding through the IRA and IIJA may evolve with the new U.S. administration. Recent presidential executive orders that directed a review and potential termination of funds appropriated through the IRA and the IIJA have resulted in some pauses and cancellations of our projects. We also anticipate that federal workforce reductions and other cost savings initiatives may cause additional delays, extend our sales cycles and impact new award activity. However, we continue to believe there is a long-term demand for our budget neutral, cost-saving solutions.

Supply Chain Disruptions and Other Global Factors

We continue to monitor the impact of global economic conditions on our operations, financial results, and liquidity, such as the impact of tariffs, supply chain challenges, the wars in Ukraine and the Middle East, evolving relations between the U.S. and China, and other geopolitical tensions. Import duties, tariffs and other import restrictions, including the Uyghur Forced Labor Protection Act, restrict the global supply of, and raise prices for, supplies needed for our business. In addition, tariffs and trade restrictions that have been introduced any may be introduced as part of the 'America First' trade policy may further increase the cost of components needed for our offerings and may strain trade relations, create inflationary pressures and cause additional supply chain disruptions. The impact to our future operations and results of operations as a result of these global trends remains uncertain and the challenges we face, including increases in costs for logistics and supply chains, intermittent supplier delays, and shortages of certain components needed for our business, such as electrical equipment, steel and aluminum as well as BESS equipment or components required for our projects and clean energy solutions may continue or become more pronounced.

During the year ended December 31, 2024, we were impacted by supply chain disruptions and varying levels of inflation, as a result macroeconomic conditions, causing delays in the timely delivery of material to customer sites and delays and disruptions in the completion of certain project, and increased shipping and transportation costs, as well as increased component and labor costs. This negatively impacted our results of operations during the year ended December 31, 2024. We expect to experience continued supply chain challenges beyond this year. We continue to monitor macroeconomic conditions to remain flexible and to optimize and evolve our business as appropriate to address the challenges presented from these conditions.

These tariffs, restrictions, and strained trade relations may affect our ability to source materials and products, potentially leading to increased costs and operational challenges and decreased demand for or offerings. We are closely monitoring the regulatory environment and actions of the current administrations that could impact our business.

Climate Change and Effects of Seasonality

The global emphasis on climate change and reducing carbon emissions has created opportunities for our industry. Sustainability has been at the forefront of our business since its inception, and we are committed to staying at the leading edge of innovation taking place in the energy sector. We believe the next decade will be marked by dramatic changes in the power infrastructure with resources shifting to more distributed assets, storage, and microgrids to increase overall reliability and resiliency. The sustainability efforts are impacted by regulations, and changes in the regulatory climate may impact the demand for our products and offerings. See “Our business depends in part on federal, state, provincial and local government support or the imposition of additional taxes, tariffs, duties, or other assessments on renewable energy or the equipment necessary to generate or deliver it, for energy efficiency and renewable energy, and a decline in such support could harm our business” and “Compliance with environmental laws could adversely affect our operating results” in Item 1A, Risk Factors.

Climate change also brings risks, as the impacts have caused us to experience more frequent and severe weather interferences, and this trend is expected to continue. We are subject to seasonal fluctuations and construction cycles, particularly in climates that experience colder weather during the winter months, such as the northern United States and Canada, and climates that experience extreme weather events, such as wildfires, storms or flooding, hurricanes, or at educational institutions, where large projects are typically carried out during summer months when their facilities are unoccupied. In addition, government customers, many of which have fiscal years that do not coincide with ours, typically follow annual procurement cycles and appropriate funds on a fiscal-year basis even though contract performance may take more than one year. Further, government contracting cycles can be affected by the timing of, and delays in, the legislative process related to government programs and incentives that help drive demand for energy efficiency and renewable energy projects. As a result, our revenues and operating income in the third and fourth quarter are typically higher, and our revenues and operating income in the first quarter are typically lower, than in other quarters of the year, however, this may become harder to predict with the potential effects of climate change. As a result of such fluctuations, we may occasionally experience declines in revenues or earnings as compared to the immediately preceding quarter, and comparisons of our operating results on a period-to-period basis may not be meaningful.

Our annual and quarterly financial results are also subject to significant fluctuations as a result of other factors, many of which are outside our control. See “Our business is affected by seasonal trends and construction cycles, and these trends and cycles could have an adverse effect on our operating results” and “Extreme weather events and other natural disasters, particularly those exacerbated by climate change, could materially affect our ability to complete our projects and develop our assets” in Item 1A, Risk Factors.

The Southern California Edison (“SCE”) Agreement

In October 2021, we entered into a contract with SCE to design and build three grid scale BESS at three sites near existing substation parcels throughout SCE’s service territory in California with an aggregate capacity of 537.5 MW (“the SCE Agreement”). The engineering, procurement and construction price is approximately $892.0 million, in the aggregate, including two years of O&M revenues, subject to customary potential adjustments for changes in the work. As previously disclosed, due to supply chain delays, weather and other events, we were unable to complete the projects by August 1, 2022 (the “Guaranteed Completion Date”). On August 30 2024, we reached an agreement with SCE on the substantial completion of two out of three battery energy storage system projects. We received approximately $110 million on September 5, 2024 as milestone payments, reflecting both an offset of liquidated damages which are still in dispute and $3 million that SCE withheld for additional work SCE required. Upon final acceptance of these two projects, we will invoice SCE for the remaining final acceptance milestone payments for these projects. The SCE Agreement also confirmed that the final resolution related to our obligation to pay the liquidated damages withheld and the applicability and scope of any force majeure relief as well as any cost recovery we may be entitled to remain subject to dispute. We are continuing discussions with SCE on these matters and our view continues to be that liquidated damages should not be applied. If we fail to come to an agreement with SCE about the applicability and scope of force majeure relief and liquidated damages, we may be required to pay liquidated damages up to an aggregate maximum of $89 million and may not be able to recover costs associated with the force majeure events.

A majority of our revenues under this contract were recognized in 2022 based upon costs incurred in 2022 relative to total expected costs on this project.

Stock-based Compensation

During the year ended December 31, 2024, we granted 791,503 common stock options to certain employees and 122,366 restricted stock units (“RSUs”) to our employees and non-employee directors under our 2020 Stock Incentive Plan. Our stock-based compensation expense increased from $10.3 million for the year ended December 31, 2023 to $14.1 million for the year ended December 31, 2024. Stock-based compensation increased in 2024, primarily due to the increase in options and RSUs granted, partially offset by a decrease in the weighted average fair value of stock options and RSUs granted.

In addition, our unrecognized stock-based compensation expense decreased from $30.1 million at December 31, 2023 to $28.0 million at December 31, 2024, and is expected to be recognized over a weighted-average period of two years. See Note 14 “Stock-based Compensation and Other Employee Benefits” for additional information.

Backlog and Awarded Projects

Backlog is an important metric for us because we believe strong order backlogs indicate growing demand and a healthy business over the medium to long term, conversely, a declining backlog could imply lower demand.

The following table presents our backlog:

(In Thousands)

Project Backlog (1) As of December 31, 2024 2023
Fully-contracted backlog $2,544,304 $1,323,742
Awarded, not yet signed customer contracts 2,274,012 2,555,197
Total project backlog $4,818,316 $3,878,939
12-month project backlog $1,145,729 $718,577
(1) Project backlog net of non-controlling interests
O&M Backlog
Fully-contracted backlog $1,378,087 $1,221,661
12-month O&M backlog $98,734 $88,930

Total project backlog represents energy efficiency projects that are active within our sales cycle, either full-contracted or awarded. Our sales cycle begins with the initial contact with the customer and ends, when successful, with a signed contract, also referred to as fully-contracted backlog. Our sales cycle recently has been averaging 18 to 42 months. Awarded backlog is created when a potential customer awards a project to Ameresco following a request for proposal. Once a project is awarded but not yet contracted, we typically conduct a detailed energy audit to determine the scope of the project as well as identify the savings that may be expected to be generated from upgrading the customer’s energy infrastructure. At this point, we also determine the subcontractor, what equipment will be used, and assist in arranging for third party financing, as applicable. Recently, awarded projects have been taking an average of 12 to 24 months to result in a signed contract and convert to fully-contracted backlog. It may take longer, as it depends on the size and complexity of the project. Historically, approximately 90% of our awarded backlog projects have resulted in a signed contract. After the customer and Ameresco agree to the terms of the contract and the contract becomes executed, the project moves to fully-contracted backlog. The contracts reflected in our fully-contracted backlog typically have a construction period of 12 to 36 months and we typically expect to recognize revenue for such contracts over the same period.

Our O&M backlog represents expected future revenues under signed, multi-year customer contracts for the delivery of O&M services, primarily for energy efficiency and renewable energy construction projects completed by us for our customers.

We define our 12-month backlog as the estimated amount of revenues that we expect to recognize in the next twelve months from our fully-contracted backlog. See Note 2 “Summary of Significant Accounting Policies” for our revenue recognition policies. See

“We may not recognize all revenues from our backlog or receive all payments anticipated under awarded projects and customer contracts” and “In order to secure contracts for new projects, we typically face a long and variable selling cycle that requires significant resource commitments and requires a long lead time before we realize revenues” in Item 1A, Risk Factors.

Assets in Development

Assets in development, which represents the potential design/build project value of small-scale renewable energy plants that have been awarded or for which we have secured development rights, were estimated at $2.3 billion as of December 31, 2024, and $2.4 billion, including $90 million attributable to a non-controlling interest, as of December 31, 2023. The portion related to spending for EaaS assets was approximately $538.4 million and $399.8 million at December 31, 2024 and 2023, respectively. These are also important metrics because they help us gauge our future capacity to generate electricity or deliver renewable gas fuel which contributes to our recurring revenue stream.

Results of Operations

The following table sets forth certain financial data from the consolidated statements of income for the periods indicated (1):

(In Thousands)

Year Ended December 31, 2024 Dollar Amount % of Revenues 2023 Dollar Amount % of Revenues Year-Over-Year Change Dollar Change % Change
Revenues $1,769,928 100.0% $1,374,633 100.0% $395,295 28.8%
Cost of revenues 1,513,837 85.5% 1,128,204 82.1% 385,633 34.2%
Gross profit 256,091 14.5% 246,429 17.9% 9,662 3.9%
Selling, general and administrative expenses 173,761 9.8% 162,138 11.8% 11,623 7.2%
Gain on sale of business, net 38,007 2.1% — —% 38,007 100.0%
Asset impairments 12,384 0.7% 3,831 0.3% 8,553 223.3%
Earnings from unconsolidated entities 792 —% 1,758 0.1% (966) (54.9)%
Operating income 108,745 6.1% 82,218 6.0% 26,527 32.3%
Interest and other expenses, net 74,805 4.2% 43,949 3.2% 30,856 70.2%
Income before income taxes 33,940 1.9% 38,269 2.8% (4,329) (11.3)%
Income tax benefit (20,000) (1.1)% (25,635) (1.9)% (5,635) (22.0)%
Net income $53,940 3.0% $63,904 4.6% $(9,964) (15.6)%
Net loss (income) attributable to non-controlling interest and redeemable non-controlling interest $2,817 0.2% $(1,434) (0.1)% $(4,251) (296.4)%
Net income attributable to common shareholders $56,757 3.2% $62,470 4.5% $(5,713) (9.1)%
(1) A comparison of our 2023 and 2022 results can be found in Item 7 of our 2023 Form 10-K filed with the SEC.

Our results of operations for the year-ended December 31, 2024 reflect a year-over-year increase in terms of revenues, operating income, and net income attributable to common shareholders. All financial result comparisons are against the prior year period.

  • Revenue: total revenues increased primarily due to a $337.4 million, or 34%, increase in our project revenue attributed to the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects.
  • Cost of Revenues and Gross Profit: the increase in cost of revenues is primarily due to the increased project revenues described above, however, our gross profit as a percent of revenues decreased primarily due to cost overruns on two large-scale legacy projects and a mix of lower-margin projects.
  • Earnings from Unconsolidated Entities: the decrease in earnings from unconsolidated entities is due to the sale of one of our equity method investments during the first quarter of 2024.
  • Gain on Sale of Business, Net: in 2024, we divested an energy technology and advisory services company and recognized a gain of $38.0 million, net of transaction expenses.
  • Selling, General and Administrative Expenses: the increase is primarily due to higher net salaries and benefits of $8.3 million, of which $3.8 million is from increased non-cash stock-based compensation expense, higher insurance of $1.6 million and occupancy costs of $1 million, partially offset by a decrease in professional fees of $2.0 million.
  • Asset Impairments: This year includes long-lived asset impairment charges of $12.4 million recorded in 2024 primarily related to one of our landfill gas to energy assets and solar panels purchased under the IRS safe harbor provisions for renewable energy projects. Last year included long-lived asset impairment charges of $1.6 million related to two of our landfill gas to energy assets, and a goodwill impairment charge of $1.6 million, which was $2.2 million after taking into account the effect of deferred income taxes related to one of our reporting units.
  • Interest and Other Expenses, Net: Interest and other expenses, net, includes gains and losses from derivatives transactions, foreign currency transactions, interest expense, interest income, amortization of financing costs and certain government incentives. Interest and other expenses, net increased primarily due to higher interest expenses, net of interest income of $28.9 million related to increased levels of project debt and higher rate paid on our second lien term loan, and foreign currency transaction losses of $3.8 million versus gains of $0.6 million last year.
  • Income Tax Benefit: the benefit for income taxes is based on various rates set by federal, state, provincial, and local authorities and is affected by generated tax credits and differences between financial accounting and tax reporting requirements. The tax benefit was lower in 2024 as compared to 2023 because we incurred additional tax expense from the deferred effect of an increase in our future effective state tax rates resulting from apportionment changes and the Section 179D Energy Efficient Commercial Buildings Deduction available for 2024 was lower due to the timing of project completions, offset by higher tax credits generated as a result of new U.S. Treasury regulations related to renewable gas projects. The tax benefit for 2023 was favorable, primarily due to higher deductions under Section 179D and deferred state tax benefits resulting from reduced state tax rates.
  • Net Income and Earnings Per Share: Net income attributable to common shareholders decreased due to the reasons described above. Basic earnings per share for 2024 was $1.08, a decrease of $0.12 per share compared to 2023. Diluted earnings per share for 2024 was $1.07, a decrease of $0.10 per share, compared to 2023.

Business Segment Analysis

Our reportable segments for the year ended December 31, 2024 were North America Regions, U.S. Federal, Europe, and Renewable Fuels (formerly Alternative Fuels). On January 1, 2024, we changed the structure of our internal organization, and our U.S. Regions and Canada are now included in North America Regions. Additionally, our Asset Sustainability Group was formerly included in Canada, but is now included in “All Other”. As a result, previously reported amounts have been reclassified for comparative purposes. See Note 20 “Business Segment Information” for additional information about our segments.

Revenues

(In Thousands)

Year Ended December 31, 2024 2023 Year-Over-Year Change Dollar Change % Change
North America Regions $878,828 $616,434 $262,394 42.6%
U.S. Federal 372,536 402,884 (30,348) (7.5)
Renewable Fuels 173,342 117,075 56,267 48.1
Europe 250,574 149,354 101,220 67.8
All Other 94,648 88,886 5,762 6.5
Total revenues $1,769,928 $1,374,633 $395,295 28.8%
  • North America Regions: the increase is primarily due to a $243.3 million, or 47%, increase in project revenues attributable to the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects.
  • U.S. Federal: the decrease is primarily due to a $48.2 million, or 14%, decrease in project revenue attributable to the timing of revenue recognized as a result of the phase of active projects compared to the prior year, partially offset by increases of $11.1 million in energy asset revenue and $6.6 million in O&M revenue.
  • Renewable Fuels: the increase is primarily due to higher project revenues of $43.4 million and a $15.6 million increase in energy asset revenues resulting from the continued growth of our operating portfolio, increased production levels and stronger pricing on renewable identification numbers (“RIN’s”) generated from our renewable natural gas facilities.
  • Europe: revenues increased primarily due to higher project revenue of $100.1 million, or 72%, resulting from the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects in the United Kingdom compared to the prior period.
  • All Other: All other revenues were higher primarily due to increased consulting revenue.

Income (Loss) before Income Taxes and Unallocated Corporate Activity

(In Thousands)

Year Ended December 31, 2024 2023 Year-Over-Year Change Dollar Change % Change
North America Regions $40,903 $40,869 $34 0.1%
U.S. Federal 41,964 49,266 (7,302) (14.8)
Renewable Fuels (1,395) 6,216 (7,611) (122.4)
Europe 776 3,637 (2,861) (78.7)
All Other 47,083 6,653 40,430 607.7
Unallocated corporate activity (95,391) (68,372) (27,019) (39.5)
Income before income taxes $33,940 $38,269 $(4,329) (11.3)%
  • North America Regions: the increase is primarily due to the higher revenues described above, offset by lower gross profit as a percent of revenues primarily due to cost overruns on two large-scale legacy projects and increased depreciation and intangible amortization and interest expense, and a loss on derivatives this year versus a gain last year.
  • U.S. Federal: the decrease is due primarily to the decreased revenues described above, higher interest expense, net of $3.6 million and lower earnings from unconsolidated entities of $1.1 million.
  • Renewable Fuels: the decrease is primarily due to higher asset impairment charges of $7.6 million on one of our landfill gas to energy assets and higher interest expense of $9.5 million, partially offset by the higher revenues described above.
  • Europe: the decrease is primarily due to a higher mix of lower-margin projects, increased salaries and benefits, net, and higher interest expense, partially offset by decreased bank discount fees.
  • All Other: the increase is primarily due to a gain of $38.0 million on the sale of business, net and increased consulting revenue.
  • Unallocated corporate activity includes all corporate level selling, general and administrative expenses and other expenses not allocated to the reportable segments. We do not allocate any indirect expenses to the segments. Corporate expenses increased primarily due higher interest expense, net of $11.1 million, higher net salaries and benefit costs of $7.6 million, including an increase in non-cash stock-based compensation expense of $3.8 million, and foreign currency transaction losses of $2.5 million versus gains of $0.5 million last year.

Liquidity and Capital Resources

Overview

Since inception, we have funded operations primarily through cash flow from operations, advances from Federal ESPC projects, our senior secured credit facility, second lien term loan, and various forms of other debt (see “Energy Asset Financing” below).

Working capital requirements can be susceptible to fluctuations during the year due to timing differences between costs incurred, the timing of milestone-based customer invoices and actual cash collections. Working capital may also be affected by seasonality, growth rate of revenue, long lead-time equipment purchase patterns, advances from Federal ESPC projects, and payment terms for payables relative to customer receivables.

We expect to incur additional expenditures in connection with the following activities:

  • equity investments, project asset acquisitions, and business acquisitions that we may fund from time to time
  • capital investment in current and future energy assets
  • material, equipment, and other expenditures for large projects

We regularly monitor and assess our ability to meet funding requirements. We believe that cash and cash equivalents, working capital and availability under our revolving senior secured credit facility, combined with our right (subject to lender consent) to increase our revolving credit facility by $100.0 million, plus develop and sell asset transactions, sales of tax attributes, and our general access to credit and equity markets, will be sufficient to fund our operations through at least February 2026.

We continue to evaluate and take action, as necessary, to preserve adequate liquidity and ensure that our business can continue to operate and that we can meet our capital and debt service requirements. This may include limiting discretionary spending across the organization and re-prioritizing our capital projects amid times of political unrest, the duration of supply challenges, and the rate and duration of the inflationary pressures, and other events affecting our liquidity. For example, recent increases in inflation and interest rates have impacted overall market returns on assets. We have therefore been particularly prudent in our capital commitments over the past few quarters, ensuring that our assets in development continue to align with our hurdle rates.

Divestiture of a Business

On December 31, 2024, we completed the sale of a business. As a result of this transaction, we received net proceeds of $54.2 million, and recorded a gain of $38.0 million, net of transaction costs of $2.2 million, from this disposition. At closing we prepaid $57.0 million towards our senior secured term loan.

August 2023 Purchase and Sale Agreement

On August 4, 2023, we entered into a purchase and sale agreement to acquire an energy asset project and the right to acquire 100% of the stock of BCE in a two-phased transaction, exclusive of each other. Phase 1, the purchase of the energy asset project, closed on August 4, 2023 and did not constitute a business in accordance with ASC 805-50, Business Combinations.

The adjusted purchase price for phase 1 was $88.0 million, of which $5.0 million was paid in cash, $46.7 million was financed through a seller’s note, and we assumed a construction loan on the energy asset project for $36.3 million. The construction loan was converted to a term loan in February 2024 and has a maturity date of April 2030. We also received cash of $11.2 million. In January 2024 we paid off the remaining balance on the seller’s note in the amount of $29.4 million. We sold back to the seller ITCs for the project acquired as part of this transaction for the fair market value of these credits and we received $21.0 million in early 2024 for the transfer of these credits. In addition, we assumed a land lease for the energy asset project. See Note 8 “Leases” for additional information on the lease.

In the second phase, which closed on January 12, 2024, we acquired BCE, including its interest in one of our consolidated joint venture and its interests in project subsidiaries developing or with rights to develop solar, battery, and microgrid assets for a purchase price of $39.1 million, of which $6.6 million was paid at the closing. The remaining $32.5 million was financed by a seller’s note accruing interest of 5.0%, through August 2024 and was adjusted to 9% per annum until the note was paid off in full in November 2024. We may be required to make additional contingent payments for this acquisition based on certain projects achieving commercial operation and if the projects qualify for higher energy tax credits than expected.

Senior Secured Credit Facility — Revolver and Term Loans

During the year ended December 31, 2024, we entered into a number of amendments to our fifth amended and restated senior secured credit facility (the “Senior Secured Credit Facility”) , which extended the maturity date of our delayed draw term loan A (“DDTLA”). The overall rate table for all loans under the agreement was also increased by 0.25%. The amendments increased the total funded debt to EBITDA covenant ratio from a maximum of 3.50 to 3.75 for the quarter ending December 31, 2024, and 3.50 thereafter. On June 28, 2024, we entered into amendment number six to the fifth amended and restated senior secured credit facility to modify certain of the covenants and other terms to permit us to enter into the second lien credit agreement (as defined below) and to incur indebtedness and make certain other conforming changes in connection with our entry into the second lien credit agreement. The remaining balance on the DDTLA of $15 million was paid off with the proceeds from the second lien credit agreement.

As of December 31, 2024, the balance on the senior secured credit facility was $148.0 million and we had funds available of $21.1 million.

On January 23, 2025, we refinanced our Senior Secured Credit Facility by entering into a sixth amended and restated senior secured credit agreement (“Restated Credit Agreement”). At closing we paid approximately $2.0 million in lender’s fees.

The restated credit agreement amended and restated the Senior Secured Credit Facility to provide for the following facilities:

  • a $225 million revolving credit facility, maturing on December 28, 2028, and
  • a $100 million term loan A, maturing on December 28, 2028.

Second Lien Term Loan

On June 28, 2024, we entered into a second lien credit agreement which provided a term loan in a principal amount of $100 million with a maturity date of June 28, 2029. The term loan bears an interest rate of Secured Overnight Financing Rate (“SOFR”) (4.692% at December 31, 2024), plus an applicable margin of 5.875% per annum. Interest is payable quarterly and unpaid interest and principal is due in the aggregate on June 28, 2029.

Energy Asset Financing

Energy Asset Construction and Operating Facilities, Sale-leasebacks, and Financing Leases

We have entered into a number of construction and term loan agreements for the purpose of constructing and owning certain renewable energy plants. The physical assets and the operating agreements related to the renewable energy plants are generally owned by wholly owned, single member “special purpose” subsidiaries of Ameresco. These construction and term loans are structured as project financings made directly to a subsidiary, and upon commercial operation and achieving certain milestones in the credit agreement, the related construction loan converts into a term loan. While we are required under generally accepted accounting principles (“GAAP”) to reflect these loans as liabilities on our consolidated balance sheets, they are generally non-recourse and not direct obligations of Ameresco, Inc., except to the extent of completion guarantees and EPC contracts and certain equity contribution obligations under our August 2023 Construction Credit Facility as described in more detail below.

Our project financing facilities contain various financial and other covenant requirements which include debt service coverage ratios and total funded debt to EBITDA, as defined. Any failure to comply with the financial or other covenants of our project financings would result in inability to distribute funds from the wholly-owned subsidiary to Ameresco, Inc. or constitute an event of default in which the lenders may have the ability to accelerate the amounts outstanding, including all accrued interest and unpaid fees.

Other than what is included above, significant financings during the year ended December 31, 2024 were as follows:

  • April 2023, 6.82%, due July 31, 2024 - one of our consolidated joint venture subsidiaries (“JV”) entered into a construction loan agreement with two lenders for a principal amount of up to $140.8 million under an energy asset credit facility. We acquired the remaining interest in this JV in January 2024 when we closed on the acquisition of BCE. In August 2024, this construction loan was repaid through a sale-leaseback financing under lease agreements entered into between the same parties, as part of the original closing. See “August 2024 Master Sale-leaseback” below.
  • August 2023, 8.53%, due August 31, 2026 - we entered into a construction and development loan agreement, which provides a loan in a principal amount of up to $300.0 million. At the closing, we drew down $200.0 million under this facility, of which approximately $187.0 million was used to reimburse Ameresco for development and construction costs. On December 18, 2024, we amended the loan agreement to increase the principal amount up to $400.0 million, extend the maturity date to December 15, 2027, and set a minimum rate of interest at 6.00% and a Term SOFR Floor of 2.00%. Additionally, an accordion option providing for an option to increase the principal amount to $500.0 million, for which we paid a $0.3 million fee. The accordion option can be exercised no later than June 18, 2026 and only if certain circumstances are met. At closing, we incurred $3.2 million in lenders fees and debt issuance costs. The obligations under the loan are guaranteed by all the subsidiaries that are part of the loan portfolio and are secured by the subsidiaries’ assets as well as Ameresco Inc.'s equity interest in the subsidiary which is the borrower entity. In the case of default under the facility, a default under our Senior Secured Credit Facility or a change in control of Ameresco, Inc., we are required to make capital contributions to the borrower entity who then would be required to use the proceeds from the capital contributions to repay the construction and development loan.

As of December 31, 2024, our total energy asset construction and operating facilities outstanding was $1.0 billion. See Note 9 “Debt and Financing Lease Liabilities” for additional information about these loans.

Sale-leasebacks and Financing Leases

We have entered into sale-leaseback arrangements for solar PV energy assets with multiple investors and in accordance with Topic 842, Leases, all sale-leaseback transactions that occurred after December 31, 2018, were accounted for as failed sales and the proceeds received from the transactions were recorded as long-term financing facilities.

During the year ended December 31, 2024, we discovered a defect in a Battery Energy Storage System (“BESS”) that we installed for a customer under a long-term power purchase agreement for a project financed under the August 2018 master sale-leaseback agreement. As a result, the BESS had to be removed. Our financing partner has agreed to temporarily waive any events of default and refrain from pursuing remedies available under the master sale-leaseback associated with the BESS failure until December 31, 2025 to allow remediation of the issue (subject to certain conditions). We have fully funded lease payments due under the master lease agreement through December 31, 2025 into a reserve account from which lease payments will be made.

August 2024 Master Sale-leaseback - On April 18, 2023 we entered into lease agreements with two investors and on August 14, 2024 we sold and leased back an energy asset for $234.8 million, of which 50% was allocated to each investor under these agreements. One lease has an expiration date of August 14, 2034 with an option to extend to August 14, 2044 while the other has an expiration date of August 14, 2044. At closing, we used $140.8 million of the proceeds to pay off the April 2023 construction credit facility and made rent prepayments of $60.1 million.

As of December 31, 2024, our total sale-leasebacks classified as long-term financing facilities outstanding was $399.4 million.

As of December 31, 2024, our total financing leases outstanding was $12.9 million. These are our sale-leaseback arrangements entered into as of December 31, 2018 which remain under the previous guidance.

See Notes 8 “Leases” and 9 “Debt and Financing Lease Liabilities” for additional information on these financing facilities.

While we are required under GAAP to reflect these lease payments as liabilities on our consolidated balance sheets, they are generally non-recourse and not direct obligations of Ameresco Inc., except that we have guaranteed certain obligations relating to taxes and project warranties, operation, and maintenance.

Federal ESPC Liabilities

We have arrangements with certain third-parties to provide advances to us during the construction or installation of projects for certain customers, typically federal governmental entities, in exchange for our assignment to the lenders of our rights to the long-term receivables arising from the ESPCs related to such projects. These financings totaled $555.4 million in principal amounts as of December 31, 2024 and $533.1 million as of December 31, 2023. Under the terms of these financing arrangements, we are required to complete the construction or installation of the project in accordance with the contract with our customer, and the liability remains on our consolidated balance sheets until the completed project is accepted by the customer.

We are the primary obligor for financing received, but only until final acceptance of the work by the customer. At this point recourse to us ceases and the ESPC receivables are transferred to the investor. The transfers of receivables under these agreements do not qualify for sales accounting until final customer acceptance of the work, so the advances from the investors are not classified as operating cash flows. Cash draws that we received under these ESPC agreements were $164.8 million during the year ended December 31, 2024 and are recorded as financing cash inflows. The use of the cash received under these arrangements is to pay project costs classified as operating cash flows and totaled $158.9 million during the year ended December 31, 2024. Due to the manner in which the ESPC contracts with the third-party investors are structured, our reported operating cash flows are materially impacted by the fact that operating cash flows only reflect the ESPC contract expenditure outflows and do not reflect any inflows from the corresponding contract revenues. Upon acceptance of the project by the federal customer the ESPC receivable and corresponding ESPC liability are removed from our consolidated balance sheets as a non-cash settlement. See Note 2, “Summary of Significant Accounting Policies”, to our consolidated financial statements in this Report.

Other

We issue letters of credit and performance bonds, from time to time, with our third-party lenders, to provide collateral.

Selected Measures of Liquidity and Capital Resources

(In Thousands)

December 31, 2024 2023
Cash and cash equivalents $108,516 $79,271
Working capital $412,126 $227,000
Availability under revolving credit facility $21,099 $37,489

Cash Flows

The following table summarizes our changes in cash, cash equivalents, and restricted cash:

(In Thousands)

Year Ended December 31, 2024 2023
Cash flows from operating activities $117,598 $(69,991)
Cash flows from investing activities (386,637) (566,943)
Cash flows from financing activities 313,944 640,803
Effect of exchange rate changes on cash (203) (81)
Net increase in cash, cash equivalents, and restricted cash $44,702 $3,788

36

Our service offering also includes the development, construction, and operation of small-scale renewable energy plants. Small-scale renewable energy projects, or energy assets, can either be developed for the portfolio of assets that we own and operate or designed and built for customers. Expenditures related to projects that we own are recorded as cash outflows from investing activities. Expenditures related to projects that we build for customers are recorded as cash outflows from operating activities as cost of revenues.

Cash Flows from Operating Activities

Our cash flow from operating activities in 2024 improved over 2023 primarily due to a decrease in the use of cash from Federal ESPC receivables of $101.4 million, increase in cash flows of $90.5 million from accounts payable, accrued expenses, and other current liabilities, $68.2 million from unbilled revenue, and $63.7 million from prepaid expenses and other current assets which includes the sale of ITCs on energy assets for $47.5 million. These were partially offset by decreased cash flows of $149.5 million from accounts receivable.

Cash Flows from Investing Activities

During 2024, we made capital investments of $417.0 million in new energy assets and $17.1 million in major maintenance of energy assets, compared to $538.4 million and $7.6 million, respectively, in 2023. As noted above, we sold a business in December 2024 and received net proceeds of $54.2 million,

We currently plan to invest approximately $350.0 million to $400.0 million in capital investments in 2025, principally for the construction or acquisition of new renewable energy plants.

Cash Flows from Financing Activities

Our primary sources of financing during 2024 were proceeds of $643.5 million from energy asset debt financings, $170.8 million from advances on Federal ESPC projects and energy assets, proceeds from the second lien term loan of $100.0 million, contributions from non-controlling interest of $35.4 million, partially offset by repayments of energy asset debt and financing leases totaling $424.4 million, repayments of long-term corporate debt of $127.0 million, and payments on the seller’s promissory note of $61.9 million.

During 2023, we received net proceeds of $843.5 million from long-term energy asset debt financings, $168.9 million from advances on Federal ESPC projects and energy assets, partially offset by repayments of long-term corporate debt of $155.0 million, repayments of energy asset debt totaling $148.1 million, and net payments on our senior secured revolving credit facility of $43.0 million.

We currently plan additional financings of $300.0 million to $350.0 million in 2025 to fund the construction or acquisition of new renewable energy plants as discussed above.

We may also, from time to time, finance our operations through issuance or offering of equity or debt securities.

Critical Accounting Policies and Estimates

Preparing our consolidated financial statements in accordance with GAAP involves us making estimates and assumptions that affect reported amounts of assets and liabilities, net sales, and expenses, and related disclosures in the accompanying notes at the date of our financial statements. We base our estimates on historical experience, industry and market trends, and on various other assumptions that we believe to be reasonable under the circumstances. However, by their nature, estimates are subject to various assumptions and uncertainties, and changes in circumstances could cause actual results to differ from these estimates, sometimes materially.

We believe that our policies and estimates that require our most significant judgments are considered our critical accounting policies and are discussed below. In addition, refer to Note 2 “Summary of Significant Accounting Policies” for further details.

Revenue Recognition

As described in Note 2, we recognize revenue from the installation or construction of projects over time using the cost-based input method. We use the total costs incurred on the project relative to the total expected costs to satisfy the performance obligation. When the estimate on a contract indicates a loss or claims against costs incurred reduce the likelihood of recoverability of such costs, we record the entire estimated loss in the period the loss becomes known. In addition, some contracts contain an element of variable consideration, including liquidated damages and/or penalties, which requires payment to the customer in the event that construction timelines or milestones are not met. We estimate the total consideration payable by the customer when the contracts contain variable consideration provisions, based on the most likely amount anticipated to be recognized for transferring the promised goods or services. As a result, we may constrain revenue to the extent that a significant reversal in the amount of cumulative revenue recognized will not occur when the uncertainty associated with the variable consideration is subsequently resolved.

To the extent a contract is deemed to have multiple performance obligations, we allocate the transaction price of the contract to each performance obligation using our best estimate of the standalone selling price of each distinct good or service in the contract.

Significant judgement is required to estimate the total expected costs and variable consideration for projects that typically have a construction period of 12 to 36 months. Any increase or decrease in estimated costs to complete a performance obligation without a corresponding change to the contract price could impact the calculation of cumulative revenue to date and gross profit on the project. Similarly, if we recognize revenue based upon our current estimate of variable consideration, and our estimate is later adjusted, we may be required to increase or decrease cumulative revenue to date and gross profit on the project. Factors that may result in a change to our estimates include unforeseen engineering problems, construction delays, the performance of contractors and major material suppliers, and unusual weather conditions, among others.

We have a long history of working with multiple types of projects and preparing cost estimates, and we rely on the expertise of key personnel to prepare what we believe are reasonable best estimates given available facts and circumstances. Due to the nature of the work involved, however, judgment is involved to estimate the costs to complete and the amounts estimated could have a material impact on the revenue we recognize in each accounting period. We cannot estimate unforeseen events and circumstances which may result in actual results being materially different from previous estimates.

Impairment Assessments

We evaluate our long-lived assets, including goodwill and intangible assets, for impairment as events or changes in circumstances indicate the carrying value of these assets may not be fully recoverable, and at least annually (fourth quarter) for goodwill and intangible assets that have indefinite lives. In 2023, we changed the assessment date from December 31st to October 31st. Examples of such triggering events applicable to our assets include a significant decrease in the market price of a long-lived asset or asset group, a current-period operating or cash flow loss combined with a history of operating or cash flow losses, a projection or forecast that demonstrates continuing losses associated with the use of a long-lived asset or asset group, or adverse industry or economic trends.

We evaluate recoverability of long-lived assets and definite-lived intangible assets by estimating the undiscounted future cash flows associated with the expected uses and eventual disposition of those assets. When these comparisons indicate that the carrying value of those assets is greater than the undiscounted cash flows, we recognize an impairment loss for the amount that the carrying value exceeds the fair value.

The process of evaluating the potential impairment of long-lived assets, goodwill and intangible assets requires significant judgment. For goodwill, we estimate the reporting unit’s fair value and compare it with the carrying value of the reporting unit, including goodwill. If the fair value is greater than the carrying value of its reporting unit, no impairment is recorded. Fair value is determined using both an income approach and a market approach. The estimates and assumptions used in our calculations include revenue growth rates, expense growth rates, expected capital expenditures to determine projected cash flows, expected tax rates and an estimated discount rate to determine present value of expected cash flows. These estimates are based on historical experiences, our projections of future operating activity and our weighted-average cost of capital. Unforeseen events and changes in circumstances or market conditions could adversely affect these estimates, which could result in an impairment charge.

We had no goodwill impairments for the year ended December 31, 2024 and reporting units with goodwill had estimated fair values that exceeded their carrying values by at least 49%. During the year ended December 31, 2023, one reporting unit had a fair value that was 2% less than the carrying value and we recorded a $1,644 goodwill impairment, which was $2,222 net of tax and was primarily driven by a decline in projected cash flows, including revenues and profitability. One reporting unit with goodwill had an estimated fair value that exceeded its carrying value by 16%. All other reporting units with goodwill had estimated fair values that exceeded their carrying values by at least 65% as of December 31, 2023.

Derivative Financial Instruments

We account for our interest rate swaps and our make-whole provisions as derivative financial instruments which are carried on our consolidated balance sheets at fair value.

The fair value of our interest rate swaps are determined based on observable market data in combination with expected cash flows for each instrument. Among the key drivers of value are interest rates, since the future floating rates are unknown. The value of our interest rate swaps will change in subsequent periods as counterparty credit risk and forward expectations of the floating rate change. Therefore, depending on how the yield curve changes in subsequent measuring periods, a swap can become an asset or a liability for us. In addition, model inputs used in swap analyses can also substantially affect the fair value of the swaps.

Our make-whole provisions fulfill the requirements of embedded derivative instruments that were required to be bifurcated from the host agreement. The fair value of these make-whole provisions are determined based on available market data and a with and without model. There are several assumptions and estimates used in the calculation of the fair value of derivatives, such as discount rate and risk premium.

Any changes in the fair value of our derivatives designated as hedging instruments are recorded as adjustments to other comprehensive (loss) income and any changes in fair value of our derivatives not designated hedging instruments are recorded in interest and other expenses, net in our consolidated statements of income. See Note 19 “Derivative Instruments and Hedging Activities” for more information.

Income Taxes

We are subject to income taxes in the U.S. and six foreign jurisdictions. Significant judgment is required in determining income tax expense, deferred tax assets and liabilities and uncertain tax positions. The underlying assumptions are also highly susceptible to change from period to period. We took advantage of the Safe Harbor commence-construction provisions contained in IRS Notice 2018-59 by pre-purchasing solar equipment in 2019 thereby preserving the ability to take 30% ITC for projects placed in service before 2024. However, the IRA signed by the President on August 16, 2022 increased the ITC rate back to 30% for projects placed in service after January 1, 2022 and before January 1, 2033. If these or other deductions and credits expire without being extended, or otherwise are reduced or eliminated, our effective tax rate would increase, which could increase our income tax expense and reduce our net income. In addition, our tax rate has historically been significantly impacted by the IRC Section 179D deduction. This deduction is related to energy-efficient improvements we provide under government contracts. The Consolidated Appropriations Act, 2021 made permanent the Section 179D Energy Efficient Commercial Building Deduction. That Act made changes to the way the deduction is calculated. If those changes result in lower levels of energy efficiency improvements, it could impact the deduction available and the tax rate. On December 12, 2024, the U.S. Department of the Treasury and IRS issued final regulations regarding ITCs for Section 48 of the Internal Revenue Code, including the ITCs for energy generation, energy storage technology, qualified biogas property, and interconnection property. We are taking additional ITCs on our renewable gas projects consistent with the regulation language permitting separate ownership.

We accrue for the estimated additional tax and interest that may result from tax authorities disputing uncertain tax positions. We believe we have made adequate provisions for income taxes for all years that are subject to audit based upon the latest information available. We operate within multiple taxing jurisdictions and are subject to tax audits in these jurisdictions. These audits can involve complex issues and may require an extended period of time to resolve. We recognize tax benefits from uncertain tax positions only if we believe that it is more likely than not that the tax position will be sustained on examination by the taxing authorities based on the technical merits of the position. Although we believe that we have adequately reserved for our uncertain tax positions, we can provide no assurance that the final tax outcome of these matters will not be materially different. We adjust these reserves when facts and circumstances change, such as the closing of a tax audit or the refinement of an estimate. To the extent that the final tax outcome of these matters is different than the amounts recorded, such differences may affect the provision for income taxes in the period in which such determination is made and could have an impact on our results of operations.

On a quarterly basis, we assess our current and projected earnings by jurisdiction to determine whether or not our earnings during the periods when the temporary differences become deductible will be sufficient to realize the related future tax benefits. Should we determine that we would not be able to realize all or part of our net deferred tax asset in a particular jurisdiction in the future, a valuation allowance to the deferred tax asset would be charged to income in the period such determination was made. This valuation allowance is maintained for deferred tax assets that we estimate are more likely than not to be unrealizable based on available evidence at the time the estimate is made. The determination of whether a valuation allowance for deferred tax assets is appropriate is subject to considerable judgment and requires an evaluation of all positive and negative evidence, including our historical financial results, the source and consistency of those results, whether they should be adjusted for certain one-time or nonrecurring items, whether losses cumulatively exceed income over a reasonable period of time, the availability of tax planning strategies, availability of carryback and carryforward periods, and other factors, including our expectations of future taxable income. Adjustments to income tax expense to the extent we establish a valuation allowance or adjust this allowance in a period could have a material impact on our financial condition and results of operations.

Recent Accounting Pronouncements

See Note 2 of the “Notes to Consolidated Financial Statements” for a discussion of recent accounting standards.

Market risk

As filed, 5,994 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We are exposed to changes in interest rates and foreign currency exchange rates because we finance certain operations through fixed and variable rate debt instruments and denominate our transactions in U.S. dollars, Canadian dollars, British pounds sterling (“GBP”), and Euros. Changes in these rates may have an impact on future cash flows and earnings. We manage these risks through normal operating and financing activities and, when deemed appropriate, through the use of derivative financial instruments.

Interest Rate Risk

We had cash and cash equivalents totaling $108.5 million as of December 31, 2024 and $79.3 million as of December 31, 2023. Our exposure to interest rate risk primarily relates to the interest expense paid on our senior secured credit facility.

Derivative Instruments

We do not enter into derivative instruments for trading or speculative purposes. However, through our subsidiaries we do enter into derivative instruments for purposes other than trading purposes. Certain of the term loans that we use to finance our renewable energy projects bear variable interest rates that are indexed to short-term market rates. We have entered into interest rate swaps in connection with these term loans in order to seek to hedge our exposure to adverse changes in the applicable short-term market rate. In some instances, the conditions of our renewable energy project term loans require us to enter into interest rate swap agreements in order to mitigate our exposure to adverse movements in market interest rates. All but three of the interest rate swaps that we have entered into qualify and have been designated as cash flow hedges. In the past, we entered into commodity swap contracts in order to hedge our exposure to adverse changes in the short-term market rates of natural gas, which have not been designated for hedge accounting, and may do so in the future.

We have also entered into term loan agreements that contain make-whole provisions that qualify as embedded derivatives and are required to be bifurcated from their host term loan agreement and valued separately. These derivatives cannot be hedged.

By using derivative instruments, we are subject to credit and market risk. The fair market value of the interest rate and commodity swaps are determined by using valuation models whose inputs are derived using market observable inputs, including interest rate yield curves, and reflects the asset or liability position as of the end of each reporting period. When the fair value of a derivative contract is positive, the counterparty owes us, thus creating a receivable risk for us. We are exposed to counterparty credit risk in the event of non-performance by counterparties to our derivative agreements. We minimize counterparty credit (or repayment) risk by entering into transactions with major financial institutions of investment grade credit rating. The fair value of these make-whole provisions was determined based on available market data and a with and without model.

Our exposure to market interest rate risk is not hedged in a manner that completely eliminates the effects of changing market conditions on earnings or cash flow. See Notes 2 “Summary of Significant Accounting Policies”, 18 “Fair Value Measurement”, and 19 “Derivative Instruments and Hedging Activities” included in Item 8 of this Report for additional information about our derivative instruments.

Foreign Currency Risk

We have revenues, expenses, assets, and liabilities that are denominated in foreign currencies, principally the Canadian dollar, GBP, and Euro. Also, a significant number of employees are located in Canada and Europe, and our subsidiaries in those countries transact business in those respective currencies. As a result, we have designated the Canadian dollar as the functional currency for Canadian operations. Similarly, the GBP has been designated as the functional currency for our operations in the United Kingdom. The Euro has been designated as the functional currency for our operations in Europe. When we consolidate the operations of these foreign subsidiaries into our financial results, because we report our results in U.S. dollars, we are required to translate the financial results and position of our foreign subsidiaries from their respective functional currencies into U.S. dollars. We translate the revenues, expenses, gains, and losses from our Canadian, United Kingdom, and European subsidiaries into U.S. dollars using a weighted average exchange rate for the applicable fiscal period. We translate the assets and liabilities of these subsidiaries into U.S. dollars at the exchange rate in effect at the applicable balance sheet date. Translation adjustments are not included in determining net income for the period but are disclosed and accumulated in a separate component of consolidated equity until sale or until a complete or substantially complete liquidation of the net investment in our foreign subsidiary takes place. Changes in the values of these items from one period to the next which result from exchange rate fluctuations are recorded in our consolidated statements of changes in stockholders’ equity as accumulated other comprehensive income (loss). For the year ended December 31, 2024, due to the weakening of the CAD, GBP, and EUR versus the U.S. dollar, our foreign currency translation resulted in a loss of $3.2 million which we recorded as a decrease in accumulated other comprehensive income, compared to a gain of $1.6 million for the year ended December 31, 2023. As a consequence, gross profit, operating results, profitability, and cash flows are impacted by relative changes in the value of the CAD, GB and EUR. We have not repatriated earnings from our foreign subsidiaries but have elected to invest in new business opportunities there. See Note 10, “Income Taxes” to our consolidated financial statements in this Report. We do not hedge our exposure to foreign currency exchange risk.

Controls and procedures

As filed, 4,049 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our principal executive officer and principal financial officer, evaluated the effectiveness of our disclosure controls and procedures, as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, as of the end of the period covered by this annual report, or the evaluation date. Disclosure controls and procedures are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Our management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives, and management necessarily applies its judgment in evaluating the cost-benefit relationship of possible controls and procedures. Our management, after evaluating the effectiveness of our disclosure controls and procedures as of the evaluation date, concluded that as of the evaluation date, our disclosure controls and procedures were effective at the reasonable assurance level.

Management’s Annual Report on Internal Control over Financial Reporting

Our management, with the participation of our principal executive officer and principal financial officer, is responsible for establishing and maintaining adequate internal control over our financial reporting as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act as a process designed by, or under the supervision of, a company’s principal executive and principal financial officers and effected by our board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with GAAP. Our internal control over financial reporting includes those policies and procedures that:

  • pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect our transactions and dispositions of our assets,
  • provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with GAAP, and that our receipts and expenditures are being made only in accordance with authorizations of our management and directors, and
  • provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of our assets that could have a material effect on our financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Our management assessed the effectiveness of our internal control over financial reporting as of December 31, 2024. In making this assessment, management used the criteria set forth by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in Internal Control - Integrated Framework (2013).

Based on this assessment and those criteria, our management concluded that, as of December 31, 2024, our internal control over financial reporting was effective.

The effectiveness of our internal control over financial reporting as of December 31, 2024 has been audited by RSM US LLP, an independent registered public accounting firm, as stated in their report, which appears under Item 8.

Changes in Internal Control over Financial Reporting

During the year ended December 31, 2024, there were no changes in our internal control over financial reporting during our most recent fiscal quarter that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2024-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2024-01-01 to 2024-12-31$1.77bnus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Cost of revenue12 months2024-01-01 to 2024-12-31$1.51bnus-gaap:CostOfGoodsAndServicesSold
Gross profit12 months2024-01-01 to 2024-12-31$256.1mus-gaap:GrossProfit
Selling, general and administrative12 months2024-01-01 to 2024-12-31$173.8mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income12 months2024-01-01 to 2024-12-31$108.7mus-gaap:OperatingIncomeLoss
Income tax12 months2024-01-01 to 2024-12-31−$20.0mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2024-01-01 to 2024-12-31$56.8mus-gaap:NetIncomeLoss
Diluted EPS12 months2024-01-01 to 2024-12-31$1.07us-gaap:EarningsPerShareDiluted
Basic EPS12 months2024-01-01 to 2024-12-31$1.08us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2024-01-01 to 2024-12-3153,140,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2024-01-01 to 2024-12-31$117.6mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2024-01-01 to 2024-12-31$4.3mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Cash and equivalentsAt period end2024-12-31$108.5mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2024-12-31$1.30bnus-gaap:AssetsCurrent
Total assetsAt period end2024-12-31$4.16bnus-gaap:Assets
Current liabilitiesAt period end2024-12-31$889.0mus-gaap:LiabilitiesCurrent
Current portion of debtAt period end2024-12-31$149.4mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2024-12-31$1.01bnus-gaap:StockholdersEquity