Niocorp Developments Ltd: Form 10-Q for the period ended Mar 31, 2017
Filed with the SEC on May 12, 2017 and accepted by EDGAR at May 12, 2017, 16:31 ET.
Management's discussion and analysis
As filed, 41,331 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion and analysis should be read in conjunction with our unaudited condensed interim consolidated financial statements as at and for the three and nine months ended March 31, 2017 and the related notes thereto, which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors, including, but not limited to, those set forth elsewhere in this Quarterly Report on Form 10-Q. See section heading “Note Regarding Forward-Looking Statements” below.
All currency amounts are stated in thousands of U.S. dollars unless noted otherwise.
As used in this report, unless the context otherwise indicates, references to “we,” “our,” the “Company,” “NioCorp” and “us” refer to NioCorp Developments Ltd. and its subsidiaries collectively.
Note Regarding Forward Looking Statements
This Quarterly Report on Form 10-Q and the exhibits attached hereto contain “forward-looking statements” within the meaning of Section 27A of the Securities Act and Section 21E of the United States Exchange Act of 1934, as amended, and “forward-looking information” within the meaning of applicable Canadian securities legislation, collectively “forward-looking statements.” Such forward-looking statements concern our anticipated results and developments in the operations of the Company in future periods, planned exploration activities, the adequacy of the Company’s financial resources, and other events or conditions that may occur in the future. Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following:
- risks related to our ability to operate as a going concern;
- risks related to our requirement of significant additional capital;
- risks related to our limited operating history;
- risks related to our history of losses;
- risks related to cost increases for our exploration and, if warranted, development projects;
- risks related to our properties being in the exploration stage;
- risks related to mineral exploration and production activities;
- risks related to our lack of mineral production from our properties;
- risks related to estimates of mineral resources;
- risks related to changes in mineral resource estimates;
- risks related to differences in United States and Canadian reserve and resource reporting;
- risks related to our exploration activities being unsuccessful;
- risks related to our ability to obtain permits and licenses for production;
- risks related to government and environmental regulations that may increase our costs of doing business or restrict our operations;
- risks related to proposed legislation that may significantly affect the mining industry;
- risks related to land reclamation requirements;
- risks related to competition in the mining industry;
- risks related to equipment and supply shortages;
- risks related to current and future joint ventures and partnerships;
- risks related to our ability to attract qualified management;
- risks related to the ability to enforce judgment against certain of our Directors;
- risks related to currency fluctuations;
- risks related to claims on the title to our properties;
- risks related to surface access on our properties;
- risks related to potential future litigation;
- risks related to our lack of insurance covering all our operations;
- risks related to our status as a “passive foreign investment company” under US federal tax code;
- risks related to the Common Shares, including price volatility, lack of dividend payments, dilution, and penny stock rules; and
- risks related to our debt.
Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties, and other factors, including without limitation those discussed under the heading “Risk Factors” of our Registration Statement on Form S-1, as filed with the SEC on April 12, 2017, which are incorporated herein by reference, as well as other factors described elsewhere in this report and the Company’s other reports filed with the SEC.
The Company’s forward-looking statements contained in this Quarterly Report on Form 10-Q are based on the beliefs, expectations, and opinions of Management as of the date of this report. The Company does not assume any obligation to update forward-looking statements if circumstances or Management’s beliefs, expectations, or opinions should change, except as required by law. For the reasons set forth above, investors should not attribute undue certainty to or place undue reliance on forward-looking statements.
Company Overview
NioCorp is developing the Elk Creek Project, located in southeast Nebraska. The Elk Creek Project is an advanced Niobium/Scandium/Titanium exploration project. Niobium is used to produce High-Strength, Low-Alloy (“HSLA”) steel, a stronger steel used in automotive, structural, and pipeline applications that is lighter than carbon steel with the same strength. Scandium can be combined with Aluminum and other metals to make high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally advanced method of generating electricity with fewer emissions than conventional methods. Titanium is a key component of pigments used in paper, paint, and plastics, and also is a component of high-performance metal alloys used for aerospace applications, armor, and medical implants.
Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional funds to carry out our near-term planned work programs and complete a feasibility study for the Elk Creek Project (the “Feasibility Study”). Subject to delivering a positive Feasibility Study, we intend to secure the project financing necessary to complete the development, construction, commissioning, and start-up of commercial operation of the Elk Creek Project.
Emerging Growth Company Status
We qualify as an “emerging growth company” as defined in Section 101 of the Jumpstart our Business Startups Act (“JOBS Act”) as we do not have more than $1.07 billion in annual gross revenue and did not have such amount as of June 30, 2016, being the last day of our most recently completed fiscal year.
We may lose our status as an emerging growth company on the last day of our fiscal year during which (i) our annual gross revenue exceeds $1.07 billion or (ii) we issue more than $1.07 billion in non-convertible debt in a three-year period. We will lose our status as an emerging growth company if at any time we are deemed to be a large accelerated filer. We will lose our status as an emerging growth company on the last day of our fiscal year following the fifth anniversary of the date of the first sale of common equity securities pursuant to an effective registration statement.
As an emerging growth company under the JOBS Act, we have elected to opt out of the extended transition period for complying with new or revised standards pursuant to Section 107(b) of the Act. The election is irrevocable.
As an emerging growth company, we are exempt from Section 404(b) of the Sarbanes-Oxley Act of 2002 and Section 14A(a) and (b) of the Securities Exchange Act of 1934. Such sections are provided below:
- Section 404(b) of the Sarbanes-Oxley Act of 2002 requires a public company’s auditor to attest to, and report on, Management's assessment of its internal controls.
- Sections 14A(a) and (b) of the Securities and Exchange Act, implemented by Section 951 of the Dodd-Frank Act, require companies to hold shareholder advisory votes on executive compensation and golden parachute compensation.
As long as we qualify as an emerging growth company, we will not be required to comply with the requirements of Section 404(b) of the Sarbanes-Oxley Act of 2002 and Section 14A (a) and (b) of the Securities Exchange Act of 1934.
Recent Corporate Events
- On January 16, 2017, we entered into a non-revolving credit facility agreement (the “Credit Facility”) in the amount of $2.0 million with Mark Smith. The Credit Facility bears an interest rate of 10% and is drawdowns are subject to a 2.5% establishment fee. Amounts outstanding under the Credit Facility will become due January 16, 2018, and are secured by all of the Company’s assets pursuant to a general security agreement between the Company and Mr. Smith dated June 17, 2015. The Credit Facility contains financial and non-financial covenants customary for a facility of this size and nature. On January 18, 2017, we completed a drawdown from the Credit Facility in the amount of $175.
- On January 27, 2017, we announced a non-brokered private placement (the “February 2017 Offering”) of up to 2,857,143 units of the Company (each a “Unit”) at a price of C$0.70 per Unit. Subsequently, the maximum February 2017 Offering was increased to 7,364,789 Units. Each Unit consists of one Common Share and one transferable Common Share purchase warrant (each whole such warrant a "Warrant"), with each Warrant entitling the holder thereof to acquire one additional Common Share at a price of C$0.85 for a period of 36 months from their date of issuance.
- On February 1, 2017, the Company issued 617,971 common shares of the Company to Lind upon conversion of US$275 in principal amount of the Company’s outstanding convertible note issued in December of 2015 at a conversion price of C$0.76641 per share.
- On February 6, 2017, the Company issued 1,698,072 common shares of the Company to Lind Asset Management IV, LLC upon conversion of US$750 in principal amount of the Company’s outstanding convertible note issued in December of 2015 at a conversion price of C$0.76426 per share.
- On February 14, 2017, the Company completed the first tranche closing (the "First Tranche Closing") of the February 2017 Offering. The First Tranche Closing consisted of the issuance of 3,860,800 Units at a price of C$0.70 per Unit, for gross proceeds of C$2.7 million.
- On February 21, 2017, we announced that, further to our existing Lind Agreement, the Company had provided Lind with its demand, pursuant to which the Company called an additional $1.0 million in funds from Lind under the Lind Agreement (the “First Tranche Increase”). NioCorp was entitled to demand the First Tranche Increase pursuant to the terms of the Lind Agreement. The First Tranche Increase funds were required to be delivered by Lind to the Company on or before March 30, 2017, will have a term of two years and bear prepaid interest at a rate of 10% per annum. In connection with the First Tranche Increase, the Company is obligated to issue Lind warrants of the Company at the time of funding of the First Tranche Increase (the “First Tranche Increase Warrants”). The First Tranche Increase Warrants will have a term of 36 months from issuance, and the number of First Tranche Warrants to be issued will be equal to $1.0 million divided by the VWAP for the five (5) consecutive trading days immediately before the First Tranche Increase funding is received, multiplied by 0.5. The exercise price of the First Tranche Increase Warrants issuable in connection with the First Tranche Increase will be equal to 120% of the Company’s five (5) trading day VWAP per share immediately prior to the date the First Tranche Increase funding is received.
- On February 28, 2017, the Company completed the second and final tranche closing (the "Final Closing") of the February 2017 Offering. The Final Closing consisted of the issuance of 3,503,989 Units including 2,964,682 Units dated February 21, 2017, and 539,307 Units dated February 28, 2017, at a price of C$0.70 per Unit, for gross aggregate proceeds of C$2.5 million.
- On March 24, 2017, we announced that we had entered into an amending agreement dated March 20, 2017, with Lind to extend the term of the Initial Convertible Security by six months to June 17, 2018, and entered into amending agreements dated March 20, 2017, with Mark Smith to extend the due dates of the Smith Credit Agreement and Original Smith Loan to June 16, 2018 and June 17, 2018, respectively.
- On March 31, 2017, we received $1.0 million in First Tranche Increase funding from Lind. In connection with this additional funding, the Company issued 890,670 Lind first Tranche Increase Warrants, at an exercise price of C$0.90 per warrant.
- On May 10, 2017, the Company announced that it had entered into an agreement, subject to regulatory approval, with Mackie Research Capital Corporation (“Mackie”), which agreement was subsequently amended on May 12, 2017. Pursuant to the amended agreement, Mackie has agreed to purchase, on a bought deal short form prospectus basis, 3,077,000 units of the Company (the “May 2017 Units”) at a price of C$0.65 per May 2017 Unit for gross proceeds to the Company of up to C$2,000,050 (the “May 2017 Offering”), subject to an option to increase the size of the May 2017 Offering by up to 15% in May 2017 Units. Each May 2017 Unit will consist of one Common Share and one warrant, with each warrant entitling the holder to acquire one Common Share at a price of C$0.85 at any time prior to the date which is three years following completion of the May 2017 Offering. Proceeds of the May 2017 Offering will be used for general working capital purposes.
Elk Creek Project Update
- On January 9, 2017, we announced the successful conclusion of negotiations with private landowners in the Elk Creek, Nebraska area that will allow the Company to purchase land needed for the preferred layout of the Elk Creek Project’s proposed underground mine and surface processing facility.
- On January 18, 2017, we announced the achievement of two major process breakthroughs as part of final design work for the Feasibility Study. Both advances – one in the Niobium metallurgical process and one related to regenerating useful materials from process streams previously slated for disposal – may lead to lower-than-expected capital expenditures (CAPEX) and operating expenses (OPEX) for the sub-systems involved. Subsequently, on January 24, 2017, we announced that based on these breakthroughs we will eliminate a planned railroad spur line and supporting infrastructure from the Elk Creek Project. The original railroad spur line would have required constructing several railroad bridges over the Nemaha River, Elk Creek, and various tributaries, as well as impacting an estimated 2.6 acres of wetlands and open water, and more than 1,700 feet of various water channels. Final CAPEX estimates will be determined when all remaining Feasibility Study work is complete.
- On January 24, 2017, we announced that recent metallurgical process breakthroughs allowing the recycling of materials previously planned for disposal as part of the Elk Creek Project should simplify and streamline the Elk Creek Project’s permitting by the United States Army Corps of Engineers (the “USACE”) because of significantly reduced environmental impacts. The Company’s October 2015 Preliminary Economic Assessment called for a seven-kilometer railroad spur line, along with supporting rail infrastructure, in order to deliver approximately 7,000 tonnes per week of reagents needed for separation and purification of the three superalloy metals (Niobium, Scandium, and Titanium) that NioCorp plans to produce. Metallurgical process advances announced January 18, 2017 will allow The Elk Creek Project to recycle many of these reagents from material that previously was planned for disposal either in an on-site tailings storage area or as mine backfill. They also will allow an elimination of the planned railroad spur line and supporting infrastructure. That, in turn, will reduce the Elk Creek Project’s projected impacts to wetlands and waterways that are subject to regulation by the USACE.
- On February 6, 2017, we announced that new environmental improvements in our Elk Creek Project may allow for a permit under the USACE Nationwide Permit program under Section 404 of the Clean Water Act, instead of the USACE’s lengthier and more costly Individual Permit process. As a result of recent engineering and environmental design advances achieved by NioCorp and its consulting team, we believe that the Elk Creek Project’s estimated impacts on federally regulated wetlands and stream channels have been materially reduced. As a result, the Elk Creek Project is expected to qualify for a Nationwide Permit rather than an Individual Permit under Section 404 of the Clean Water Act. USACE officials have confirmed to NioCorp that impacts at these relatively low levels generally qualify a project for the Nationwide Permit program, although a final determination by the USACE can be made only after a complete permit application is submitted.
- On March 27, 2017, we announced that we successfully produced high-purity 99.9% commercial grade Scandium from the Elk Creek Project resource. In addition, we announced the finalization of plans for the proposed Scandium purification circuit to be used at Elk Creek Project.
- On March 30, 2017, we announced the submission of a Pre-Construction Notification (“PCN”) permit application to the U.S. Army Corps of Engineers (“USACE”) for the proposed waterline from the Elk Creek Project to the Missouri River. The PCN covers the outfall structure portion of the Project’s waterline in the Missouri River. Under current federal law (40CFR330.1 (e)), NioCorp may presume that the PCN qualifies for the USACE’s Nationwide Permit 12 (Utility Line Activities) unless it is notified by the USACE within 45 calendar days. If the USACE notifies NioCorp that the notification is incomplete, one additional 45-day period commences upon receipt of the revised notification.
- On April 10, 2017, we announced that we had reached agreement with private landowners on the final land parcel needed prior to completion of a feasibility study for our Elk Creek Project. The perpetual easement between NioCorp and the landowners is for a land parcel at the terminus of the Company’s proposed waterline to the Missouri River from its Elk Creek property. The easement facilitates the shortest route for the waterline between the property and the Missouri River, which helps to cut costs, reduce the Elk Creek Project’s environmental footprint, and furthers the Company’s goal of minimizing impacts to federally regulated wetlands and stream channels.
We continued to advance Feasibility Study and other Elk Creek Project-related work during the quarter. This included advancing the final confirmatory metallurgical test programs at third party labs to firm up the basis of design for the surface production plant, as well as advancing characterization studies for the various products that the surface production plant would produce. In parallel with this work, the Company has completed equipment sizing, layout and engineering design sufficient to support a Feasibility Study level cost estimate for the project.
With the completion of the work efforts noted above, we are now engaged in wrapping up the final components of the Feasibility Study and expect to publicly release our FS results by June 30, 2017. Remaining work elements are currently being worked to completion, and include the following tasks:
- Materials Characterization for Impoundment Design and Mine Backfill Purposes: We are now analyzing and quantifying the physical, geotechnical, environmental, and geochemical properties of our plant tailings and evaluating their engineering properties for use as a backfill material in the mine. Testing required in this process involves the curing of a range of mixtures of the tailings with cement and or backfill that can take up to 28 days. The properties determined during these test programs will drive the capital and operating costs of the backfill system and the surface impoundment.
- Feasibility Study-Level Hydrometallurgical Engineering Design: We have now locked down hydrometallurgical process and are working to complete the Feasibility Study level process engineering, layout, and cost estimating for the hydrometallurgical plant (where we separate and purify Scandium, Titanium and Niobium). We have already completed this work for the pyrometallurgical plant, mineral processing plant, wastewater treatment plant, and supporting infrastructure systems.
- Cost Estimating: We are securing multiple vendor cost estimates on major equipment and process systems as design engineering for those systems is advanced. This involves providing a Feasibility Study-level engineering specification to each vendor in order to get a Feasibility Study-level estimate for the cost of each major piece of equipment. These quotes are important in estimating costs of construction, a key input to the Feasibility Study.
- Updates to Market Studies for Planned Commercial Products: Given that previously commissioned market studies are more than one year old, we are having these updated. These updates have been completed as of April 13, 2017.
- Final CAPEX/OPEX Estimates: Once all design engineering, cost estimates, and other inputs are finalized, this data is integrated into the Feasibility Study Technical Economic Model, which will provide project CAPEX, mining rates, production rates, and OPEX. The model is prepared with a targeted CAPEX and OPEX accuracy of +/-15%. The model will reflect a detailed construction and commissioning schedule for all aspects of the Project.
- Final Review of Feasibility Study Prior to Release: A careful review will be conducted of the Feasibility Study documents to ensure consistency across its many elements.
Once these remaining steps have been completed, we will announce the Feasibility Study results and findings, followed by the required filing of the complete Feasibility Study Technical Report within 45 days of such announcement.
In the eighteen months since the publication of our PEA, we have spent approximately $11.7 million in exploration related expenditures. The following table compares cost guidance from the PEA to actual exploration costs incurred.
| Category PEA Recommended & Budgeted Work2: | Description | PEA Guidance1 | Actual Expenditures FY2016 | YTD2017 | Totals |
|---|---|---|---|---|---|
| Feasibility Study and Engineering | Feasibility study with hydrogeological, geochemistry, and geotechnical work programs | $6,000 | $2,617 | $3,952 | $6,569 |
| Metallurgical | Process feasibility study design and metallurgical testing program including backfill testing | 2,400 | 844 | 2,057 | 2,901 |
| Other2 | Tailings geotechnical field test work with drilling, logging, cone penetration testing, and in situ and borrow materials laboratory testing in Area 7 | 160 | - | 17 | 17 |
| Marketing Studies | 200 | - | 13 | 13 | |
| Sub Total | 8,760 | 3,461 | 6,039 | 9,500 | |
| Other exploration expenditures3: | |||||
| Drilling | - | 197 | - | 197 | |
| Geologists and Field Staff | - | - | 85 | 85 | |
| Field Management and Other | 944 | 1,004 | 1,948 | ||
| Total | $8,760 | $4,602 | $7,128 | $11,730 |
1 Anticipated expenditures required to develop a feasibility study, as outlined in the PEA.
2 Expenditures included in “Feasibility study and engineering” in financial statements.
3 Expenditures incurred to advance the overall Elk Creek Project and Feasibility Study.
Substantially all the Feasibility Study work has now been completed and as of March 31, 2017, we anticipate approximately $0.2 – $0.3 million of work remains, which is expected to be incurred for final Feasibility Study and engineering wrap up. While we may ultimately exceed the amounts as budgeted in the PEA by 5-10%, most of this deviation is for additional metallurgical analyses that Management incurred to identified process breakthroughs with the potential to reduce CAPEX and OPEX, as discussed above.
Financial and Operating Results
The Company continues to expense all expenditures when incurred, except for equipment, which is capitalized. The Company has no revenues from mining operations. Operating expenses incurred related primarily to performing exploration activities, as well as the activities necessary to support corporate and shareholder duties, and are detailed in the following table.
| Operating expenses: | For the three months ended March 31, 2017 | 2016 | For the nine months ended March 31, 2017 | 2016 |
|---|---|---|---|---|
| Consulting | $- | $27 | $1 | $158 |
| Depreciation | 3 | 3 | 7 | 7 |
| Employee-related costs | 578 | 732 | 1,614 | 1,252 |
| Finance costs | 4 | (38) | 4 | 240 |
| Professional fees | 133 | 151 | 745 | 273 |
| Exploration expenditures | 2,761 | 566 | 7,128 | 2,962 |
| Other operating expenses | 596 | 442 | 906 | 933 |
| Total operating expenses | 4,075 | 1,883 | 10,405 | 5,825 |
| Change in financial instrument fair value | 524 | 1,132 | 189 | 2,501 |
| Foreign exchange loss (gain) | (80) | (686) | 113 | (489) |
| Interest expense | 78 | 62 | 218 | 203 |
| Loss (gain) on available for sale securities | 12 | 19 | 6 | 13 |
| Income tax expense | - | - | - | - |
| Net Loss | $4,609 | $2,410 | $10,931 | $8,053 |
Nine months ended March 31, 2017 compared to nine months ended March 31, 2016
Significant items affecting operating expenses are noted below:
Employee related costs increased primarily due to increased share-based compensation costs reflecting the timing of option issuances, as well as the number of options granted and associated fair value calculations, as well as the impact of additional personnel costs to support finance and external communications activities.
Professional fees include legal and accounting services, and increased $0.5 million. This increase reflects costs associated with registration statements filed with the SEC and ongoing compliance efforts. The Company expects that professional fees through the remainder of the fiscal year will return to historical levels as the Company has completed the transition to being a reporting issuer with the SEC.
Exploration expenditures increased $4.2 million, reflecting the timing of expenditures at the Elk Creek Project as discussed above under “Elk Creek Project Update.” 2017 expenditures primarily related to engineering and metallurgical bench and pilot plant testwork in support of our continuing Feasibility Study work, while 2016 costs were primarily directed towards engineering costs in support of the Preliminary Economic Assessment studies that were completed that year.
Other operating expenses include investor relations, general office expenditures, stock and proxy expenditures and other miscellaneous costs. The decline in expenditures was related to financing-related costs incurred in 2016.
Other significant items impacting the change in the Company’s net loss are noted below:
Change in financial instrument fair value represents non-cash changes in the market value of the Convertible Security, which is carried at fair value, as well as changes in the market value of the derivative liability component of the Convertible Notes and the fair market value of warrants issued in connection with the Convertible Security. Overall, the decline in expenses relates to fair value amounts ascribed to the Convertible Security at original issuance.
Foreign exchange (gain) loss is primarily due to changes in the United States dollar (“USD”) against the Canadian dollar (“C$”), and reflects the timing of foreign currency transactions and subsequent changes in exchange rates. The impacts in both periods primarily relates to the impact of changing foreign currency rates as applied to the USD-denominated convertible debt instruments and related party debt, which are recorded on the Canadian parent company books.
Three months ended March 31, 2017 compared to three months ended March 31, 2016
Operating expenses increased $2.2 million, reflecting the timing of expenditures at the Elk Creek Project as discussed above under “Elk Creek Project Update.” Other impacts to net loss include declines in both change in financial instrument fair value and foreign exchange gain as discussed above under “Nine months ended March 31, 2017 compared to nine months ended March 31, 2016.”
Liquidity and Capital Resources
We have no revenue generating operations from which we can internally generate funds. To date, our ongoing operations have been financed by the sale of our equity securities by way of private placements, convertible securities issuances, and the exercise of incentive stock options and share purchase warrants. We believe that we will be able to secure additional private placements financings in the future, although we cannot predict the size or pricing of any such financings. In addition, we can raise funds through the sale of interests in our mineral properties, although current market conditions have substantially reduced the number of potential buyers/acquirers of any such interest(s). This situation is unlikely to change until such time as we can complete work on the Feasibility Study.
As of March 31, 2017, the Company had cash of $1.9 million and working capital of $0.3 million, compared to cash of $4.4 million and working capital of $2.3 million on June 30, 2016. This change in working capital is the result of our continued work towards completion of the Feasibility Study, and the timing of financing inflows.
We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned operational needs are approximately $1.6 million until June 30, 2017. In addition to outstanding accounts payable, our ongoing burn rate averages to approximately $400 per month where approximately $320 is for administrative purposes and approximately $84 is for planned exploration expenditures related to the completion of the Feasibility Study, permitting efforts, and third party consultants until June 30, 2017. The Company’s ability to continue operations and fund our current work plan is dependent on Management’s ability to secure additional financing.
The Company anticipates that it may need to raise $5 million to $6 million to continue planned operations focused on financing the Elk Creek Resources Project after the completion of the Feasibility Study. Management is actively pursuing such additional sources of debt and equity financing, and while it has been successful in doing so in the past, there can be no assurance it will be able to do so in the future.
Exploration expenditure commitments (for example, lease payments) are $32 until June 30, 2017 and planned exploration and development activities are approximately $0.2 million until June 30, 2017. To maintain its currently held properties and fund its currently anticipated general and administrative costs and planned exploration and development activities at the Elk Creek Project for the fiscal year ending June 30, 2017, the Company may require additional financing during 2017. Should such financing not be available in that time-frame, we will be required to reduce our activities and will not be able to carry out all our presently planned exploration and development activities at the Elk Creek Project.
We currently have no further funding commitments or arrangements for additional financing at this time (other than the potential exercise of options and warrants) and there is no assurance that we will be able to obtain additional financing on acceptable terms, if at all. There is significant uncertainty that we will be able to secure any additional financing in the current equity markets. The quantity of funds to be raised and the terms of any proposed equity financing that may be undertaken will be negotiated by Management as opportunities to raise funds arise. Specific plans related to the use of proceeds will be devised once financing has been completed and Management knows what funds will be available for these purposes. Management intends to pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to equity lines of credit or public offerings in the form of underwritten/brokered offerings, at-the-market offerings, registered direct offerings, or other forms of equity financing and public or private issuances of debt securities including secured and unsecured convertible debt instruments or secured debt project financing. Management does not currently know the terms pursuant to which such financings may be completed in the future, but any such financings will be negotiated at arms-length. Future financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current market price of the Company’s securities and will likely be dilutive to current shareholders.
The audit opinion and notes that accompany our financial statements for the year ended June 30, 2016 disclose a “going concern” qualification to our ability to continue in business. The accompanying financial statements have been prepared under the assumption that we will continue as a going concern. We are an exploration stage company and we have incurred losses since our inception. We do not have sufficient cash to fund normal operations and meet debt obligations for the next 12 months without deferring payment on certain current liabilities and raising additional funds. We believe that the going concern condition cannot be removed with confidence until the Company has entered into a business climate where funding of its planned ongoing operating activities is secured.
We have no exposure to any asset-backed commercial paper. Other than cash held by our subsidiaries for their immediate operating needs in Colorado and Nebraska, all of our cash reserves are on deposit with major United States and Canadian chartered banks. We do not believe that the credit, liquidity, or market risks with respect thereto have increased as a result of the current market conditions. However, in order to achieve greater security for the preservation of its capital, we have, of necessity, been required to accept lower rates of interest, which has also lowered our potential interest income.
Operating Activities
During the nine months ended March 31, 2017, the Company's operating activities consumed $9.0 million of cash (2016: $9.1 million). The cash used in operating activities for 2017 reflects the Company's funding of losses of $10.9 million offset by minor non-cash adjustments and changes in working capital items. Overall, 2017 operational outflows remained steady with 2016. Going forward, the Company’s working capital requirements are expected to increase substantially in connection the development of the Elk Creek Project.
Financing Activities
Financing inflows were $6.8 million in 2017 as compared to $10.2 million in 2016, reflecting the timing of convertible debt instrument and private placement issuances initiated during the comparative periods.
Cash Flow Considerations
The Company has historically relied upon equity financings, and to a lesser degree, debt financings, to satisfy its capital requirements and will continue to depend heavily upon equity capital to finance its activities. The Company may pursue debt financing in the medium term if it is able to procure such financing on terms more favorable than available equity financing; however, there can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms.
The Company has limited financial resources compared to its proposed expenditures, no source of operating income, and no assurance that additional funding will be available to it for current or future projects, although the Company has been successful in the past in financing its activities through the sale of equity securities.
The ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital market conditions and its success in developing the Elk Creek Project. Any quoted market for the Company's shares may be subject to market trends generally, notwithstanding any potential success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading price of the Company’s Common Shares could impact its ability to obtain equity financing on acceptable terms.
Historically, the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration and development plans and other contractual obligations when due. However, further development and construction of the Elk Creek Project will require substantial additional capital resources. This includes near-term funding and, ultimately, funding for Elk Creek Project construction and other costs. See “Liquidity and Capital Resources” above for the Company’s discussion of arrangements related to possible future financing(s).
Contractual Obligations
Other than as described below, there have been no material changes to our contractual obligations discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Tabular Disclosure of Contractual Obligations” as of June 30, 2016, in our registration statement on Form S-1 (333-213451) filed on September 2, 2016, as amended September 22, 2016, which discussion is incorporated herein by reference. During the nine-month period ended March 31, 2017, debt obligations decreased $0.5 million due to conversions under the Lind Agreement, partially offset by funds received from the Lind First Tranche Increase and the Smith Credit Facility. There were no other substantial changes to contractual obligations.
Off Balance Sheet Arrangements
The Company has no off balance sheet arrangements.
Critical Accounting Policies
There have been no material changes in our critical accounting policies discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Critical Accounting Policies” as of June 30, 2016, in our registration statement on Form S-1 (333-213451) filed on September 2, 2016, as amended September 22, 2016 and incorporated herein by reference.
Certain U.S. Federal Income Tax Considerations
The Company has been a “passive foreign investment company” (“PFIC”) as defined under Section 1297 of the U.S. Internal Revenue Code of 1986, as amended, in recent years and expects to continue to be a PFIC in the future. Current and prospective United States shareholders should consult their tax advisors as to the tax consequences of PFIC classification and the U.S. federal tax treatment of PFICs. Additional information on this matter is included in the Company’s registration statement on Form S-1 (333-213451) filed on September 2, 2016, as amended September 22, 2016, under the heading “Certain United States Federal Income Tax Considerations” and incorporated herein by reference.
Market risk
As filed, 1,283 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Interest rate risk
The Company’s exposure to changes in market interest rates, relates primarily to the Company’s earned interest income on cash deposits and short term investments. The Company maintains a balance between the liquidity of cash assets and the interest rate return thereon. The carrying amount of financial assets, net of any provisions for losses, represents the Company’s maximum exposure to credit risk.
Foreign currency exchange risk
The company incurs expenditures in both U.S. and Canadian dollars. Canadian dollar expenditures are primarily related to metallurgical-related exploration expenses, as well as certain common share-related costs and professional services. As a result, currency exchange fluctuations may impact the costs of our operating activities. To reduce this risk, we maintain sufficient cash balances in Canadian dollars to fund expected near-term expenditures.
Commodity price risk
The Company is exposed to commodity price risk related to the elements associated with the Elk Creek Project. A significant decrease in the global demand for these elements may have a material adverse effect on our business. The Elk Creek Project is not in production, and the Company does not currently hold any commodity derivative positions.
Controls and procedures
As filed, 2,043 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Disclosure Controls and Procedures
At the end of the period covered by this quarterly report on Form 10-Q for the nine months ended March 31, 2017, an evaluation was carried out under the supervision of and with the participation of our Management, including the Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”), of the effectiveness of the design and operations of our disclosure controls and procedures (as defined in Rule 13a-15(e) and Rule 15d-15(e) under the Exchange Act). Based on that evaluation, the CEO and the CFO have concluded that as of the end of the period covered by this quarterly report, our disclosure controls and procedures were effective in ensuring that: (i) information required to be disclosed by us in reports that we file or submit to the SEC under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in applicable rules and forms and (ii) material information required to be disclosed in our reports filed under the Exchange Act is accumulated and communicated to our Management, including our CEO and CFO, as appropriate, to allow for accurate and timely decisions regarding required disclosure.
Our Management does not expect that our disclosure controls and procedures will prevent all error and all fraud. The effectiveness of our or any system of disclosure controls and procedures, however well designed and operated, can provide only reasonable assurance that the objectives of the system will be met and is subject to certain limitations, including the exercise of judgment in designing, implementing and evaluating controls and procedures and the assumptions used in identifying the likelihood of future events.
Changes in Internal Control over Financial Reporting
There have been no changes in the Company’s internal control over financial reporting during the nine months ended March 31, 2017 that have materially affected, or are reasonably likely to materially affect, the Company’s internal controls over financial reporting.
Risk factors
As filed, 226 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
There have been no changes to the risk factors set forth under the heading “Risk Factors” in our Registration Statement on Form S-1 (333-217272) filed with the SEC on April 12, 2017, which are incorporated herein by reference.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2017-03-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Interest expense | 3 months2017-01-01 to 2017-03-31 | $78.0k | us-gaap:InterestExpense |
| Interest expense | 9 months2016-07-01 to 2017-03-31 | $218.0k | us-gaap:InterestExpense |
| Net income | 3 months2017-01-01 to 2017-03-31 | −$4.6m | us-gaap:NetIncomeLoss |
| Net income | 9 months2016-07-01 to 2017-03-31 | −$10.9m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2017-01-01 to 2017-03-31 | $0.02 | us-gaap:EarningsPerShareBasicAndDiluted |
| Diluted EPS | 9 months2016-07-01 to 2017-03-31 | $0.06 | us-gaap:EarningsPerShareBasicAndDiluted |
| Cash and equivalents | At period end2017-03-31 | $1.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2017-03-31 | $2.2m | us-gaap:AssetsCurrent |
| Total assets | At period end2017-03-31 | $12.9m | us-gaap:Assets |
| Current liabilities | At period end2017-03-31 | $1.9m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2017-03-31 | $8.7m | us-gaap:Liabilities |
| Shareholders' equity | At period end2017-03-31 | $4.2m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001615774-17-002351. Last ingested by Listed: Nov 24, 2026, 17:52 ET. Listed shows no prices and gives no investment advice.