Nano Nuclear Energy Inc.: Form 10-Q for the period ended Dec 31, 2025

Filed with the SEC on Feb 17, 2026 and accepted by EDGAR at Feb 17, 2026, 21:05 ET.

Share

Management's discussion and analysis

As filed, 54,959 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

You should read the following discussion and analysis of our financial condition and results of operations of the unaudited financial statements and related notes included elsewhere in this Report. Data as of and for the year ended September 30, 2025 has been derived from our audited consolidated financial statements. Data as of and for the three months ended December 31, 2025 and 2024 has been derived from our unaudited condensed consolidated financial statements appearing in this Report.

The following discussion contain forward-looking statements, such as those relating to our plans, objectives, expectations, intentions, and beliefs, which involve significant risks, uncertainties and assumptions. Our actual results could differ materially from those discussed in these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those identified below and those discussed in the section titled “Cautionary Note Regarding Forward-Looking Statements” in this Report.

In particular, readers should note that in this Report, we provide our current estimated timelines for advancing and commercially launching our business lines, including key assumptions and variables. Based on our management’s experience, expertise and communications with applicable regulators and other stakeholders (such as third-party contractors), we believe we have a sufficient basis to provide reasonable timing estimates for our efforts, and our expectation is that we will meet such timing for our proposed business lines. However, readers are cautioned that our business plans are evolving and remain subject to the completion of ongoing technical, regulatory, and operational preparations, which are inherently uncertain and risky given the nature of our business and may be affected by factors beyond our control. Accordingly, no assurances can be given that we will be able to progress and commercially launch our several business lines as currently anticipated, or that such progress or commercial launches will occur in the timeframes we anticipate, if at all. For further information, please see the “Cautionary Note Regarding Forward-Looking Statements” and the “Risk Factors” section of this Report and in our Annual Report on Form 10-K for the year ended September 30, 2025, which was filed on December 18, 2025.

All references to “we,” “us,” “our” and the “Company” refer to NANO Nuclear Energy Inc., a Nevada corporation and its consolidated subsidiaries unless the context requires otherwise.

Overview

We are an emerging nuclear energy company developing smaller, simpler, and safer advanced microreactors utilizing proprietary microreactor designs, intellectual property and research methods to contribute towards a sustainable future. Led by a world class management and technical team, our business plan involves comprehensive engagement across every sector of the nuclear power and energy industry, traversing the path from sourcing raw materials through to developing leading edge advanced nuclear microreactors. Our dedication extends further, with our company looking at opportunities to involve ourselves in other key aspects of the nuclear energy fuel supply chain and the commercial nuclear fuel transportation sector. We are currently in the pre-revenue stage, and we have not generated any material revenues from our inception through December 31, 2025. We have incurred accumulated net losses of $64,017,136 since inception in 2022 through December 31, 2025.

With the goal of vertical integration across the nuclear energy supply chain, we are principally focused on the following four business lines as part of our development strategy:

  • Nuclear Reactor Business. We are developing the next generation of advanced nuclear microreactors, with our principal focus centered on our KRONOS MMR™ Energy System. This high technology readiness level (or TRL), high-temperature gas-cooled reactor (or HTGR), Tristructural-Isotropic (or TRISO) fueled stationary modular reactor is designed for both small- and large-scale operations, optimizing between size and output to allow for modularity and easier mass manufacturing, and efficient scalable energy generation. The KRONOS MMR™ design incorporates negative reactivity feedback, passive heat removal, passive shutdown characteristics, and uses helium — an inert gas — along with TRISO fuel. These features allow the reactor to safely dissipate heat without operator intervention or external power. We are developing the prototype KRONOS MMR in collaboration with The University of Illinois (U. of I.). We are also seeking to develop a KRONOS MMR prototype at Chalk River Laboratories in Ontario, Canada. Our KRONOS MMR™ reactor is the closest to licensing and eventual deployment, so a substantial majority of our investment is focused on advancing this reactor through development, prototype construction, testing and regulatory licensing.
Our portfolio of reactors also includes the LOKI MMR™ reactor, a portable nuclear reactor designed for versatility in application and deployment which is also a HTGR utilizing TRISO fuel, and the ZEUS™ reactor, a portable modular solid core battery reactor. Through the collaboration of our world-renowned nuclear scientists and engineers, the U.S. national nuclear laboratories, and government support, we believe our reactors will have the potential to impact the global energy landscape. Our goal is to commercially launch these products in the 2030s, and we are aiming to commercially launch the KRONOS MMR™ Energy System first in the early 2030s as we are currently dedicating a significant majority of our time and resources to its advancement. We also own the rights to the ODIN™ reactor, a portable modular low pressure coolant reactor, which we are currently in the process of selling.
● Fuel Supply Chain Business. Through our subsidiary, HALEU Energy Fuel Inc., and in coordination with the DOE, we are seeking to develop a domestic low-enriched uranium (LEU) and high-assay low-enriched uranium (HALEU) fuel supply chain to supply fuel not only for our own reactors but also to the broader advanced nuclear reactor industry. While we may engage in this activity through our related party LIST as described below, as of the date of this Report, we have tentatively identified the site where we might construct the facilities and have begun to build the team to design and develop these facilities. However, while we aim to launch our fuel supply chain business in the second half of 2026, as of the date of this Report, we have not yet commercially launched our fuel supply chain business.
The launch of this business can be established through multiple avenues, which are all currently under examination by management. We are actively evaluating existing pilot conversion facilities where U₃O₈ is converted into uranium hexafluoride (UF₆). We may acquire an equity interest through investment in their development, and we are currently conducting the necessary due diligence, although as of the date of this prospectus, we have not entered into any definitive agreement for such acquisition. In parallel, we are exploring the collaboration opportunities with companies that license conversion technology to assess the potential for the longer-term construction of additional fuel facilities. We are also evaluating uranium mining prospects and considering the acquisition of assets that would support our long-term vertically integrated strategy, although we have not entered into any material definitive agreements as of the date of this Report. We have made a $2 million strategic investment in, and entered into a collaboration with, a laser-based uranium enrichment technology company, LIS Technologies Inc. (“LIST”) (which is a related party), to support the development of their technology. Through this investment and related collaboration, we aim to assist in advancing LIST’s technologies to secure a reliable low enriched uranium fuel supply for our future operations and the broader nuclear energy industry. The parties intend that LIST will provide us with enriched UF6 at no cost to be fabricated and sold to customers, with LIST to receive compensation as part of a profit-sharing arrangement to be agreed upon between the companies in the future. We also leased 7,000 square feet of space at our Nuclear Technology Center in Oak Ridge, Tennessee to LIST. Our relationship with LIST is considered a related party transaction since our founder and Chairman, Jay Jiang Yu. is a director, officer and significant shareholder of LIST, and our Chief Executive Officer James Walker and Chief Financial Officer Jaisun Garcha serve as consultants to LIST. Our investment in LIST was unanimously approved by all of our disinterested independent directors. In December 2024, we announced that LIST and our company were selected by the DOE to participate as one of six contract awardees in the DOE’s Low-Enriched Uranium (LEU) Enrichment Acquisition Program (“LEU Acquisition Program”). Under the contract awarded to LIST, LIST was selected as the prime contractor, with our company as the key subcontractor bringing our technical and regulatory expertise in advanced nuclear solutions to the collaboration. LIST will oversee the development of the primary uranium enrichment processes using its novel laser technology, while our company will contribute towards development in the areas of conversion, deconversion, fuel fabrication, and fuel transportation. The total overall amount appropriated under the LEU Acquisition Program across all six contract awardees is anticipated to be $3.4 billion, of which $2.7 billion was recently awarded by the DOE via agreed to task orders. While LIST did not receive the initial $2.7B awards, we believe that participation in the $3.4 billion LEU Acquisition Program provides technical validation and potential federal contracts to support our operations, as well as opportunity to be awarded some or all of the remaining $700 million through future task orders.

26

  • Fuel Transportation Business. Our nuclear fuel transportation business will build on existing work completed at the Idaho National Laboratory (“INL”), Oak Ridge National Laboratory (“ORNL”) and Pacific Northwest National Laboratory (“PNNL”), the world’s premier U.S.-backed nuclear research facilities. As of the date of this Report, we have not yet commercially launched our fuel transportation business. We expect to launch our fuel transportation business by 2028, however, the timeline of which could be impacted by progress in acquiring assets and businesses within the nuclear transport industry to provide our company with the capabilities to internally move the materials, reactors, and fuels inherent within a reactor deployment operation, and as of the date of this prospectus, we have not entered into any definitive agreements for such acquisition. Accordingly, there can be no assurance that we will be able to launch the business as currently anticipated, or that such launch will occur by 2028, if at all. Our fuel transportation business is still at the development stage as of the date of this Report. We received an exclusive license for a high capacity HALEU fuel transportation basket design in April 2024, which will form the basis for a new transportation package to complement a complete transportation system. This license grants us, as the licensee, exclusive rights for the use and development of the technology. In addition, the licensor is not permitted to license the technology to any other parties within the specified scope. We believe this technology is the most advanced concept in the United States for moving HALEU in commercial quantities. We are currently conducting work to modify the design to accommodate a variety of different fuel forms, so we are positioned to move fuel for both of our reactors and to enable us to provide transportation services to any nuclear company looking to move commercial quantities of fuel. As part of this effort, we signed an agreement with GNS Gesellschaft für Nuklear-Service mbH (“GNS”) to undertake a wide-ranging project to produce an optimized HALEU transportation system solution based on our exclusively licensed fuel transportation basket design. The GNS agreement encompasses a study for the transport of multiple HALEU nuclear fuel types, including uranium oxide, TRISO particles, uranium-zirconium hydride, uranium mononitride, and salt fuel for molten salt reactors, thus optimizing the quantity of material that can be transported and developing a conceptual package design that will accommodate the new basket design. We have also hired a former United Parcel Service (UPS) executive who works for our fuel transportation subsidiary to assist in growing a transportation business around our technology and any future acquisitions.
  • Nuclear Consultation Services. We also plan to provide a small amount of nuclear service support and consultation services for the expanding and resurgent nuclear energy industry in 2026. A material increase in consulting revenue is highly dependent on success in acquiring existing consulting businesses, which we continue to evaluate as potential acquisition candidates. Regulatory approval is not required to provide such services. This business opportunity represents our nearest term revenue generating opportunity. As of the date of this Report, we have not yet formally launched our nuclear consultation business, as formal launch of this business is dependent on success in acquiring existing businesses, although we generated a small amount of revenue during 2025 from providing such services.

Our Mission

Our mission is to become a commercially focused, diversified and vertically integrated nuclear energy company that will capture market share in the very large and growing nuclear energy sector. To implement our plans, since our founding in 2022, our management has had constant communications with key U.S. government agencies, including the DOE, the INL and ORNL, which are a part of the DOE’s national nuclear laboratory system. Our company also maintains important collaborations with leading researchers from the Cambridge Nuclear Energy Centre and The University of California, Berkeley.

Overview of Operational Plan and Estimated Timelines for Corporate Achievements

We continue to benefit from a global nuclear energy renaissance driven by several long term, sustainable growth trends and significant regulatory tailwinds. These include growth in AI data centers, industrial reshoring, and broader electrification, all driving a significant need for clean and reliable power, energy sustainability and independence, and climate mandates requiring reliable zero-emissions energy. All of this comes at a time of unprecedented bipartisan legislative and policy support in the U.S. for nuclear energy. Equally important, there is broad recognition that advanced reactors like the ones we are developing will be critical to future clean energy infrastructure.

Over the next twelve months, we will continue to progress the development of our advanced reactors (notably the KRONOS MMR reactor prototypes in the U.S. and Canada) and our vertically integrated business plan, with estimated cash expenditures to be approximately $65 million. This allocation comprises approximately $43 million dedicated to the research, development, quality assurance, licensing, and physical test work of our microreactors and other technologies. A further amount of approximately $12 million will be allocated to the development of our planned HALEU fuel processing facilities alongside LIST, the related-party uranium enrichment company with whom we collaborate and in which we have made a strategic investment. The remaining approximately $10 million is earmarked for miscellaneous costs essential to propelling the progress of our microreactors, encompassing the support of current personnel engaged in executive, finance, accounting, and other administrative functions. We may also utilize our cash resources raised in 2024 and 2025 for acquisitions of complementary businesses or assets. As such, and for a variety of other factors, our estimated expenditures may differ substantially from the above estimates and we find it desirable or necessary to utilize cash resources faster than we currently plan. Our projected expenditures are expected to be partially offset by interest income generated from the Company’s cash and cash equivalent balances.

We have made material progress advancing the KRONOS MMR™ since acquiring the asset in January of 2025. On March 29, 2025, we executed a Sponsored Research Agreement Amendment No. 2 with The Board of Trustees of the University of Illinois (referred to for these purposes as “U of I”) that substituted our company as an assignee of the rights and obligations of USNC regarding the sponsored research relationship with The University of Illinois Urbana-Champaign (“UIUC”) for the KRONOS MMR™ project. Under the Sponsored Research Agreement and its amendments (the “UIUC Agreement”), our company, in collaboration with U of I, will construct, obtain regulatory approval for, and deploy a KRONOS MMR™ research and test reactor on the UIUC campus. The UIUC Agreement as entered into with U of I is effective January 1, 2022, and will terminate on February 28, 2027, unless terminated earlier under certain stipulations. In December of 2025, we signed a Memorandum of Understanding (MOU) with the Board of Trustees of the University of Illinois (“U. of I.”) on behalf of UIUC to collaborate on the development, construction, and operation of its KRONOS MMR™ on campus as an advanced research reactor. While the aforementioned definitive sponsored research agreement between NANO Nuclear and U. of I. provided for U. of I.’s support in design and regulatory licensing of the prototype KRONOS MMR™, the December 2025 MOU set forth the next steps for the design, construction, ownership and ultimate operation of a KRONOS MMR™ on the UIUC campus.

In late April 2025, the U.S. Nuclear Regulatory Commission (“NRC”) issued its final Safety Evaluation (SE) approving the Fuel Qualification Methodology Topical Report (FQM TR) for the advanced fuel design to be used in the KRONOS MMR™ Energy System. The FQM TR is a technical document that defines the analytical framework and testing approach by which irradiation data and fuel performance information will be evaluated to demonstrate that the KRONOS MMR™ fuel meets NRC safety and reliability requirements. Approval of the FQM TR does not in itself authorize construction or operation of the KRONOS MMR™ reactor; rather, it represents NRC approval of the methodology that will be used to qualify the fuel in subsequent testing and licensing steps. Our regulatory activities to date have been conducted within the NRC’s pre-application framework, which has included multiple technical submittals, meetings, and NRC staff feedback towards our technical submittals documented on the NRC’s public pre-application docket for UIUC.

Our next steps toward submission of a construction permit application for the KRONOS MMR™ reactor consist of several regulatory and technical workstreams that are being conducted in parallel rather than sequentially. These activities include continued NRC pre-application engagement and technical interactions, completion of site characterization activities and development of site-specific inputs (including collecting and preparing location-specific technical, environmental, and engineering information to support regulatory filings and design work for a particular site), preparation of the environmental report required to support a construction permit application, preparation of preliminary safety analyses and application documentation, and initiation and ongoing execution of the NRC-approved fuel qualification program in accordance with its approved scope and phased development plan. With respect to site-specific work, we engaged AECOM, a multi-disciplinary engineering firm, in June 2025 to support site characterization, engineering, environmental analysis, and regulatory planning activities associated with the proposed reactor site at UIUC. We expect to complete these activities in the first quarter of 2026.

While the environmental report and safety analysis must be submitted with the application, the NRC’s detailed safety and environmental reviews occur after the application is docketed and may involve requests for additional information, audits, hearings, and public participation as part of the NRC’s review process. Following NRC approval of the FQM TR, we have initiated the fuel qualification program using the NRC-approved methodology. Fuel qualification is a staged and iterative process that includes defining test plans, generating and evaluating fuel performance data, and documenting results. We expect to provide sufficient fuel-related information to support submission of a construction permit application based on the approved methodology, while continuing fuel qualification activities during NRC review and in later licensing stages. However, although fuel qualification is important to our business operations, completion of all fuel qualification activities is not required as a condition for the approval or docketing of a construction permit application.

Based on the foregoing parallel workstreams, we currently anticipate submitting a construction permit application for the KRONOS MMR™ reactor in the first half of 2026 and receiving the approval in mid-2027, subject to the NRC’s review process. We estimate this will be the first construction permit for a microreactor issued in the United States. The permit application will not incur any government fees, as the KRONOS MMR™ reactor, due to its location at UIUC, qualifies for a fee exemption under applicable regulations due to its use for research purposes.

Following submission, the NRC will conduct an acceptance review to determine whether the application is sufficiently complete to docket. NRC guidance indicates that this acceptability determination is generally expected to occur within approximately 60 days; however, timing may vary. After docketing, the duration of the NRC’s safety and environmental reviews is not fixed and is not typically completed within a single year. There can be no assurance as to the timing of completion of such reviews. The duration of the NRC’s review process may vary materially based on numerous factors, including, among other things, the completeness and quality of the application at submission, the number and complexity of NRC requests for additional information, the extent to which the application relies on previously reviewed topical reports, NRC staffing and resource availability, the scope and outcome of any required hearings, and the type and complexity of the environmental review, including whether an environmental impact statement is required. Accordingly, the timing of NRC review and any resulting licensing decisions is inherently uncertain and largely outside the Company’s control and any delays in the review process could materially and adversely affect the Company’s business, financial condition, and results of operations.

The KRONOS MMR™ reactor at UIUC is being developed as a research microreactor intended primarily for demonstration, testing, and research applications, but the reactor will be a full-scale system analogous to the commercial KRONOS MMR™ reactor we are planning to sell and deploy post receipt of a construction permit issued by the NRC, followed by an operating license. The UIUC project will also serve as the reactor which the NRC will be evaluating as part of its licensing process for the entire system. Subject to the NRC review timeline, completion of required safety and environmental reviews, construction activities, and successful commissioning, we expect the KRONOS MMR™ to achieve initial operation or research availability around 2030 to 2031. When considering the above project timeline and construction timelines, licensing timeframes, sourcing key materials and fuel, we expect the KRONOS MMR™ to be commercially ready in the early 2030’s.

To support this effort, on July 30, 2025, we announced our acquisition of a 2.75-acre land and building package in Oak Brook, Illinois to serve as a regional demonstration and office facility to support the development of the KRONOS MMR™ reactor. This facility is intended to support engineering, component manufacturing and assembly, prototype fabrication, non-nuclear testing, research and development activities, and administrative functions. The timing, scale, and configuration of the Illinois facility will depend on multiple factors, including site selection, permitting, availability of skilled labor, supply chain readiness, financing, and alignment with our regulatory and commercialization milestones. We currently anticipate initiating planning and early-stage development activities for the Illinois facility during the late 2020s, with phased buildout aligned to the advancement of our reactor programs. Initial facility capabilities may precede full commercial manufacturing capacity and may focus on research, development, and prototype support, with manufacturing capabilities expanded over time as regulatory approvals are obtained and commercial demand materializes.

On October 7, 2025, we announced that, with the support of Governor JB Pritzker and the Illinois Department of Commerce and Economic Opportunity, we will establish a manufacturing and research and development facility in Illinois. We plan to make an investment of more than $12 million with the support from the Reimagining Energy and Vehicles in Illinois (REV Illinois) program, which is expected to enable us to establish our operations and create 50 new full-time jobs in Illinois. For this effort, we will receive $6.8 million in incentive awards from the REV Illinois program.

Significant capital will be needed to support our facility construction, licensing, fuel qualification testing, regulatory compliance, prototype construction, and workforce expansion for the development of our microreactors. We estimate that the capital costs needed to construct prototype KRONOS MMR™ reactors at the UIUC and Canada over the next several years could be around $300 million to $350 million per reactor. This range reflects inherent uncertainty in building a first-of-a-kind reactor due to several factors that can result in a material increase to these estimates, including site specific factors, the timing and scope of project development and regulatory licensing and supply chain considerations. Subsequent reactors’ capital costs are expected to decline substantially due to supply chain scaling for mass production of components, factory fabrication, modular assembly, and multiple deployments.

In Canada, following our acquisition of GFPL and the Chalk River Licensing Application, followed by GFPL’s recent rebranding to True North Nuclear, we are working to finalize a formal agreement with a partner for a potential Chalk River Project. Upon finalization of an agreement for the project, the timing of which is uncertain, we aim to initiate formal licensing activities with the CNSC through a submission of a License to Prepare Site (LTPS) application with the CNSC.

With respect to the LOKI MMR™ system, we are still in the process of assessing and developing demonstration, licensing and commercial launch timelines for this reactor.

With respect to our ZEUS reactor, we are examining slight modifications of the design to create an even smaller, more mobile reactor system, allowing for an increased number of applications which do not overlap with our other reactors, KRONOS and LOKI. The solid core concept permits a degree of simplicity, and fewer working parts, than other reactor types – we are working on exploiting these inherent advantages to provide this product in the market.

Given our corporate emphasis on the KRONOS MMR™ reactor and the fact that all of our reactor designs, except for the ODIN™ reactor, are within the high-temperature gas-cooled reactor family, we are considering strategic alternatives for ODIN. In September 2025, we signed a letter of intent for the proposed sale of our ODIN™ microreactor design and all associated intellectual property to Cambridge Atom Works, our commercial collaborator for the ODIN™ project. This transaction is intended to monetize our investment in the project to date and enable us to allocate more time and resources to the KRONOS MMR™ reactor and our other designs and technologies.

Readers are cautioned that the outlined expenditures and the anticipated timelines for execution of our plans discussed above and throughout this Management’s Discussion and Analysis of Financial Condition and Results of Operations are estimations only. These are inherently subject to change due to certain factors, including adjustments in the microreactor development plan and uncertainties associated with the governmental licensing approval process. Given that these elements may exceed our initial expectations or lie beyond our control, we cannot guarantee the accuracy of the actual expenditures and timelines.

Factors, Risks and Trends Affecting Our Business and Results of Operations

Our Ability to Develop Our Microreactors

Our results of operations and our long-term prospects are significantly influenced by factors and trends related to the development, commercialization, and regulatory advancement of our microreactors. KRONOS™ MMR reactor is our lead reactor program and is being designed as an advanced, high-temperature microreactor intended for deployment for AI data centers, industrial environments, defense applications, and other off-grid settings requiring resilient, emissions-free power. The following factors and trends have impacted, and we expect will continue to impact, our KRONOS development program and our operating results.

Development of the KRONOS™ reactor is affected by the evolving regulatory framework for advanced non-light-water reactors. The NRC continues to refine guidance applicable to microreactor licensing, including siting, emergency planning, fuel qualification, and security requirements. Changes in NRC expectations, the need for additional data or analysis, or delays in regulatory review may impact our development timelines and costs. In addition, university-based demonstration efforts, including our ongoing collaboration with the UIUC, will require coordination with federal and state agencies, which may introduce uncertainties in scheduling and scope.

KRONOS™ reactor development relies on strategic collaborations with academic institutions and research organizations. Our work with UIUC includes analyses of siting suitability, infrastructure requirements, and potential demonstration pathways. Such partnerships provide access to technical expertise and research infrastructure but may be influenced by academic scheduling, funding availability, or institutional priorities. Delays or changes in partner capacity could affect program timelines.

KRONOS™ technology incorporates materials and components that require specialized fabrication processes, including high-temperature alloys, advanced coatings, and precision-engineered reactor structures. Global supply-chain conditions, vendor qualification requirements, and the availability of domestic manufacturing capacity will affect development costs and timelines. Government incentives for advanced reactor supply chains may reduce uncertainties, but broader economic factors—including inflationary pressures, material cost volatility, and logistics constraints—may continue to impact the program.

The LOKI MMR™ reactor originated as a compact, transportable nuclear microreactor design. The reactor is designed for versatility across terrestrial, marine, and space applications. It is engineered to deliver on the order of 1 MWth to around 5 MWth of power, making it suitable for remote deployments, off-grid energy needs, critical infrastructure support, and other distributed energy use-cases where traditional grid power is unavailable or unreliable. Its transportability via road, rail, sea, or air enables rapid deployment and modular scalability, especially when multiple units are networked for larger power requirements. The LOKI MMR™ supports diverse applications ranging from remote industrial operations to space exploration architectures. The design is positioned to support long-duration extra-terrestrial applications, including power for lunar or orbital infrastructure and potential deep-space missions.

The portable ZEUS™ reactor is a solid-core “nuclear battery” microreactor, designed to deliver long-duration, reliable, zero-emission power in locations where grid access is unavailable, unreliable, or prohibitively expensive. The ZEUS™ reactor is optimized for remote, austere, and infrastructure-limited environments, including isolated communities, mining operations, military installations, critical infrastructure sites, and international deployments where diesel generation is currently dominant. The ZEUS™ technology includes a sealed, factory-fabricated, transportable reactor system. The reactor employs a solid fuel core and emphasizes passive safety, inherent stability, and minimal operator intervention. The system is designed to function as a “set-and-forget” power source, with all major safety, control, and thermal management features integrated into a compact, hardened structure capable of withstanding extreme environmental conditions. The design philosophy prioritizes simplicity, robustness, and high technology readiness levels (TRLs), avoiding unnecessary complexity to accelerate deployment and licensing pathways.

Development of Fuel Supply Chain Business

We believe, based on our market research, that no small modular reactor (SMR) microreactor company is currently developing a fuel supply chain to produce fuel for their reactors. Our strategy to develop key steps of the fuel for our own reactors and also to position our company to supply key steps of the fuel to the wider nuclear industry and other reactor manufacturers, addressing anticipated significant shortfalls in fuel supply. Through our investment and collaboration with LIST, which we believe is the only U.S.-origin and patented laser uranium enrichment company, our goal is to progress towards being what we believe will be the most vertically integrated microreactor business in the country. This would give our business an enormous competitive advantage for both our own reactor development and establishing multiple sources of future revenue to de-risk our company.

Development of Fuel Transportation Business

As we have developed our business, we believe capability deficiencies in the U.S. nuclear industry that would affect the future operation of all SMR and microreactor companies became apparent, notably, there is currently no established method for transporting commercial quantities of HALEU across North America. Our proactive approach to mitigate future impediments to our operations culminated in locating research and technology developed by INL, PNNL and ORNL, that had not been advanced because of budget constraints. We received an exclusive license for a high capacity HALEU fuel transportation basket design in April 2024, which will form the basis of a complete transportation package able to move the most commonly utilized fuel types. The license grants us, as the licensee, exclusive rights for the use and development of certain transportation technology. If developed and commercialized, we believe this product would be one of the few of its kind in North America and would serve as the basis for a domestic HALEU transportation company capable of providing commercial quantities of HALEU fuel. We plan to work with engineering contractors to obtain an NRC Certificate of Compliance under 10 CFR 71 for our transportation packages.

We also plan to establish a transportation business focused on the movement of both LEU and HALEU. Currently we are developing a regulatorily licensed, high-capacity HALEU transportation system, capable of moving commercial quantities of HALEU fuel around North America and beyond.

We are seeking to form the first transportation company able to supply emerging SMR and microreactor companies with the fuel they require at their manufacturing facilities to construct their reactors. We also expect to service the national nuclear laboratories and DOE programs which require HALEU by providing the fuel for their programs. Mobile reactors requiring HALEU for remote military bases are also anticipated, with potential military contacts. In 2026, our fuel transportation business will build on the work already completed by INL and ORNL to create a high-capacity HALEU transportation package. In September 2024, we signed an agreement with GNS to undertake a wide-ranging project to produce an optimized HALEU transportation system solution based on our exclusively licensed fuel transportation basket design. The GNS agreement encompasses a study for the transport of multiple HALEU nuclear fuel types, including uranium oxide, TRISO particles, uranium-zirconium hydride, uranium mononitride, and salt fuel for molten salt reactors, thus optimizing the quantity of material that can be transported and developing a conceptual package design that will accommodate the new basket design. We are receiving support from two former executives of the largest shipping company in the world who are assisting us in developing a North American transportation company using our licensed or developed technology to deliver (subject to applicable government licensing and certification) nuclear fuel for a wide customer base, including SMR and microreactor companies, national laboratories, military, and DOE programs.

Our Business Services and Consulting Business

We have identified an opportunity for more immediate revenue for our company by acquiring more expertise to advance our businesses and deploying those personnel as part of a consulting and services business. We have already identified several nuclear services and consultancy providers, which have been assessed as potentially suitable for acquisition by our company. We have concentrated on identifying small teams with expert personnel, with good portfolios of work and existing contracts, and good expansion potential, which would provide us with immediate revenue post-acquisition. We believe we are in a competitively advantageous position to expand these acquired businesses with the highly qualified teams it has built over the previous years.

Obtaining Regulatory Licensing

The regulatory licensing process for our microreactor prototypes is expected to be completed in the early 2030s, with manufacturing facilities being constructed during the licensing phase so we are ready to deploy microreactors (most notably our KRONOS MMR™) across the country upon licensing approval. Our KRONOS MMR™ reactor system has already undergone important pre-licensing activities, including the submission of a Regulatory Engagement Plan, several White Papers and Topical Reports, and NRC approval for Fuel Qualification Methodology for the advanced fuel design to be used in our KRONOS micro modular reactor energy system. Our ability to successfully license and certify our microreactors will subsequently be dependent on working through the licensing process with the NRC (and, as applicable, Canadian and other regulators) and satisfying their examinations that the reactor is safe to deploy to customers, provided the agreed protocols are adhered to. Our ability to successfully design and construct our own commercial nuclear fuel facilities will be dependent on obtaining the necessary regulatory approvals from the NRC and other applicable authorities to permit the commercial deployment of microreactors. The NRC inspects the site construction at new fuel cycle facilities and only approves the facility’s capability to possess nuclear material after ensuring that the facility’s safety controls are robust and able to safely handle these materials. Fuel cycle facilities must comply with the regulatory requirements established by the NRC. The facility will need to acquire an NRC license containing site-specific requirements that the facility is required to comply with. Each license is unique and is specific to the nuclear material and hazards present at the fuel cycle facility. To obtain a license will involve significant communication and interaction between the NRC and our company. NRC safety oversight includes three important components: NRC inspection, the routine assessment of each licensee’s performance, and enforcement in the case that the regulatory requirements are not met. We will also develop an environmental report to support any fuel cycle facility application and will work with the NRC through the process established under the National Environmental Policy Act of 1970, which will begin when a federal agency develops a proposal to take a major federal action.

Technology Acquisitions and Collaborations

During 2024 and 2025, we announced our acquisition and development of complementary nuclear pump technology (the ALIP technology) as well as non-binding memoranda of understanding with third party collaborators to explore (i) the use of our microreactors in remote artificial intelligence data centers, the use of artificial intelligence in modernizing the nuclear regulatory and licensing process and (iii) development of nuclear fuel and microreactor capabilities in several non-U.S. jurisdictions in both Africa and South America. We expect that a material aspect of our business will involve continuing to develop, identify or seek to collaborate on, or acquire novel and beneficial technology for our company, and to support advanced nuclear technology both in the U.S. and around the world. Our inability to grow our company through such acquisitions or collaborations could have a material adverse effect on our business.

Loss of EGC and Smaller Reporting Company Status

As of December 31, 2025, we continue to qualify as an “emerging growth company” as defined in the Jumpstart Our Business Startups Act of 2012. However, as of such date, we no longer qualify as a “smaller reporting company” as defined under Rule 12b-2 of the Exchange Act due to our public float exceeding the applicable threshold for smaller reporting company status. Accordingly, while we remain eligible to take advantage of certain reduced reporting and disclosure requirements applicable to emerging growth companies, we are no longer entitled to the reduced disclosure requirements available to smaller reporting companies. Notwithstanding the foregoing, we continue to qualify as a non-accelerated filer under the Exchange Act.

Results of Operations

Comparison of the Three Months Ended December 31, 2025 and the Three Months Ended December 31, 2024

Revenue

We have not generated any material revenue from our inception through December 31, 2025.

Expenses

Research and Development Expense

Our research and development expenses represent costs incurred for designing and engineering products, including the costs of developing design tools. All research and development costs related to product development are expensed as incurred.

Research and development expenses increased by $4,495,487, or 497%, to $5,400,410 for the three months ended December 31, 2025, compared to $904,923 for the comparative period ended December 31, 2024, primarily due to a significant increase in expenses from research and development of our microreactors during the three months ended December 31, 2025 compared to the three months ended December 31, 2024. Research and development expenses primarily reflect the internal and external personnel costs corresponding to the design and analysis of our microreactors. During the three months ended December 31, 2025 and 2024, $569,509 and nil, respectively, of our research and development expenses corresponded to equity-based compensation

General and Administrative Expense

Our general and administrative expenses consist of compensation costs for personnel in executive, finance, accounting, and other administrative functions. General and administrative expenses also include legal fees, professional fees paid for accounting, auditing, consulting services, advertising costs, and insurance costs.

General and administrative expenses increased by $4,392,033, or 176%, to $6,886,603 for the three months ended December 31, 2025, compared to $2,494,570 for the comparative period ended December 31, 2024, primarily due to equity-based compensation, professional fees for legal and audit costs, and additional office and staff costs to support our research and development activities during the three months ended December 31, 2025 compared to the three months ended December 31, 2024. During the three months ended December 31, 2025, general and administrative expenses primarily consisted of $4.3 million in personnel costs, including $1.5 million in equity-based compensation and $1.0 million in professional fees. During the period ended December 31, 2024, general and administrative expenses primarily consisted of $0.8 million in personnel costs and $0.8 million in professional fees.

Revaluation of contingent consideration

Revaluation of contingent consideration corresponds to equity based contingent consideration corresponding to the ALIP technology we acquired which is revalued at the end of each financial quarter based on the closing stock price of our common stock.

The revaluation of contingent consideration resulted in an expense recovery of $727,500 for the three months ended December 31, 2025, compared to an expense of $524,250 for the comparative period ended December 31, 2024, as a result of our acquisition of the ALIP technology on June 21, 2024.

Other Income

During the three months ended December 31, 2025 and 2024, we earned interest income of $4,920,707 and $789,381, respectively, on our cash and cash equivalents held at a financial institution. In addition, during the three months ended December 31, 2025 and 2024 we earned $21,000 from a lease agreement from a related party. Also, during the three months ended December 31, 2025, we earned $71,850 from consulting services.

Liquidity and Capital Resources

We have been able to utilize our status as a public company to raise significant capital since our May 2024 initial public offering. As such, we believe that our existing cash will fund our current operating and research and development plans through at least the next twelve months from the date of this Report. We have coupled our fundraising with what we believe is a prudent deployment of capital as we move our business forward. Although we have negative operating cash outflows of $3,989,840 for the three months ended December 31, 2025, and $3,242,526 for the three months ended December 31, 2024, we had approximately $578 million in cash and cash equivalents as of December 31, 2025 (compared to approximately $203 million as of September 30, 2025) and working capital of approximately $576 million as of December 31, 2025 (compared to approximately $201 million as of September 30, 2025).

However, the future development of our business towards ultimate commercialization of our products will require significant amounts of cash resources. Since we do not anticipate generating meaningful revenues for several years, we intend to finance our future cash requirements for capital expenditures, research and development and business development activities and general working capital through public or private equity or debt financings, third-party (including government) funding, or any combination of these approaches. If we raise additional funds through further issuances of equity or equity-linked instruments, our existing stockholders could suffer significant dilution. Moreover, no assurances can be given that we will be able to raise required funding on favorable terms, if at all, and our inability to raise additional funding when needed could have a material adverse effect on our company and results of operations and could cause our business to fail.

Going Concern

As part of issuing our unaudited condensed consolidated financial statements, we evaluated whether there were any conditions and events that raise substantial doubt about our ability to continue as a going concern over the twelve months after the date the unaudited condensed consolidated financial statements were issued. Since inception, we have incurred significant operating losses, and have an accumulated deficit of approximately $64 million and negative operating cash flow during the three months ended December 31, 2025 and 2024. Management expects that operating losses and negative cash flows may increase from the 2025 levels because of additional costs and expenses related to our research and development activities. Our continued solvency is dependent upon our ability to obtain additional working capital to complete the design, construction, demonstration, regulatory licensing and ultimately commercialization of our reactors in development and other technologies and contemplated services.

To date, we have not generated any material revenue. We do not expect to generate any significant revenue unless and until we are able to commercialize our reactors. We will require additional capital to develop our reactors and to fund operations for the foreseeable future. We expect our costs to increase in connection with advancement of our reactors toward commercialization and develop our other lines of business. While we believe that our existing cash may be sufficient to support our development in the near-term, certain costs are not reasonably estimable at this time and we will require additional funding.

Management is of the opinion that sufficient working capital is available to meet our company’s liabilities and commitments as they come due for at least the next twelve months after the date the unaudited condensed consolidated financial statements are issued to conform to the going concern uncertainty period. In order to achieve our company’s long-term strategy, our company expects to raise additional capital or secure other sources of financing to support its business plan and growth.

Summary Statement of Cash Flows for the Three Months Ended December 31, 2025, and the Three Months Ended December 31, 2024

The following table sets forth the primary sources and uses of cash for the periods presented below:

For the Three Months Ended December 31, 2025 For the Three Months Ended December 31, 2024
Net cash used in operating activities $(3,989,840) $(3,242,526)
Net cash used in investing activities (3,058,681) (3,560,000)
Net cash provided by financing activities 381,328,870 101,562,942
Net increase in cash $374,280,349 $94,760,416

Cash Flows used in Operating Activities

Net cash used by operating activities for the three months ended December 31, 2025 was $3,989,840, which consisted of our net loss of $6,516,279, net of non-cash items of $1,608,114, and net of changes in working capital accounts of $918,325.

Net cash used by operating activities for the three months ended December 31, 2024 was $3,242,526, which consisted of our net loss of $3,113,362, net of non-cash items of $63,894, and net of changes in working capital accounts of negative $198,058.

Our cash used in operating activities increased by $747,314 during the three months ended December 31, 2025, due to an increase in net loss and changes in working capital accounts. The increase in cash used in operating activities during the three months ended December 31, 2025, when compared to the three months ended December 31, 2024, was primarily due to increased research and development activities, additional regulatory and staff costs to support our research and development activities, and additional office and professional fees during the three months ended December 31, 2025 compared to the three months ended December 31, 2024.

Cash Flows used in Investing Activities

Net cash used by investing activities for the three months ended December 31, 2025 was $3,058,681 representing $1.4 million payments related to construction in progress of property acquired in Oak Brook Illinois and $1.6 million in deposits related to additional acquisitions of property and further construction.

Net cash used by investing activities for the three months ended December 31, 2024 was $3,560,000 representing the payment of deposits towards the acquisition of the USNC Assets that closed subsequent to December 31, 2024.

Cash Flows provided by Financing Activities

Net cash provided by financing activities for the three months ended December 31, 2025 was $381,328,870, which consisted of approximately $2.5 million from exercises of warrants, $0.5 million from exercises of stock options, and $400,000,333 in cash received from our October 2025 private placement offering less $21,520,711 of corresponding offering costs, and less $135,500 in deferred financing costs.

Net cash provided by financing activities for the three months ended December 31, 2024 was $101,562,943, which consisted of approximately $8 million from exercises of warrants, $1.2 million from exercises of stock options, and $101,400,012 in cash received from the issuance of shares of common stock from equity financings, less $9,058,855 in offering costs.

Commitments

As of December 31, 2025 and September 30, 2025, we had two long-term operating leases corresponding to (1) our corporate headquarters located at 10 Times Square, 30th Floor, New York, New York and (2) space being used as a technology demonstration facility in Westchester County, New York. Our corporate headquarters cover approximately 7,800 square feet. We lease this space for $33,605 per month whereby the monthly lease rent will increase by 2.5% on an annual basis. The lease has a term ending on July 31, 2031. Our demonstration facility covers approximately 6,800 square feet in Westchester County, New York. We lease this space for $17,000 per month whereby the monthly lease rent will increase by 2.5% on an annual basis. The lease has a term ending on December 31, 2030.

Off-Balance Sheet Arrangements

As of December 31, 2025 and September 30, 2025, we have not engaged in any off-balance sheet arrangements, as defined in the rules and regulations of the SEC.

Market risk

As filed, 867 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We are exposed to the impact of changes in interest rates and foreign currency exchange rates in the normal course of business and to market price fluctuations related to our financial investments. We may have involvement with derivative financial instruments and use such instruments to the extent necessary to manage exposure to foreign currency fluctuations. At December 31, 2025, we performed sensitivity analyses to assess the potential loss in the fair values of market risk sensitive instruments resulting from a hypothetical change of 10 percent in foreign currency exchange rates, a 10 percent decline in the market value of our long-term investments, or a 10 percent change in interest rates. Based upon the analyses performed, such changes would not be expected to materially affect our consolidated financial position, results of operations or cash flows.

Controls and procedures

As filed, 1,984 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Evaluation of Disclosure Controls and Procedures

Under the supervision and with the participation of our management, including our principal executive officer and principal financial officer, we conducted an evaluation of the effectiveness of our disclosure controls and procedures as of the period ended December 31, 2025, as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act. Based on this evaluation, our principal executive officer and principal financial officer have concluded that our disclosure controls and procedures were effective as of December 31, 2025. Accordingly, our management believes that the unaudited condensed consolidated financial statements included in this Report present fairly in all material respects our consolidated financial position, results of operations and cash flows for the periods presented. In addition, because we are an “emerging growth company” as defined under the terms of the JOBS Act of 2012, our independent registered public accounting firm is not required to issue an attestation report on our internal control over financial reporting.

Disclosure controls and procedures are designed to ensure that information required to be disclosed by us in our SEC filing reports is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer or persons performing similar functions, as appropriate, to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

There have been no changes in internal control over financial reporting (as defined in Rule 13a-15(f) of the Exchange Act) during the quarter ended December 31, 2025, that materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.

Risk factors

As filed, 1,132 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Factors that could cause our actual results to differ materially from those in this Report include the risk factors described in our filings with the SEC, including the section titled “Risk Factors” in our 2025 Annual Report. Any of these factors could result in a significant or material adverse effect on our results of operations or financial condition. We may disclose changes to such risk factors or disclose additional risk factors from time to time in our future filings with the SEC.

As of the date of this Report, except as set forth below, there have been no material changes to the risk factors disclosed in our prior SEC filings, including our 2025 Annual Report.

On January 16, 2026, we received a subpoena for documents from the Securities and Exchange Commission (“SEC”) relating to two service providers. This subpoena, which is part of an investigation by the SEC, follows an initial request for information by the SEC to us in April 2025. We completed a voluntary production of documents in August 2025. We are cooperating fully with the SEC. At this juncture, we cannot predict the outcome of the investigation.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Research and development3 months2025-10-01 to 2025-12-31$5.4mus-gaap:ResearchAndDevelopmentExpense
Net income3 months2025-10-01 to 2025-12-31−$6.5mus-gaap:NetIncomeLoss
Diluted EPS3 months2025-10-01 to 2025-12-31−$0.13us-gaap:EarningsPerShareDiluted
Basic EPS3 months2025-10-01 to 2025-12-31−$0.13us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2025-10-01 to 2025-12-3149,807,203 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow3 months2025-10-01 to 2025-12-31−$4.0mus-gaap:NetCashProvidedByUsedInOperatingActivities
Cash and equivalentsAt period end2025-12-31$577.5mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2025-12-31$580.8mus-gaap:AssetsCurrent
Total assetsAt period end2025-12-31$606.1mus-gaap:Assets
Current liabilitiesAt period end2025-12-31$4.3mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-12-31$6.5mus-gaap:Liabilities
Shareholders' equityAt period end2025-12-31$599.6mus-gaap:StockholdersEquity