Nano Nuclear Energy Inc.: Form 10-Q for the period ended Mar 31, 2026
Filed with the SEC on May 14, 2026 and accepted by EDGAR at May 14, 2026, 20:05 ET.
Management's discussion and analysis
As filed, 55,034 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
You should read the following discussion and analysis of our financial condition and results of operations of the unaudited financial statements and related notes included elsewhere in this Report. Data as of and for the year ended September 30, 2025 has been derived from our audited consolidated financial statements. Data as of and for the three and six months ended March 31, 2026 and 2025 has been derived from our unaudited condensed consolidated financial statements appearing in this Report.
The following discussion contains forward-looking statements, such as those relating to our plans, objectives, expectations, intentions, and beliefs, which involve significant risks, uncertainties and assumptions. Our actual results could differ materially from those discussed in these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those identified below and those discussed in the section titled “Cautionary Note Regarding Forward-Looking Statements” in this Report.
In particular, readers should note that in this Report, we provide our current estimated timelines for advancing and commercially launching our business lines, including key assumptions and variables. Based on our management’s experience, expertise and communications with applicable regulators and other stakeholders (such as third-party contractors), we believe we have a sufficient basis to provide reasonable timing estimates for our efforts, and our expectation is that we will meet such timing for our proposed business lines. However, readers are cautioned that our business plans are evolving and remain subject to the completion of ongoing technical, regulatory, and operational preparations, which are inherently uncertain and risky given the nature of our business and may be affected by factors beyond our control. Accordingly, no assurances can be given that we will be able to progress and commercially launch our several business lines as currently anticipated, or that such progress or commercial launches will occur in the timeframes we anticipate, if at all. For further information, please see the “Cautionary Note Regarding Forward-Looking Statements” and the “Risk Factors” section of this Report and in our Annual Report on Form 10-K for the year ended September 30, 2025, which was filed on December 18, 2025.
All references to “we,” “us,” “our” and the “Company” refer to NANO Nuclear Energy Inc., a Nevada corporation and its consolidated subsidiaries unless the context requires otherwise.
Overview
We are a nuclear energy and technology company developing smaller, simpler, and safer advanced clean energy solutions, utilizing proprietary reactor designs, intellectual property and research methods to build the sustainable energy solutions of the future. Led by a world class scientific and management team, our business plan involves comprehensive engagement across every sector of the nuclear power and energy industry, traversing the path from sourcing raw materials through to developing cutting edge advanced nuclear microreactors. Our dedication extends further, encompassing ambitions within the commercial nuclear fuel transportation sector, of the nuclear energy fuel supply chain, technology development, and nuclear consulting services.
To date, we have not generated any material revenues. For the three and six months ended March 31, 2026 and the year ended September 30, 2025, our net loss was approximately $9.2 million, $15.7 million and $40.1 million, respectively, and our accumulated deficit was approximately $73.5 million, $73.5 million and $57.5 million, respectively.
We are principally focused on the following four business lines as part of our development strategy:
- Nuclear Reactor Business. We are developing the next generation of advanced nuclear microreactors, with our current principal allocation of time and capital resources directed toward the development of our KRONOS MMR™ Energy System. This high technology readiness level (or TRL), high-temperature gas-cooled reactor (or HTGR), Tristructural-Isotropic (or TRISO) fueled is designed for both small- and large-scale operations, optimizing between size and output to allow for modularity and easier mass manufacturing, and efficient scalable energy generation. Our company, in collaboration with the University of Illinois at Urbana-Champaign (“UIUC”), will construct, obtain regulatory approval for, and deploy a KRONOS MMR™ research and test reactor on the UIUC campus. On April 2, 2026, we issued a press release announcing the formal submission of the Construction Permit Application by The Grainger College of Engineering at the UIUC, our partner for the KRONOS MMR™ deployment, to the NRC. Our KRONOS MMR™ reactor at UIUC is being developed as a research microreactor intended primarily for demonstration, testing, and research purposes. We also intend, subject to applicable approvals and arrangements, to supply power generated by the KRONOS MMR™ reactor to the UIUC grid. The reactor is expected to be a full-scale system – analogous to the commercial KRONOS MMR™ reactor we intend to sell and deploy after receiving an operating license. The UIUC project will also serve as the reactor which the NRC will be evaluating as part of its licensing process for the entire system under the Part 50 licensing rules and regulations. Subject to the NRC review timeline, completion of required safety and environmental reviews, construction activities, and successful commissioning, we expect the KRONOS MMR™ to achieve initial operation or research availability around 2030. The KRONOS MMR™ reactor is currently under development and is subject to applicable licensing processes required for its potential commercialization as a power-producing product. Until the reactor is fully developed and required approvals are obtained, our development activities are focused on technology demonstration, fuel qualification, and design validation. Our portfolio of reactors also includes the LOKI MMR™ reactor, a portable nuclear reactor designed for versatility in application and deployment, and particularly utilized for space applications, which is also a HTGR utilizing TRISO fuel, and ZEUS™ reactor, a portable modular solid core battery reactor ideal for military applications. Through the collaboration of our world-renowned nuclear scientists and engineers, the U.S. national nuclear laboratories, and government support, we believe our reactors will have the potential to impact the global energy landscape. Our goal is to commercially launch these products in the 2030s, and we are aiming to commercially launch the KRONOS MMR™ Energy System first in the early 2030s as we are currently dedicating a substantial majority of time and resources to such project. There can be no assurance that we will attain our construction, licensing and commercialization goals for our microreactors as currently anticipated.
- Fuel Supply Chain Business. Through our subsidiary, HALEU Energy Fuel Inc., and in coordination with the DOE, we are also seeking to develop a domestic LEU and HALEU fuel supply chain to supply fuel not only for our own reactors, but also to the broader advanced nuclear reactor industry. In December 2024, we announced that LIST, our related party through common ownership and management (see Note 9), and our Company were selected by the DOE to participate as one of six contract awardees in the DOE’s LEU Acquisition Program. Under the contract awarded to LIST, LIST was selected as the prime contractor, with our Company as the key subcontractor bringing our technical and regulatory expertise in advanced nuclear solutions to the collaboration (see Note 9 for further information). We are also evaluating ways to participate in other key aspects of the nuclear fuel supply chain in areas such as conversion through commercial agreements or acquisitions to achieve our goal of vertical integration across key aspects of the nuclear fuel cycle. Based on our active engagement regarding potential acquisitions or partnerships, we anticipate launching our fuel supply chain business in the second half of 2026, which is dependent on our success in consummating such transactions. As of the date of this Report, we have not yet entered into any definitive agreement for commercially launching our fuel supply chain business. There can be no assurance that we will proceed with the launch as currently anticipated.
- Fuel Transportation Business. Through our subsidiary, Advanced Fuel Transportation Inc., we are developing a high-capacity HALEU transportation product, capable of moving commercial quantities of HALEU fuel, which we expect to integrate into our fuel transportation business. Our fuel transportation business will build on existing work completed at the INL, ORNL and PNNL, the world’s premier U.S.-backed nuclear research facilities. Commercial launch of this business has been dependent on our progress in acquiring assets and businesses within the nuclear transport industry to provide our company with the capabilities to internally move the materials, reactors, and fuels inherent within a reactor deployment operation. We are actively evaluating the potential acquisition of an existing, revenue-generating business focused on the transportation of nuclear fuel and nuclear waste that could provide internal and external capabilities to support future nuclear fuel logistics requirements for our company and third parties. There can be no assurance that we will proceed with any such acquisition as currently anticipated.
- Nuclear Consultation and Technical Services. We also see an opportunity to provide nuclear technical support and consultation services for the resurgent and expanding nuclear energy industry in the future, primarily by acquiring businesses whose technical expertise will provide internal capabilities necessary to support us in developing and deploying its reactors or advancing its fuel supply chain business. Regulatory approval is not required to provide such services. As of the date of this Report, we have not yet formally launched our nuclear consultation business, although we generated a small amount of revenue from providing such services during our 2025 fiscal year. The timing and formal launch of this business, should we elect to proceed, will depend on our ability to identify and complete its evaluation of potential acquisition targets and to consummate one or more such acquisitions, as well as the satisfaction of applicable conditions.
Our Mission
Our mission is to become a commercially focused, diversified and vertically integrated nuclear energy company that will capture market share in the very large and growing nuclear energy sector. To implement our plans, since our founding in 2022, our management has had constant communications with key U.S. government agencies, including the DOE, the INL and ORNL, which are a part of the DOE’s national nuclear laboratory system. Our company also maintains important collaborations with leading researchers from the Cambridge Nuclear Energy Centre and The University of California, Berkeley.
Overview of Operational Plan and Estimated Timelines for Corporate Achievements
We continue to benefit from a global nuclear energy renaissance driven by several long term, sustainable growth trends and significant regulatory tailwinds. These include growth in AI data centers, industrial reshoring, and broader electrification, all driving a significant need for clean and reliable power, energy sustainability and independence, and climate mandates requiring reliable zero-emissions energy. All of this comes at a time of unprecedented bipartisan legislative and policy support in the U.S. for nuclear energy. Equally important, there is growing recognition that advanced reactors like the ones we are developing will be critical to future clean energy infrastructure.
For our fiscal year 2026 (the period from October 1, 2025 to September 30, 2026), we will continue to progress the development of our advanced reactors (notably the KRONOS MMR reactor prototypes in the U.S. and Canada) and our vertically integrated business plan, with estimated cash expenditures to be approximately $65 million. This allocation comprises approximately $43 million dedicated to the research, development, quality assurance, licensing, and physical test work of our microreactors and other technologies. A further amount of approximately $12 million will be allocated to activities related to our nuclear fuel supply chain business, the related-party uranium enrichment company with whom we collaborate and in which we have made a strategic investment. The remaining approximately $10 million is earmarked for miscellaneous costs essential to propelling the progress of our microreactors, encompassing the support of current personnel engaged in executive, finance, accounting, and other administrative functions. We assess our cash expenditure estimates each quarter during the fiscal year, and there are no material changes to the estimated expenditures for the 2026 fiscal year as of the date of this Report. However, we may utilize our cash resources raised in 2024 and 2025 for acquisitions of complementary businesses or assets. As such, and for a variety of other factors, our estimated cash expenditures may differ substantially from the above estimates and if we find it desirable or necessary to utilize cash resources faster than we currently plan. Our projected expenditures are expected to be partially offset by interest income generated from our significant cash and cash equivalent balances.
We have made material progress advancing the KRONOS MMR™ since acquiring the asset in January of 2025. On March 29, 2025, we executed a Sponsored Research Agreement Amendment No. 2 with The Board of Trustees of the University of Illinois (referred to for these purposes as “U of I”) that substituted our company as an assignee of the rights and obligations of USNC regarding the sponsored research relationship with UIUC for the KRONOS MMR™ project. Under the Sponsored Research Agreement and its amendments (the “UIUC Agreement”), our company, in collaboration with U of I, will construct, obtain regulatory approval for, and deploy a KRONOS MMR™ research and test reactor on the UIUC campus. The UIUC Agreement as entered into with U of I is effective January 1, 2022, and will terminate on February 28, 2027, unless terminated earlier under certain stipulations. In December of 2025, we signed a Memorandum of Understanding (MOU) with the U. of I. on behalf of UIUC to collaborate on the development, construction, and operation of its KRONOS MMR™ on campus as an advanced research reactor. While the aforementioned definitive sponsored research agreement between NANO Nuclear and U. of I. provided for U. of I.’s support in design and regulatory licensing of the prototype KRONOS MMR™, the December 2025 MOU set forth the next steps for the design, construction, ownership and ultimate operation of a KRONOS MMR™ on the UIUC campus.
In late April 2025, the NRC issued its final Safety Evaluation (SE) approving the Fuel Qualification Methodology Topical Report (FQM TR) for the advanced fuel design to be used in the KRONOS MMR™ Energy System. The FQM TR is a technical document that defines the analytical framework and testing approach by which irradiation data and fuel performance information will be evaluated to demonstrate that the KRONOS MMR™ fuel meets NRC safety and reliability requirements. Approval of the FQM TR does not in itself authorize construction or operation of the KRONOS MMR™ reactor; rather, it represents NRC approval of the methodology that will be used to qualify the fuel in subsequent testing and licensing steps. Following NRC approval of the FQM TR, we have initiated the fuel qualification program using the NRC-approved methodology. Fuel qualification is a staged and iterative process that includes defining test plans, generating and evaluating fuel performance data, and documenting results.
On April 2, 2026, we announced that a Construction Permit Application (CPA) had been formally submitted by The Grainger College of Engineering at the U. of I., our partner for the KRONOS MMR™ deployment, to the NRC. With this submission, we become the first commercially-ready microreactor developer and the third commercially-ready Generation IV advanced reactor developer to submit a CPA, placing us among a small group of advanced nuclear companies progressing toward commercial deployment. The CPA submission represented a significant milestone for the KRONOS MMR™ in its progression from engineering design to potential construction on the campus of the U of I, through the reactor licensing process, and ultimately toward commercial deployment. Our regulatory activities prior to the submission were conducted within the NRC’s pre-application framework, which had included multiple technical submittals, meetings, and NRC staff feedback towards our technical submittals documented on the NRC’s public pre-application docket for UIUC. In order to make the CPA submission, the Company had to complete NRC pre-application engagement and technical interactions, completion of site characterization activities and development of site-specific inputs (including collecting and preparing location-specific technical, environmental, and engineering information to support regulatory filings and design work for a particular site), preparation of the environmental report required to support a construction permit application, preparation of preliminary safety analyses and application documentation, and initiation and ongoing execution of the NRC-approved fuel qualification program in accordance with its approved scope and phased development plan. With respect to site-specific work, we engaged AECOM, a multi-disciplinary engineering firm, in June 2025 to support site characterization, engineering, environmental analysis, and regulatory planning activities associated with the proposed reactor site at UIUC.
While the environmental report and safety analysis must be submitted with the application, the NRC’s detailed safety and environmental reviews occur after the application is docketed and may involve requests for additional information, audits, hearings, and public participation as part of the NRC’s review process. We will also continue fuel qualification activities during NRC review and in later licensing stages.
Following submission, the NRC will conduct an acceptance review to determine whether the application is sufficiently complete to docket. NRC guidance indicates that this acceptability determination is generally expected to occur within approximately 60 days; however, timing may vary. We currently expect to receive the CPA approval in ~12 months following the application being docketed, or sometime in mid-2027, subject to the NRC’s review process. We estimate this will be the first construction permit for a commercially-ready microreactor issued in the United States. The permit application will not incur any government fees, as the KRONOS MMR™ reactor, due to its location at UIUC, qualifies for a fee exemption under applicable regulations due to its use for research purposes.
After docketing, the duration of the NRC’s safety and environmental reviews is not fixed. There can be no assurance as to the timing of completion of such reviews. The duration of the NRC’s review process may vary materially based on numerous factors, including, among other things, the completeness and quality of the application at submission, the number and complexity of NRC requests for additional information, the extent to which the application relies on previously reviewed topical reports, NRC staffing and resource availability, the scope and outcome of any required hearings, and the type and complexity of the environmental review, including whether an environmental impact statement is required. Accordingly, the timing of NRC review and any resulting licensing decisions is inherently uncertain and largely outside the Company’s control and any delays in the review process could materially and adversely affect the Company’s business, financial condition, and results of operations.
To support the building of our first prototype reactor at the U of I and further development of our KRONOS MMR™ reactor, on July 30, 2025, we announced our acquisition of a 2.75-acre land and building package in Oak Brook, Illinois to serve as a regional demonstration and office facility. This facility is intended to support engineering, component manufacturing and assembly, prototype fabrication, non-nuclear testing, research and development activities, and administrative functions. We have undertaken significant work on retrofitting this facility to meet our anticipated needs, although the timing, scale, and configuration of our Oak Brook facility will depend and may change based on multiple factors, including permitting, availability of skilled labor, supply chain readiness, financing, and alignment with our regulatory and commercialization milestones. We will continue activities for our Oak Brook facility in the coming years in a manner aligned with the advancement of our reactor programs or other needs. Initial facility capabilities will focus on research, development, and prototype support, with manufacturing capabilities expanded over time as regulatory approvals are obtained and commercial demand materializes.
On October 7, 2025, we announced that, with the support of Governor JB Pritzker and the Illinois Department of Commerce and Economic Opportunity, we will establish a manufacturing and research and development facility in Illinois. We plan to make an investment of more than $12 million with the support from the Reimagining Energy and Vehicles in Illinois (REV Illinois) program, which is expected to enable us to establish our operations and create 50 new full-time jobs in Illinois. For this effort, we will receive $6.8 million in incentive awards from the REV Illinois program.
On April 9, 2026, we announced that we have been awarded a Gateway for Accelerated Innovations in Nuclear (GAIN) Voucher, NE-26-38854, by DOE relating to our KRONOS MMR™ Energy System titled, “Uncertainty Quantification and Sensitivity Analysis Support for NANO Nuclear Reactor Design Using ORNL’s Tools – SCALE/TSUNAMI.” In collaboration with the ORNL, we will apply the SCALE/TSUNAMI code suite to quantify the impact of nuclear data, modeling assumptions, and operational parameters on key reactor physics metrics, including reactivity, power distribution, and temperature coefficients. ORNL’s analytical tools and expertise, which are recognized by the NRC, will enable development of a validated UQ framework tailored to the KRONOS MMR™ design.
Significant capital will be needed to support our facility construction, licensing, fuel qualification testing, regulatory compliance, prototype construction, and workforce expansion for the development of our microreactors. We estimate that the capital costs needed to construct prototype KRONOS MMR™ reactors at the UIUC and Canada over the next several years could be around $300 million to $350 million per reactor. This range reflects inherent uncertainty in building a first-of-a-kind (FOAK) reactor due to several factors that can result in a material increase to these estimates, including site specific factors, the timing and scope of project development and regulatory licensing and supply chain considerations. At the same time, we are evaluating several potential non-dilutive funding sources, including government incentives and strategic funding support to reduce the cost of these FOAK reactors. Subsequent reactors’ capital costs are expected to decline substantially due to supply chain scaling for mass production of components, factory fabrication, modular assembly, and multiple deployments.
In Canada, following our acquisition of GFPL and the Chalk River Licensing Application, followed by GFPL’s recent rebranding to True North Nuclear (see Note 10 to the accompanying unaudited consolidated financial statements for background information), we are working to finalize a formal agreement with a partner for a potential Chalk River Project. Upon finalization of an agreement for the project, the timing of which is uncertain, we aim to initiate formal licensing activities with the CNSC through a submission of a License to Prepare Site (LTPS) application with the CNSC.
With respect to the LOKI MMR™ system, we are still in the process of assessing and developing demonstration, licensing and commercial launch timelines for this reactor, while also assessing potential strategic partners that could help accelerate development and commercialization.
With respect to our ZEUS reactor, we are examining slight modifications of the design to create an even smaller, more mobile reactor system, allowing for an increased number of applications which do not overlap with our other reactors, KRONOS and LOKI. The solid core concept permits a degree of simplicity, and fewer working parts, than other reactor types – we are working on exploiting these inherent advantages to provide this product in the market.
Readers are cautioned that the outlined expenditures and the anticipated timelines for execution of our plans discussed above and throughout this Management’s Discussion and Analysis of Financial Condition and Results of Operations are estimations only. These are inherently subject to change due to certain factors, including adjustments in the microreactor development plan and uncertainties associated with the governmental licensing approval process. Given that these elements may exceed our initial expectations or lie beyond our control, we cannot guarantee the accuracy of the actual expenditures and timelines.
Factors, Risks and Trends Affecting Our Business and Results of Operations
Our Ability to Develop Our Microreactors
Our results of operations and our long-term prospects are significantly influenced by factors and trends related to the development, commercialization, and regulatory advancement of our microreactors. KRONOS™ MMR reactor is our lead reactor program and is being designed as a high-temperature microreactor intended for deployment for AI data centers, industrial environments, defense applications, and other off-grid settings requiring resilient, emissions-free power. The following factors and trends have impacted, and we expect will continue to impact, our KRONOS development program and our operating results.
Development of the KRONOS™ reactor is affected by the evolving regulatory framework for advanced non-light-water reactors. The NRC continues to refine guidance applicable to microreactor licensing, including siting, emergency planning, fuel qualification, and security requirements. Changes in NRC expectations, the need for additional data or analysis, or delays in regulatory review may impact our development timelines and costs. In addition, university-based demonstration efforts, including our ongoing collaboration with the UIUC, will require coordination with federal and state agencies, which may introduce uncertainties in scheduling and scope.
KRONOS™ reactor development relies on strategic collaborations with academic institutions and research organizations. Our work with UIUC includes analyses of siting suitability, infrastructure requirements, and potential demonstration pathways. Such partnerships provide access to technical expertise and research infrastructure but may be influenced by academic scheduling, funding availability, or institutional priorities. Delays or changes in partner capacity could affect program timelines.
KRONOS™ technology incorporates materials and components that require specialized fabrication processes, including high-temperature alloys, advanced coatings, and precision-engineered reactor structures. Global supply-chain conditions, vendor qualification requirements, and the availability of domestic manufacturing capacity will affect development costs and timelines. Government incentives for advanced reactor supply chains may reduce uncertainties, but broader economic factors—including inflationary pressures, material cost volatility, and logistics constraints—may continue to impact the program.
The LOKI MMR™ reactor originated as a compact, transportable nuclear microreactor design. The reactor is designed for versatility across terrestrial, marine, and space applications. It is engineered to deliver on the order of 0.5 MWe to around 3 MWe of power, making it suitable for remote deployments, off-grid energy needs, critical infrastructure support, and other distributed energy use-cases where traditional grid power is unavailable or unreliable. Its transportability via road, rail, sea, or air enables rapid deployment and modular scalability, especially when multiple units are networked for larger power requirements. The LOKI MMR™ supports diverse applications ranging from remote industrial operations to space exploration architectures. The design is positioned to support long-duration extra-terrestrial applications, including power for lunar or orbital infrastructure and potential deep-space missions.
The portable ZEUS™ reactor is a solid-core “nuclear battery” microreactor, designed to deliver long-duration, reliable, zero-emission power in locations where grid access is unavailable, unreliable, or prohibitively expensive. The ZEUS™ reactor is optimized for remote, austere, and infrastructure-limited environments, including isolated communities, mining operations, military installations, critical infrastructure sites, and international deployments where diesel generation is currently dominant. The ZEUS™ technology includes a sealed, factory-fabricated, transportable reactor system. The reactor employs a solid fuel core and emphasizes passive safety, inherent stability, and minimal operator intervention. The system is designed to function as a “set-and-forget” power source, with all major safety, control, and thermal management features integrated into a compact, hardened structure capable of withstanding extreme environmental conditions. The design philosophy prioritizes simplicity, robustness, and high technology readiness levels (TRLs), avoiding unnecessary complexity to accelerate deployment and licensing pathways.
Development of Fuel Supply Chain Business
Our strategy is to develop key steps of the fuel for our own reactors and also to position our company to supply key steps of the fuel to the wider nuclear industry and other reactor manufacturers, addressing anticipated significant shortfalls in fuel supply. Through our investment and collaboration with LIST, which we believe is the only U.S.-origin and patented laser uranium enrichment company, our goal is to progress towards being what we believe will be the most vertically integrated microreactor business in the country. This would give our business a significant competitive advantage for both our own reactor development and establishing multiple sources of future revenue to de-risk our company.
Development of Fuel Transportation Business
As we have developed our business, we believe capability deficiencies in the U.S. nuclear industry that would affect the future operation of all SMR and microreactor companies became apparent, notably, there is currently no established method for transporting commercial quantities of HALEU across North America. Our proactive approach to mitigate future impediments to our operations culminated in locating research and technology developed by INL, PNNL and ORNL, that had not been advanced because of budget constraints. We received an exclusive license for a high capacity HALEU fuel transportation basket design in April 2024, which will form the basis of a complete transportation package able to move the most commonly utilized fuel types. The license grants us, as the licensee, exclusive rights for the use and development of certain transportation technology. If developed and commercialized, we believe this product would be one of the few of its kind in North America and would serve as the basis for a domestic HALEU transportation company capable of providing commercial quantities of HALEU fuel. We plan to work with engineering contractors to obtain an NRC Certificate of Compliance under 10 CFR 71 for our transportation packages.
We also plan to establish a transportation business focused on the movement of both LEU and HALEU. Currently we are developing a regulatorily licensed, high-capacity HALEU transportation system, capable of moving commercial quantities of HALEU fuel around North America and beyond. We are also actively exploring the potential acquisition of an existing nuclear fuel transportation business as a means of launching this business line.
We are seeking to establish the first transportation company able to supply emerging SMR and microreactor companies with the fuel they require at their manufacturing facilities to construct their reactors. We also expect to service the national nuclear laboratories and DOE programs which require HALEU by providing the fuel for their programs. Mobile reactors requiring HALEU for remote military bases are also anticipated, with potential military contacts. In 2026, our fuel transportation business will build on the work already completed by INL and ORNL to create a high-capacity HALEU transportation package. In September 2024, we signed an agreement with GNS to undertake a wide-ranging project to produce an optimized HALEU transportation system solution based on our exclusively licensed fuel transportation basket design. The GNS agreement encompasses a study for the transport of multiple HALEU nuclear fuel types, including uranium oxide, TRISO particles, uranium-zirconium hydride, uranium mononitride, and salt fuel for molten salt reactors, thus optimizing the quantity of material that can be transported and developing a conceptual package design that will accommodate the new basket design. We are receiving support from two former executives of the largest shipping company in the world who are assisting us in developing a North American transportation company using our licensed or developed technology to deliver (subject to applicable government licensing and certification) nuclear fuel for a wide customer base, including SMR and microreactor companies, national laboratories, military, and DOE programs.
Obtaining Regulatory Licensing
The regulatory licensing process for our microreactor prototypes is expected to be completed in the early 2030s, with manufacturing facilities being constructed during the licensing phase so we are ready to deploy microreactors (most notably our KRONOS MMR™) globally upon licensing approval. Our KRONOS MMR™ reactor system has already undergone important pre-licensing activities, including the submission of a Regulatory Engagement Plan, several White Papers and Topical Reports, and NRC approval for Fuel Qualification Methodology for the advanced fuel design to be used in our KRONOS micro modular reactor energy system. Our ability to successfully license and certify our microreactors will subsequently be dependent on working through the licensing process with the NRC (and, as applicable, Canadian and other regulators) and satisfying their examinations that the reactor is safe to deploy to customers, provided the agreed protocols are adhered to. Our ability to successfully design and construct our own commercial nuclear fuel facilities will be dependent on obtaining the necessary regulatory approvals from the NRC and other applicable authorities to permit the commercial deployment of microreactors. On April 2, 2026, we issued a press release announcing the formal submission of the Construction Permit Application by The Grainger College of Engineering at the UIUC, our partner for the KRONOS MMR™ deployment, to the NRC.
As it relates to any potential fuel cycle facilities, the NRC inspects the site construction of new fuel cycle facilities and only approves the facility’s capability to possess nuclear material after ensuring that the facility’s safety controls are robust and able to safely handle these materials. Fuel cycle facilities must comply with the regulatory requirements established by the NRC. The facility will need to acquire an NRC license containing site-specific requirements that the facility is required to comply with. Each license is unique and is specific to the nuclear material and hazards present at the fuel cycle facility. To obtain a license will involve significant communication and interaction between the NRC and our company. NRC safety oversight includes three important components: NRC inspection, the routine assessment of each licensee’s performance, and enforcement in the case that the regulatory requirements are not met. We will also develop an environmental report to support any fuel cycle facility application and will work with the NRC through the process established under the National Environmental Policy Act of 1970, which will begin when a federal agency develops a proposal to take a major federal action.
EGC and Smaller Reporting Company Status
As of March 31, 2026, we continue to qualify as an “emerging growth company” as defined in the Jumpstart Our Business Startups Act of 2012. However, as of such date, we no longer qualify as a “smaller reporting company” as defined under Rule 12b-2 of the Exchange Act due to our public float exceeding the applicable threshold for smaller reporting company status. Accordingly, while we remain eligible to take advantage of certain reduced reporting and disclosure requirements applicable to emerging growth companies, we are no longer entitled to the reduced disclosure requirements available to smaller reporting companies. Notwithstanding the foregoing, we continue to qualify as a non-accelerated filer under the Exchange Act until September 30, 2026.
Results of Operations
Comparison of the Three Months Ended March 31, 2026 and the Three Months Ended March 31, 2025
Revenue
We have not generated any material revenue from our inception through March 31, 2026.
Expenses
Research and Development Expense
Our research and development expenses represent costs incurred for designing and engineering products, including the costs of developing design tools. All research and development costs related to product development are expensed as incurred.
Research and development expenses decreased by $1,053,116 or 16%, to $5,659,427 for the three months ended March 31, 2026, compared to $6,712,543 for the comparative period ended March 31, 2025. This overall decrease was entirely driven by a reduction in research and development-related equity-based compensation. During the three months ended March 31, 2026 and 2025, $646,762 and $4,700,077, respectively, of our total research and development expenses corresponded to equity-based compensation. Excluding this non-cash equity-based compensation, our core research and development expenses, which primarily reflect internal and external personnel costs corresponding to the design and analysis of our microreactors, actually increased by approximately $3.0 million, reflecting our continued operational investment in microreactor development during the period.
General and Administrative Expense
Our general and administrative expenses consist of compensation costs for personnel in executive, finance, accounting, and other administrative functions. General and administrative expenses also include legal fees, professional fees paid for accounting, auditing, consulting services, advertising costs, and insurance costs.
General and administrative expenses decreased by $7,107,866, or 45%, to $8,589,312 for the three months ended March 31, 2026, compared to $15,697,178 for the comparative period ended March 31, 2025. This overall decrease was entirely driven by a significant reduction in equity-based compensation. During the three months ended March 31, 2026, general and administrative expenses primarily consisted of $5.2 million in total personnel costs, of which $2.0 million corresponded to equity-based compensation and $1.9 million in professional fees for legal and audit costs. In contrast, during the three months ended March 31, 2025, expenses primarily consisted of $12.6 million in total personnel costs, of which $11.8 million corresponded to equity-based compensation and $1.7 million in professional fees. Excluding the impact of non-cash equity-based compensation, our core general and administrative expenses increased during the current period, primarily due to the aforementioned rise in professional fees and additional office and staff costs required to support our research and development activities.
Revaluation of contingent consideration
Revaluation of contingent consideration corresponds to equity based contingent consideration corresponding to the ALIP technology we acquired which is revalued at the end of each financial quarter based on the closing stock price of our common stock.
The revaluation of contingent consideration resulted in an expense recovery of $176,500 for the three months ended March 31, 2026, compared to an expense of $78,250 for the comparative period ended March 31, 2025, as a result of our acquisition of the ALIP technology on June 21, 2024.
Other Income
During the three months ended March 31, 2026 and 2025, we earned interest income of $4,632,690 and $1,158,252, respectively, on our cash and cash equivalents held at a financial institution. In addition, during the three months ended March 31, 2026 and 2025, we earned $21,000 and $21,000, respectively, from a lease agreement from a related party.
Comparison of the Six Months Ended March 31, 2026 and the Six Months Ended March 31, 2025
Revenue
We have not generated any material revenue from our inception through March 31, 2026.
Expenses
Research and Development Expense
Our research and development expenses represent costs incurred for designing and engineering products, including the costs of developing design tools. All research and development costs related to product development are expensed as incurred.
Research and development expenses increased by $3,442,372, or 45%, to $11,059,838 for the six months ended March 31, 2026, compared to $7,617,466 for the comparative period ended March 31, 2025. This increase was primarily driven by a significant ramp-up in core research and development activities related to our microreactors during both the first and second quarters of the current fiscal year. These core expenses primarily reflect internal and external personnel costs corresponding to the design and analysis of our microreactors. The overall increase in total research and development expenses was partially offset by a reduction in research and development-related equity-based compensation. During the six months ended March 31, 2026 and 2025, $1,216,271 and $4,700,077, respectively, of our research and development expenses corresponded to equity-based compensation.
General and Administrative Expense
Our general and administrative expenses consist of compensation costs for personnel in executive, management, regulatory, finance, accounting, and other administrative functions. General and administrative expenses also include professional fees paid for legal, auditing and accounting services, consulting services, regulatory and compliance costs, lease and office costs, advertising costs, and insurance costs.
General and administrative expenses decreased by $2,715,834, or 15%, to $15,475,915 for the six months ended March 31, 2026, compared to $18,191,748 for the comparative period ended March 31, 2025. This overall decrease was entirely driven by a significant reduction in equity-based compensation. During the six months ended March 31, 2026, general and administrative expenses primarily consisted of $9.5 million in total personnel costs, of which $3.5 million corresponded to equity-based compensation and $3.8 million in professional fees for legal and audit costs. In contrast, during the six months ended March 31, 2025, expenses primarily consisted of $13.4 million in total personnel costs, of which $11.8 million corresponded to equity-based compensation and $2.5 million in professional fees. Excluding the impact of non-cash equity-based compensation, our core general and administrative expenses increased significantly during the current six-month period. This increase was primarily due to the aforementioned rise in professional fees and additional office and staff costs required to support our expanding research and development activities.
Revaluation of contingent consideration
Revaluation of contingent consideration corresponds to equity-based contingent consideration corresponding to the ALIP technology we acquired which is revalued at the end of each financial quarter based on the closing stock price of our common shares.
The revaluation of contingent consideration was $904,000 for the six months ended March 31, 2026, compared to $602,500 for the comparative period ended March 31, 2025, as a result of our acquisition of the ALIP technology on June 21, 2024.
Other Income
During the six months ended March 31, 2026 and 2025, the company earned interest income of $9,553,397 and $1,947,631, respectively, on its cash held at financial institutions. During the six months ended March 31, 2026 and 2025, the Company earned $42,000 and $42,000, respectively, from a lease agreement with LIST, a related party. Also, during six months ended March 31, 2026, the Company earned $71,850 from consulting services.
Liquidity and Capital Resources
We have been able to utilize our status as a public company to raise significant capital since our May 2024 initial public offering. As such, we believe that our existing cash will fund our current operating and research and development plans through at least the next twelve months from the date of this Report. We have coupled our fundraising with what we believe is a prudent deployment of capital as we move our business forward. Although we experienced operating cash outflows of $9.3 million and $5.6 million for the six months ended March 31, 2026, and 2025, respectively, we maintain a robust liquidity profile. As of March 31, 2026, we held $568.7 million in total liquidity, consisting of $197.7 million in cash and cash equivalents and $371 million in short-term U.S. Treasury securities. This represents a significant increase from September 30, 2025, when we held $203.3 million in cash and cash equivalents and no short-term investments. Additionally, our working capital increased to $565.7 million as of March 31, 2026, compared to $200.8 million at our prior fiscal year-end. On March 13, 2026, our 2025 Shelf Registration Statement was declared effective by the SEC, which registers the offer and sale of securities with an aggregate offering price of up to $900 million. Of this amount, up to $400 million may be offered pursuant to an “at-the-market” offering program, which we may utilize from time to time in the future if needed and subject to market conditions (See Note 5 to the accompanying unaudited consolidated financial statements for background information).
However, the future development of our business towards ultimate commercialization of our products will require significant amounts of cash resources. Since we do not anticipate generating meaningful revenues for several years, we intend to finance our future cash requirements for capital expenditures, research and development and business development activities and general working capital through public or private equity or debt financings, third-party (including government) funding, or any combination of these approaches. If we raise additional funds through further issuances of equity or equity-linked instruments, our existing stockholders could suffer significant dilution. Moreover, no assurances can be given that we will be able to raise required funding on favorable terms, if at all, and our inability to raise additional funding when needed could have a material adverse effect on our company and results of operations and could cause our business to fail.
Going Concern
As part of issuing our unaudited condensed consolidated financial statements, we evaluated whether there were any conditions and events that raise substantial doubt about our ability to continue as a going concern over the twelve months after the date the unaudited condensed consolidated financial statements were issued. Since inception, we have incurred significant operating losses, and have an accumulated deficit of approximately $73 million and negative operating cash flow during the six months ended March 31, 2026 and 2025. Management expects that operating losses and negative cash flows may increase from the 2025 and 2026 levels because of additional costs and expenses related to our research and development activities. Our continued solvency is dependent upon our ability to obtain additional working capital to complete the design, construction, demonstration, regulatory licensing and ultimately commercialization of our reactors in development and other technologies and contemplated services.
To date, we have not generated any material revenue. We do not expect to generate any significant revenue unless and until we are able to commercialize our reactors. We will require additional capital to develop our reactors and to fund operations for the foreseeable future. We expect our costs to increase in connection with advancement of our reactors toward commercialization and develop our other lines of business. While we believe that our existing cash may be sufficient to support our development in the near-term, certain costs are not reasonably estimable at this time and we will require additional funding.
Management is of the opinion that sufficient working capital is available to meet our company’s liabilities and commitments as they come due for at least the next twelve months after the date the unaudited condensed consolidated financial statements are issued to conform to the going concern uncertainty period. In order to achieve our company’s long-term strategy, our company expects to raise additional capital or secure other sources of financing to support its business plan and growth.
Summary Statement of Cash Flows for the Six Months Ended March 31, 2026, and the Six Months Ended March 31, 2025
The following table sets forth the primary sources and uses of cash for the periods presented below:
| For the Six Months Ended March 31, 2026 | For the Six Months Ended March 31, 2025 | |
|---|---|---|
| Net cash used in operating activities | $(9,254,201) | $(5,620,979) |
| Net cash used in investing activities | (380,500,548) | (12,700,891) |
| Net cash provided by financing activities | 384,182,368 | 108,365,064 |
| Net (decrease) increase in cash | $(5,572,381) | $90,043,194 |
Cash Flows used in Operating Activities
Net cash used by operating activities for the six months ended March 31, 2026 was $9,254,201, which consisted of our net loss of $15,696,445, net of non-cash items of $4,203,320, and net of changes in working capital accounts of $2,238,924.
Net cash used in operating activities for the six months ended March 31, 2025 was $5,620,979, which consisted of our net loss of $24,422,083, net of non-cash items of $17,251,684, and net of changes in working capital accounts of $1,549,420.
Our cash used in operating activities increased by $3,633,222 during the six months ended March 31, 2026, due to an increase in net loss and changes in working capital accounts. The increase in cash used in operating activities during the six months ended March 31, 2026, when compared to the six months ended March 31, 2025, was primarily due to increased research and development activities, additional regulatory and staff costs to support our research and development activities, and additional office and professional fees during the six months ended March 31, 2026 compared to the six months ended March 31, 2025.
Cash Flows used in Investing Activities
Net cash used by investing activities for the six months ended March 31, 2026 was $380,500,548, representing $370,690,337 related to short-term investments, $5,620,823 paid for the acquisition of land and building for office space in New York, $3,139,388 payments related to construction in progress of property acquired in Oak Brook Illinois, and $1,050,000 in deposits.
Net cash used in investing activities for the six months ended March 31, 2025 was $12,700,891, which consisted of $9,075,045 of cash paid for the acquisition of the USNC Assets that closed on January 10, 2025 and consisted of $3,625,846 of cash paid for additions to property, plant and equipment.
Cash Flows provided by Financing Activities
Net cash provided by financing activities for the six months ended March 31, 2026 was $384,182,368, which consisted of approximately $2.5 million from exercises of warrants, $3.3 million from exercises of stock options, and $400,000,333 in cash received from our October 2025 private placement offering less $21,520,711 of corresponding offering costs, and less $85,500 in deferred financing costs.
Net cash provided by financing activities for the six months ended March 31, 2025 was $108,365,064, which consisted of approximately $14.4 million from exercises of warrants, $1.6 million from exercises of stock options, and net proceeds of approximately $92.3 million from the Company’s registered follow-on offering in October 2024, and its November 2024 private placement offering.
Commitments
As of March 31, 2026 and September 30, 2025, we had two long-term operating leases corresponding to (1) our corporate headquarters located at 10 Times Square, 30th Floor, New York, New York and (2) space being used as a technology demonstration facility in Westchester County, New York. Our corporate headquarters cover approximately 7,800 square feet. We lease this space for $33,605 per month whereby the monthly lease rent will increase by 2.5% on an annual basis. The lease has a term ending on July 31, 2031. Our demonstration facility covers approximately 6,800 square feet in Westchester County, New York. We lease this space for $17,000 per month whereby the monthly lease rent will increase by 2.5% on an annual basis. The lease has a term ending on December 31, 2030.
Off-Balance Sheet Arrangements
As of March 31, 2026 and September 30, 2025, we have not engaged in any off-balance sheet arrangements, as defined in the rules and regulations of the SEC.
Market risk
As filed, 864 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We are exposed to the impact of changes in interest rates and foreign currency exchange rates in the normal course of business and to market price fluctuations related to our financial investments. We may have involvement with derivative financial instruments and use such instruments to the extent necessary to manage exposure to foreign currency fluctuations. At March 31, 2026, we performed sensitivity analyses to assess the potential loss in the fair values of market risk sensitive instruments resulting from a hypothetical change of 10 percent in foreign currency exchange rates, a 10 percent decline in the market value of our long-term investments, or a 10 percent change in interest rates. Based upon the analyses performed, such changes would not be expected to materially affect our consolidated financial position, results of operations or cash flows.
Controls and procedures
As filed, 1,975 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Under the supervision and with the participation of our management, including our principal executive officer and principal financial officer, we conducted an evaluation of the effectiveness of our disclosure controls and procedures as of the period ended March 31, 2026, as such term is defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act. Based on this evaluation, our principal executive officer and principal financial officer have concluded that our disclosure controls and procedures were effective as of March 31, 2026. Accordingly, our management believes that the unaudited condensed consolidated financial statements included in this Report present fairly in all material respects our consolidated financial position, results of operations and cash flows for the periods presented. In addition, because we are an “emerging growth company” as defined under the terms of the JOBS Act of 2012, our independent registered public accounting firm is not required to issue an attestation report on our internal control over financial reporting.
Disclosure controls and procedures are designed to ensure that information required to be disclosed by us in our SEC filing reports is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our principal executive officer and principal financial officer or persons performing similar functions, as appropriate, to allow timely decisions regarding required disclosure.
Changes in Internal Control over Financial Reporting
There have been no changes in internal control over financial reporting (as defined in Rule 13a-15(f) of the Exchange Act) during the quarter ended March 31, 2026, that materially affected, or are reasonably likely to materially affect, the Company’s internal control over financial reporting.
Risk factors
As filed, 7,273 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Factors that could cause our actual results to differ materially from those in this Report include the risk factors described in our filings with the SEC, including the section titled “Risk Factors” in our 2025 Annual Report. Any of these factors could result in a significant or material adverse effect on our results of operations or financial condition. We may disclose changes to such risk factors or disclose additional risk factors from time to time in our future filings with the SEC.
As of the date of this Report, except as set forth below, there have been no material changes to the risk factors disclosed in our prior SEC filings, including our 2025 Annual Report.
On January 16, 2026, we received a subpoena for documents from the Securities and Exchange Commission (“SEC”) relating to two service providers. This subpoena, which is part of an investigation by the SEC, follows an initial request for information by the SEC to us in April 2025. We completed an initial voluntary production of documents in August 2025. We are communicating and cooperating fully with the SEC and at this juncture, we cannot predict the outcome of the investigation.
Our business operations may be adversely affected by current global geopolitical conditions and armed conflicts in the Ukraine and Russia and in the Middle East between United States, Israel and Iran and others, as well as by other events that are outside of our control.
Our business operations could be adversely affected by events that are outside of our control. For example, United States and global markets have experienced and may continue to experience volatility and disruption following the geopolitical instability resulting from the ongoing Russia-Ukraine conflict and the recent conflict in the Middle East and Southwest Asia between the United States, Israel and Iran and others. Recent hostilities between the United States, Israel and Iran and others have caused significant disruption in the normal flow of oil, refined petroleum products and related commodities, with consequent price rises and associated economic volatility. In response to such conflicts, the North Atlantic Treaty Organization (“NATO”) deployed additional military forces to eastern Europe, and the United States, the United Kingdom, the European Union and other countries have announced various sanctions and restrictive actions against Russia, Belarus and related individuals and entities, including the removal of certain financial institutions from the Society for Worldwide Interbank Financial Telecommunication (SWIFT) payment system. Certain countries, including the United States, have also provided and may continue to provide military aid or other assistance to Ukraine and to Israel, or have undertaken or will undertake military strikes in locations related to the conflicts, including but not limited to Iran, and there have been retaliatory military responses, increasing geopolitical tensions among a number of nations.
The invasion of Ukraine by Russia and the escalation of the conflict involving the United States, Israel and Iran and others in the Middle East and Southwest Asia and the resulting measures that have been taken, and could be taken in the future, by NATO, the United States, the United Kingdom, the European Union, Israel and its neighboring states and other countries have created global security concerns that could have a lasting impact on regional and global economies. Although the length and impact of the ongoing conflicts and geopolitical turmoil are highly unpredictable, they could lead to market disruptions, including significant volatility in commodity prices, credit and capital markets, as well as supply chain interruptions, changes in consumer or producer purchasing behavior and increased cyber-attacks against U.S. companies. Additionally, any resulting sanctions could adversely affect the global economy and financial markets and lead to instability and lack of liquidity in capital markets.
Similarly, other events outside of our control, including natural disasters, climate-related events and pandemic or health crises (such as the COVID-19 pandemic) may arise from time to time, and any such events may cause significant volatility and declines in the global markets and have disproportionate impacts to certain industries or sectors and disruptions to commerce (including economic activity, travel and supply chain), and may adversely affect the global economy or capital markets.
Any of the abovementioned factors, or any other negative impact on the global economy, capital markets or other geopolitical conditions resulting from the Russian invasion of Ukraine, the escalation of the conflict involving the United States, Israel and Iran and others in the Middle East and Southwest Asia and subsequent sanctions or related actions, could adversely affect our business, financial conditions and results of operations.
The extent and duration of the ongoing conflicts, resulting sanctions and any related market disruptions are impossible to predict, but could be substantial, particularly if current or new sanctions continue for an extended period of time, if geopolitical tensions result in expanded military operations on a global scale or if there are disruptions in the supply of oil or other commodities.
Any such disruptions may also have the effect of heightening many of the other risks described in this Item. If these disruptions or other matters of global concern continue for an extensive period of time, our business, financial conditions and results of operations may be adversely affected. In addition, our ability to raise equity or debt financing may be impacted by these and other events, including as a result of increased market volatility or decreased availability of third-party financing on acceptable terms or at all.
Military or other conflicts in Ukraine, between the United States, Israel and Iran and others in the Middle East and Southwest Asia or other armed hostilities may lead to increased volume and price volatility for publicly traded securities.
Ongoing and potential military conflicts, including those in Ukraine and tensions involving the United States, Israel, Iran, and other countries in the Middle East and Southwest Asia, as well as other regions, may contribute to heightened geopolitical uncertainty. Such developments have led, and may continue to lead, to increased volatility in global financial markets, including fluctuations in the volume and price of publicly traded securities. Geopolitical events are inherently unpredictable and may result in sharp market reactions, including declines in asset prices and reduced investor confidence.
Furthermore, geopolitical tensions may lead to the imposition of sanctions, export controls, trade restrictions, or other governmental actions that could limit our ability to conduct business with certain counterparties or in certain jurisdictions. Such developments may also affect our access to capital markets or increase our cost of capital.
Any of the foregoing factors, individually or in the aggregate, could adversely affect our business, results of operations, financial condition, and the market price and liquidity of our securities.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2026-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Research and development | 3 months2026-01-01 to 2026-03-31 | $5.7m | us-gaap:ResearchAndDevelopmentExpense |
| Research and development | 6 months2025-10-01 to 2026-03-31 | $11.1m | us-gaap:ResearchAndDevelopmentExpense |
| Net income | 3 months2026-01-01 to 2026-03-31 | −$9.2m | us-gaap:NetIncomeLoss |
| Net income | 6 months2025-10-01 to 2026-03-31 | −$15.7m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2026-01-01 to 2026-03-31 | −$0.18 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months2025-10-01 to 2026-03-31 | −$0.31 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2026-01-01 to 2026-03-31 | −$0.18 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months2025-10-01 to 2026-03-31 | −$0.31 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2026-01-01 to 2026-03-31 | 51,649,161 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months2025-10-01 to 2026-03-31 | 50,718,061 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months2025-10-01 to 2026-03-31 | −$9.3m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months2025-10-01 to 2026-03-31 | $8.8m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | At period end2026-03-31 | $197.7m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2026-03-31 | $571.7m | us-gaap:AssetsCurrent |
| Total assets | At period end2026-03-31 | $603.9m | us-gaap:Assets |
| Current liabilities | At period end2026-03-31 | $6.0m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2026-03-31 | $8.0m | us-gaap:Liabilities |
| Shareholders' equity | At period end2026-03-31 | $595.9m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001493152-26-023071. Last ingested by Listed: Oct 24, 2026, 15:06 ET. Listed shows no prices and gives no investment advice.