The following discussion and analysis should be read in conjunction with our unaudited consolidated financial statements and related notes, which have been prepared in accordance with U.S. GAAP, included elsewhere in this Quarterly Report on Form 10-Q. Additionally, the following discussion and analysis should be read in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and the audited consolidated financial statements included in Part II of our Annual Report on Form 10-K for the year ended December 31, 2024. This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties and assumptions. Our actual results may differ materially from those anticipated, projected, forecasted or expected in these forward-looking statements as a result of various factors, including, but not limited to, those discussed below and elsewhere in this Quarterly Report. See “Cautionary Note Regarding Forward-Looking Statements” in this Quarterly Report and the information under the heading “Risk Factors” in Part I, Item IA, “Risk Factors” of our Annual Report. Our management believes the assumptions underlying the Company’s financial statements and accompanying notes are reasonable. However, the Company’s financial statements and accompanying notes may not be an indication of our financial condition and results of operations in the future.
Business Overview
enCore Energy Corp., America’s Clean Energy Company™, was incorporated on October 30, 2009, under the Laws of British Columbia and is a reporting issuer in all of the provinces and territories of Canada. As of January 1, 2025, the Company ceased to be a “foreign private issuer” and has become a “domestic issuer” and a large accelerated filer within the meanings under the Exchange Act. As a result, the Company must comply with the filing deadlines and disclosure obligations of a domestic issuer and large accelerated filer as set forth in the Exchange Act. This classification impacts the timing of our periodic filings, internal control assessments, and other regulatory requirements. The Company’s common shares are listed on Nasdaq and the TSX Venture Exchange (“TSX-V”) under the trading symbol EU.
We are an exploration stage issuer as defined by S-K 1300, and as required by the SEC, as we have not established proven or probable mineral reserves, through the completion of a pre-feasibility or feasibility study for any of our uranium projects. Even though we commenced extraction of uranium at our Rosita Project and our Alta Mesa Project, the Company remains classified as an exploration stage issuer and will continue to remain an exploration stage issuer until such time as proven or probable mineral reserves have been established at one of our uranium projects.
The Company is focused on extracting domestic uranium within the United States. The Company only utilizes proven ISR technology to provide necessary fuel for the generation of clean, reliable, and carbon-free nuclear energy. In 2024, the Company commenced uranium extraction at the Rosita Central ISR Uranium Processing Plants (“CPPs”) and at the Alta Mesa CPP in South Texas. enCore’s strategy is to build uranium extraction capacity by developing and placing into operation a series of uranium extraction facilities in South Texas, followed by a future pipeline of exploration projects in South Dakota and Wyoming, becoming a leading supplier of domestic uranium to fuel a growing demand for clean energy generation using nuclear power.
Industry and Market Update
The primary use of uranium is to fuel nuclear power plants for the generation of carbon and emission free electricity. According to the World Nuclear Association (“WNA”), as of January 2025, there were 440 operable nuclear reactors world-wide, which required approximately 175.2 million pounds of U3O8 annually at full operation. According to data from TradeTech LLC (“TradeTech”), the world continues to require more uranium than it produces from primary extraction. The gap between demand and primary supply is being filled by stockpiled inventories and secondary supplies, which the Company believes have dwindled significantly in recent years.
Expanding the current reactor fleet to meet that level of electrical generating capacity remains a significant challenge to the nuclear industry. To meet those goals, the global industry must protect existing capacity, and there have been multiple public pronouncements from several countries, including the U.S. to protect existing nuclear generating capacity. In the U.S., as a result of clean energy credits granted by several states and the production tax credit for nuclear power provided in the Inflation Reduction Act of 2022, several nuclear utilities have announced operating life extensions and capacity expansions within their existing operating fleet. Also, the industry has seen a truly unprecedented trend in reactor recommissioning. In the U.S., where just a few years ago reactors were being shut down prematurely, nuclear plants such as Diablo Canyon, Palisades, Three Mile Island, and Duane Arnold are positioned to re-enter service.
With increasing demand expectations, an increase in uranium production must occur in an environment beset by risks, including import bans, sanctions, and secondary sanctions imposed by various countries, transportation issues, trade restrictions in other goods and services beyond nuclear fuel, and fewer available ports, all of which have combined to create widespread uncertainty in the market regarding the availability of both current and future supply.
On January 20, 2025, President Trump issued two Executive Orders that specifically referenced nuclear power and uranium as key parts to expanding energy in the U.S. The Executive Order titled, “Unleashing American Energy,” in addition to directing federal agencies to advance permitting for energy projects also called for uranium to be designated as a “critical mineral” by the U.S. Geological Survey. The Executive Order titled, “Declaring a National Energy Emergency,” that directs federal agencies, under emergency authority, to advance permit and license approvals for the production of energy and energy resources. In that Executive Order, uranium is defined as an “energy resource” and subject to the emergency declaration. The U.S. Senate, on February 4, 2025, confirmed Chris Wright, former CEO of Denver-based Liberty Energy, to serve as Energy Secretary. The following day, Wright issued his first Secretarial Order, which directs the Department of Energy (“DOE”) to take immediate action to unleash energy produced in the America in accordance with President Donald Trump’s executive orders.
Below is a list of some of the recent government policy, U.S. market and global market news that can influence the uranium market.
U.S. Government Policy News
- Constellation Energy Corporation, the U.S.’s largest producer of clean, emissions-free, energy, has been awarded more than $1 billion in combined contracts by the U.S. General Services Administration (GSA) to supply power to more than 13 government agencies, and perform energy savings and conservation measures, at five GSA-owned facilities in the National Capital Region.
- U.S. President Donald Trump signed Executive Orders on February 1, 2025, to initiate tariffs on all imports from Canada, Mexico, and China, and later agreed to a 30-day pause on tariffs against Mexico and Canada as both nations took steps to appease his concerns about border security and drug trafficking. A second pause was issued to expire in mid-April. As of May 5, 2025, President Donald Trump's executive orders imposing tariffs on imports from Canada, Mexico, and China have evolved significantly since their initial announcement, see updates below:
- Canada tariff update - A 25% tariff on most Canadian goods (excluding energy) was implemented on March 4, 2025, however, tariffs on goods compliant with the United States-Mexico-Canada Agreement (“USMCA”) were delayed indefinitely, affecting approximately 38% of Canadian imports.
- Mexico tariff update - Similar to Canada, Mexico faced a 25% tariff on most goods, effective March 4. Tariffs on USMCA compliant goods were delayed indefinitely, affecting about 50% of Mexican imports.
- China tariff update - A 145% tariff on most Chinese goods was implemented in stages, with the final increase on April 12. China responded with tariffs on U.S. agricultural products and suspended exports of critical minerals. President Trump expressed a desire for a fair trade deal with China, indicating that negotiations are ongoing.
- While some tariffs have been paused or delayed, significant trade tensions persist with all three countries. Negotiations are ongoing, and further developments are expected in the coming weeks.
- U.S. President Donald Trump signed an Executive Order on February 14, 2025, to establish the National Energy Dominance Council, which will be chaired by the Secretary of Interior, Doug Burgum, and vice-chaired by Energy Secretary, Chris Wright. The council's members will also include the Secretary of State, Secretary of the Treasury, Secretary of Defense, the Attorney General, Secretary of Agriculture, Secretary of Commerce, and Secretary of Transportation. The Council is expected to present the president with a plan for how to raise awareness of the American energy dominance plan within 100 days.
- On March 20, 2025, U.S. President Donald Trump issued an Executive Order aiming to revitalize U.S. Mineral Production. The Secretary of Interior is to provide a list of critical minerals and corresponding specific projects, that with U.S. Government assistance, can begin production via the expediting of approvals.
U.S. Market News
- Xcel Energy Inc., will extend the operation of its Monticello Nuclear Generating Plant (628 MWe BWR) well into the future to support its clean energy vision, following the recent renewal of the plant’s operating license by the U.S. Nuclear Regulatory Commission (“NRC”). The NRC approval allows the plant to operate an additional 20 years, through 2050.
- In response to national interest in new nuclear power to help meet growing electricity needs, South Carolina state utility Santee Cooper has launched a process seeking proposals to acquire and complete, or propose alternatives, for two partially constructed generating units at the V.C. Summer Nuclear Station (the “Summer facility.”) The Summer facility is the only U.S. site that could deliver 2,200 MW of nuclear capacity on an accelerated timeline incorporating the AP1000 technology.
- NextEra Energy, Inc., is advancing plans for the potential restart of the Duane Arnold Nuclear Power Plant in the U.S. state of Iowa.
- Arizona Public Service Company, operator of the three-unit Palo Verde Nuclear Power Plant, announced it is collaborating with the Salt River Project and Tucson Electric Power to assess possible locations for new nuclear capacity, including retiring coal plants. The group will consider small modular reactors (“SMRs”) and has applied for a DOE grant to begin the preliminary search for a potential site under the Generation III+ Small Modular Reactor program, an initiative announced last year providing up to $900 million to support SMR deployment support.
- Nuclear developer, Terrestrial Energy, and The Texas A&M University System announced plans to site an Integral Molten Salt Reactor plant at the Texas A&M-RELLIS campus near Texas A&M University in College Station, Texas. U.S. nuclear developer, TerraPower LLC, has received approval from the Wyoming Industrial Siting Council on its permit for the first Natrium plant, Kemmerer Power Station Unit 1 (345 MWe sodium-cooled fast reactor). TerraPower plans to start construction on both the Kemmerer Training Center and the energy island in 2025.
- The NRC has issued its final environmental impact statement on February 7, 2025, for the proposed second license renewal for Duke Energy's Oconee Nuclear Station, Units 1-3. NRC staff concluded there are no adverse environmental impacts to preclude the renewal of Oconee’s operating licenses for an additional 20 years.
- The DOE disbursed a $56.8 million loan installment to Holtec in support of the restart of the Palisades Nuclear Plant in Michigan on March 19, 2025.
- The DOE has re-issued a $900 million solicitation to support the deployment of small modular reactors in the U.S.A., in alignment with the Trump administration’s agenda to “unleash American energy” and bolster the growing artificial intelligence sector.
Global Market News
- Uranium producer Kazatomprom has announced a temporary suspension of production activity, effective January 1, 2025, at block No. 1 of the Inkai deposit, which is operated by JV Inkai LLP in the Turkestan region of Kazakhstan. On December 30, 2024, JV Inkai, a joint venture involving Kazatomprom (60%) and Cameco Corp. (40%), had not received the necessary approval from the relevant state authorities, as initially expected, due to delayed submission of the required documentation. It is expected to submit the required documentation to Kazakhstan's Ministry of Energy "within the next couple of weeks, and the situation shall be resolved shortly thereafter."
- Westinghouse Electric Co. (“Westinghouse”) has reached a global settlement agreement with Korea Electric Power Corporation and Korea Hydro & Nuclear Power Company to resolve its outstanding intellectual property dispute. The agreement allows both parties to move forward with certainty in the pursuit and deployment of new nuclear reactors.
- Saudi Arabia issued a statement in April of 2025, of its plans to monetize its minerals industry, including selling uranium. Saudi Energy Minister Prince Abdulaziz bin Salman said, "We will enrich it and we will sell it." Saudi Arabia aims to grow its emerging nuclear program to eventually include uranium enrichment. The government has stated it wants to use nuclear power to diversify its energy mix.
- The Plenary Session of the Spanish Congress approved a proposal that calls for extending the operational life of nuclear power plants and improving their safety. The proposal, which includes eight points, urges the Government of Spain to implement a series of measures that would reverse the country's decision to phase out nuclear power. It calls on the government to extend the operational life of existing nuclear power plants in Spain.
- During CERAWeek 2025, in Houston, Texas, a global coalition pledged to emphasize nuclear energy’s essential role in enhancing energy dependability and security while providing continuous clear energy. Per Secretary of Energy, Chris Wright, “our goal is to re-industrialize America. We are working to launch the long awaited American nuclear renaissance, fission and fusion.”
- Westinghouse and Urenco Group entered into an agreement for the supply of high-assay low-enriched uranium (“HALEU”) for the eVinci Microreactors.
Sales of Uranium and Sales Agreements
During the three months ended March 31, 2025, the Company completed uranium sales totaling 290,000 pounds of U3O8, not including converter and transaction costs, for an average sales price of $62.89 per pound of U3O8.
enCore’s uranium sales strategy provides a base level of projected income from sales contracts while preserving significant ability to realize opportunities when strong short-term market fundamentals are present. This strategy assures that the Company will have committed sales to support the capital necessary for construction of new projects while maintaining flexibility to be opportunistic as market conditions continue to change in favorable ways.
The Company has been able to use improving uranium market conditions to create a balanced uranium sales agreement portfolio to provide multiple pricing structures to support future market changes and support production plans. As of March 31, 2025, we have executed fourteen uranium sales agreements to supply uranium to nuclear power plants in the United States and one legacy uranium sales agreement with a uranium trading company. enCore’s uranium sales agreement portfolio is a mix of market related pricing, hybrid base price and market related pricing, base escalated pricing, and fixed prices. Of enCore’s fourteen current uranium sales agreements, two are market-related with no floors or ceilings, and eight are market related that typically retain exposure to spot pricing, while including minimum floor and maximum ceiling prices, some of which are adjusted upwards periodically for inflation. Minimum floor prices are set at levels that provide the Company with a comfortable margin over its expected costs of operations in Texas while still allowing the Company to participate in anticipated escalations of the price of uranium. The Company will continue to assess opportunities to secure future sales agreements that will support its continued project and production growth strategies. The Company is committed to honoring all sales commitments. To meet delivery obligations during the quarter, as uranium extraction increased, the Company occasionally purchased U3O8 in the open market to fill those contractual obligations.
Corporate Updates for the First Quarter 2025
- During the three months ended March 31, 2025, the Company entered into 2 uranium sales agreements, increasing the total number of current uranium, sales agreements to 14 as of March 31, 2025.
- During the three months ended March 31, 2025, the Company increased the number of active rigs in South Texas from 17 to 22, as of March 31, 2025.
- During the quarter, the Company and certain of its officers and directors were named as defendants in a Litigation. The Litigation asserts claims under Sections 10(b) and 20(a) of the Exchange Act Rule 10b-5 against enCore and the Company’s former Chief Executive Officer and current Chief Financial Officer. The key allegations are that the officers failed to disclose that: (1) enCore lacked effective internal controls over financial reporting; (2) enCore could not capitalize certain exploratory and development costs under U.S. GAAP; and (3) as a result, its net losses had substantially increased. The foregoing omissions allegedly made defendants’ positive public statements about the Company’s business, operations, and prospects materially false or misleading. The Litigation seeks compensatory damages for the damages sustained pursuant to the claims alleged above.
- On February 21, 2025, a subsidiary of enCore Energy Corp. (the “Company”) entered into an Amendment No. 2 to the Uranium Loan Agreement (the “Amendment”) with Boss Energy Limited (“Boss Energy”) which, effective February 26, 2025, amends the Uranium Loan Agreement, dated December 5, 2023, (as amended by Amendment No. 1 dated January 31, 2024, the “Agreement”) to revise the schedule of Repayment (as defined in the Agreement) of the amount due as follows:
- On or before February 26, 2025, the Company paid to Boss Energy 118,000 pounds of Outstandings at $100.54 per pound in cash, which includes 18,000 pounds of Outstandings as interest;
- On or before June 27, 2025, the Company must pay Boss Energy an additional 100,000 pounds of Outstandings at $100.54 per pound plus interest. Boss Energy must notify the Company of its election to be paid back in Loan Material (as defined in the Agreement), in cash, or in a combination thereof for the Outstandings due on or before June 27, 2025.
- On March 13, 2025, the Company announced the successful startup of its second Ion Exchange (“IX”) Circuit at its South Texas Alta Mesa CPP location. IX Circuits collect uranium from process water pumped from recovery wells in the wellfield. This second IX Circuit at Alta Mesa doubles the total flow capacity from 2,500 gallons per minute (”GPM”) to 5,000 GPM. Flow rate is an essential factor in expanding the amount of uranium captured. In
conjunction with the expansion of processing capacity, the Company also installed additional injection and extraction wells in the currently permitted and operational Wellfield 7 (“PAA-7”) The combination of the second IX Circuit and wellfield expansion utilizes approximately 75% of the current processing capacity. Additional wells will be brought online systematically in order to reach CPP capacity and increase the capture of uranium.
- On March 17, 2025, the Company and NM Energy Canada entered into the Share Purchase Agreement with Verdera, pursuant to which the Company completed the Sale on April 8, 2025. See further details of the Share Purchase Agreement in Note 7 – Mineral Rights and Properties in Alta Mesa and Note 18 – Subsequent Events in the Notes to the Consolidated Unaudited Financial Statements.
Subsequent Event
On April 23, 2025, the Company’s former chief executive officer filed a demand for arbitration with the Judicial Arbiter Group against the Company. The demand principally alleges that the Company breached his employment agreement and by refusing to pay him the amount he claims he would be entitled to under his employment agreement had the Company terminated his employment without just cause. Therefore, he seeks damages for the amounts allegedly owed under his employment agreement for termination without just cause, including salary, his 2024 cash bonus, the annual target bonus and his COBRA coverage for 24 months. Management believes that this litigation is preliminary in nature and the Company believes that a loss is not probable or estimable at this time.
Our website is located at www.encoreuranium.com (http://www.encoreuranium.com). From time to time, we may use our website as a distribution channel for material company information.
Our Mineral Properties
enCore controls key mineral properties within the United States, in Texas, South Dakota, Wyoming and New Mexico. Our plants’ operations are designed and permitted to process uranium from a mix of satellite plants and primary sources within South Texas.
Property Location Map
Summary of Properties
South Texas Integrated ISR Project (Rosita CPP)
The South Texas Integrated ISR Project is an Exploration Stage Property which consists of five project areas: the Rosita Central Processing Plant (Rosita CPP), Butler Ranch Uranium ISR Project (Butler Ranch), Upper Spring Creek - Brevard Area ISR Uranium Project (USC – Brevard or Brevard), Upper Spring Creek - Brown Area ISR Uranium Project (USC – Brown or Brown), and Rosita South Cadena ISR Project (RS – Cadena or Cadena).
Alta Mesa Uranium Project, Texas
The Alta Mesa Uranium Project is an Exploration Stage Property and is a fully licensed and constructed ISR project and central processing facility, located on over 4,597 acres of private land in the state of Texas
Mesteña Grande Uranium Project, Texas
The Mesteña Grande Uranium Project is an Exploration Stage Property that is located in Brooks and Jim Hogg Counties, Texas and is on land located adjacent to, and to the south, north, and west of the Alta Mesa Uranium Project. The property covers an approximate area of 35 miles in a north-south direction by 30 miles in an east-west direction.
Dewey Burdock Project, South Dakota
The Dewey Burdock Project is an Exploration Stage Property located in southwest South Dakota and is part of the northwestern extension of the Edgemont Uranium Mining District. The Dewey Burdock Project includes federal claims, private mineral rights and private surface rights controlling the entire area within the licensed project permit boundary as well as surrounding areas. The Company currently controls approximately 16,962 acres of net mineral rights and 12,613 acres of surface rights.
Gas Hills Project, Wyoming
The Gas Hills Project is an Exploration Stage Property located in Wyoming. The Company owns a 100% interest in the Gas Hills Exploration Project located in the historic Gas Hills Uranium District 45 miles east of Riverton, Wyoming. The Project consists of approximately 1,280 surface acres and 12,960 net mineral acres of unpatented lode mining claims, a State of Wyoming mineral lease, and private mineral leases, within a brownfield site which has experienced extensive development including mine and mill site production.
Other Non-Material Properties
The Company holds a number of other Exploration Stage Properties that the Company has determined are not material to its business. In total the properties total an aggregate of approximately 360,000 acres of mineral claims, mineral leases, and fee minerals.
Operations Update
The Company is focused on producing uranium in the United States and delivering that uranium to customers. The Company currently utilizes only the proven ISR technology to provide necessary fuel for the generation of clean, reliable, and carbon-free nuclear energy.
enCore owns 3 of the 11 licensed and constructed CPPs in the United States. The Company has several key mineral resource projects in other jurisdictions within the United States. Our S-K 1300 compliant resources are listed below:
Total measured and indicated mineral resources 30.94 million lbs U3O8
Total inferred mineral resources 20.54 million lbs U3O8
The Company’s strategy over the next three years is centered around two of its fully licensed Texas CPPs; Rosita and Alta Mesa. The CPPs located at the Rosita and Kingsville Dome Projects are designed for, and fully capable of, processing feed resin from relocatable satellite IX plants employed at various deposits within a 100-mile radius of each plant. The Rosita CPP was the starting point for enCore’s Texas extraction strategy. In the fourth quarter of 2023, the Company announced it had commenced uranium extraction operations at Rosita from the Rosita Extension wellfield, PAA-5. Rosita is located approximately 60 miles from Corpus Christi, Texas and has an 800,000-pound U3O8 per year production capacity. The Rosita CPP will act as the central processing site for the Rosita South - Cadena, Upper Spring Creek- Brown, Upper Spring Creek – Brevard, and Butler Ranch Projects.
In February 2023, the Company acquired 100% of the Alta Mesa Uranium Project and the Mesteña Grande Uranium Project from Energy Fuels for $120 million. enCore’s fully licensed Alta Mesa CPP is located approximately 100 miles southeast of Corpus Christi, TX, and has a production capacity of 1.5 million pounds of U3O8 per year through its Ion exchange system (IX) located at the plant. The facility has elution, precipitation, drying, and packaging capacity for 2.0 million pounds of U3O8 per year. This plant is designed to accept direct production feed to the IX columns in the plant and concurrently accept loaded resin from satellite locations, once the resin transfer system has been installed. The Alta Mesa Project includes existing and near-term production areas, including fully permitted and authorized production areas 6 and 7. The Mesteña Grande Uranium Project has additional inferred mineral resource areas that will require significant additional exploration drilling and permitting prior to being able to be brought online. In total, the Alta Mesa Uranium Project combined with the Mesteña Grande Uranium Project encompasses mineral leases on over 200,000 acres of private land. In February 2024, the Company sold a 30% interest in the Alta Mesa and Mesteña Grande projects to Boss for $60 million.
In June 2024, the Company announced the successful startup of uranium extraction operations at the Alta Mesa Project. With the restart of the previously operating Alta Mesa Project, the Company is now the only uranium producer in the United States with multiple production facilities in operation as of March 31, 2025. The initial ramp-up was a progressive process to advance and continue increased uranium extraction via direct feed to the Alta Mesa CPP. Exploration drilling and wellfield installation continued at PAA-7 and is showing positive results to support expanding extraction rate capacity through a second IX circuit at the Alta Mesa CPP. During 2024, wellfield solution head grades at Alta Mesa peaked at approximately 150 mg/L U3O8 and averaged approximately 54 mg/L U3O8. Additional wells are being brought online regularly which have the potential to maintain or improve head grades. During the three months ending March 31, 2025, a proprietary wellfield simulation and design software package was installed. This software allows the Company the ability to model wellfield and predict the underground flow patterns for current and future wellfields.
The Kingsville Dome CPP is currently maintained in a standby condition and will require refurbishment prior to commencement of operations. This facility, similar in size and design to the Rosita CPP facility, has a capacity of 800,000 pounds of U3O8 per year.
As the Company has been increasing its operational pace to meet our targets for uranium extraction rates, we have successfully increased our drill rig capacity to facilitate replacing mineral resource depletion and adding mineral resources in South Texas. The Company started with 6 active drill rigs in South Texas at the beginning of 2024, and by December 31, 2024, the number of active rigs in South Texas increased to 17. As of March 31, 2025, the Company had 22 active rigs in South Texas.
enCore has an experienced technical team with years of experience in ISR operations in Texas, Wyoming, and Nebraska supporting and managing our operations. We have been able to utilize that experience and “know how” to self-execute the refurbishment of the Rosita and Alta Mesa CPPs, along with the design, construction and installation of infrastructure for three wellfields and two satellite IX facilities over a period of three years.
South Texas Regulatory Proceedings
Each of the Company’s production facilities maintain several permits and licenses in order to manage the current operations. For the Company’s operating locations, permits and licenses remain current and in effect. In specific cases, some of those permits and licenses are in renewal, and for some expansion activities, new permits or amendments will be necessary. All of our South Texas facility in-situ uranium recovery and underground injection operations are regulated by the Texas Commission on Environment Quality (“TCEQ,”) The TCEQ is the principal regulator of in-situ uranium recovery and underground injection operations. The Radioactive Materials Licenses for Rosita and Alta Mesa are issued by the TCEQ under the NRC Agreement State Program that assures that a mature and consistent regulatory process is in place to provide more certainty regarding regulatory approvals.
Currently, at Alta Mesa, the Radioactive Materials License and the Class III UIC Area Permit are in timely renewal and under technical review by the TCEQ, but those do not affect current expansion activities. At Upper Spring Creek, the TCEQ has issued the Class III UIC Area Permit, and the agency is completing the technical review of the License Amendment to the Rosita Radioactive Materials License that incorporates the Upper Spring Creek wellfield and satellite IX facility into the current license activities. This approval of the license amendment is necessary to advance wellfield and satellite IX construction, and the progress on the approval remains within schedule expectations.
South Dakota Developments
In addition to the Company’s operations in South Texas, it is also developing pipeline projects in other states. Notably, the advanced stage Dewey-Burdock Uranium Project in South Dakota has demonstrated ISR resources, including a 2024 S-K 1300 Technical Report Summary and Canadian National Instrument 43-101 Technical Report and Preliminary Economic Assessment (“PEA”) citing robust economics. The project has its source material license from the NRC and its underground injection permits and aquifer exemption from the EPA. In April 2024, the Company submitted its application to renew the ten (10) year old Source Material License, SUA-1600. The NRC has confirmed that the Dewey-Burdock Source Material License is in timely renewal. The underground injection permits were appealed to the EPA’s Environmental Appeals Board (“EAB”) and the aquifer exemption was appealed to the 8th Circuit Court of Appeals. In September 2024, the Company provided an update regarding the EAB appeal, including a ruling denying the intervenors’ contentions on the merits, and remanded to the EPA to review and complete, if necessary, the administrative record for its permit decisions. Based on a successful outcome for the Company of the appeal of the NRC license, the Company also believes it will be successful in appeals related to the EPA’s underground injection permits and aquifer exemption.
Wyoming Developments
The Company has commenced the initial permitting work to advance the Gas Hills Project as an ISR uranium recovery operation located in central Wyoming, approximately 60 miles west of Casper. As part of the initial data collection for project permitting, the Company initiated core drilling during 2024. Our Gas Hills Project is located in the historic Gas Hills Uranium Mining District in the brownfield area of extensive previous mining.
In addition, the Company initiated exploration drilling to expand the project area at its Dewey Terrace Project area. Notably, the orebody that comprises the Dewey-Burdock Uranium Project extending into Wyoming from South Dakota. Historically, the Company has designated that portion of the ore body extending into Wyoming as its Dewey Terrace Project.
Results of Operations:
Three months ended March 31, 2025 compared to the Three months ended March 31, 2024
The following table summarizes the results of operations for the three months ended March 31, 2025, and 2024:
(in thousands except per share data)
| Three Months Ended March 31, 2025 $ | 2024 $ | Increase (Decrease) | Percent Change | |
|---|---|---|---|---|
| Revenue | 18,239 | 30,394 | (12,155) | (40)% |
| Cost of goods sold | 18,262 | 30,863 | (12,601) | (41)% |
| Operating expenses, excluding stock option expense | 14,725 | 10,991 | 3,734 | 34% |
| Stock option expense | 878 | 818 | 60 | 7% |
| Interest income | 279 | 440 | (161) | (37)% |
| Interest expense | (346) | (399) | 53 | (13)% |
| Loss on marketable securities, unrealized | (9,876) | (821) | (9,055) | 1103% |
| Gain on marketable securities, realized | - | 252 | (252) | 100% |
| Other expense | - | (17) | 17 | 100% |
| Net loss before income taxes | (25,569) | (12,823) | (12,746) | 99% |
| Basic and diluted loss per share | (0.13) | (0.04) | (0.09) | 225% |
The following table sets forth selected operating data and financial metrics for uranium sales for the three months ended March 31, 2025, and 2024.
| Three Months Ended March 31, 2025 | 2024 | Increase (Decrease) | Percent Change | |
|---|---|---|---|---|
| Volumes sold (lbs) | 290,000 | 320,000 | (30,000) | (9)% |
| Realized sales price ($/lb) | 62.89 | 94.98 | (32.1) | (34)% |
| Costs applicable to revenues ($/lb) | 62.97 | 96.45 | (33.4) | (35)% |
- Revenue - Revenue from uranium sales for the three months ended March 31, 2025, was $18,239 compared to revenue of $30,394 for the three months ended March 31, 2024, a decrease of $12,155. The decrease was due to lower volume resulting in completed sales of 290,000 pounds of uranium, compared to completed sales of 320,000 pounds of uranium for three months ended March 31, 2024. The realized sales prices per pound of uranium for the three months ended March 31, 2025, and 2024 were $62.89 and 94.98, respectively, and included the contractual sales price less sales-related costs such as transfer fees. The realized sale price per pound decrease is dictated by the market for uranium, which is a commodity.
- Cost of Sales - Costs applicable to uranium sales were $18,262 for the three months ended March 31, 2025, related to the completed sale of 290,000 pounds of uranium at a weighted average cost of $62.97 per pound compared to uranium costs of $30,863 for the sale of 320,000 pounds at a weighted average cost of $96.45 per pound for the three months ended March 31, 2024. The decrease in costs was due to a lower volume of uranium sold and purchases of uranium at a lower market price. The Company’s weighted average cost components include the cost of purchased uranium and uranium from extraction.
- Operating expenses - Operating expenses include selling, general and administrative expenses. Operating expenses, excluding stock option expenses, for the three months ended March 31, 2025, were $14,725 as compared to $10,991 for the year ended March 31, 2024. This increase primarily reflects the growth and increased activity levels the Company is experiencing in 2025, which is driven primarily by the increased extraction of uranium at Alta Mesa and Rosita which commenced during the latter part of 2024.
- Stock option expense - Stock option expense remained relatively flat for the three months ended March 31, 2025, at $878 compared to $818 for the same period in 2024. Stock option expense is driven by the issuance, exercise, expiration and forfeiture of issued options and common shares.
- Interest income - Interest income for the three months ended March 31, 2025, and March 31, 2024, were $279 and $440, respectively. The change was primarily driven by income recognized on investments in marketable securities.
- Interest expense - Interest expense for the three months ended March 31, 2025, and March 31, 2024, were $346 and $399, respectively. The slight decrease is primarily driven by the conversion of the $60,000 convertible promissory note in February 2024, partially offset by interest expense on the uranium loan in 2024.
- Loss on marketable securities, unrealized - The Company recognized a loss of $9,876 on the fair value of marketable securities for the three months ended March 31, 2025, compared to a loss of $821 for the three months ended March 31, 2024. Unrealized losses for the three months ended March 31, 2025, are due to unfavorable market conditions during the first quarter of 2025.
Non-GAAP Financial Measures
We present non-GAAP financial measures of the total cost of extracted pounds and uranium cost per extracted pound during the reporting period. Total cost of extracted pounds is the cost of sales less the cost of sales of purchased goods, which includes the aggregate purchase price of uranium sourced from purchased uranium. Uranium cost per extracted pound is the total cost of extracted pounds divided by the pounds of uranium extracted during the period. We believe the total cost of extracted pounds and uranium cost per extracted pound, including allocation of cash and non-cash costs, assist investors in evaluating the efficiency and cost-effectiveness of the Company’s extraction process and overall cost structure and financial performance. In addition, management uses these non-GAAP measures to evaluate the ongoing operations for internal planning and forecasting.
During the three months ended March 31, 2025, the Company continued its uranium extraction activities at its South Texas operations.
Total Costs of U3O8 Sold
Three Months Ended March 31, 2025
Pounds U3O8 Cost ($000s) Cost/Pounds
Total Cost of Pounds 290,000 $18,262 $62.97
Purchased inventory (1) 216,289 $14,900 $68.89
Extracted total cost 73,711 $3,362 $45.62
Extracted:
Cash costs (2) $2,304 $31.26
Non-Cash costs (3) $1,058 $14.36
(1) Lower of actual cost or market price as of end Q1-2025.
(2) Cash costs of extracted pounds related to cost of goods sold are a metric for investors in evaluating the Company's operations.
(3) Non-cash costs of extracted pounds related to cost of goods sold as an insight into additional expenses that impact overall costs and include depletion and certain sales related fees.
| Inventory Remaining on Hand | As of March 31, 2025 Pounds U3O8 Cost ($000s) Cost/Pounds |
|---|---|
| Total Cost of Inventory | 153,058 $6,182 $40.39 |
| Purchased inventory | (1) 28,711 $1,717 $59.80 |
| Extracted total cost | 124,347 $4,465 $35.91 |
| Extracted: | |
| Cash costs | (2) $2,859 $22.99 |
| Non-Cash costs | (3) $1,606 $12.91 |
| (1) | Lower of actual cost or market price as of end Q1-2025. |
| (2) | Cash costs of extracted pounds related to cost of goods sold are a metric for investors in evaluating the Company's operations. |
| (3) | Non-cash costs of extracted pounds related to cost of goods sold as an insight into additional expenses that impact overall costs and include depletion and certain sales related fees. |
The Company remains committed to cost efficiency and production optimization, ensuring competitive uranium extraction and processing. The Company anticipates further cost efficiencies as additional wellfield patterns come online and economies of scale improve.
Liquidity and Capital Resources
Our short-term cash requirements are primarily driven by exploration and development activities aimed at advancing properties for uranium extraction. We expect to meet our short-term cash requirements generally through existing working capital. As of March 31, 2025, and December 31, 2024, respectively, the Company had cash and cash equivalents of $29,704 and $39,701, respectively, and working capital of $35,677 and $57,334, respectively. Operations to date have been funded primarily from the issue of share capital.
Our long-term cash requirements are also primarily driven by exploration and development activities aimed at advancing properties for uranium extraction. We expect to meet our long-term cash requirements through various sources of capital, which may include a revolving credit facility or line of credit and future debt or equity issuances, existing working capital, and net cash provided by operations and property dispositions. However, there are a number of factors that may have a material adverse effect on our ability to access these capital sources, including the state of overall equity and credit markets, our degree of leverage, our unencumbered asset base and borrowing restrictions imposed by lenders (including as a result of any failure to comply with financial covenants in future indebtedness), general market conditions for uranium mining companies and other energy companies, our operating performance and liquidity and market perceptions about us. The success of our business strategy will depend, in part, on our ability to access these various capital sources.
We believe that our available cash, expected operating cash flows, and potential debt or equity financings will provide sufficient funds for our operations, anticipated scheduled debt service payments and dividend requirements for the next twelve-month period following March 31, 2025. We believe that our sources of long-term cash will be sufficient for our needs thereafter.
On December 5, 2023, the Company, through a subsidiary, entered into a loan agreement (the “Uranium Loan”) with Boss to borrow up to 200,000 pounds of uranium from Boss. The Uranium Loan bears interest of 9% and will be repayable in 12 months in cash or uranium at the election of Boss. Boss is considered a related party given its minority ownership of the JV Alta Mesa. On February 21, 2025, the Company, through a subsidiary, amended the Uranium Loan effective February 26, 2025 to revise the schedule of repayment of the loaned uranium and to update the redelivery and repayment methods. See details above in Corporate Highlights for the First Quarter 2025.
During the three months ended March 31, 2025, the Company paid an additional $10,054 of the principal balance off, reducing the outstanding debt to $10,054 as of March 31, 2025.
During the three months ended March 31, 2025 and 2024, the Company incurred interest expense of $346 and $174, respectively.
Cash Flows
The following table reflects cash flow activities for the three months ended March 31, 2025, and 2024:
| Three Months Ended March 31, 2025 | 2024 | Increase (Decrease) | |
|---|---|---|---|
| Net cash used in operating activities | $(7,735) | $(3,049) | $(4,686) |
| Net cash used in investing activities | (7,710) | (5,092) | (2,618) |
| Net cash provided by financing activities | 5,422 | 89,793 | (84,371) |
| Impact of currency rate changes in cash | 27 | 946 | (919) |
| Net (decrease) increase in cash, cash equivalents and restricted cash | $(9,996) | $82,598 | $(92,594) |
Net Cash Used in Operating Activities
Net cash used in operating activities increased by $4,686, to cash used in of $7,735, for the three months ended March 31, 2025, compared to the three months ended March 31, 2024. This is largely driven by the absence of outflows related purchases of uranium inventory during the three months ended March 31, 2025. Additionally, there were outflows in 2025, related to the Company’s payments on the uranium loan, which is included as an operating activity given that it was to pay for the delivery of uranium (inventory).
Net Cash Used in Investing Activities
Net cash used in investing activities increased by $2,618, to $7,710, for the three months ended March 31, 2025, compared to the three months ended March 31, 2024. This was largely driven by an increase in the Company’s capital expenditures and mineral property exploration expenditures at Alta Mesa.
Net Cash Provided by Financing Activities
Net cash provided by financing activities decreased by $84,371, to cash provided of $5,422 for the three months ended March 31, 2025, compared to cash provided by financing activities for the three months ended March 31, 2024. This was largely driven by cash inflows related to the Company’s sale of a minority interest (30%) in JV Alta Mesa in 2024 as well as higher inflows from warrant exercises in 2024. Additionally, there were cash outflows in 2025 related to the Company’s payments on the uranium loan.
Off Balance Sheet Arrangements
As of March 31, 2025, the Company had no material off-balance sheet arrangements such as guarantee contracts, contingent interest in assets transferred to an entity, derivative instruments obligations or any obligations that trigger financing, liquidity, market or credit risk to the Company.
Critical Accounting Policies and Estimates
Our unaudited consolidated financial statements have been prepared in accordance with U.S. GAAP. Preparation of the financial statements requires us to make judgments, estimates and assumptions that impact the reported amount of net sales and expenses, assets and liabilities and the disclosure of contingent assets and liabilities. We consider an accounting judgment, estimate or assumption to be critical when the estimate or assumption is complex in nature or requires a high degree of judgment and when the use of different judgments, estimates and assumptions could have a material impact on our unaudited consolidated financial statements. We evaluate our estimates and assumptions on a regular basis. We base our estimates on historical experience and various other assumptions that are believed to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates and assumptions used in preparation of our financial statements. While our significant accounting policies are described in more detail in Note 2 – Summary of Significant Accounting Policies of our unaudited consolidated financial statements, we provide expanded discussion of our most critical accounting policies, estimates and judgments in the Annual Report on Form 10-K for the year ended December 31, 2024.
Market risk
As filed, 1,951 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our exposure to market risks includes, but is not limited to, equity price risk, uranium price risk and foreign currency risk.
Equity Price Risk
We are subject to market risk related to the market price of our common shares, which trade on Nasdaq and TSX-V. Historically, we have relied upon equity financing from the sale of our common shares to fund our operations. Movements in the price of our common shares have been volatile in the past and may continue to be volatile in the future. As a result, there is a risk that we may not be able to complete an equity financing at an acceptable price when required.
In addition, we have investments in equity securities, which are common shares and warrants of publicly listed companies. Movements in the price of these equity securities have been volatile in the past and may continue to be volatile in the future.
Uranium Price Risk
We are subject to market risk related to the market price of uranium. As of March 31, 2025, we had no uranium supply or off-take agreements in place. Since future sales of uranium concentrates are contracted based on both spot and fixed pricing, fluctuations in the market price of uranium would have a direct impact on our revenues, results of operations and cash flows. We do not use derivative financial instruments for speculative trading purposes, nor do we hedge our uranium price exposure to manage our uranium price risk.
Foreign Currency Risk
We are subject to market risk related to foreign currency exchange rate fluctuations. Our functional currency is the United States Dollar; however, a portion of our business is transacted in other currencies including the Canadian Dollar. To date, these fluctuations have not had a material impact on our results of operations.
We do not use derivative financial instruments for speculative trading purposes, nor do we hedge our foreign currency exposure to manage our foreign currency fluctuation risk.
Controls and procedures
As filed, 5,742 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
As of March 31, 2025, our management, including our Acting Chief Executive Officer and Chief Financial Officer, evaluated, the effectiveness of our disclosure controls and procedures as defined in Rules 13a-15(e) and 15d-15(e) of the Exchange Act. Based on that evaluation, our Acting Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures cannot yet be considered effective as of March 31, 2025, due to the existence of the material weaknesses in internal control over financial reporting described below.
A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of annual or interim financial statements will not be prevented or detected on a timely basis. As disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2024, management identified the following material weaknesses in internal control over financial reporting.
- The Company had ineffective general information technology controls (“GITCs”) that support the consistent operation of the Company’s information technology (“IT”) systems, including its enterprise resource planning system. As a result, automated process-level controls and manual controls dependent upon the accuracy and completeness of information derived from those IT systems were also ineffective because they could have been adversely impacted; and
- The Company did not effectively design, implement, or operate process-level control activities related to its financial reporting processes.
Notwithstanding such material weaknesses in our internal control over financial reporting, our management performed additional analyses and other procedures to ensure that our consolidated financial statements were prepared in accordance with U.S. GAAP. Accordingly, management, including our Acting Chief Executive Officer and Chief Financial Officer, believe that the consolidated financial statements included in this Quarterly Report present fairly, in all material respects, our financial position, results of operations and cash flows as of and for the periods presented, in accordance with those principles.
Remediation Activities
As part of improving the effectiveness of our disclosure controls and procedures, management, with oversight from the Audit Committee of the Board of Directors, continued implementing corrective measures during the three months ended March 31, 2025. The Company has invested significant time and resources to enhance the design, implementation, and operation of its internal control over financial reporting.
As previously disclosed, during the three months ended March 31, 2025, we continued to enhance our internal control over financial reporting, including the following:
- Continuing to recruit key positions within our technology, accounting, business operations and other support functions with appropriate qualified experience and enterprise resource planning (“ERP”) knowledge to enhance our risk assessment processes and internal control capabilities, allow for appropriate segregation of duties and change management, and provide appropriate oversight and reviews.
- Designing and implementing a continuous risk assessment process to identify and assess risks of material misstatement and ensure that the impacted financial reporting processes and related internal controls are properly designed and in place to respond to those risks in our financial reporting.
- Developing and implementing a framework to identify risks of material misstatement to our consolidated financial statements and are currently designing controls to mitigate those risks.
- Working to establish a comprehensive GITC evaluation and monitoring program and invest in people and technology to address gaps in information technology (“IT”) systems security controls, IT systems change management controls, and IT systems batch/program monitoring controls, including design of controls to address gaps over our GITC’s for our ERP and certain other IT systems.
- Enhancing policies and procedures to improve our overall control environment and monitoring controls around timely evaluation and communication of internal control deficiencies to those parties responsible for taking corrective action, including senior management and the board of directors, as appropriate.
Changes in Internal Control over Financial Reporting
Other than the material weakness and remediation efforts described above, there were no changes to our internal control over financial reporting identified in connection with the evaluation required by rule 13a-15(d) and 15d-15(d) of the Exchange Act that occurred during the quarter ended March 31, 2025 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Limitations on Effectiveness of Controls and Procedures
Our management, including our principal executive officer and principal financial officer, does not expect that our disclosure controls and procedures over our internal control over financial reporting will prevent all errors and all fraud, no matter how well designed and operated, due to the inherent limitations of internal controls. Because of such limitations, there is a risk that material misstatements will not be prevented or detected on a timely basis by internal control over financial reporting. However, these inherent limitations are known features of the financial reporting process. Therefore, it is possible to design into the process safeguards to reduce, though not eliminate, this risk.
Risk factors
As filed, 3,019 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
An investment in our Company involves a high degree of risks and potential loss. Investors should carefully consider the risk factors discussed below and all of the other information included in this report before you make any investment decision regarding our securities. We believe the risks and uncertainties as described below are the most significant we face at this current time, but additional risks and uncertainties not known to us or that we currently deem immaterial could also be or become significant. The occurrence of any risks could harm our business, financial condition, results of operations, prospects and reputation and could cause the trading price of our common stock to decline.
The Company could be impacted by the economic implications of tariffs.
The potential imposition of tariffs on uranium and other critical minerals could have complex economic effects. While tariffs may incentivize domestic production by making imported goods more expensive, they can also disrupt established supply chains and increase costs for industries reliant on these materials. For instance, the U.S. has updated tariffs on certain uranium products, which, although not directly used in nuclear energy production, could affect related industries and raise concerns about circumventing sanctions on Russian uranium imports, which could materially adversely affect our business, financial condition and results of operations.
We currently are subject to, and in the future may be subject to, litigation, disputes or regulatory inquiries for a variety of claims, which could adversely affect our results of operations, harm our reputation or otherwise negatively affect our business.
From time to time, we may be involved in litigation, disputes or regulatory inquiries that arise in the ordinary course of business. These may include claims, lawsuits and proceedings involving labor and employment, wage and hour, commercial, alleged securities law violations or other investor claims, and other matters. For example, we currently are involved in a federal securities class action litigation (as previously defined, the “Litigation”), as described further in Note 10 - Commitments and Contingencies. Although we intend to defend against the claims vigorously and carry directors’ and officers’ liability insurance coverage, it is possible that our insurance may not cover all potential claims to which we are exposed and/or may not be adequate to fully cover liability that may be imposed as a result of such claims. Any claims against us, whether meritorious or not, could be time consuming, result in costly litigation, require significant amounts of management time, adversely affect our reputation and/or result in the diversion of significant operational resources. Because litigation is inherently unpredictable, we cannot ensure that such actions, including the Litigation, will not have a material adverse effect on our revenue, business, brand, results of operations and financial condition.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2025-01-01 to 2025-03-31 | $18.2m | us-gaap:Revenues |
| Cost of revenue | 3 months2025-01-01 to 2025-03-31 | $18.3m | us-gaap:CostOfRevenue |
| Gross profit | 3 months2025-01-01 to 2025-03-31 | −$23.0k | us-gaap:GrossProfit |
| Operating income | 3 months2025-01-01 to 2025-03-31 | −$15.6m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2025-01-01 to 2025-03-31 | $346.0k | us-gaap:InterestExpenseNonoperating |
| Income tax | 3 months2025-01-01 to 2025-03-31 | −$182.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2025-01-01 to 2025-03-31 | −$24.2m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2025-01-01 to 2025-03-31 | −$0.13 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2025-01-01 to 2025-03-31 | −$0.13 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2025-01-01 to 2025-03-31 | 186,222,285 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 3 months2025-01-01 to 2025-03-31 | −$7.7m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 3 months2025-01-01 to 2025-03-31 | $4.0m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | At period end2025-03-31 | $29.7m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-03-31 | $54.0m | us-gaap:AssetsCurrent |
| Total assets | At period end2025-03-31 | $362.6m | us-gaap:Assets |
| Current liabilities | At period end2025-03-31 | $18.4m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2025-03-31 | $62.7m | us-gaap:Liabilities |
| Short-term borrowings | At period end2025-03-31 | $10.1m | us-gaap:ShortTermBorrowings |