Management's discussion and analysis
As filed, 52,579 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion and analysis should be read in conjunction with our consolidated financial statements and notes thereto contained herein and our annual financial statements for the year ended December 31, 2024, included in our annual report on Form 10-K along with the section Management’s Discussion and Analysis of financial condition and Results of Operations contained in such annual report. Any terms used but not defined in the following discussion have the same meaning given to them in the annual report. Our discussion and analysis includes forward-looking statements that involve risks and uncertainties and should be read in conjunction with “Risk Factors” under Item 1A of this report and in the annual report, along with “Forward-Looking Information” at the end of this section for information about the risks and uncertainties that could cause our actual results to be materially different than our forward-looking statements.
Overview
Kosmos Energy is a leading deepwater exploration and production company focused on meeting the world’s growing demand for energy. We have diversified oil and gas production from assets offshore Ghana, Equatorial Guinea, Mauritania, Senegal and the Gulf of America. Additionally, in the proven basins where we operate we are advancing high-quality development opportunities, which have come from our exploration success.
Recent Developments
Ghana
During the third quarter of 2025, Ghana production averaged approximately 93,600 Boepd gross (31,300 Boepd net).
Jubilee development drilling progressed in the third quarter of 2025 bringing one producer well successfully online in July 2025. After undergoing scheduled maintenance, the rig is back in the field and currently drilling an additional producer well in the Jubilee Field in the fourth quarter of 2025 to be followed by drilling four planned producer wells and an additional water injector well in 2026.
In June 2025, the Jubilee and TEN partnerships entered into a Memorandum of Understanding with the Government of Ghana to extend to 2040 the WCTP and the DT licenses, which cover the Jubilee and TEN fields offshore Ghana. The partnership has prepared amendments to the respective Petroleum Agreements, a Jubilee Plan of Development Amendment, an amendment to the Jubilee Gas Sales Agreement covering future gas sales from the Jubilee Field, as well as the other necessary documents for submission to the Government of Ghana for parliamentary approval.
Gulf of America
Production from the Gulf of America averaged approximately 16,600 Boepd net (~84% oil) for the third quarter of 2025.
On Tiberius, Kosmos (operator, 50% working interest) continues to progress the development plan with our partner Occidental Petroleum Corporation (“Oxy”) (50% working interest). A production handling agreement for the Oxy-operated Lucius platform was signed in the third quarter of 2025. Final investment decision and a farm down to reduce Kosmos’ working interest is expected in 2026.
In July 2024, we announced start-up of oil production from the first phase of the Winterfell development in the Green Canyon area of the Gulf of America (25% working interest). In October 2024, shortly after startup of the third well, production at the field was curtailed due to sand production from the third well. Production from the first two wells was restored in December 2024. Remediation work on Winterfell-3 was performed in the first quarter of 2025, however, it was unsuccessful. Winterfell-3 was temporarily plugged and abandoned during the first quarter of 2025 while the partnership evaluates options to restore production from the Winterfell-3 fault block. During the second quarter of 2025, the partnership drilled the Winterfell-4 well to test a separate fault block and define the eastern extent of the Winterfell reservoir area. The Wintefell-4 well was abandoned in September 2025 by the operator due to challenges during completion operations arising from the collapse of the production casing. As a result, all associated drilling and completion capitalized costs of approximately $51.1 million related to
Winterfell-4 have been written off in the third quarter of 2025. The partnership will continue to review alternative options to access those resources with near-term activity in 2026 focused on restoring production from the Winterfell-3 fault block.
Equatorial Guinea
Production in Equatorial Guinea averaged approximately 17,700 Bopd gross (6,200 Bopd net) in the third quarter of 2025, impacted by multiple subsea multiphase flow pump (MPP) mechanical failures at Ceiba during the second quarter of 2025. The first pump was repaired ahead of schedule early in the fourth quarter of 2025, and the second pump is now also expected online in the fourth quarter followed by the third pump in the first quarter of 2026.
In October 2025, we received approval from the Ministry of Hydrocarbons and Mining Development for a twelve month extension to December 2026 for the current exploration phase of Block EG-24.
Mauritania and Senegal
Greater Tortue Ahmeyim Project
Production in Mauritania and Senegal averaged approximately 46,900 Boepd gross (11,400 Boepd net) in the third quarter of 2025, as production from the GTA field continued to ramp up.
The Greater Tortue Ahmeyim (GTA) liquified natural gas (LNG) project achieved first gas production from the subsea system to the FPSO on December 31, 2024. First LNG was achieved in February 2025 and the first gross LNG cargo was successfully exported in April 2025 with 13.5 gross cargoes lifted through October 2025, along with the first gross condensate cargo. Additionally, the Gimi FLNG vessel Commercial Operations Date was achieved in the second quarter of 2025 with successful ramp-up to the daily contracted sales volume level under the Tortue Phase 1 SPA, equivalent to approximately 2.45 million tonnes per annum.
Sao Tome and Principe
In May 2025, we received approval for a twelve month extension to May 2026 for the current exploration phase for Block 5 offshore Sao Tome and Principe.
Corporate
In July 2025, new U.S tax legislation was signed into law in the United States known as the "One Big Beautiful Bill Act" or "OBBBA". The legislation includes a broad range of U.S. corporate tax reform provisions affecting businesses across numerous industries. The necessary adjustments have been reflected for the nine months ended September 30, 2025. Based on our evaluation, we have determined that the impact of OBBBA is not material to the Company’s financial position or results.
On September 24, 2025, the Company entered into a senior secured term loan credit agreement secured by first priority liens on all of the Company’s Gulf of America assets (as defined in the Credit Agreement). The GoA Term Loan Facility is structured in two tranches, with the first tranche consisting of a four-year term loan in an aggregate principal amount of $150.0 million, which was funded on October 1, 2025, and a second tranche comprising commitments to lend up to an additional $100.0 million, available for drawing until April 1, 2026. On October 1, 2025, we received net proceeds of $147.2 million from funding of the first tranche after deducting fees and other expenses. On October 6, 2025, the net proceeds were used, together with cash on hand, to fund the redemption of a portion of the 7.125% Senior Notes due 2026 totaling $150 million in aggregate. The GoA Term Loan Facility matures in 2029, with principal payments beginning June 30, 2026.
Results of Operations
All of our results, as presented in the table below, represent operations from Ghana, Equatorial Guinea, Mauritania, Senegal and the Gulf of America. Certain operating results and statistics for the three and nine months ended September 30, 2025 and 2024 are included in the following tables:
(In thousands, except per volume data)
| Sales volumes: | Three Months Ended September 30, 2025 | 2024 | Nine Months Ended September 30, 2025 | 2024 | ||||
|---|---|---|---|---|---|---|---|---|
| Oil (MBbl) | 3,799 | 5,135 | 12,822 | 15,234 | ||||
| Gas (MMcf) | 9,712 | 3,554 | 21,004 | 11,991 | ||||
| NGL (MBbl) | 97 | 84 | 301 | 232 | ||||
| Total (MBoe) | 5,515 | 5,811 | 16,624 | 17,465 | ||||
| Total (Boepd) | 59,942 | 63,167 | 60,893 | 63,739 | ||||
| Revenues: | ||||||||
| Oil sales | $255,661 | $393,555 | $880,584 | $1,230,772 | ||||
| Gas sales | 53,761 | 12,586 | 107,439 | 42,218 | ||||
| NGL sales | 1,537 | 1,653 | 5,706 | 4,807 | ||||
| Total oil and gas revenue | $310,959 | $407,794 | $993,729 | $1,277,797 | ||||
| Average oil sales price per Bbl | $67.30 | $76.64 | $68.68 | $80.79 | ||||
| Average gas sales price per Mcf | 5.54 | 3.54 | 5.12 | 3.52 | ||||
| Average NGL sales price per Bbl | 15.85 | 19.68 | 18.96 | 20.72 | ||||
| Average total sales price per Boe | $56.39 | $70.18 | $59.78 | $73.16 | ||||
| Costs: | ||||||||
| Oil and gas production, excluding workovers | $143,737 | $132,736 | $538,670 | $345,902 | ||||
| Oil and gas production, workovers | 3,959 | 735 | 19,452 | 31,920 | ||||
| Total oil and gas production costs | $147,696 | (1) | $133,471 | (2) | $558,122 | (1) | $377,822 | (2) |
| Depletion, depreciation and amortization | $141,514 | $120,728 | $413,449 | $311,750 | ||||
| Average cost per Boe: | ||||||||
| Oil and gas production, excluding workovers | $26.06 | $22.84 | $32.40 | $19.81 | ||||
| Oil and gas production, workovers | 0.72 | 0.13 | 1.17 | 1.83 | ||||
| Total oil and gas production costs | $26.78 | (1) | $22.97 | (2) | $33.57 | (1) | $21.64 | (2) |
| Depletion, depreciation and amortization | 25.66 | 20.77 | 24.87 | 17.85 | ||||
| Total | $52.44 | $43.74 | $58.44 | $39.49 |
(1) Includes $59.4 million and $186.6 million for the three and nine months ended September 30, 2025, respectively, related to the LNG production at the GTA Phase 1 project in Mauritania and Senegal. All gas sales in Mauritania and Senegal are LNG sales. First LNG was achieved in February 2025 and the first LNG cargo was successfully completed in April 2025.
(2) Includes $39.7 million and $57.9 million for the three and nine months ended September 30, 2024, respectively, of oil and gas production costs related to the LNG production at the GTA Phase 1 project in Mauritania and Senegal.
The following table shows the number of wells in the process of being drilled or in active completion stages, and the number of wells suspended or waiting on completion as of September 30, 2025:
| Ghana | Actively Drilling or Completing Exploration Gross | Net | Development Gross | Net | Wells Suspended or Waiting on Completion Exploration Gross | Net | Development Gross | Net |
|---|---|---|---|---|---|---|---|---|
| Jubilee Unit | — | — | — | — | — | — | 3 | 1.16 |
| TEN | — | — | — | — | — | — | 5 | 1.02 |
| Equatorial Guinea | ||||||||
| Block G | — | — | — | — | — | — | 1 | 0.40 |
| Gulf of America | ||||||||
| Tiberius | — | — | — | — | 1 | 0.50 | — | — |
| Mauritania / Senegal | ||||||||
| Greater Tortue Ahmeyim | — | — | — | — | 1 | 0.27 | — | — |
| Senegal Cayar Profond | — | — | — | — | 3 | 2.70 | — | — |
| Total | — | — | — | — | 5 | 3.47 | 9 | 2.58 |
The discussion of the results of operations and the period-to-period comparisons presented below analyze our historical results. The following discussion may not be indicative of future results.
Three months ended September 30, 2025 compared to three months ended September 30, 2024
(In thousands)
| Revenues and other income: | Three Months Ended September 30, 2025 | 2024 | Increase (Decrease) |
|---|---|---|---|
| Oil and gas revenue | $310,959 | $407,794 | $(96,835) |
| Other income, net | 270 | 37 | 233 |
| Total revenues and other income | 311,229 | 407,831 | (96,602) |
| Costs and expenses: | |||
| Oil and gas production | 147,696 | 133,471 | 14,225 |
| Exploration expenses | 54,948 | 14,697 | 40,251 |
| General and administrative | 12,886 | 23,298 | (10,412) |
| Depletion, depreciation and amortization | 141,514 | 120,728 | 20,786 |
| Interest and other financing costs, net | 57,919 | 22,112 | 35,807 |
| Derivatives, net | (3,646) | (15,254) | 11,608 |
| Other expenses, net | 6,384 | 2,227 | 4,157 |
| Total costs and expenses | 417,701 | 301,279 | 116,422 |
| Income (loss) before income taxes | (106,472) | 106,552 | (213,024) |
| Income tax expense | 17,827 | 61,578 | (43,751) |
| Net income (loss) | $(124,299) | $44,974 | $(169,273) |
38
Oil and gas revenue. Oil and gas revenue decreased by $96.8 million during the three months ended September 30, 2025 as compared to the three months ended September 30, 2024 primarily as a result of lower average realized oil and gas prices and lower production and sales volumes at Jubilee and Ceiba offset by an increase in production and sales volumes in Mauritania & Senegal with first LNG cargo sales beginning in 2025. We sold 5,515 MBoe at an average realized price per barrel equivalent of $56.39 during the three months ended September 30, 2025 and 5,811 MBoe at an average realized price per barrel equivalent of $70.18 during the three months ended September 30, 2024.
Oil and gas production. Oil and gas production costs increased by $14.2 million during the three months ended September 30, 2025 as compared to the three months ended September 30, 2024 primarily as a result of operating costs associated with the ramp-up of LNG production at the GTA Phase 1 project in Mauritania and Senegal offset by lower operating costs at Jubilee and Ceiba.
Exploration expenses. Exploration expenses increased by $40.3 million during the three months ended September 30, 2025, as compared to the three months ended September 30, 2024 primarily as a result of approximately $51.1 million of exploration expense for the three months ended September 30, 2025 related to the Winterfell-4 step out well which was plugged and abandoned during the third quarter of 2025 offset by decreased geological and geophysical studies and related costs as part of the Company’s focus on managing costs across our portfolio.
General and administrative expenses. General and administrative expenses decreased during the three months ended September 30, 2025, as compared to the three months ended September 30, 2024 primarily as a result of a reduction in employee compensation during 2025.
Depletion, depreciation and amortization. Depletion, depreciation and amortization increased by $20.8 million during the three months ended September 30, 2025, as compared with the three months ended September 30, 2024 primarily as a result higher depletion rates per boe across our portfolio owing to increased cost basis related to the respective development activities in 2024 partially offset by lower sales volumes across our portfolio.
Interest and other financing costs, net. Interest and other financing costs, net increased by $35.8 million during the three months ended September 30, 2025, as compared to the three months ended September 30, 2024 primarily as a result of decreased capitalized interest related to the GTA Phase 1 project post first gas production in December 2024.
Derivatives, net. During the three months ended September 30, 2025 and 2024, we recorded a gain of $3.6 million and a gain of $15.3 million, respectively, on our outstanding hedge positions. The amounts recorded were a result of changes in the forward oil price curve during the respective periods.
Income tax expense. For the three months ended September 30, 2025 and 2024, changes to our effective tax rates are driven by which tax jurisdictions our income (loss) before income taxes is generated. The jurisdictions in which we operate have statutory tax rates ranging from 0% to 35%.
Nine months ended September 30, 2025 compared to nine months ended September 30, 2024
(In thousands)
| Revenues and other income: | Nine Months Ended September 30, 2025 | 2024 | Increase (Decrease) |
|---|---|---|---|
| Oil and gas revenue | $993,729 | $1,277,797 | $(284,068) |
| Gain on sale of assets | 600 | — | 600 |
| Other income, net | 849 | 109 | 740 |
| Total revenues and other income | 995,178 | 1,277,906 | (282,728) |
| Costs and expenses: | |||
| Oil and gas production | 558,122 | 377,822 | 180,300 |
| Exploration expenses | 68,686 | 39,992 | 28,694 |
| General and administrative | 58,215 | 76,724 | (18,509) |
| Depletion, depreciation and amortization | 413,449 | 311,750 | 101,699 |
| Interest and other financing costs, net | 164,595 | 75,839 | 88,756 |
| Derivatives, net | (18,480) | 5,716 | (24,196) |
| Other expenses, net | 14,854 | 6,418 | 8,436 |
| Total costs and expenses | 1,259,441 | 894,261 | 365,180 |
| Income (loss) before income taxes | (264,263) | 383,645 | (647,908) |
| Income tax expense | 58,382 | 187,215 | (128,833) |
| Net income (loss) | $(322,645) | $196,430 | $(519,075) |
Oil and gas revenue. Oil and gas revenue decreased by $284.1 million during the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024 primarily as a result of lower average realized oil and gas prices and lower production and sales volume at Jubilee and Ceiba offset by increased sales volumes in Mauritania & Senegal with first LNG cargo sales beginning in 2025. We sold 16,624 MBoe at an average realized price per barrel equivalent of $59.78 during the nine months ended September 30, 2025 and 17,465 MBoe at an average realized price per barrel equivalent of $73.16 during the nine months ended September 30, 2024.
Oil and gas production. Oil and gas production costs increased by $180.3 million during the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024 primarily as a result of operating costs associated with the ramp-up of LNG production at the GTA Phase 1 project in Mauritania and Senegal offset by lower average oil and gas operating costs at Jubilee and Ceiba.
Exploration expenses. Exploration expenses increased by $28.7 million during the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024 primarily as a result of approximately $51.1 million of exploration expense for the nine months ended September 30, 2025 related to the Winterfell-4 step out well which was plugged and abandoned during the third quarter of 2025 offset by decreased geological and geophysical studies and related costs as part of the Company’s focus on managing costs across our portfolio.
General and administrative expenses. General and administrative expenses decreased during the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024 primarily as a result of a reduction in employee compensation during 2025.
Depletion, depreciation and amortization. Depletion, depreciation and amortization increased $101.7 million during the nine months ended September 30, 2025, as compared with the nine months ended September 30, 2024 primarily as a result of higher depletion rates per boe across our portfolio.
Interest and other financing costs, net. Interest and other financing costs, net increased $88.8 million during the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024, primarily as a result of decreased capitalized interest related to the GTA Phase 1 project post first gas production in December 2024 partially offset by a $24.8 million loss on debt modifications and extinguishments related to the amendment and restatement of the Facility during the second quarter of 2024.
Derivatives, net. During the nine months ended September 30, 2025 and 2024, we recorded a gain of $18.5 million and a loss of $5.7 million, respectively, on our outstanding hedge positions. The changes recorded were a result of changes in the forward curve of oil prices during the respective periods.
Income tax expense. For the nine months ended September 30, 2025 and 2024, our overall effective tax rates were impacted by the difference in our 21% U.S. income tax reporting rate and the 35% statutory tax rate applicable to our Ghanaian and 25% statutory tax rate applicable to our Equatorial Guinean operations, jurisdictions that have a 0% statutory tax rate or where we have incurred losses and have recorded valuation allowances against the corresponding deferred tax assets, and other non-deductible expenses, primarily in the U.S.
Liquidity and Capital Resources
We are actively engaged in an ongoing process of anticipating and meeting our funding requirements related to our strategy as a deepwater exploration and production company. We have historically met our funding requirements through cash flows generated from our operating activities and obtained additional funding from issuances of equity and debt, as well as partner carries.
Oil prices are historically volatile and could negatively impact our ability to generate sufficient operating cash flows to meet our funding requirements. This oil price volatility could impact our ability to comply with our financial covenants. To partially mitigate this price volatility, we maintain an active hedging program and review our capital spending program on a regular basis. Our investment decisions are based on longer-term commodity prices based on the nature of our projects and development plans. Current commodity prices, combined with our hedging program and our current liquidity position support our remaining capital program for 2025.
As such, our 2025 capital budget is based on our exploitation and production plans for Ghana, Equatorial Guinea, Mauritania, Senegal and the Gulf of America, and our appraisal and development activities in the Gulf of America, Mauritania and Senegal.
Our future financial condition and liquidity can be impacted by, among other factors, the success of our exploration, appraisal and exploitation drilling programs, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, the reliability of our oil and gas production facilities, our ability to continuously export oil and gas, our ability to secure and maintain partners and their alignment with respect to capital plans, the actual cost of exploration, appraisal, exploitation and development of our oil and natural gas assets, and coverage of any claims under our insurance policies.
As of September 30, 2025, borrowings under the Facility totaled approximately $1.1 billion and the undrawn availability under the Facility was $225.0 million. In September 2025, during the Fall 2025 redetermination, the Company’s lending syndicate approved a borrowing base at the full Facility size of $1.35 billion. In July 2025, the Company and the Facility lenders agreed to amend the debt cover ratio required under the Facility. The amendment makes this covenant less restrictive for the two scheduled financial covenant assessment dates in September 2025 and March 2026, up to a maximum of 4.0x and 4.25x, respectively, and thereafter returns to the originally agreed upon ratio of 3.50x for assessment dates thereafter. The change is intended to align the covenant calculation with recent business operations, lower oil prices and the impact of pre-production operating costs associated with the GTA Phase 1 project on our results of operations.
Sources and Uses of Cash
The following table presents the sources and uses of our cash and cash equivalents and restricted cash for the nine months ended September 30, 2025 and 2024:
(In thousands)
| Sources of cash, cash equivalents and restricted cash: | Nine Months Ended September 30, 2025 | 2024 |
|---|---|---|
| Net cash provided by operating activities | $98,712 | $502,502 |
| Net proceeds from issuance of senior notes | — | 885,285 |
| Borrowings under long-term debt | 375,000 | 275,000 |
| 473,712 | 1,662,787 | |
| Uses of cash, cash equivalents and restricted cash: | ||
| Oil and gas assets | 244,133 | 772,238 |
| Notes receivable and other investing activities | 86,791 | 2,575 |
| Payments on long-term debt | 150,000 | 350,000 |
| Purchase of capped call transactions | — | 49,800 |
| Repurchase of senior notes | — | 499,515 |
| Other financing costs | 1 | 35,534 |
| 480,925 | 1,709,662 | |
| Decrease in cash, cash equivalents and restricted cash | $(7,213) | $(46,875) |
Net cash provided by operating activities. Net cash provided by operating activities for the nine months ended September 30, 2025 was $98.7 million compared with net cash provided by operating activities for the nine months ended September 30, 2024 of $502.5 million. The decrease in cash provided by operating activities in the nine months ended September 30, 2025 when compared to the same period in 2024 is primarily a result of lower average realized oil and gas prices, lower sales volumes in Ghana and Equatorial Guinea partially offset by increased sales volumes in Mauritania & Senegal with first LNG cargo sales beginning in 2025 and higher oil and gas production costs related to the ramp-up of LNG production at the GTA Phase 1 project for the nine months ended September 30, 2025.
The following table presents our liquidity and financial position as of September 30, 2025 and December 31, 2024:
(In thousands)
| Outstanding debt principal balances: | September 30, 2025 | December 31, 2024 |
|---|---|---|
| Facility | $1,125,000 | $900,000 |
| 7.125% Senior Notes | 250,000 | 250,000 |
| 7.750% Senior Notes | 350,000 | 350,000 |
| 7.500% Senior Notes | 400,274 | 400,274 |
| 8.750% Senior Notes | 500,000 | 500,000 |
| 3.125% Convertible Senior Notes | 400,000 | 400,000 |
| Total long-term debt | 3,025,274 | 2,800,274 |
| Cash and cash equivalents | 64,032 | 84,972 |
| Total restricted cash | 14,032 | 305 |
| Net debt | $2,947,210 | $2,714,997 |
| Availability under the Facility | $225,000 | $450,000 |
| Availability under the GoA Term Loan Facility(1) | $250,000 | $— |
| Available borrowings plus cash and cash equivalents | $539,032 | $534,972 |
(1) As of September 30, 2025, the undrawn availability under the GoA Term Loan Facility was $250 million, subject to certain conditions on borrowing. On October 1, 2025, we received net proceeds of $147.2 million after deducting fees and other expenses. On October 6, 2025, the net proceeds were used, together with cash on hand, to fund the redemption of a portion of the 7.125% Senior Notes due 2026 totaling $150.0 million in aggregate, thereby decreasing the remaining availability under the GoA Term Loan Facility to $100 million. The proceeds from any additional borrowings on the GoA Term Loan Facility is expected to be used to fund the redemption or repayment of the remainder of the 7.125% Senior Notes due 2026.
Capital Expenditures and Investments
For our 2025 capital expenditure budget, we expect to incur capital costs as we:
- drill additional infill wells and execute exploitation and production activities in Ghana, Equatorial Guinea and the Gulf of America;
- complete development of the first phase of GTA; and
- advance appraisal and development efforts for the existing discoveries in the Gulf of America and internationally.
We have relied on a number of assumptions in budgeting for our future activities. These include the number of wells we plan to drill, our paying interests in our operations including disproportionate payment amounts, the costs involved in developing or participating in the development of a prospect, the timing of third‑party projects, the availability of suitable equipment and qualified personnel and our cash flows from operations. We also evaluate potential corporate and asset acquisition opportunities to support and expand our asset portfolio which may impact our budget assumptions. These assumptions are inherently subject to significant business, political, economic, regulatory, health, environmental and competitive uncertainties, contingencies and risks, all of which are difficult to predict and many of which are beyond our control. We may need to raise additional funds more quickly if market conditions deteriorate, or one or more of our assumptions proves to be incorrect, or if we choose to expand our acquisition, exploration, appraisal, development efforts or any other activity more rapidly than we presently anticipate. We may decide to raise additional funds before we need them if the conditions for raising capital are favorable. We may seek to sell assets, equity or debt securities or obtain additional bank credit facilities. The sale of equity securities could result in dilution to our shareholders. The incurrence of additional indebtedness could result in increased fixed obligations and additional covenants that could restrict our operations.
2025 Capital Program
We estimate we will spend in aggregate less than $350 million of capital for the year ending December 31, 2025, excluding any acquisitions or divestiture of oil and gas properties during the year. This capital expenditure budget consists of:
- Approximately $250 million related to maintenance activities across our producing Ghana, Equatorial Guinea and Gulf of America assets, including infill development drilling and facilities integrity spend;
- Approximately $75 million related to the completion of the first phase of the GTA development in Mauritania and Senegal;
- Approximately $25 million related to progressing our appraisal and development programs in the Gulf of America, Mauritania and Senegal.
The ultimate amount of capital we will spend may fluctuate materially based on market conditions and the success of our exploitation and drilling results among other factors. Our future financial condition and liquidity will be impacted by, among other factors, our level of production of oil, natural gas and LNG and the prices we receive from the sale of oil, natural gas and LNG, and our ability to effectively hedge future production volumes, the success of our multi-faceted infrastructure-led exploration, appraisal and development drilling programs, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, our partners’ alignment with respect to capital plans, and the actual cost of exploration, appraisal, exploitation and development of our oil and natural gas assets, and coverage of any claims under our insurance policies.
Significant Sources of Capital
Facility
The Facility supports our oil and gas exploration, appraisal and development programs and corporate activities. The amount of funds available to be borrowed under the Facility, also known as the borrowing base amount, is determined every March and September. The borrowing base amount is based on the sum of the net present values of net cash flows and relevant capital expenditures reduced by certain percentages as well as value attributable to certain assets’ reserves and/or resources in the Company’s production assets in Ghana and Equatorial Guinea. As of September 30, 2025, borrowings under the Facility totaled approximately $1.1 billion and the undrawn availability under the Facility was $225.0 million.
In September 2025, during the Fall 2025 redetermination, the Company’s lending syndicate approved a borrowing base at the full Facility size of $1.35 billion.
The Facility provides a revolving credit and letter of credit facility. The availability period for the revolving credit facility expires one month prior to the final maturity date. The letter of credit facility expires on the final maturity date. The available facility amount is subject to borrowing base constraints and, beginning on April 1, 2027, outstanding borrowings will be constrained by an amortization schedule. The Facility has a final maturity date of December 31, 2029. As of September 30, 2025, we had no letters of credit issued under the Facility. We have the right to cancel all the undrawn commitments under the amended and restated Facility.
If an event of default exists under the Facility, the lenders can accelerate the maturity and exercise other rights and remedies, including the enforcement of security granted pursuant to the Facility over certain assets. In July 2025, the Company and the Facility lenders agreed to amend the debt cover ratio required under the Facility. The amendment makes this covenant less restrictive for the two scheduled financial covenant assessment dates in September 2025 and March 2026, up to a maximum of 4.0x and 4.25x, respectively, and thereafter returns to the originally agreed upon ratio of 3.50x for assessment dates thereafter. The change is intended to align the covenant calculation with recent business operations, lower oil prices and the impact of pre-production operating costs associated with the GTA Phase 1 project on our results of operations. We were in compliance with the financial covenants contained in the Facility as of September 30, 2025 (the most recent assessment date). The Facility contains customary cross default provisions.
The U.S. and many foreign economies continue to experience uncertainty driven by varying macroeconomic conditions. Although some of these economies have shown signs of improvement, macroeconomic recovery remains uneven. Uncertainty in the macroeconomic environment and associated global economic conditions have resulted in extreme volatility in credit, equity, and foreign currency markets, including the European sovereign debt markets and volatility in various other markets. If any of the financial institutions within our Facility are unable to perform on their commitments, our liquidity could be impacted. We actively monitor all of the financial institutions participating in our Facility. None of the financial institutions have indicated to us that they may be unable to perform on their commitments. In addition, we periodically review our banking and financing relationships, considering the stability of the institutions and other aspects of the relationships. Based on our monitoring activities, we currently believe our banks will be able to perform on their commitments.
Senior Notes
We have four series of senior notes outstanding as of September 30, 2025, which we collectively refer to as the “Senior Notes.” Our 7.125% Senior Notes had an outstanding balance of $250.0 million as of September 30, 2025, and mature on April 4, 2026. In October 2025, we used net proceeds from the GoA Term Loan Facility, together with cash on hand, to fund the repurchase of $150.0 million of the 7.125% Senior Notes resulting in $100.0 million remaining outstanding. Interest is payable on the 7.125% Senior Notes each April 4 and October 4. Our 7.750% Senior Notes have an outstanding balance of $350.0 million and mature on May 1, 2027. Interest is payable on the 7.750% Senior Notes each May 1 and November 1. Our 7.500% Senior Notes have an outstanding balance of approximately $400.3 million and mature on March 1, 2028. Interest is payable on the 7.500% Senior Notes each March 1 and September 1. Our 8.750% Senior Notes have an outstanding balance of $500.0 million and mature on October 1, 2031. Interest is payable on the 8.750% Senior Notes each April 1 and October 1.
The Senior Notes are senior, unsecured obligations of Kosmos Energy Ltd. and rank equally in right of payment with all of its existing and future senior indebtedness (including the 3.125% Convertible Senior Notes) and rank effectively junior in right of payment to all of its existing and future secured indebtedness (including all borrowings under the Facility). The Senior Notes are jointly and severally guaranteed on a senior, unsecured basis by certain subsidiaries owning the Company’s Gulf of America assets, and on a subordinated, unsecured basis by entities that borrow under, or guarantee, our Facility.
3.125% Convertible Senior Notes due 2030
We have one series of senior convertible notes outstanding. Our 3.125% Convertible Senior Notes mature on March 15, 2030, unless earlier converted, redeemed or repurchased. Interest is payable in arrears each March 15 and September 15, commencing September 15, 2024.
The 3.125% Convertible Senior Notes are senior, unsecured obligations of Kosmos Energy Ltd. and rank equal in right of payment with all of its existing and future senior indebtedness (including all borrowings under the Senior Notes) and rank effectively junior in right of payment to all of its existing and future secured indebtedness (including all borrowings under the Facility, to the extent of the value of the assets securing such indebtedness). The 3.125% Convertible Senior Notes are guaranteed on a senior, unsecured basis by certain of our existing subsidiaries that guarantee on a senior basis the Senior Notes, and, in certain circumstances, certain of our other existing or future subsidiaries. The 3.125% Convertible Senior Notes are guaranteed on a subordinated, unsecured basis by certain of our existing subsidiaries that borrow under or guarantee the Facility and guarantee on a subordinated basis the Senior Notes, and, in certain circumstances, certain of our other existing or future subsidiaries.
The 3.125% Convertible Senior Notes indenture contains customary terms and covenants.
In connection with the issuance of the 3.125% Convertible Senior Notes, the Company entered into capped call transactions (the “Capped Call Transactions”). The Capped Call Transactions are generally expected to reduce potential dilution to holders of our common stock upon any conversion of the 3.125% Convertible Senior Notes and/or offset any cash payments that we are required to make in excess of the principal amount of any 3.125% Convertible Senior Notes that are converted, as the case may be, with such reduction and/or offset subject to a cap.
GoA Term Loan Facility
On September 24, 2025, the Company entered into a senior secured term loan credit agreement secured by first priority liens on all of the Company’s Gulf of America assets (as defined in the Credit Agreement). The GoA Term Loan Facility is structured in two tranches, with the first tranche consisting of a four-year term loan in an aggregate principal amount of $150.0 million, which was funded on October 1, 2025, and a second tranche comprising commitments to lend up to an additional $100.0 million, available for drawing until April 1, 2026. On October 1, 2025, we received net proceeds of $147.2 million from funding of the first tranche after deducting fees and other expenses. On October 6, 2025, the net proceeds were used, together with cash on hand, to fund the redemption of a portion of the 7.125% Senior Notes due 2026 totaling $150.0 million in aggregate. The proceeds from any additional borrowings on the GoA Term Loan Facility is expected be used to fund the redemption or repayment of the company’s Senior Notes.
Interest on outstanding loans under the GoA Term Loan Facility is payable quarterly in arrears at a rate per annum equal to 3.75% plus the term SOFR reference rate administered by CME Group Benchmark Administration Limited for the relevant period published. The GoA Term Loan Facility matures in 2029, with principal payments beginning June 30, 2026.
The GoA Term Loan Facility contains customary affirmative and negative covenants, including covenants that affect our ability to incur additional indebtedness, create liens, merge, dispose of assets, and make distributions, dividends, investments or capital expenditures, among other things. The GoA Term Loan Facility requires the Company to maintain certain financial covenants including:
- the GoA field life coverage ratio (as defined in the glossary), not less than 1.50x; and
- the GoA net leverage ratio (as defined in the glossary), not more than 3.50x.
The GoA Term Loan Facility includes certain representations and warranties, indemnities and events of default that, subject to materiality thresholds and grace periods, arise as a result of a payment of default, failure to comply with covenants, material inaccuracy of representation or warranty, and certain bankruptcy or insolvency proceedings. If there is an event of default, all or any portion of the outstanding indebtedness may be immediately due and payable and other rights may be exercised including against the collateral.
Contractual Obligations
The following table summarizes by period the payments due for our estimated contractual obligations as of September 30, 2025, and the weighted average interest rates expected to be paid on the Facility given current contractual terms and market conditions, and the instrument’s estimated fair value. Weighted-average interest rates are based on implied forward rates in the yield curve at the reporting date. This table does not include amortization of deferred financing costs.
(In thousands, except percentages)
| Fixed rate debt: | Years Ending December 31, 2025(2) | 2026 | 2027 | 2028 | 2029 | Thereafter | Total | Asset (Liability) Fair Value at September 30, 2025 |
|---|---|---|---|---|---|---|---|---|
| 7.125% Senior Notes | $— | $250,000 | $— | $— | $— | $— | $250,000 | $249,448 |
| 7.750% Senior Notes | — | — | 350,000 | — | — | — | 350,000 | 341,022 |
| 7.500% Senior Notes | — | — | — | 400,274 | — | — | 400,274 | 352,978 |
| 8.750% Senior Notes | — | — | — | — | — | 500,000 | 500,000 | 386,875 |
| 3.125% Convertible Senior Notes | — | — | — | — | — | 400,000 | 400,000 | 254,000 |
| Variable rate debt: | ||||||||
| Weighted average interest rate | 8.24% | 8.40% | 8.31% | 8.93% | 9.28% | —% | ||
| Facility(1) | $— | $— | $219,086 | $396,487 | $509,427 | $— | $1,125,000 | $1,125,000 |
| Total principal debt repayments | $— | $250,000 | $569,086 | $796,761 | $509,427 | $900,000 | $3,025,274 | |
| Interest & commitment fee payments on long-term debt | 99,999 | 221,189 | 192,088 | 136,775 | 86,710 | 93,750 | 830,511 | |
| Operating leases(3) | 1,060 | 3,572 | 3,245 | 3,018 | 2,808 | — | 13,703 | |
| Purchase obligations(4) | 18,657 | — | — | — | — | — | 18,657 | |
| Decommissioning Trust Funds(5) | — | 11,460 | 11,460 | 11,460 | 11,460 | 80,218 | 126,058 | |
| Firm transportation commitments | 955 | 4,182 | 2,074 | — | — | — | 7,211 |
(1) The amounts included in the table represent principal maturities only. The scheduled maturities of debt related to the Facility are based on the level of borrowings and the available borrowing base as of September 30, 2025. Any increases or decreases in the level of borrowings or increases or decreases in the available borrowing base would impact the scheduled maturities of debt during the next five years and thereafter.
(2) Represents the period October 1, 2025 through December 31, 2025.
(3) Primarily relates to corporate and foreign office leases.
(4) Represents gross contractual obligations to execute planned future capital projects. Other joint owners in the properties operated by Kosmos will be billed for their working interest share of such costs. Does not include our share of operator’s purchase commitments for jointly owned fields and facilities where we are not the operator and excludes commitments for exploration activities, including well commitments and seismic obligations, in our petroleum contracts. The Company’s liabilities for asset retirement obligations associated with the dismantlement, abandonment and restoration costs of oil and gas properties are not included. See Note 13 - Additional Financial Information for additional information regarding these liabilities.
(5) In April 2024, a decommissioning trust agreement with the Jubilee unit partners to cash fund future retirement costs associated with the Jubilee Field was finalized. The operator currently estimates the total commitment to be approximately $126.1 million as of September 30, 2025, net to Kosmos, which will be funded annually by Kosmos over an estimated 11 year period. It is possible that our funding requirements could change based on future changes in the decommissioning plan or estimates.
As of September 30, 2025, we have a commitment to drill one development well in Equatorial Guinea.
Once the Tortue Phase 1 SPA Commercial Operations Date is achieved, we have a commitment to our buyer under the Tortue Phase 1 SPA, BP Gas Marketing Limited, to deliver our proportionate share of a minimum annual contract quantity of LNG of 127,951,000 MMBtu, which is equivalent to approximately 2.45 million tonnes per annum, subject to certain downward adjustments by the sellers. Under certain circumstances, in the event the annual quantities provided are lower than the minimum annual contract quantity, Kosmos may be obligated to credit or pay a portion of the Contract Price to BP Gas Marketing Limited for the shortfall volumes.
Critical Accounting Policies
We consider accounting policies related to our revenue recognition, exploration and development costs, receivables, income taxes, derivative instruments and hedging activities, estimates of proved oil and gas reserves, asset retirement obligations and impairment of long-lived assets as critical accounting policies. The policies include significant estimates made by management using information available at the time the estimates are made. However, these estimates could change materially if different information or assumptions were used. Other than items discussed in Note 2 — Accounting Policies, there have been no changes to our critical accounting policies which are summarized in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” section in our annual report on Form 10-K, for the year ended December 31, 2024.
Cautionary Note Regarding Forward-looking Statements
This quarterly report on Form 10-Q contains estimates and forward-looking statements, principally in “Management’s Discussion and Analysis of Financial Condition and Results of Operations.” Our estimates and forward-looking statements are mainly based on our current expectations and estimates of future events and trends, which affect or may affect our businesses and operations. Although we believe that these estimates and forward-looking statements are based upon reasonable assumptions, they are subject to several risks and uncertainties and are made in light of information currently available to us. Many important factors, in addition to the factors described in our quarterly report on Form 10-Q and our annual report on Form 10-K, may adversely affect our results as indicated in forward-looking statements. You should read this quarterly report on Form 10-Q, the annual report on Form 10-K and the documents that we have filed with the Securities and Exchange Commission completely and with the understanding that our actual future results may be materially different from what we expect. Our estimates and forward-looking statements may be influenced by the following factors, among others:
- the impact of a potential regional or global recession, inflationary pressures and other varying macroeconomic conditions on us and the overall business environment;
- the impacts of the continued war in Ukraine and ongoing instability in the Middle East and the effects these events have on the oil and gas industry as a whole, including increased volatility with respect to oil, natural gas and LNG prices and operating and capital expenditures;
- our ability to find, acquire or gain access to other discoveries and prospects and to successfully develop and produce from our current discoveries and prospects;
- uncertainties inherent in making estimates of our oil and natural gas data;
- the successful implementation of our and our block partners’ prospect discovery and development and drilling plans;
- projected and targeted capital expenditures and other costs, commitments and revenues;
- termination of or intervention in concessions, rights or authorizations granted to us by the governments of the countries in which we operate (or their respective national oil companies) or any other federal, state or local governments or authorities;
- our dependence on our key management personnel and our ability to attract and retain qualified technical personnel;
- the ability to obtain financing and to comply with the terms under which such financing may be available;
- the volatility of oil, natural gas and LNG prices, as well as our ability to implement hedges addressing such volatility on commercially reasonable terms;
- the availability, cost, function and reliability of developing appropriate infrastructure around and transportation to our discoveries and prospects;
- the availability and cost of drilling rigs, production equipment, supplies, personnel and oilfield services;
- other competitive pressures;
- potential liabilities inherent in oil and natural gas operations, including drilling and production risks and other operational and environmental risks and hazards;
- current and future government regulation of the oil and gas industry, applicable monetary/foreign exchange sectors or regulation of the investment in or ability to do business with certain countries or regimes;
- cost of compliance with laws and regulations;
- changes in, or new, environmental, health and safety or climate change or GHG laws, regulations and executive orders, or the implementation, or interpretation, of those laws, regulations and executive orders;
- adverse effects of sovereign boundary disputes in the jurisdictions in which we operate;
- environmental liabilities;
- geological, geophysical and other technical and operations problems, including drilling and oil and gas production and processing;
- military operations, civil unrest, outbreaks of disease, terrorist acts, wars or embargoes;
- the cost and availability of adequate insurance coverage and whether such coverage is enough to sufficiently mitigate potential losses and whether our insurers comply with their obligations under our coverage agreements;
- our vulnerability to severe weather events, including, but not limited to, tropical storms and hurricanes, and the physical effects of climate change;
- our ability to meet our obligations under the agreements governing our indebtedness;
- the availability and cost of financing and refinancing our indebtedness;
- the amount of collateral required to be posted from time to time in our hedging transactions, letters of credit, performance bonds and other secured debt;
- our ability to obtain surety or performance bonds on commercially reasonable terms;
- the result of any legal proceedings, arbitrations, or investigations we may be subject to or involved in;
- our success in risk management activities, including the use of derivative financial instruments to hedge commodity and interest rate risks; and
- other risk factors discussed in the “Item 1A. Risk Factors” section of our quarterly reports on Form 10-Q and our annual report on Form 10-K.
The words “believe,” “may,” “will,” “aim,” “estimate,” “continue,” “anticipate,” “intend,” “expect,” “plan” and similar words are intended to identify estimates and forward-looking statements. Estimates and forward-looking statements speak only as of the date they were made, and, except to the extent required by law, we undertake no obligation to update or to review any estimate and/or forward-looking statement because of new information, future events or other factors. Estimates and forward-looking statements involve risks and uncertainties and are not guarantees of future performance. As a result of the risks and uncertainties described above, the estimates and forward-looking statements discussed in this quarterly report on Form 10-Q might not occur, and our future results and our performance may differ materially from those expressed in these forward-looking statements due to, including, but not limited to, the factors mentioned above. Because of these uncertainties, you should not place undue reliance on these forward-looking statements.
Market risk
As filed, 6,883 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The primary objective of the following information is to provide forward-looking quantitative and qualitative information about our potential exposure to market risks. The term “market risks” as it relates to our currently anticipated transactions refers to the risk of loss arising from changes in commodity prices and interest rates. These disclosures are not meant to be precise indicators of expected future losses, but rather indicators of reasonably possible losses. This forward-looking information provides indicators of how we view and manage ongoing market risk exposures. We enter into market-risk sensitive instruments for purposes other than to speculate.
We manage market and counterparty credit risk in accordance with our policies. In accordance with these policies and guidelines, our management determines the appropriate timing and extent of derivative transactions. See “Item 8. Financial Statements and Supplementary Data — Note 2 — Accounting Policies, Note 7 — Derivative Financial Instruments and Note 8— Fair Value Measurements” section of our annual report on Form 10-K for a description of the accounting procedures we follow relative to our derivative financial instruments.
The following table reconciles the changes that occurred in fair values of our open derivative contracts during the nine months ended September 30, 2025:
(In thousands)
| Derivative Contracts Assets (Liabilities) Commodities | Interest Rates | Total | |
|---|---|---|---|
| Fair value of contracts outstanding as of December 31, 2024 | $9,468 | $2,202 | $11,670 |
| Changes in contract fair value | 9,909 | 766 | 10,675 |
| Contract maturities | (11) | (2,790) | (2,801) |
| Fair value of contracts outstanding as of September 30, 2025 | $19,366 | $178 | $19,544 |
Commodity Price Risk
The Company’s revenues, earnings, cash flows, capital investments, debt capacity and, ultimately, future rate of growth are highly dependent on the prices we receive for our crude oil, which have historically been very volatile. Substantially all of our oil sales are indexed against Dated Brent, and Heavy Louisiana Sweet. Oil prices in the first nine months of 2025 ranged between $61.09 and $83.06 per Bbl for Dated Brent, with Heavy Louisiana Sweet experiencing similar volatility during the first nine months of 2025.
Commodity Derivative Instruments
We enter into various oil derivative contracts to mitigate our exposure to commodity price risk associated with anticipated future oil production. These contracts currently consist of swaps, collars, put options and call options. In regards to our obligations under our various commodity derivative instruments, if our production does not exceed our existing hedged positions, our exposure to our commodity derivative instruments would increase. In addition, a reduction in our ability to access credit could reduce our ability to implement derivative contracts on commercially reasonable terms.
Commodity Price Sensitivity
The following table provides information about our oil derivative financial instruments that were sensitive to changes in oil prices as of September 30, 2025. Volumes and weighted average prices are net of any offsetting derivatives entered into.
(In thousands)
| Term 2025: | Type of Contract | Index | MBbl | Weighted Average Price per Bbl Net Deferred Premium Payable/ (Receivable) | Swap | Sold Put | Floor | Ceiling | Asset (Liability) Fair Value at September 30, 2025(2) |
|---|---|---|---|---|---|---|---|---|---|
| Oct - Dec | Two-way collars | Dated Brent | 2,000 | $1.35 | $— | $— | $60.00 | $74.94 | $(1,092) |
| Oct - Dec | Three-way collars | Dated Brent | 500 | 1.13 | — | 55.00 | 70.00 | 85.00 | 1,553 |
| 2026: | |||||||||
| Jan - Jun | Two-way collars | Dated Brent | 1,000 | 1.55 | — | — | 60.00 | 74.75 | (393) |
| Jan - Dec | Three-way collars | Dated Brent | 2,000 | — | — | 50.00 | 60.00 | 75.51 | (10) |
| Jan - Jun | Swaps(1) | Dated Brent | 1,000 | — | 72.90 | — | — | 80.00 | 6,412 |
| Jan - Dec | Swaps(1) | Dated Brent | 1,000 | — | 72.46 | — | — | 80.00 | 5,528 |
| Jan - Dec | Swaps(1) | Dated Brent | 2,000 | — | 69.70 | 55.00 | — | — | 4,234 |
| Jan - Dec | Swaps(1) | NYMEX WTI | 1,500 | — | 64.83 | 50.00 | — | — | 2,134 |
(1) Includes option contracts sold to counterparties to enhance Swaps.
(2) Fair values are based on the average forward oil prices on September 30, 2025.
At September 30, 2025, our open commodity derivative instruments were in a net asset position of $18.4 million. As of September 30, 2025, a hypothetical 10% price increase in the oil price curves would decrease future pre-tax earnings by approximately $53.6 million. Similarly, a hypothetical 10% price decrease would increase future pre-tax earnings by approximately $47.3 million. For example, if oil prices averaged $50.00 or $60.00 per barrel the rest of 2025 and 2026, our average realized pricing after derivatives would be approximately $56.00 and $62.00 per barrel, respectively, excluding any impact of differentials.
Interest Rate Derivative Instruments
See Note 7 — Derivative Financial Instruments and Note 8 — Fair Value Measurements for specific information regarding the terms of our interest rate derivative instruments that are sensitive to changes in interest rates.
Interest Rate Sensitivity
Changes in market interest rates affect the amount of interest we pay on certain of our borrowings. Outstanding borrowings under the Facility, which as of September 30, 2025 total approximately $1.1 billion and have a weighted average interest rate of 8.2%, are subject to variable interest rates which expose us to the risk of earnings or cash flow loss due to potential increases in market interest rates. If the floating market rate increased 10%, our weighted average interest rate would increase to approximately 8.5%. At this level of floating rate debt, we would pay an estimated additional $4.4 million interest expense per year. The impact of the 2025 fixed interest rate swap would reduce the estimated additional interest expense to $0.6 million for the three months ending December 31, 2025. The commitment fees on the undrawn availability under the Facility are not subject to changes in interest rates. All of our other long-term indebtedness is fixed rate and does not expose us to the risk of cash flow loss due to changes in market interest rates. Additionally, a change in the market interest rates could impact interest costs associated with future debt issuances or any future borrowings and future payments associated with the GTA FPSO arrangement.
As of September 30, 2025, the fair market value of our interest rate swaps was a net asset of approximately $0.2 million. If SOFR changed by 10%, it would have a negligible impact on the fair market value of our interest rate swaps.
Controls and procedures
As filed, 2,227 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
As of the end of the period covered by this report, an evaluation of the effectiveness of the design and operation of the Company’s disclosure controls and procedures (as defined in Rule 13a-15(e) under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) was performed under the supervision and with the participation of the Company’s management, including our Chief Executive Officer and Chief Financial Officer. This evaluation considered the various processes carried out under the direction of our disclosure committee in an effort to ensure that information required to be disclosed in the SEC reports we file or submit under the Exchange Act is accurate, complete and timely. However, a control system, no matter how well conceived and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. The design of a control system must reflect the fact that there are resource constraints, and the benefit of controls must be considered relative to their costs. Consequently, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, within our company have been detected. Based upon this evaluation, our Chief Executive Officer and our Chief Financial Officer concluded that the Company’s disclosure controls and procedures were effective as of September 30, 2025, in ensuring that information required to be disclosed by the Company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, including that such information is accumulated and communicated to the Company’s management, including our Chief Executive Officer and our Chief Financial Officer, to allow timely decisions regarding required disclosure.
Evaluation of Changes in Internal Control over Financial Reporting
There were no changes in our internal control over financial reporting that occurred during our most recent fiscal quarter that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Risk factors
As filed, 172 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no material changes from the risks discussed in the “Item 1A. Risk Factors” sections of our annual report on Form 10-K for the year ended December 31, 2024.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-09-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2025-07-01 to 2025-09-30 | $311.0m | us-gaap:Revenues |
| Revenue | 9 months2025-01-01 to 2025-09-30 | $993.7m | us-gaap:Revenues |
| Income tax | 3 months2025-07-01 to 2025-09-30 | $17.8m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 9 months2025-01-01 to 2025-09-30 | $58.4m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2025-07-01 to 2025-09-30 | −$124.3m | us-gaap:NetIncomeLoss |
| Net income | 9 months2025-01-01 to 2025-09-30 | −$322.6m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2025-07-01 to 2025-09-30 | −$0.26 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 9 months2025-01-01 to 2025-09-30 | −$0.68 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2025-07-01 to 2025-09-30 | −$0.26 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 9 months2025-01-01 to 2025-09-30 | −$0.68 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2025-07-01 to 2025-09-30 | 478,254,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 9 months2025-01-01 to 2025-09-30 | 477,344,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 9 months2025-01-01 to 2025-09-30 | $98.7m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Cash and equivalents | At period end2025-09-30 | $64.0m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-09-30 | $365.6m | us-gaap:AssetsCurrent |
| Total assets | At period end2025-09-30 | $5.09bn | us-gaap:Assets |
| Current liabilities | At period end2025-09-30 | $705.4m | us-gaap:LiabilitiesCurrent |
| Long-term debt | At period end2025-09-30 | $2.73bn | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2025-09-30 | $250.0m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2025-09-30 | $898.8m | us-gaap:StockholdersEquity |