Management's discussion and analysis

As filed, 59,237 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Forward Looking Statements

This Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2016 (“Second Quarter 2016 Report”) contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), which are subject to the “safe harbor” created by those sections. Forward-looking statements include information concerning our possible or assumed future results of operations, business strategies, financing plans, competitive position, industry environment, potential growth opportunities, the effects of regulation and the economy, generally. Forward-looking statements include all statements that are not historical facts and can be identified by terms such as “anticipates”, “believes”, “could”, “estimates”, “expects”, “intends”, “may”, “plans”, “potential”, “predicts”, “projects”, “should”, “will”, “would” or similar expressions.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. We discuss many of these risks in detail in Part I, Item 1A “Risk Factors” of our Annual Report on Form 10-K for the year ended December 31, 2015 and our other filings with the Securities and Exchange Commission (“SEC”). You should read this Second Quarter 2016 Report, our Annual Report on Form 10-K for the year ended December 31, 2015 and our other filings with the SEC completely and with the understanding that our actual future results may be materially different from what we expect.

Given these uncertainties, you should not place undue reliance on these forward-looking statements. Also, forward-looking statements represent our management’s beliefs and assumptions only as of the date of this Second Quarter 2016 Report. We assume no obligation to update these forward-looking statements publicly, or to update the reasons actual results could differ materially from those anticipated in any forward-looking statements, even if new information becomes available.

The following discussion and analysis should be read in conjunction with the unaudited financial statements and the accompanying notes included in Part 1, Item 1 of this Second Quarter 2016 Report and our Annual Report on Form 10-K for the year ended December 31, 2015.

Introduction

Primoris is a holding company of various subsidiaries, which form one of the larger publicly traded specialty contractors and infrastructure companies in the United States. Serving diverse end-markets, we provide a wide range of construction, fabrication, maintenance, replacement, water and wastewater, and engineering services to major public utilities, petrochemical companies, energy companies, municipalities, state departments of transportation and other customers. We install, replace, repair and rehabilitate natural gas, refined product, water and wastewater pipeline systems; large diameter gas and liquid pipeline facilities; and heavy civil projects, earthwork and site development. We also construct mechanical facilities and other structures, including power plants, petrochemical facilities, refineries, water and wastewater treatment facilities and parking structures. Finally, we provide specialized process and product engineering services.

We have longstanding customer relationships with major utility, refining, petrochemical, power and engineering companies. We have completed major underground and industrial projects for a number of large natural gas transmission and petrochemical companies in the western United States, as well as significant projects for our engineering customers. We enter into a large number of contracts each year and the projects can vary in length – from several weeks, to as long as 48 months for completion on larger projects. Although we have not been dependent upon any one customer in any year, a small number of customers tend to constitute a substantial portion of our total revenues.

We recognize revenues and profitability on our contracts depending on the type of contract. For our fixed price, or lump sum, contracts, we record revenue as the work progresses on a percentage-of-completion basis which means that we recognize revenue based on the percentage of costs incurred to date in proportion to the total estimated costs expected to complete the contract. Fixed price contracts may include retainage provisions under which customers withhold a percentage of the contract price until the project is complete. For our unit price, time and material, and cost-plus contracts, we recognize revenue as units are completed or services are performed.

The Company segregates its business into three operating segments, which include: The West Construction Services segment (“West segment”), the East Construction Services segment (“East segment”) and the Energy segment. The following is a brief description of each of our reportable segments and business activities.

The West segment includes the underground and industrial operations and construction services performed by ARB, Inc. (“ARB”), ARB Structures, Inc., Rockford Corporation (“Rockford”), Q3 Contracting, Inc. (“Q3C”), and Vadnais Trenchless Services, Inc. (“Vadnais”). ARB and ARB Structures perform work primarily in California; while, Rockford operates throughout the United States and Q3C operates in Colorado and the upper Midwest United States. The segment also included two joint venture operations. The West segment consists of business headquartered primarily in the western United States.

The East segment includes the James Construction Group (“JCG”) Heavy Civil division, the JCG Infrastructure and Maintenance division, BW Primoris, LLC and Cardinal Contractors, Inc. construction business, located primarily in the southeastern United States and in the Gulf Coast region of the United States and includes heavy civil construction and infrastructure and maintenance operations.

The Energy segment businesses are located primarily in the southeastern United States and in the Gulf Coast region of the United States. The segment includes the operations of the Primoris Energy Services (“PES”) pipeline and gas facility construction and maintenance operations, the PES Industrial division, the Ram-Fab operations and the Primoris Aevenia, Inc. (“Aevenia”) operations. Additionally, the segment includes the OnQuest, Inc. (“OnQuest”) and OnQuest Canada, ULC operations for the design and installation of high-performance furnaces and heaters for the oil refining, petrochemical and power generation industries.

The following table lists the Company’s primary operating subsidiaries and their operating segment:

Subsidiary Reportable Segment
ARB, Inc. (“ARB”) West
ARB Structures, Inc. West
Q3 Contracting, Inc. (“Q3C”) West
Rockford Corporation (“Rockford”) West
Vadnais Trenchless Services, Inc. (“Vadnais”) West
Cardinal Contractors, Inc. East
BW Primoris, LLC (“BWP”) East
James Construction Group, LLC (“JCG”): East
JCG Heavy Civil Division East
JCG Infrastructure and Maintenance Division East
Primoris Energy Services Corporation (“PES”) Energy
PES Pipeline Services Energy
PES Industrial Division Energy
OnQuest, Inc. Energy
OnQuest Canada, ULC Energy
Primoris Aevenia, Inc. (“Aevenia”); acquired February 28, 2015 Energy

The Company owned 50% of the Blythe Power Constructors joint venture (“Blythe”) created for the installation of a parabolic trough solar field and steam generation system in California, and its operations have been included as part of the West segment. The project has been completed, the project warranty expired in May 2015 and dissolution of the joint venture was completed in the third quarter 2015.

The Company owns a 50% interest in two separate joint ventures, both formed in 2015 to engineer and construct gas-fired power generation facilities: Carlsbad Power Constructors joint venture (“Carlsbad”) and ARB Inc. & B&M Engineering Co. joint venture (“Wilmington”). Both projects are located in the Southern California area. At this time, completion for both projects is expected in 2018. The joint venture operations are included as part of the West segment. As a result of determining that the Company is the primary beneficiary of the two VIE’s, the results of the Carlsbad and Wilmington joint ventures are consolidated in the Company’s financial statements.

On February 28, 2015, the Company acquired the net assets of Aevenia, Inc. for $22.3 million in cash, and established a new entity, Primoris Aevenia, Inc. (“Aevenia”), which operates as part of the Company’s Energy segment. Headquartered in Moorhead, Minnesota, Aevenia is an energy and electrical construction company. Aevenia specializes in overhead and underground line work, substations, telecom/fiber, and certain other client-specific on-demand call out services. The majority of their work is delivered under unit-price Master Services Agreements (“MSAs”). Aevenia has operations in Minnesota, North Dakota, South Dakota and Iowa. The Company believes there are opportunities for Aevenia to grow sales by performing in-house work for other Primoris subsidiaries and to expand the Company’s offerings to new geographies in the Midwest United States. On January 29, 2016, Aevenia acquired the net assets of Mueller Concrete Construction Company (“Mueller”) for $4.1 million.

For some end markets we perform the same services in each of our West, East and Energy segments, while for other end markets, such as poured-in-place parking structures, only one of our segments currently serves the market. The following table shows the approximate percentage of revenues over three years derived from our major end-markets, with prior periods conformed to the current year market breakdown:

Market Twelve Months Ended June 30, 2016 Twelve Months Ended December 2015 Twelve Months Ended June 30, 2015
Underground capital projects 10% 12% 16%
Utility services 35% 34% 32%
Industrial 18% 16% 19%
Heavy Civil 29% 30% 26%
Engineering 2% 4% 4%
Other 6% 4% 3%
Total 100% 100% 100%

Material trends and uncertainties

We generate our revenue from both large and small construction and engineering projects. The award of these contracts is dependent on many factors, most of which are not within our control. We depend in part on spending by companies in the energy and oil and gas industries, the gas utility industry, as well as municipal water and wastewater customers. Over the past several years, each segment has benefited from demand for more efficient and more environmentally friendly energy and power facilities, local highway and bridge needs and from the activity level in the oil and gas industry; however, each of these industries and the government agencies periodically are adversely affected by macroeconomic conditions. Economic factors outside of our control may affect the amount and size of contracts we are awarded in any particular period.

We closely monitor our customers to assess the effect that changes in economic, market and regulatory conditions may have on them. We have experienced reduced spending by some of our customers over the last several years, which we attribute to negative economic and market conditions, and we anticipate that these negative conditions may continue to affect demand for our services in the near-term. Major fluctuations in market prices of oil, gas and other fuel sources have affected demand for our services. The recent significant reduction in the price of oil, gas and liquid natural gas has created uncertainty with respect to demand for our oil and gas pipeline and roustabout services in the near term, with additional uncertainty resulting over the length of time that prices will remain depressed. We believe that our upstream operations, such as the construction of gathering lines within the oil shale formations will remain at lower levels for an extended period. While there was some improvement in the price of oil in the second quarter of 2016, the increase has not resulted in a significant change in the contracting activities of our customers. We believe that over time, the need for pipeline infrastructure for mid-stream and gas utility companies will result in a continuing need for our services, but the impact of the low oil prices and the bankruptcy of some smaller oil and gas producers may delay midstream pipeline opportunities. The continuing changes in the regulatory environment also affects the demand for our services, either by increasing our work or delaying projects. For example, the regulatory environment in California may well result in delays for the construction of gas-fired power plants while the regulators continue to search for significant renewable resources, but the renewable resources may also create a demand for our construction services. Finally, we believe that regulated utility customers will continue to invest in our maintenance and replacement services.

Seasonality, cyclicality and variability

Our results of operations are subject to quarterly variations. Some of the variation is the result of weather, particularly rain, ice and snow, which can impact our ability to perform construction services. While the majority of the Company’s work is in the southern half of the United States, these seasonal impacts affect revenues and profitability since gas and other utilities defer routine replacement and repair during their period of peak demand. Any quarter can be affected either negatively or positively by atypical weather patterns in any part of the country. In addition, demand for new projects tends to be lower during the early part of the year due to clients’ internal budget cycles. As a result, the Company usually experiences higher revenues and earnings in the third and fourth quarters of the year as compared to the first two quarters.

The Company is also dependent on large construction projects which tend not to be seasonal, but can fluctuate from year to year based on general economic conditions. Our business may be affected by declines or delays in new projects or by client project schedules. Because of the cyclical nature of our business, the financial results for any period may fluctuate from prior periods, and the Company’s financial condition and operating results may vary from quarter-to-quarter. Results from one quarter may not be indicative of its financial condition or operating results for any other quarter or for an entire year.

Critical Accounting Policies and Estimates

The preparation of financial statements in conformity with accounting principles generally accepted in the United States requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities as of the date of the financial statements and that affect the amounts of revenues and expenses reported for each period. These estimates and assumptions must be made because certain information that is used in the preparation of our financial statements cannot be calculated with a high degree of precision from data available, is dependent on future events, or is not capable of being readily calculated based on generally accepted methodologies. Often, these estimates are particularly difficult to determine, and we must exercise significant judgment. We use estimates in our assessments of revenue recognition under percentage-of-completion accounting, the allowance for doubtful accounts, useful lives of property and equipment, fair value assumptions in analyzing goodwill and long-lived asset impairments, self-insured claims liabilities and deferred income taxes. Actual results could differ significantly from our estimates, and our estimates could change if they were made under different assumptions or conditions.

As described in our Annual Report on Form 10-K for the year ended December 31, 2015, our critical accounting policies relate primarily to revenue recognition for fixed and unit price contracts, income taxes, goodwill, long-lived assets, reserves for uninsured risks and contingencies. There have been no material changes to our critical accounting policies since December 31, 2015.

Results of operations

Revenues, gross profit, operating income and net income for the three and six months ended June 30, 2016 and 2015 were as follows:

Three Months Ended June 30, 2016 (Thousands) % of Revenue 2015 (Thousands) % of Revenue
Revenues $456,811 100.0% $483,545 100.0%
Gross profit 43,285 9.5% 46,496 9.6%
Selling, general and administrative expense 32,498 7.1% 38,547 8.0%
Operating income 10,787 2.4% 7,949 1.6%
Other income (expense) (2,167) (0.5%) (1,917) (0.4%)
Income before income taxes 8,620 1.9% 6,032 1.2%
Income tax provision (3,333) (0.7%) (2,340) (0.4%)
Net income $5,287 1.2% $3,692 0.8%
Net income attributable to noncontrolling interests (231) (0.1%) (54) (0.0%)
Net income attributable to Primoris $5,056 1.1% $3,638 0.8%

28

Six Months Ended June 30, 2016 (Thousands) % of Revenue 2015 (Thousands) % of Revenue
Revenues $887,257 100.0% $876,325 100.0%
Gross profit 82,562 9.3% 84,501 9.6%
Selling, general and administrative expense 65,156 7.3% 72,307 8.3%
Operating income 17,406 2.0% 12,194 1.4%
Other income (expense) (4,037) (0.5%) (3,435) (0.4%)
Income before income taxes 13,369 1.5% 8,759 1.0%
Income tax provision (5,166) (0.6%) (3,395) (0.4%)
Net income $8,203 0.9% $5,364 0.6%
Net income attributable to noncontrolling interests (454) (0.0%) (54) (0.0%)
Net income attributable to Primoris $7,749 0.9% $5,310 0.6%

Revenues

Revenues for the three months ended June 30, 2016 decreased by $26.7 million, or 5.5%, and revenues for the six months ended June 30, 2016 increased by $10.9 million, or 1.2%, compared to the same periods in 2015. Revenues for the six months ended June 30, 2016 increased in the Energy segment while revenues decreased in both the West and East segments.

From an end-market perspective, our end-market revenues during the second quarter of 2016 compared to the prior year increased by $28.0 million for the industrial end-market, an increase of $3.2 million for the underground utility end-market, a decrease of $30.4 million for the heavy civil end-market and an increase of $9.1 million for other markets. Revenues decreased by $19.5 million with underground capital end-market and decreased by $17.1 million with the engineering end-market.

Gross Profit

For the three and six months ended June 30, 2016, gross profit decreased by $3.2 million or 6.9%, and $1.9 million, or 2.3%, respectively. Gross profit as a percent of revenue decreased to 9.5% for the three months ended June 30, 2016 compared to 9.6% for the same period in 2015 and decreased to 9.3% for the six months ended June 30, 2016 compared to 9.6% for the same period in 2015, primarily reflecting the impact of weather delays and productivity issues on a project in the East segment.

Selling, general and administrative expenses

Selling, general and administrative expenses (“SG&A”) decreased $6.0 million, or 15.7%, for the three months ended June 30, 2016, compared to the same period in 2015. The decrease was primarily due to a $2.0 million reduction in legal fees, an expense for a valuation adjustment made in the prior period for a long-term asset of $1.2 million, with reduced administration and payroll related expenses primarily accounting for the remainder of the decreased amount.

In spite of the revenue reduction for the quarter, SG&A as a percentage of revenue for the three months ended June 30, 2016 decreased to 7.1% compared to 8.0% for the corresponding period in 2015 as a result of the decreases in SG&A expenses for the period.

SG&A decreased $7.2 million, or 9.9%, for the six months ended June 30, 2016, compared to the same period in 2015. The second quarter reduction of $6.0 million discussed above was the primary reason for the decrease. Additionally, our pension withdrawal liability decreased by $0.8 million during the first quarter 2016 as a result of the settlement of litigation.

SG&A as a percentage of revenue for the six months ended June 30, 2016 decreased to 7.3% compared to 8.3% for the corresponding period in 2015, primarily as a result of the decreases in SG&A expenses for the period.

Other income and expense

Non-operating income and expense items for the three and six months ended June 30, 2016 and 2015 were as follows:

Three Months Ended June 30, 2016 (Thousands) 2015 Six Months Ended June 30, 2016 (Thousands) 2015
Income from non-consolidated investments $— $— $— $—
Foreign exchange gain 21 (140) $380 $296
Other expense — (45) — (89)
Interest income 52 6 91 18
Interest expense (2,240) (1,738) (4,508) (3,660)
Total other income (expense) $(2,167) $(1,917) $(4,037) $(3,435)

For the three and six months ended June 30, 2016, foreign exchange gains and losses reflect currency exchange fluctuations of the United States dollar compared to the Canadian dollar. Most of our Canadian subsidiary’s contracts are sold based on United States dollars, but a portion of the work is paid for with Canadian dollars creating a positive currency exchange difference when the value of the Canadian dollar is less than the US dollar.

Interest income is derived from interest earned on excess cash invested primarily in short term U.S. Treasury bills, backed by the federal government and other investments that may not be backed by the federal government.

The increase in interest expense for the three and six months ended June 30, 2016 is due primarily to the $25 million increase in senio secured notes.

Provision for income taxes

Our provision for income taxes increased $1.0 million for the three months ended June 30, 2016 to $3.3 million compared to $2.3 million in the same period in 2015 primarily as a result of higher income before taxes and a higher effective tax rate.

Our provision for income taxes increased $1.8 million for the six months ended June 30, 2016 to $5.2 million compared to $3.4 million in the same period in 2015 primarily as a result of an increase in income before taxes and noncontrolling interests of $4.2 million and a higher effective tax rate. The tax rate applied to income attributable to Primoris in the six months ended June 30, 2016 was 40.0%, compared to 39.0% for the same period in 2015. The 1.0% increase in the effective tax rate results primarily from the partial non-deductibility of meals and incidental per diem expenses.

To determine our quarterly provision for income taxes, we use an estimated annual effective tax rate, which is based on expected annual income, statutory tax rates and tax planning opportunities available in the various jurisdictions in which we operate. Certain significant or unusual items are separately recognized in the quarter in which they occur and can be a source of variability in the effective tax rate from quarter to quarter.

Segment results

West Segment

Revenue and gross profit for the West segment for the three and six months ended June 30, 2016 and 2015 were as follows:

West Segment Three Months Ended June 30, 2016 (Thousands) % of Segment Revenue 2015 (Thousands) % of Segment Revenue
Revenue $222,432 $239,999
Gross profit $31,401 14.1% $30,444 12.7%
West Segment Six Months Ended June 30, 2016 (Thousands) % of Revenue 2015 (Thousands) % of Revenue
Revenue $388,387 $426,384
Gross profit $45,199 11.6% $51,908 12.2%

Revenue for the West segment decreased by $17.6 million, or 7.3%, for the three months ended June 30, 2016, compared to the same period in 2015. This reduction was the result of a decrease at Rockford of $38.8 million, primarily the result of the 2015 completion of a large pipeline project in the Houston, Texas area which had revenues of $51.7 million in 2015. The decrease was partially offset by increased revenues of $6.2 million at the ARB Structures division; increased revenues of $6.6 million at Q3C and increased revenue of $8.9 million at the ARB Underground division, primarily from work for its two largest utility customers.

Year to date revenues for the West segment decreased by $38.0 million in 2016 as compared to the six months ended June 30, 2015, primarily the result of a decrease in volume at Rockford of $85.0 million reflecting the 2015 completion of a large pipeline project which had contributed $103.9 million in 2015. This decrease was partially offset by increases totaling $48.8 million at ARB Structures ($20.8 million), Q3C ($15.5 million) and ARB Underground ($12.5 million), as described above in the quarterly changes.

Gross profit for the West segment increased by $1.0 million, or 3.1%, during the three months ended June 30, 2016, compared to the same period in 2015. Gross profit increased by $3.8 million at Q3C as a result of increased revenue, and Rockford realized an increase in gross profit of $1.6 million primarily due to the impact of the low gross margin realized in the second quarter of 2015 on the large pipeline project as a result of the adverse weather conditions. These increases were offset by a $3.8 million decrease in gross margin at the ARB Underground division, primarily from a reduction in the margin for work at its largest utility customer and mobilization and initial costs incurred as a result of a delay in expected work in the quarter.

Gross profit for the West segment decreased by $6.7 million, or 12.9%, during the six months ended June 30, 2016, compared to the same period in 2015. This decrease was primarily driven by an $8.2 million decrease in gross margin at the ARB Underground division, primarily from a reduction in gross margin for its two largest utility customers, as well as inefficiencies from the delay in expected work for the second quarter 2016.

Gross profit as a percentage of revenue increased to 14.1% during the three months ended June 30, 2016, from 12.7% in the same period in 2015 primarily as a result of the increase in margin recognized at the Rockford division of 20.6% in 2016 versus 5.7% during the same period in 2015.

Gross profit as a percentage of revenue decreased to 11.6% during the six months ended June 30, 2016, from 12.2% in the same period in 2015 primarily as a result of the change in the mix of work at the ARB Underground division as described above.

East Segment

Revenue and gross profit for the East segment for the three and six months ended June 30, 2016 and 2015 were as follows:

East Segment Three Months Ended June 30, 2016 (Thousands) % of Segment Revenue 2015 (Thousands) % of Segment Revenue
Revenue $127,479 $154,887
Gross profit $374 0.3% $9,115 5.9%
East Segment Six Months Ended June 30, 2016 (Thousands) % of Revenue 2015 (Thousands) % of Revenue
Revenue $275,450 $278,587
Gross profit $11,896 4.3% $18,223 6.5%

East segment revenue decreased by $27.4 million, or 17.7% for the three months ended June 30, 2016 compared to the same period in 2015. JCG’s Infrastructure & Maintenance division revenue decreased $32.1 million of which $26.3 million was from a large petrochemical project in Louisiana. This decrease was partially offset by a revenue increase at Cardinal Contractors of $2.6 million.

Revenue decreased by $3.1 million, or 1.1% for the six months ended June 30, 2016 compared to the same period in 2015. Revenue at the JCG Infrastructure & Maintenance division decreased by $29.0 million mainly from the large petrochemical project in Louisiana. JCG’s Heavy Civil division revenue increased by $16.8 million. Increases in TX DOT and municipal projects of $23.2 million, increases of $4.8 million in LA DOT projects and increases of $9.8 million in Texas airport projects were offset by a decrease of $22.1 million from Mississippi DOT. Revenue at Cardinal Contractors increased $6.3 million as multiple ongoing projects in Texas started in the second half of 2015.

Gross Profit decreased by $8.7 million, or 95.9% for the three months ended June 30, 2016 compared to the same period in 2015. The gross profit decrease at JCG’s Infrastructure & Maintenance division was $7.8 million due to the decreased volume from a large petrochemical project in Louisiana. JCG’s Heavy Civil division experienced a gross profit decrease of $1.2 million primarily related to the impact of weather delays and productivity issues on the TX DOT projects, including a reduction of $12 million for two Belton area jobs reflecting an increase in expected total costs and a reduction in the realization of expected claim recovery.

Gross profit decreased by $6.3 million or 34.7% for the six months ended June 30, 2016. The gross profit decrease at JCG’s Infrastructure and Maintenance division was $5.5 million from the decreased volume at the petrochemical project in Louisiana. JCG’s Heavy Civil division had a gross profit decrease of $2.4 million, mainly related to the impact of the weather delays and productivity issues on the TX DOT projects.

Gross profit as a percent of revenue decreased to 0.3% and 4.3% during the three and six months ended June 30, 2016, respectively, from 5.9% and 6.5% in the prior year periods, respectively, primarily as a result of decreased margins on the Texas Heavy Civil division jobs and the decreased volume on the Louisiana petrochemical project. The significant reduction for the quarter reflects the impact of the $12 million reduction for the two Belton area jobs.

Energy Segment

Revenue and gross profit for the Energy segment for the three and six months ended June 30, 2016 and 2015 were as follows:

Energy Segment Three Months Ended June 30, 2016 (Thousands) % of Segment Revenue 2015 (Thousands) % of Segment Revenue
Revenue $106,900 $88,659
Gross profit $11,510 10.8% $6,937 7.8%
Energy Segment Six Months Ended June 30, 2016 (Thousands) % of Revenue 2015 (Thousands) % of Revenue
Revenue $223,420 $171,354
Gross profit $25,467 11.4% $14,370 8.4%

Revenue for the Energy segment increased by $18.2 million, or 20.6%, for the three months ended June 30, 2016, compared to the same period in 2015. The primary differences were increased revenues of $34.3 million at the PES Industrial division and reduced revenues of $17.1 million at OnQuest. For the PES Industrial division, the increase was related a petrochemical project in Louisiana. OnQuest experienced decreased revenues primarily due to project delays and deferrals caused by the energy industry slowdown as a result of the decrease in the price of oil.

Revenue increased by $52.1 million, or 30.4%, for the six months ended June 30, 2016, compared to the same period in 2015. The revenues were higher by $57.9 million at the PES Industrial division and by $31.9 million at the PES Pipeline division. For the Industrial division, the increase was related to the petrochemical project in Louisiana partially offset by the reduction in revenue from the completion of a fertilizer plant project in the first quarter of 2015. For the Pipeline division, the revenue increase is primarily related to several smaller diameter pipeline projects in Texas. Revenues decreased by $30.7 million at OnQuest and by $8.8 million at the PES Saxon division, primarily from completion of prior year projects.

Gross profit for the three months ended June 30, 2016 increased by $4.6 million or 65.9%, compared to the same period in 2015. Gross profit at the PES Industrial division increased by $7.4 million as a result of increased revenues. That increase was offset by the impact of revenue decreases of $1.6 million at other divisions of PES, $1.0 million at Aevenia and $0.5 million at OnQuest.

Gross profit for the six months ended June 30, 2016 increased by $11.1 million or 77.2%, compared to the same period in 2015. Gross profits increased by $12.5 million at the PES Industrial division and by $4.6 million at the PES Pipeline division as a result of increased revenues. For OnQuest, gross profit decreased by $3.8 million due to decreased revenues and to fees earned on a suspended project in the first quarter of 2015.

Gross profit as a percent of revenue increased to 10.8% and 11.4% during the three and six months ended June 30, 2016, respectively, from 7.8% and 8.4 % in the prior year periods, respectively, as a result of improved margins from the petrochemical project in Louisiana and the pipeline work in Texas.

Geographic area financial information

The majority of the Company’s revenues are derived from customers in the United States with approximately 1% generated from sources outside of the United States.

Backlog

For companies in the construction industry, backlog can be an indicator of future revenue streams. Different companies define and calculate backlog in different manners. For the Company, backlog is defined as a combination of:

(1) anticipated revenue from the uncompleted portions of existing contracts for which we have known revenue amounts such as for fixed price and fixed unit price contracts (“Fixed Backlog”), and (2) the estimated revenues on master service agreements (“MSA”) for the next four quarters (“MSA Backlog”). We normally do not include time-and-equipment, time-and-materials and cost reimbursable plus fee contracts in the calculation of backlog, since their ultimate revenue amount is difficult to estimate in advance. We will include these types of contracts in backlog if the customer specifies an anticipated revenue amount.

The two components of backlog, Fixed Backlog and MSA Backlog, are detailed below.

Fixed Backlog

Fixed Backlog by reportable segment as of December 31, 2015 and June 30, 2016 and the changes in Fixed Backlog for the six months ended June 30, 2016 (in millions) are as follows:

Reportable Segment Beginning Fixed Backlog at December 31, 2015 Contract Additions to Fixed Backlog Revenue Recognized from Fixed Backlog Ending Fixed Backlog at June 30, 2016 Revenue Recognized from Non-Fixed Backlog Projects Total Revenue for six months ended June 30, 2016
West $577.1 $258.0 $162.3 $672.8 $226.1 $388.4
East 752.3 155.8 267.0 641.1 8.5 275.5
Energy 187.8 83.2 204.6 66.4 18.8 223.4
Total $1,517.2 $497.0 $633.9 $1,380.3 $253.4 $887.3

Revenues recognized from non-Fixed Backlog projects shown above are generated by projects completed under time-and-equipment, time-and-materials and cost-reimbursable-plus-fee contracts or are revenue from the sale of construction materials, such as rock or asphalt to outside third parties.

As of June 30, 2016, our total Fixed Backlog was $1.38 billion representing a decrease of $136.9 million, or 9.0% compared to the $1.52 billion as of December 31, 2015. We expect that approximately 56% of the total Fixed Backlog at June 30, 2016, will be recognized as revenue over the next four quarters, with approximately $306 million expected for the West segment, $410 million for the East segment and $63 million for the Energy segment.

MSA Backlog

The following table outlines historical MSA revenues for the past six quarters ($ in millions):

Quarterly MSA Revenues 2015 2016
First Quarter 90.7 $105.2
Second Quarter 134.1 142.2
Third Quarter 175.6
Fourth Quarter 164.7

MSA Backlog includes anticipated MSA revenues for the next twelve months. We estimate MSA revenues based on historical trends, anticipated seasonal impacts and estimates of customer demand based on information from our customers.

The following table shows our estimated MSA Backlog at June 30, 2016 by reportable segment (in millions):

Reportable Segment: MSA Backlog at June 30, 2016
West $487.1
East 4.0
Energy 41.5
Total $532.6

34

Total Backlog

The following table shows total backlog (Fixed Backlog plus MSA Backlog), by reportable segment as of the quarter-end dates shown below (in millions):

Reportable Segment: March 31, 2015 June 30, 2015 September 30, 2015 December 31, 2015 March 31, 2016 June 30, 2016
West $848.6 $972.7 $949.3 $1,077.3 $1,283.8 $1,159.9
East 962.9 935.7 810.9 756.3 724.2 645.1
Energy 331.8 290.6 289.6 254.3 186.7 107.9
Total $2,143.3 $2,199.0 $2,049.8 $2,087.9 $2,194.7 $1,912.9

Backlog should not be considered a comprehensive indicator of future revenues, as a percentage of our revenues are derived from projects that are not part of a backlog calculation. The backlog estimates include amounts from estimated MSA revenues, but our customers are not contractually obligated to purchase an amount of services from us under the MSAs. Any of our contracts, MSA, fixed price or fixed unit price, may be terminated by our customers on relatively short notice. In the event of a project cancellation, we may be reimbursed for certain costs, but typically we have no contractual right to the total revenues reflected in backlog. Projects may remain in backlog for extended periods of time as a result of customer delays, regulatory requirements or project specific issues. Future revenues from projects completed under time-and-equipment, time-and-materials and cost-reimbursable-plus-fee contracts may not be included in our estimated backlog amount.

Liquidity and Capital Resources

Cash Needs

Liquidity represents our ability to pay our liabilities when they become due, fund business operations and meet our contractual obligations and execute our business plan. Our primary sources of liquidity are our cash balances at the beginning of each period and our net cash flow. If needed, we have availability under our lines of credit to augment liquidity needs. In order to maintain sufficient liquidity, we evaluate our working capital requirements on a regular basis. We may elect to raise additional capital by issuing common stock, convertible notes, term debt or increasing our credit facility as necessary to fund our operations or to fund the acquisition of new businesses.

Our cash and cash equivalents totaled $97.1 million at June 30, 2016 compared to $161.1 million at December 31, 2015. The primary reason for the decrease was to fund the working capital needs of construction projects, purchase of equipment and other operating needs of the Company. We anticipate that our cash and investments on hand, existing borrowing capacity under our credit facility and our future cash flows from operations will provide sufficient funds to enable us to meet our operating needs, our planned capital expenditures and our ability to grow for at least the next twelve months.

The construction industry is capital intensive, and we expect to continue to make capital expenditures to meet anticipated needs for our services. Historically, we have invested an amount that approximated the sum of depreciation and amortization expenses plus proceeds from equipment sales. During the six months ended June 30, 2016, capital expenditures were approximately $42.1 million, while the amount of depreciation, amortization and equipment sales during this period was approximately $39.8 million. Purchases as of June 30, 2016 included the purchase of $13.4 million of specialty directional drilling/tunneling equipment from Pipe Jacking Unlimited, Inc. in June 2016. Excluding the Pipe Jacking equipment purchases, capital expenditures are expected to total $55 million to $60 million for the 2016 year, which would be more in line with our historical practice.

Cash Flows

Cash flows during the six months ended June 30, 2016 and 2015 are summarized as follows:

Change in cash: Six months ended June 30, 2016 (Thousands) 2015
Net cash (used in) provided by operating activities $5,498 $(17,261)
Net cash used in investing activities (40,525) (23,382)
Net cash used in financing activities (28,980) (12,852)
Net change in cash and cash equivalents $(64,007) $(53,495)

Operating Activities

The source of our cash flow from operating activities and the use of that cash in our operations for the six months ended June 30, 2016 and 2015 were as follows:

Operating Activities: Six months ended June 30, 2016 (Thousands) 2015 Change
Operating income $17,406 $12,194 $5,212
Depreciation and amortization 34,089 31,882 2,207
Stock-based compensation expense 710 524 186
Gain on sale of property and equipment (2,293) (24) (2,269)
Changes in assets and liabilities (35,211) (55,007) 19,796
Net other expense and tax provision (9,203) (6,830) (2,373)
Net cash (used by) provided by operating activities $5,498 $(17,261) $22,759

The net change in assets and liabilities during the six months ended June 30, 2016 resulted in a use of cash of $35.2 million, compared to $55.0 million in the prior year, a decrease in the usage of cash of $19.8 million. The $19.8 million change in assets and liabilities is outlined below:

  • The decrease in the use of cash relating to construction projects, which included the change in accounts receivable, customer retention deposits, costs and estimated earnings in excess of billings, billings in excess of costs and estimated earnings and accounts payable totaled $43.7 million. This compares to $40.8 million for the same period in the prior year. This increase in the use of cash of $2.9 million was primarily due to the increase in revenues of $11.0 million for the six months ended June 30, 2016 compared to the same period in 2015.

The primary changes for this use of cash of $32.7 million from December 31, 2015 to June 30, 2016 were as follows:

  • Accounts receivable decreased by $2.5 million reflecting the lower level of billed construction work during the six months ended June 30, 2016 compared to the third and fourth quarter of 2015. At June 30, 2016 accounts receivable represented 29.2% of our total assets compared to 28.3% at the end of 2015. With the exception of two specific collection issues on two large projects (see the discussion in the “Receivable Collection Actions” below), we continue to maintain an excellent collection history, and we have certain lien rights that can provide additional security for collections;
  • Costs and estimated earnings in excess of billings increased by $17.2 million. The increases are primarily associated with the time lag from when revenues were earned until the customer can be billed, the result of either contractual terms or the billing lag at the end of each month. The change was also impacted by estimated realization of claims and unapproved change orders. The increase during the six months ended June 30, 2016 was approximately $6.1 million for JCG, $6.8 million for PES, $3.8 million for Q3C and $0.5 million for the other operating units;
  • Billings in excess of costs and estimated earnings decreased by $17.6 million primarily reflecting the completion of work paid for in advance; and
  • Accounts payable decreased by $11.1 million at June 30, 2016, compared to a modest increase in accounts payable of $0.4 million at June 30, 2015. This resulted in an increase of $11.5 million of cash usage for the six months ended June 30, 2016 compared to the same period in 2015.
  • At June 30, 2016 there were no earn-out liabilities, which was a decrease of $4.9 million compared to the liability at June 30, 2015.
  • Uninstalled inventory decreased by $2.7 million at June 2016 compared to an increase of $6.7 million at June 2015. This resulted in a decrease of $9.4 million of cash usage for the six months ended June 30, 2016 compared to the same period in 2015.
  • Accrued expenses and other current liabilities increased by $7.3 million at June 2016, compared to an increase of $3.8 million at June 2015. This resulted in an increase of $3.5 million of cash for the six months ended June 30, 2016 compared to the same period in 2015.

Investing activities

During the six months ended June 30, 2016, we purchased property and equipment for $42.1 million in cash compared to $35.7 million during the same period in the prior year. This amount included a $13.4 million purchase of specialty directional drilling/tunneling equipment from Pipe Jacking Unlimited, Inc. in June 2016. We believe that ownership of equipment is generally preferable to renting equipment on a project-by-project basis, as ownership helps to ensure the equipment is available for our workloads when needed. Over the past years, ownership has resulted in lower overall equipment costs.

Historically, we have invested an amount that approximated the sum of depreciation and amortization expenses plus proceeds from equipment sales. Excluding the Pipe Jacking purchases, capital expenditures, primarily for construction equipment, are expected to total $55 million to $60 million for 2016 which would be in line with our historical practice.

We periodically sell and acquire equipment, typically to update our fleet. We received proceeds from the sale of used equipment of $5.7 million during the six months ending June 30, 2016 and $3.6 million during the same period in 2015.

On January 29, 2016, we purchased the net assets of Mueller for $4.1 million in cash and in the prior year, on February 28, 2015, we purchased the net assets of Aevenia for $22.3 million in cash.

Financing activities

Financing activities used cash of $29.0 million for the six months ended June 30, 2016, which was net of several transactions, which included:

  • $24.3 million in repayment of long-term debt and the repayment of $0.5 million in capital leases;
  • Dividend payments of $5.7 million to our stockholders during the six months ended June 30, 2016; and
  • $1.4 million in proceeds from the issuance of 85,907 shares of common stock purchased by the participants in the Primoris Long-term Retention Plan.

Debt Activities

For a description of our credit agreements, see Note 10 — “Credit Agreements” in Item 1, Financial Statements of this Second Quarter 2016 Report.

Related party transactions

Primoris has entered into leasing transactions with Stockdale Investment Group, Inc. (“SIGI”). Brian Pratt, our Chairman of the Board of Directors and our largest stockholder, holds a majority interest and is the chairman, president and chief executive officer and a director of SIGI. John M. Perisich, our Executive Vice President and General Counsel, is secretary of SIGI.

Primoris leases properties from SIGI at the following locations:

1. Bakersfield, California (lease expires October 2022)

2. Pittsburg, California (lease expires April 2023)

3. San Dimas, California (lease expires March 2019)

During the six months ended June 30, 2016 and 2015, the Company paid $0.42 million and $0.41 million, respectively, in lease payments to SIGI for the use of these properties.

Primoris leases a property from Roger Newnham, a former owner and current employee of our subsidiary, OnQuest Canada, ULC. The property is located in Calgary, Canada. During the six months ended June 30, 2016 and 2015, Primoris paid $0.126 million and $0.131 million, respectively, in lease payments. The current term of the lease is through December 31, 2017.

Primoris leases a property from Lemmie Rockford, one of the Rockford sellers, which commenced November 1, 2011. The property is located in Toledo, Washington. During the six months ended June 30, 2016 and 2015, Primoris paid $0.023 million and $0.05 million, respectively, in lease payments. The lease was terminated early at March 31, 2016.

Primoris leases a property from Quality RE Partners, owned by six of the Q3C selling shareholders, of whom two are current employees, including Jay Osborn, an operations president in the West segment. The property is located in Little Canada, Minnesota. During the six months ended June 30, 2016 and 2015, the Company paid $0.13 million in both periods, in lease payments to Quality RE Partners. The lease expires in October 2022.

Primoris leases property from the sellers of the Mueller acquisition, which commenced January 29, 2016. The property is located in Iowa. During the six months ended June 30, 2016, the Company paid $0.016 million in lease payments to the sellers.

Common stock

For a discussion of items affecting our common stock, please see Note 17 — “Stockholders’ Equity” in Item 1, Financial Statements of this Second quarter 2016 Report.

Contractual Obligations

As of June 30, 2016, we had $250.6 million of outstanding long-term debt and capital lease obligations and there were no short-term borrowings.

A summary of contractual obligations as of June 30, 2016 was as follows:

(In Thousands)

Total 1 Year 2 - 3 Years 4 - 5 Years After 5 Years
Long-term debt and capital lease obligations $250,555 $50,669 $92,982 $58,134 $48,770
Interest on long-term debt (1) 26,683 6,830 10,011 5,517 4,325
Equipment operating leases 12,528 5,070 5,127 2,221 110
Real property leases 10,644 3,851 5,459 1,334 —
Real property leases—related parties 7,155 1,490 2,494 1,704 1,467
$307,565 $67,910 $116,073 $68,910 $54,672
Letters of credit $17,361 $12,361 $5,000 $— $—

(1) The interest amount represents interest payments for our fixed rate debt assuming that principal payments are made as originally scheduled.

The table does not include obligations under multi-employer pension plans in which some of our employees participate. Our multi-employer pension plan contribution rates are generally specified in our collective bargaining agreements, and contributions are made to the plans based on employee payrolls. Our obligations for future periods cannot be determined because we cannot predict the number of employees that we will employ at any given time nor the plans in which they may participate.

We may also be required to make additional contributions to multi-employer pension plans if they become underfunded, and these contributions will be determined based on our union payroll. The Pension Protection Act of 2006 added special funding and operational rules for multi-employer plans that are classified as “endangered,” “seriously endangered” or “critical” status. Plans in these classifications must adopt measures to improve their funded status through a funding improvement or rehabilitation plan, which may require additional contributions from employers. The amounts of additional funds that we may be obligated to contribute cannot be reasonably estimated and is not included in the table above.

In November 2011, members of the Pipe Line Contractors Association “PLCA” including ARB, Rockford and Q3C (prior to the Company’s acquisition in 2012), withdrew from the Central States Southeast and Southwest Areas Pension Fund multiemployer pension plan (“Plan”). These withdrawals were made in order to mitigate additional liability in connection with the significantly underfunded Plan. The Company recorded a withdrawal liability of $7.5 million, which was increased to $7.6 million after the acquisition of Q3C, based on information provided by the Plan. The Plan asserted that the PLCA members did not affect a proper withdrawal in 2011, and in May 2014, the Plan asserted that the total liability for the Company was $11.8 million. A legal proceeding commenced, and a United States District Court ruled that the withdrawal of the PLCA members in 2011 was not effective. The PLCA appealed this decision, but as required by the Plan, the Company began making monthly payments, including interest, which totaled $1.8 million through December 31, 2015. The payments were expensed as they were made.

On September 2, 2015, the U.S. Court of Appeals for the 7th Circuit reversed the decision of the District Court and ruled that the withdrawal was effective in 2011 as had been asserted by the PLCA. The Plan provided the Company with a revised withdrawal liability amount which was approximately the amount originally accrued. During the first quarter of 2016, the Company received a revised payment schedule reflecting all the prior payments. While the Company and other members of the PLCA are engaged in arbitration to further reduce the amount owed, the Company will continue to make payments as required by the Plan-provided payment schedule. Based on this schedule and the Company’s ongoing payments, the liability recorded as of June 30, 2016 was $6,197. The Company has no plans to withdraw from any other multi-employer agreements.

We have also excluded from the table any interest and fees associated with letters of credit and commitment fees under our credit facility since these amounts are variable.

Off-balance sheet transactions

As is common in our industry, we enter into certain off-balance sheet arrangements in the ordinary course of business that result in risks not directly reflected on our balance sheet. We have no off-balance sheet financing arrangement with variable interest entities. The following represent transactions, obligations or relationships that could be considered material off-balance sheet arrangements.

  • Letters of credit issued under our lines of credit. At June 30, 2016, we had letters of credit outstanding of $17.4 million, for international project engineering jobs in our Energy segment and for providing security to our insurance carriers. These letters of credit are used by some of our vendors to ensure reimbursement for amounts that they are disbursing on our behalf, such as beneficiaries under our self-funded insurance program. In addition, from time to time, certain customers require us to post a letter of credit to ensure payments to our subcontractors or guarantee performance under our contracts. Letters of credit reduce our borrowing availability under our Credit Agreement and Canadian Credit Facility. If these letters of credit were drawn on by the beneficiary, we would be required to reimburse the issuer of the letter of credit, and we may be required to record a charge to earnings for the reimbursement. As of the date of this Second quarter 2016 Report, we do not believe that it is likely that any material claims will be made under a letter of credit;
  • We enter into non-cancellable operating leases for some of our facilities, equipment and vehicles, including leases with related parties. At June 30, 2016, equipment operating leases had a remaining commitment of $12.5 million and facility rental commitments were $17.8 million;
  • In the ordinary course of our business, we may be required by our customers to post surety bid or completion bonds in connection with services that we provide. At June 30, 2016, we had $1.37 billion in outstanding bonds. As of the date of this Second Quarter 2016 Report, we do not believe that it is likely that we would have to fund material claims under our surety arrangements;
  • As discussed in the previous section, “Contractual Obligations”, certain of our subsidiaries are parties to collective bargaining agreements with unions which may create future obligations not recorded on our balance sheet;
  • Other guarantees that we make from time to time, such as guaranteeing the obligations of our subsidiaries; and
  • Employment agreements with executive officers or with executives from acquired companies may create obligations.

Receivable Collection Actions

At June 30, 2016, the Company is engaged in dispute resolution to enforce collection for two construction projects completed by the Company in 2014. For one project, a cost reimbursable contract, the Company has recorded a receivable of $32.9 million, and for the other project, the Company has a receivable balance due of $17.9 million. At June 30, 2016, the Company has not recorded revenues in excess of cost for these two projects; however, the Company has specific reserves for both projects of approximately $26 million included in “billings in excess of costs and estimated earnings.” At this time, the Company cannot predict the amount that it will collect nor the timing of any collection.

The dispute resolution for the $32.9 million receivable involves contractually required international arbitration for four separate construction projects. As part of the process of filing claims and counter-claims with the arbitration tribunal, the Company determined in the fourth quarter of 2015 that there were no remaining claims from the owner for two of the smaller projects for which the Company had been paid in full. As a result, the Company recorded approximately $2 million in revenues and margin in that quarter. During the six months ended June 30, 2016, the owner sought bankruptcy protection in U.S. bankruptcy court. In addition, the Company has pending litigation against the sureties who provided lien and stop payment release bonds for the total amount owed.

The second project (reflecting the balance due of $17.9 million) involved two small jobs (with separate contracts) that were part of the larger project. A dispute over the termination of these two small jobs was mediated by the owner and Company in April 2016. As a result of the mediation, the Company recorded additional revenue and profit of $0.5 million during the second quarter 2016.

Effects of Inflation and Changing Prices

Our operations are affected by increases in prices, whether caused by inflation or other economic factors. We attempt to recover anticipated increases in the cost of labor, equipment, fuel and materials through price escalation provisions in certain major contracts or by considering the estimated effect of such increases when bidding or pricing new work or by entering into back-to-back contracts with suppliers and subcontractors.

Market risk

As filed, 1,334 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In the ordinary course of business, we are exposed to risks related to market conditions. These risks primarily include fluctuations in foreign currency exchange rates, interest rates and commodity prices. We may seek to manage these risks through the use of financial derivative instruments. These instruments may include foreign currency exchange contracts and interest rate swaps.

We do not execute transactions or use financial derivative instruments for trading or speculative purposes. We enter into transactions with counter parties that are generally financial institutions in a matter to limit significant exposure with any one party.

At June 30, 2016, we had no derivative financial instruments.

The carrying amounts for cash and cash equivalents, accounts receivable, short-term debt, accounts payable and accrued liabilities shown in the consolidated balance sheets approximate fair value at June 30, 2016 and December 31, 2015, due to the generally short maturities of these items. At June 30, 2016, we held no short term investments. In the periods where we have, we generally invest in in U.S. Treasury bills with various financial institutions that are backed by the federal government. We expect to hold our investments to maturity.

At June 30, 2016, all of our long-term debt was subject to fixed interest rates.

Controls and procedures

As filed, 2,026 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Disclosure Controls and Procedures

As of June 30, 2016, we carried out an evaluation, under the supervision and with the participation of our management, including our chief executive officer (“CEO”) and chief financial officer (“CFO”), of the effectiveness of the design and operation of our “disclosure controls and procedures”, as such term is defined under Exchange Act Rules 13a-15(e) and 15d-15(e).

Based on this evaluation, our CEO and CFO concluded that, at June 30, 2016, the disclosure controls and procedures were effective at the reasonable assurance level to ensure that information required to be disclosed by us in the reports we file or submit under the Exchange Act is recorded, processed, summarized and reported within the time periods specified in the rules and forms of the SEC, and accumulated and communicated to our management, including our CEO and CFO, as appropriate to allow timely decisions regarding required disclosure.

In designing and evaluating the disclosure controls and procedures, our management recognized that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives. In reaching a reasonable level of assurance, our management necessarily was required to apply its judgment in evaluating the cost-benefit relationship of possible controls and procedures. The Company’s disclosure controls and procedures are designed to provide reasonable assurance of achieving their stated objectives. We anticipate continuing enhancement of our controls, especially as we complete the process of integrating our financial and operations information systems onto a common platform.

Changes in Internal Control Over Financial Reporting

During the fiscal quarter ended June 30, 2016, there were no changes to our internal control over financial reporting practices or processes that materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Risk factors

As filed, 602 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

In addition to the information set forth in this Report, you should carefully consider the factors discussed in the section entitled “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31, 2015, which to our knowledge have not materially changed. Those risks, which could materially affect our business, financial condition or future results, are not the only risks we face. Additional risks and uncertainties not currently known to us or that we currently deem to be immaterial also may materially adversely affect our business, financial condition and/or operating results.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2016-06-30. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Cost of revenue3 months2016-04-01 to 2016-06-30$413.5mus-gaap:CostOfServices
Cost of revenue6 months2016-01-01 to 2016-06-30$804.7mus-gaap:CostOfServices
Gross profit3 months2016-04-01 to 2016-06-30$43.3mus-gaap:GrossProfit
Gross profit6 months2016-01-01 to 2016-06-30$82.6mus-gaap:GrossProfit
Selling, general and administrative3 months2016-04-01 to 2016-06-30$32.5mus-gaap:SellingGeneralAndAdministrativeExpense
Selling, general and administrative6 months2016-01-01 to 2016-06-30$65.2mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income3 months2016-04-01 to 2016-06-30$10.8mus-gaap:OperatingIncomeLoss
Operating income6 months2016-01-01 to 2016-06-30$17.4mus-gaap:OperatingIncomeLoss
Interest expense3 months2016-04-01 to 2016-06-30$2.2mus-gaap:InterestExpense
Interest expense6 months2016-01-01 to 2016-06-30$4.5mus-gaap:InterestExpense
Income tax3 months2016-04-01 to 2016-06-30$3.3mus-gaap:IncomeTaxExpenseBenefit
Income tax6 months2016-01-01 to 2016-06-30$5.2mus-gaap:IncomeTaxExpenseBenefit
Net income6 months2016-01-01 to 2016-06-30$8.2mus-gaap:ProfitLoss
Diluted EPS3 months2016-04-01 to 2016-06-30$0.10us-gaap:EarningsPerShareDiluted
Diluted EPS6 months2016-01-01 to 2016-06-30$0.15us-gaap:EarningsPerShareDiluted
Basic EPS3 months2016-04-01 to 2016-06-30$0.10us-gaap:EarningsPerShareBasic
Basic EPS6 months2016-01-01 to 2016-06-30$0.15us-gaap:EarningsPerShareBasic
Diluted shares (weighted)3 months2016-04-01 to 2016-06-3052,022,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Diluted shares (weighted)6 months2016-01-01 to 2016-06-3051,950,000 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Capital expenditure6 months2016-01-01 to 2016-06-30$42.1mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Dividends paid6 months2016-01-01 to 2016-06-30$5.7mus-gaap:PaymentsOfDividendsCommonStock
Cash and equivalentsAt period end2016-06-30$97.1mus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2016-06-30$635.2mus-gaap:AssetsCurrent
Total assetsAt period end2016-06-30$1.09bnus-gaap:Assets
Current liabilitiesAt period end2016-06-30$389.6mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2016-06-30$601.5mus-gaap:Liabilities
Long-term debtAt period end2016-06-30$199.9mus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2016-06-30$50.2mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2016-06-30$488.6mus-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest

Source: SEC EDGAR, the filing index for accession 0001558370-16-007687. Last ingested by Listed: Nov 13, 2026, 16:58 ET. Listed shows no prices and gives no investment advice.