Talen Energy Corp: Form 10-Q for the period ended Mar 31, 2015

Filed with the SEC on May 8, 2015 and accepted by EDGAR at May 8, 2015, 16:33 ET.

Share

Management's discussion and analysis

As filed, 65,492 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

See "Business Strategy" below for discussion of the June 2014 executed definitive agreements of PPL and PPL Energy Supply with affiliates of Riverstone to combine their competitive power generation businesses into a new, stand-alone, publicly traded company named Talen Energy. It is expected that after completion of the spinoff merger and combination, Holdco will request to have its Securities Exchange Act filing requirements suspended as it will be a wholly owned subsidiary of Talen Energy. On April 29, 2015, PPL's Board of Directors declared the distribution of Holdco to PPL's shareowners of record on May 20, 2015, with the spinoff to occur on June 1, 2015. See Note 1 to the Financial Statements for additional information.

Holdco's and Talen Energy's obligations to report under the Securities Exchange Act of 1934 commenced on May 1, 2015, the date the Registration Statement on Form S-1 of Holdco and Talen Energy was declared effective by the SEC. Because this was prior to the completion of the spinoff and the acquisition of RJS Power, the financial information presented in this Quarterly Report on Form 10-Q represents only legacy PPL Energy Supply activity for the periods presented. Following completion of the spinoff, Talen Energy will report consolidated financial results of PPL Energy Supply (which will be renamed Talen Energy Supply, LLC following completion of the spinoff transaction) and RJS Power for the periods subsequent to the combination.

The following should be read in conjunction with PPL Energy Supply's Condensed Consolidated Financial Statements and the accompanying Notes and with PPL Energy Supply's 2014 Form 10-K. Capitalized terms and abbreviations are defined in the glossary. Dollars are in millions, unless otherwise noted.

"Management's Discussion and Analysis of Financial Condition and Results of Operations" includes the following information:

  • "Overview" provides a description of PPL Energy Supply's business strategy, a summary of earnings, a discussion of important financial and operational developments and a description of key factors expected to impact future earnings.
  • "Results of Operations" provides a summary of earnings. "Margins" provides an explanation of PPL Energy Supply's non-GAAP financial measure and "Statement of Income Analysis" addresses significant changes in principal line items on the Statements of Income, comparing the three months ended March 31, 2015 with the same period in 2014.
  • "Financial Condition - Liquidity and Capital Resources" provides an analysis of PPL Energy Supply's liquidity positions and credit profiles. This section also includes a discussion of rating agency actions.
  • "Financial Condition - Risk Management" provides an explanation of PPL Energy Supply's risk management programs relating to market and credit risk.

Overview

Introduction

PPL Energy Supply, headquartered in Allentown, Pennsylvania is an indirect wholly owned subsidiary of PPL and is an energy company that through its principal subsidiaries is primarily engaged in the competitive generation and marketing of electricity in two key markets - the northeastern and northwestern U.S.

PPL Energy Supply's principal subsidiaries are shown below:

PPL Energy Supply
PPL EnergyPlus • Performs energy marketing and trading activities • Purchases fuel PPL Generation • Engages in the competitive generation of electricity, primarily in Pennsylvania and Montana

38

Business Strategy

In June 2014, PPL and PPL Energy Supply executed definitive agreements with affiliates of Riverstone to combine their competitive power generation businesses into a new, stand-alone, publicly traded company named Talen Energy. Under the terms of the agreements, at closing, PPL will spin off to PPL shareowners a newly formed entity, Holdco, which at such time will own all of the membership interests of PPL Energy Supply and all of the common stock of Talen Energy. Immediately following the spinoff, Holdco will merge with a special purpose subsidiary of Talen Energy, with Holdco continuing as the surviving company to the merger and as a wholly owned subsidiary of Talen Energy and the sole owner of PPL Energy Supply. Substantially contemporaneous with the spinoff and merger, RJS Power will be contributed by its owners to become an indirect subsidiary of Talen Energy and a direct subsidiary of PPL Energy Supply. Following completion of these transactions, PPL shareowners will own 65% of Talen Energy and affiliates of Riverstone will own 35%. PPL will have no continuing ownership interest in, control of, or affiliation with Talen Energy or PPL Energy Supply. The transaction is subject to customary closing conditions, including receipt of required regulatory approvals from the NRC, FERC, DOJ and PUC, all of which were received by mid-April 2015. In addition, there must be available, subject to certain conditions, at least $1 billion of undrawn credit capacity under a Talen Energy (or its subsidiaries) revolving credit or similar facility. Any letters of credit or other credit support measures posted in connection with energy marketing and trading transactions at the time of the spinoff are excluded from this calculation.

In connection with the FERC approval, PPL and RJS Power have agreed that within 12 months after closing of the transaction, Talen Energy will divest approximately 1,300 MW of generating assets in one of two groups of assets (from PPL Energy Supply's existing portfolio, this includes either the Holtwood and Wallenpaupack hydroelectric facilities or the Ironwood facility), and limit PJM energy market offers from assets it would retain in the other group to cost-based offers.

On April 29, 2015, PPL's Board of Directors declared the distribution of Holdco to PPL's shareowners of record on May 20, 2015, with the spinoff to occur on June 1, 2015. Talen Energy and PPL Energy Supply will own and operate a diverse mix of approximately 14,000 MW (after divestitures to meet FERC market power standards) of generating capacity in certain U.S. competitive energy markets primarily in PJM and ERCOT.

See "Financial and Operational Developments - Other Financial and Operational Developments - Anticipated Spinoff from PPL" below for additional information.

The strategy for PPL Energy Supply is to optimize the value from its competitive generation asset and marketing portfolios while mitigating near-term volatility in both cash flows and earnings. PPL Energy Supply endeavors to do this by matching energy supply with load, or customer demand, under contracts of varying durations with creditworthy counterparties to capture profits while effectively managing exposure to energy and fuel price volatility, counterparty credit risk and operational risk. PPL Energy Supply is focused on maintaining profitability and positive cash flow during this current period of low energy and capacity prices.

To manage financing costs and access to credit markets, and to fund capital expenditures, a key objective of PPL Energy Supply is to maintain targeted credit profiles and liquidity positions. In addition, PPL Energy Supply has financial and operational risk management programs that, among other things, are designed to monitor and manage exposure to earnings and cash flow volatility related to, as applicable, changes in energy and fuel prices, interest rates, counterparty credit quality and the operating performance of generating units. To manage these risks, PPL Energy Supply generally uses contracts such as forwards, options, swaps and insurance contracts.

Financial and Operational Developments

Net Income (Loss)

Net Income (Loss) for the three months ended March 31, 2015 and 2014 was $96 million and $(66) million.

See "Results of Operations - Earnings" below for discussion and analysis of the consolidated results of operations.

Other Financial and Operational Developments

Economic and Market Conditions

The businesses of PPL Energy Supply are subject to extensive federal, state and local environmental laws, rules and regulations, including those pertaining to CCRs, GHG, effluent limitation guidelines and MATS. See "Financial Condition -

Environmental Matters" below for additional information on these requirements. These and other stringent environmental requirements, combined with low energy margins for competitive generation, have led several energy companies, including PPL Energy Supply to announce plans to either temporarily or permanently close or place in long-term reserve status, and/or impair certain of their coal-fired generating plants.

Given current and forecasted economic and market conditions, the announced transaction with affiliates of Riverstone to form Talen Energy, PPL Energy Supply's current sub-investment grade credit rating and Talen Energy's expected sub-investment grade credit rating, PPL Energy Supply will continue to monitor its business and operational plans, including capital and operation and maintenance expenditures, its hedging strategies and potential plant modifications to burn lower cost fuels. See "Margins" below for additional information on energy margins.

PPL Energy Supply cannot predict the impact that future economic and market conditions and regulatory requirements may have on its financial condition or results of operations.

PJM Market Developments

As a result of unusually cold weather conditions in the first quarter of 2014, PJM identified that changes were necessary to ensure system reliability. In December 2014, PJM proposed to add an enhanced "Capacity Performance" (CP) product to the capacity market structure to permit additional compensation for generation owners/operators to make the necessary investments to maintain system reliability in exchange for stronger performance requirements. In March 2015, the FERC issued a deficiency letter on PJM's CP filing and gave PJM 30 days to respond to additional questions about the proposal. PJM submitted responses to the FERC's questions and requested that the FERC approve an accelerated process to resolve the FERC's concerns. PJM also requested that the FERC approve a delay in the scheduled May capacity auction by up to three months so that the CP filing can still be implemented in this year's capacity auction. The FERC granted PJM's request for a delay in the scheduled capacity auction for up to three months. Also, late in 2014, the FERC approved changes to PJM's capacity market "Variable Resource Requirement" (VRR) curve. The VRR curve is a downward-sloping demand curve used by PJM to model sufficient capacity resources for PJM and set capacity prices. PJM's recent changes include a shift in the VRR curve, which signifies an increase in demand and therefore may put upward pressure on capacity prices. Additionally, there currently exists some uncertainty associated with DR providers' ability to participate in future energy and capacity auctions in PJM. The FERC has rejected PJM's contingency plan to include DR in its capacity auctions in the event an appellate court ruling limiting the FERC's jurisdiction over DR is allowed to stand. The U.S. Solicitor General requested that the U.S. Supreme Court reconsider the May 2014 U.S. Court of Appeals for the D.C. Circuit Court ruling, holding that DR compensation in organized energy markets was beyond the jurisdiction of the FERC and improperly infringed on state authority over retail load. On May 4, 2015, the U.S. Supreme Court agreed to review the ruling.

Anticipated Spinoff from PPL

Following the announcement of the transaction to form Talen Energy as discussed in "Business Strategy" above, efforts were initiated to identify the appropriate staffing for Talen Energy following completion of the spinoff. Organizational plans were substantially completed in 2014. The new organizational plans identified the need to resize and restructure the PPL Energy Supply organization and as a result, in 2014, estimated charges for employee separation benefits were recorded. See Note 8 in PPL Energy Supply's 2014 Form 10-K for additional information. The separation benefits include cash severance compensation, lump sum COBRA reimbursement payments and outplacement services. Most separations and payment of separation benefits are expected to be completed by the end of 2015. At March 31, 2015 and December 31, 2014, the recorded liabilities related to the separation benefits were $3 million and $9 million, which are included in “Other current liabilities” on the Balance Sheets.

Additional employee-related costs to be incurred primarily include accelerated stock-based compensation and pro-rated performance-based cash incentive and stock-based compensation awards primarily for PPL Energy Supply employees and for PPL employees who have become PPL Energy Supply employees in connection with the transaction. These costs will be recognized at the spinoff closing date. PPL Energy Supply estimates these additional costs will be in the range of $30 million to $40 million.

In accordance with business combination accounting guidance, PPL Energy Supply will treat the combination with RJS Power as an acquisition and PPL Energy Supply will be considered the acquirer of RJS Power.

Susquehanna Turbine Blade Inspection

PPL Susquehanna continues to make modifications to address the causes of turbine blade cracking at the PPL Susquehanna nuclear plant first identified in 2011. Unit 1 completed its planned refueling and turbine inspection outage in June 2014 and installed newly designed shorter last stage blades on one of the low pressure turbines. This change allowed Unit 1 to run with reduced blade vibration and no identified cracking during 2014. In the first, second and third quarters of 2014, Unit 2 was shut down for blade inspection and replacement, as well as additional maintenance. The financial impact of the Unit 2 outages was not material. Based on the positive experience on Unit 1, the same short blade modifications are currently being installed on two of the three turbines on Unit 2 during the spring 2015 scheduled refueling outage. All remaining turbine blade modifications are scheduled to be performed during planned refueling and maintenance outages. Inspections will be performed over the next several maintenance cycles to validate the performance of the modifications and ensure that the problem has been corrected. PPL Susquehanna does not expect additional unscheduled turbine maintenance outages after these modifications are complete.

IRS Audits for 1998 - 2011

In February 2015, PPL and the IRS Appeals division reached a settlement on the amount of PPL's refund from its open audits for the years 1998 - 2011. The settlement was required to be reviewed and approved by the Joint Committee on Taxation (JCT) before it is considered final. In April 2015, PPL was notified that the JCT approved PPL's settlement. Subject to a final determination of interest on the refund, PPL Energy Supply expects to record a tax benefit in the range of $7 million to $15 million in the second quarter of 2015 related to the settlement of previously unrecognized tax benefits.

2015 Outlook

In anticipation of the spinoff from PPL, no forward looking information, including an earnings forecast, is being provided for 2015.

Earnings in future periods are subject to various risks and uncertainties. See "Forward-Looking Information," the rest of this "Management's Discussion and Analysis of Financial Condition and Results of Operations" and Note 7 to the Financial Statements in this Form 10-Q and "Item 1. Business" and "Item 1A. Risk Factors" in PPL Energy Supply's 2014 Form 10-K for a discussion of the risks, uncertainties and factors that may impact future earnings.

Results of Operations

The "Earnings" discussion provides a summary of PPL Energy Supply's earnings. The "Margins" discussion includes a reconciliation of PPL Energy Supply's non-GAAP financial measure to "Operating Income" and "Statement of Income Analysis" addresses significant changes in principal line items on the Statements of Income comparing the three months ended March 31, 2015 with the same period in 2014.

The results for interim periods can be disproportionately influenced by numerous factors and developments and by seasonal variations. As such, the results of operations for interim periods do not necessarily indicate results or trends for the year or future periods.

Earnings, Margins and Statement of Income Analysis

Earnings Three Months Ended March 31, 2015 2014
Net Income (Loss) $96 $(66)
Special items, gains (losses), after-tax 22 (149)

Excluding special items, earnings were lower for the three month period. This was primarily due to lower capacity prices and lower load-following and wholesale electric margins as in the first quarter of 2014, the PJM region experienced unusually cold weather conditions, higher demand and congestion patterns, causing rising natural gas and electricity prices in spot and near- term forward markets, partially offset by higher baseload energy prices, higher baseload generation volume and higher intermediate and peaking margins.

The table below quantifies the changes in the components of Net Income (Loss) between these periods, which reflect amounts classified as Gross Energy Margins and certain items that management considers special on separate lines within the table and not in their respective Statement of Income line items. See below for details of special items.

Three Months
Gross Energy Margins $(58)
Other operation and maintenance 8
Other Income (Expense) - net 1
Interest expense (4)
Energy-related businesses 5
Other 2
Income taxes 10
Discontinued operations, after-tax 27
Special items, after-tax 171
Total $162

The following after-tax gains (losses), which management considers special items, also impacted PPL Energy Supply's results during the periods ended March 31.

Income Statement Line Item Three Months 2015 2014
Adjusted energy-related economic activity - net, net of tax of $(18), $95 (a) $27 $(139)
Kerr Dam Project impairment, net of tax of $0, $8 (b) Discontinued Operations — (10)
Corette closure costs, net of tax of $2, $0 (c) Other operation and maintenance (3) —
Transition costs, net of tax of $0, $0 Other operation and maintenance (1) —
Employee transition services, net of tax of $1, $0 Other operation and maintenance (1) —
Total $22 $(149)

(a) Represents unrealized gains (losses), after-tax, on economic activity. See "Commodity Price Risk (Non-trading) - Economic Activity" in Note 11 to the Financial Statements for additional information. Amounts have been adjusted for insignificant amounts for option premiums.

(b) In 2014, an arbitration panel issued its final decision holding that the conveyance price payable to PPL Montana was $18 million. As a result, PPL Energy Supply determined the Kerr Dam Project was impaired and recorded a pre-tax charge of $18 million. See Note 10 to the Financial Statements for additional information.

(c) Operations were suspended and the Corette plant was retired in March 2015.

Margins

Management utilizes "Gross Energy Margins," a non-GAAP financial measure, as an indicator of performance for its business.

"Gross Energy Margins" is defined as, energy revenues, including operating revenues associated with certain businesses classified as discontinued operations, offset by the cost of fuel, energy purchases, certain other operation and maintenance expenses, primarily ancillary charges, gross receipts tax, recorded in "Taxes, other than income," and operating expenses associated with certain businesses classified as discontinued operations. This performance measure is relevant due to the volatility in the individual revenue and expense lines on the Statements of Income that comprise "Gross Energy Margins." This volatility stems from a number of factors, including the required netting of certain transactions with ISOs and significant fluctuations in unrealized gains and losses. Such factors could result in gains or losses being recorded in either "Unregulated wholesale energy," "Unregulated retail energy" or "Energy purchases" on the Statements of Income. This performance measure includes PLR revenues from energy sales to PPL Electric by PPL EnergyPlus, which are reflected in "Unregulated wholesale energy to affiliate" in the reconciliation table below. "Gross Energy Margins" excludes adjusted energy-related economic activity, which includes the changes in fair value of positions used to economically hedge a portion of the economic value of the competitive generation assets, full-requirement sales contracts and retail activities. This economic value is subject to changes in fair value due to market price volatility of the input and output commodities (e.g., fuel and power) prior to the delivery period that was hedged. Adjusted energy-related economic activity includes the ineffective portion of qualifying cash flow hedges and premium amortization associated with options. Unrealized gains and losses related to this activity are deferred and included in "Gross Energy Margins" over the delivery period of the item that was hedged or upon realization.

This measure is not intended to replace "Operating Income," which is determined in accordance with GAAP, as an indicator of overall operating performance. Other companies may use different measures to analyze and report their results of operations. Management believes this measure provides additional useful criteria to make investment decisions. This performance measure is used, in conjunction with other information, by senior management, to manage PPL Energy Supply's operations and analyze actual results compared with budget.

Reconciliation of Gross Energy Margins

The following tables contain the components from the Statements of Income that are included in Gross Energy Margins and a reconciliation to "Operating Income" for the periods ended March 31.

Operating Revenues 2015 Three Months Gross Energy Margins Other (a) Operating Income (b) 2014 Three Months Gross Energy Margins Other (a) Operating Income (b)
Unregulated wholesale energy $614 $(92 ) (c) $522 $(665) $(792 ) (c) $(1,457)
Unregulated wholesale energy to affiliate 9 — 9 27 — 27
Unregulated retail energy 324 (13 ) (c) 311 377 (27 ) (c) 350
Energy-related businesses — 104 104 — 125 125
Total Operating Revenues 947 (1) 946 (261) (694) (955)
Operating Expenses
Fuel 351 — 351 481 1 (c) 482
Energy purchases 152 (151 ) (c) 1 (1,219) (585 ) (c) (1,804)
Other operation and maintenance 4 222 226 7 222 229
Depreciation — 77 77 — 75 75
Taxes, other than income 12 3 15 13 5 18
Energy-related businesses 2 96 98 2 122 124
Total Operating Expenses 521 247 768 (716) (160) (876)
Income (Loss) from Discontinued Operations — — — 29 (29 ) (d) —
Total $426 $(248) $178 $484 $(563) $(79)

(a) Represents amounts excluded from Margins.

(b) As reported on the Statements of Income.

(c) Includes energy-related economic activity, which is subject to fluctuations in value due to market price volatility. See "Commodity Price Risk (Non-trading) - Economic Activity" within Note 11 to the Financial Statements. Amounts have been adjusted for insignificant option premiums.

(d) Represents the revenue associated with the hydroelectric facilities located in Montana that are classified as discontinued operations. These revenues are not reflected in "Operating Income" on the Statements of Income.

Changes in Gross Energy Margins

The following table shows Gross Energy Margins on a geographic basis, for the three months ended March 31 as well as the change between periods. The factors that gave rise to the changes are described following the table.

Gross Energy Margins Three Months 2015 2014 Change
Northeastern U.S. $405 $435 $(30)
Northwestern U.S. 21 49 (28)
Total $426 $484 $(58)

43

Gross Energy Margins

Northeastern U.S.

Northeastern margins decreased primarily due to lower capacity prices of $69 million, unusually cold weather conditions in 2014 as discussed below of $38 million, net change on commodity positions of $28 million and full-requirement sales contracts of $22 million, partially offset by higher baseload energy prices of $75 million and favorable asset performance of $49 million.

During the first quarter of 2014, the PJM region experienced unusually cold weather conditions, higher demand and congestion patterns, causing rising natural gas and electricity prices in spot and near-term forward markets. Due to these market dynamics, PPL Energy Supply captured opportunities on unhedged generation, which were offset primarily by losses incurred by under-hedged full-requirement sales contracts and retail electric portfolios, which were not fully hedged or able to be fully hedged given the extreme load conditions and lack of market liquidity.

Northwestern U.S.

Northwestern margins decreased primarily due to the sale of the Montana hydroelectric generating facilities in November 2014.

Statement of Income Analysis --

Certain Operating Revenues and Expenses Included in "Margins"

The following Statement of Income line items and their related increase (decrease) during the period ended March 31, 2015 compared with 2014 are included above within "Margins" and are not discussed separately.

Three Months
Unregulated wholesale energy (a) $1,979
Unregulated wholesale energy to affiliate (18)
Unregulated retail energy (39)
Fuel (131)
Energy purchases (b) 1,805

(a) 2014 includes significant realized and unrealized losses on physical and financial commodity sales contracts due to the unusually cold weather.

(b) 2014 includes significant realized and unrealized gains on physical and financial commodity purchase contracts due to the unusually cold weather.

Energy-Related Businesses

Net contributions from energy-related businesses increased by $5 million for 2015 compared with 2014 due to higher margins on existing construction projects at the mechanical contracting and engineering subsidiaries.

PPL Energy Supply is presently considering divesting its mechanical and engineering contracting subsidiaries and its renewable plants. The potential divestitures are not expected to have a significant impact on the financial condition and results of operations of PPL Energy Supply.

Other Operation and Maintenance

The increase (decrease) in other operation and maintenance for the period ended March 31, 2015 compared with 2014 was due to:

Three Months
Northeastern fossil and hydroelectric plants (a) $(4)
Northwestern fossil plants (b) 8
PPL EnergyPlus (a) (9)
Other 2
Total $(3)

(a) The decrease was primarily due to lower labor costs attributable to restructuring activities.

(b) The increase was primarily due to costs related to the retirement of Corette in March 2015.

Income Taxes

The increase (decrease) in income taxes for the period ended March 31, 2015 compared with 2014 was due to:

Three Months
Change in pre-tax income at current period tax rates $106
Federal income tax credits (2)
Other (4)
Total $100

See Note 3 to the Financial Statements for additional information.

Income (Loss) from Discontinued Operations (net of income taxes)

Income (Loss) from Discontinued Operations (net of income taxes) for the three month period ended March 31, 2014 includes the results of operations of the Montana hydroelectric generating facilities which were sold in November 2014. See "Discontinued Operations - Montana Hydro Sale" in Note 5 to the Financial Statements for additional information.

Financial Condition

Liquidity and Capital Resources

PPL Energy Supply had the following at:

March 31, 2015 December 31, 2014
Cash and cash equivalents $221 $352
Short-term debt 600 630

Net cash provided by (used in) operating, investing and financing activities for the three months ended March 31, and the changes between periods were as follows.

2015 2014 Change - Cash Provided (Used)
Operating activities $221 $276 $(55)
Investing activities (130) (389) 259
Financing activities (222) 315 (537)

Operating Activities

The components of the change in cash provided by (used in) operating activities for the three months ended March 31, 2015 compared with 2014 were as follows.

Change - Cash Provided (Used)
Net income $162
Non-cash components (146)
Working capital (33)
Defined benefit plan funding (44)
Other operating activities 6
Total $(55)

Net income improved by $162 million between the periods; however, it was primarily offset by $146 million of non-cash components. The non-cash components consisted primarily of an increase in unrealized gains on hedging and other hedging activities of $267 million, partially offset by an increase in deferred tax expense of $134 million. The decrease in cash from operating activities from changes in working capital was partially due to a decrease in accounts payable partially offset by decreases in unbilled revenues and prepayments. The decreases to accounts payable and unbilled revenues were both related to power swap activity in 2014 that resulted from the unusually cold weather in 2014. The decrease in prepayments was primarily due to the receipt of a tax refund in 2015.

Investing Activities

The $259 million reduction in cash used in investing activities for the three months ended March 31, 2015 compared with 2014 primarily reflects activity that occurred in 2014 that did not occur in 2015. In 2014, PPL Energy Supply experienced an increase of $344 million in restricted cash related to collateral requirements to support its commodity hedging program, primarily due to higher 2014 forward energy commodity prices. This was partially offset by the receipt of $56 million related to a U.S. Department of the Treasury grant for the Rainbow Dam capital project.

Financing Activities

The components of the change in cash provided by (used in) financing activities for the three months ended March 31, 2015 compared with 2014 was as follows.

Change - Cash Provided (Used)
Capital contributions/distributions, net $463
Change in short-term debt, net (1,000)
Total $(537)

PPL Energy Supply required $537 million less in financing sources for the three months ended March 31, 2015 compared with 2014. As noted above, cash used in investing activities declined by $259 million between these periods primarily due to lower collateral requirements for the commodity hedging program. PPL Energy Supply was able to use cash from operating activities and cash on hand to fund its investing needs in the first quarter of 2015 and to make its permitted $191 million distribution to PPL. In addition, the change resulted from the reduction in distributions to PPL and a reduction in the funding of those distributions in 2014 with short-term debt. Under the terms of the definitive agreement related to the spinoff transaction, PPL Energy Supply is limited to cash distributions it can make to PPL. PPL Energy Supply does not expect to make significant cash equity contributions to PPL for the remainder of 2015, however, it may receive cash equity contributions in lieu of transfers of certain assets.

See Note 4 to the Financial Statements for information on 2015 short and long-term debt activity. See PPL Energy Supply's 2014 Form 10-K for information on 2014 activity.

Credit Facilities

PPL Energy Supply maintains a syndicated credit facility to enhance liquidity and provide credit support. The amounts borrowed under this credit facility are reflected in "Short-term debt" on the Balance Sheet. At March 31, 2015, the total committed borrowing capacity under this credit facility and the use of this borrowing capacity were:

Committed Capacity (a) Borrowed Letters of Credit Issued Unused Capacity
$3,000 $600 $267 $2,133

(a) The commitments under the credit facility are provided by a diverse bank group, with no one bank and its affiliates providing an aggregate commitment of more than 6% of the total committed capacity.

As a result of the proposed spinoff transaction, PPL Energy Supply has syndicated a $1.85 billion credit facility which is currently fully committed. This syndicated credit facility will replace the existing $3 billion PPL Energy Supply syndicated credit facility and will be effective upon closing of the spinoff transaction. See "Overview – Business Strategy" and "Financial and Operational Developments - Other Financial and Operational Developments - Anticipated Spinoff from PPL" above for additional information.

See Note 4 to the Financial Statements for further discussion of the credit facilities.

Rating Agency Actions

Moody's, S&P and Fitch periodically review the credit ratings on the debt of PPL Energy Supply and its subsidiaries. Based on their respective independent reviews, the rating agencies may make certain ratings revisions or ratings affirmations.

A credit rating reflects an assessment by the rating agency of the creditworthiness associated with an issuer and particular securities that it issues. The credit ratings of PPL Energy Supply and its subsidiaries are based on information provided by PPL Energy Supply and other sources. The ratings of Moody's, S&P and Fitch are not a recommendation to buy, sell or hold any securities of PPL Energy Supply or its subsidiaries. Such ratings may be subject to revisions or withdrawal by the agencies at any time and should be evaluated independently of each other and any other rating that may be assigned to the securities. The credit ratings of PPL Energy Supply and its subsidiaries affect their liquidity, access to capital markets and cost of borrowing under their credit facilities.

In January 2015, Fitch withdrew its rating for PPL Energy Supply.

Ratings Triggers

Various derivative and non-derivative contracts, including contracts for the sale and purchase of electricity and fuel, commodity transportation and storage and interest rate instruments contain provisions that require the posting of additional collateral, or permit the counterparty to terminate the contract, if PPL Energy Supply's credit rating were to fall below investment grade. See Note 11 to the Financial Statements for a discussion of "Credit Risk-Related Contingent Features," including a discussion of the potential additional collateral requirements for PPL Energy Supply for derivative contracts in a net liability position at March 31, 2015.

For additional information on PPL Energy Supply's liquidity and capital resources, see "Item 7. Combined Management's Discussion and Analysis of Financial Condition and Results of Operations," in PPL Energy Supply's 2014 Form 10-K.

Risk Management

Market Risk

See Notes 10 and 11 to the Financial Statements for information about PPL Energy Supply's risk management objectives, valuation techniques and accounting designations.

The forward-looking information presented below provides estimates of what may occur in the future, assuming certain adverse market conditions and model assumptions. Actual future results may differ materially from those presented. These disclosures are not precise indicators of expected future losses, but only indicators of possible losses under normal market conditions at a given confidence level.

Commodity Price Risk (Non-trading)

PPL Energy Supply segregates its non-trading activities into two categories: hedge activity and economic activity. Transactions that are accounted for as hedge activity qualify for hedge accounting treatment. The economic activity category includes transactions that address a specific risk, but were not eligible for hedge accounting or for which hedge accounting was not elected. This activity includes the changes in fair value of positions used to hedge a portion of the economic value of PPL Energy Supply's competitive generation assets and full-requirement sales and retail contracts. This economic activity is subject to changes in fair value due to market price volatility of the input and output commodities (e.g., fuel and power). Although they do not receive hedge accounting treatment, these transactions are considered non-trading activity. See Note 11 to the Financial Statements for additional information.

To hedge the impact of market price volatility on PPL Energy Supply's energy-related assets, liabilities and other contractual arrangements, PPL Energy Supply both sells and purchases physical energy at the wholesale level under FERC market-based tariffs throughout the U.S. and enters into financial exchange-traded and over-the-counter contracts. PPL Energy Supply's non-trading commodity derivative contracts range in maturity through 2020.

The following tables sets forth the changes in the net fair value of non-trading commodity derivative contracts for the periods ended March 31. See Notes 10 and 11 to the Financial Statements for additional information.

Gains (Losses) Three Months 2015 2014
Fair value of contracts outstanding at the beginning of the period $53 $107
Contracts realized or otherwise settled during the period 133 505
Fair value of new contracts entered into during the period (a) (5) (16)
Other changes in fair value (92) (737)
Fair value of contracts outstanding at the end of the period $89 $(141)

(a) Represents the fair value of contracts at the end of the quarter of their inception.

The following table segregates the net fair value of non-trading commodity derivative contracts at March 31, 2015, based on the observability of the information used to determine the fair value.

Source of Fair Value Net Asset (Liability) Maturity Less Than 1 Year Maturity 1-3 Years Maturity 4-5 Years Maturity in Excess of 5 Years Total Fair Value
Prices based on significant observable inputs (Level 2) $53 $(34) $13 $— $32
Prices based on significant unobservable inputs (Level 3) 32 23 2 — 57
Fair value of contracts outstanding at the end of the period $85 $(11) $15 $— $89

PPL Energy Supply sells electricity, capacity and related services and buys fuel on a forward basis to hedge the value of energy from its generation assets. If PPL Energy Supply were unable to deliver firm capacity and energy or to accept the delivery of fuel under its agreements, under certain circumstances it could be required to pay liquidating damages. These damages would be based on the difference between the market price and the contract price of the commodity. Depending on price changes in the wholesale energy markets, such damages could be significant. Extreme weather conditions, unplanned power plant outages, transmission disruptions, nonperformance by counterparties (or their counterparties) with which it has energy contracts and other factors could affect PPL Energy Supply's ability to meet its obligations, or cause significant increases in the market price of replacement energy. Although PPL Energy Supply attempts to mitigate these risks, there can be no assurance that it will be able to fully meet its firm obligations, that it will not be required to pay damages for failure to perform, or that it will not experience counterparty nonperformance in the future.

Commodity Price Risk (Trading)

PPL Energy Supply's trading commodity derivative contracts range in maturity through 2020. The following table sets forth changes in the net fair value of trading commodity derivative contracts for the periods ended March 31. See Notes 10 and 11 to the Financial Statements for additional information.

Gains (Losses) Three Months 2015 2014
Fair value of contracts outstanding at the beginning of the period $48 $11
Contracts realized or otherwise settled during the period (30) —
Fair value of new contracts entered into during the period (a) (7) (13)
Other changes in fair value 35 33
Fair value of contracts outstanding at the end of the period $46 $31

(a) Represents the fair value of contracts at the end of the quarter of their inception.

The following table segregates the net fair value of trading commodity derivative contracts at March 31, 2015, based on the observability of the information used to determine the fair value.

Source of Fair Value Net Asset (Liability) Maturity Less Than 1 Year Maturity 1-3 Years Maturity 4-5 Years Maturity in Excess of 5 Years Total Fair Value
Prices based on significant observable inputs (Level 2) $(6) $(11) $(9) $— $(26)
Prices based on significant unobservable inputs (Level 3) 4 33 33 2 72
Fair value of contracts outstanding at the end of the period $(2) $22 $24 $2 $46

VaR Models

A VaR model is utilized to measure commodity price risk in unregulated gross energy margins for the non-trading and trading portfolios. VaR is a statistical model that attempts to estimate the value of potential loss over a given holding period under normal market conditions at a given confidence level. VaR is calculated using a Monte Carlo simulation technique based on a five-day holding period at a 95% confidence level. Given the company's disciplined hedging program, the non-trading VaR exposure is expected to be limited in the short-term. The VaR for portfolios using end-of-month results for the three months ended March 31, 2015 was as follows.

95% Confidence Level, Five-Day Holding Period Trading VaR Non-Trading VaR
Period End $4 $12
Average for the Period 4 10
High 4 12
Low 4 8

The trading portfolio includes all proprietary trading positions, regardless of the delivery period. All positions not considered proprietary trading are considered non-trading. The non-trading portfolio includes the entire portfolio, including generation, with delivery periods through the next 12 months. Both the trading and non-trading VaR computations exclude FTRs due to the absence of reliable spot and forward markets. The fair value of the non-trading and trading FTR positions was insignificant at March 31, 2015.

Interest Rate Risk

PPL Energy Supply and its subsidiaries issue debt to finance their operations, which exposes them to interest rate risk. PPL Energy Supply and its subsidiaries utilize various financial derivative instruments to adjust the mix of fixed and floating interest rates in their debt portfolios, adjust the duration of their debt portfolios and lock in benchmark interest rates in anticipation of future financing, when appropriate. Risk limits under the risk management program are designed to balance risk exposure to volatility in interest expense and changes in the fair value of the debt portfolios due to changes in the absolute level of interest rates.

PPL Energy Supply has no interest rate hedges outstanding at March 31, 2015.

PPL Energy Supply is exposed to a potential increase in interest expense and to changes in the fair value of its debt portfolio. The estimated impact of a 10% adverse movement in interest rates at March 31, 2015 would cause an insignificant increase in interest expense and a $43 million increase in the fair value of debt.

NDT Funds - Securities Price Risk

In connection with certain NRC requirements, PPL Susquehanna maintains trust funds to fund certain costs of decommissioning the PPL Susquehanna nuclear plant (Susquehanna). At March 31, 2015, these funds were invested primarily in domestic equity securities and fixed-rate, fixed-income securities and are reflected at fair value on the Balance Sheet. The mix of securities is designed to provide returns sufficient to fund Susquehanna's decommissioning and to compensate for inflationary increases in decommissioning costs. However, the equity securities included in the trusts are exposed to price fluctuation in equity markets, and the values of fixed-rate, fixed-income securities are primarily exposed to changes in interest rates. PPL Energy Supply actively monitors the investment performance and periodically reviews asset allocation in accordance with its nuclear decommissioning trust policy statement. At March 31, 2015, a hypothetical 10% increase in interest rates and a 10% decrease in equity prices would have resulted in an estimated $74 million reduction in the fair value of the trust assets. See Notes 10 and 13 to the Financial Statements for additional information regarding the NDT funds.

Credit Risk

See Notes 10 and 11 to the Financial Statements in this Form 10-Q and "Risk Management - Credit Risk" in PPL Energy Supply's 2014 Form 10-K for additional information.

Related Party Transactions

PPL Energy Supply is not aware of any material ownership interests or operating responsibility by senior management in outside partnerships, including leasing transactions with variable interest entities, or other entities doing business with PPL Energy Supply. See Note 8 to the Financial Statements for additional information on PPL Energy Supply's related party transactions.

Acquisitions, Development and Divestitures

PPL Energy Supply from time to time evaluates opportunities for potential acquisitions, divestitures and development projects. Development projects are reexamined based on market conditions and other factors to determine whether to proceed with the projects, sell, cancel or expand them, execute tolling agreements or pursue other options. See Note 1 to the Financial Statements for information on the anticipated spinoff from PPL and Note 5 to the Financial Statements for information on the completed Montana hydro sale.

Environmental Matters

Extensive federal, state and local environmental laws and regulations are applicable to PPL Energy Supply's air emissions, water discharges and the management of hazardous and solid waste, as well as other aspects of the its businesses. The cost of compliance or alleged non-compliance cannot be predicted with certainty but could be material. In addition, costs may increase significantly if the requirements or scope of environmental laws or regulations, or similar rules, are expanded or changed. Costs may take the form of increased capital expenditures or operating and maintenance expenses, monetary fines, penalties or other restrictions. Many of these environmental law considerations are also applicable to the operations of key suppliers, or customers, such as coal producers and industrial power users, and may impact the cost for their products or their demand for the PPL Energy Supply's services.

The following is a discussion of the more significant environmental matters. See Note 7 to the Financial Statements in this Form 10-Q and "Item 1. Business - Environmental Matters" in PPL Energy Supply's 2014 Form 10-K for additional information on environmental matters.

Climate Change

Physical effects associated with climate change could include the impact of changes in weather patterns, such as storm frequency and intensity, and the resultant potential damage, as applicable, to PPL Energy Supply's generation assets, as well as impacts on its customers and the electricity transmission and delivery systems it utilizes. In addition, changed weather patterns could potentially reduce annual rainfall in areas where PPL Energy Supply has hydroelectric generating facilities or where river water is used to cool their fossil and nuclear (as applicable) powered generators. PPL Energy Supply cannot currently predict whether its businesses will experience these potential risks or estimate the cost of their related consequences.

In June 2013, President Obama released his Climate Action Plan which reiterates the goal of reducing GHG emissions in the U.S. through such actions as regulating power plant emissions, promoting increased use of renewables and clean energy technology, and establishing more restrictive energy efficiency standards. Additionally, the Climate Action Plan calls for the U.S. to prepare for the impacts of climate change. Requirements related to this plan could affect PPL Energy Supply and others in the industry as modifications may be needed to electricity delivery systems to improve the ability to withstand major storms in order to meet those requirements. As further described below, the EPA has proposed rules pursuant to this directive, which it expects to finalize in the second or third quarter of 2015. The EPA has also announced that it will develop a federal implementation plan which would apply to any states that fail to submit an acceptable state implementation plan. The EPA's authority to promulgate these regulations under Section 111 of the Clean Air Act when the sources are already regulated under Section 112 is under challenge in the D.C. Circuit Court. Oral arguments were heard on April 16, 2015.

In January 2014, the EPA issued a revised proposal to regulate carbon dioxide emissions from new power plants. The proposed limits for coal-fired plants can only be achieved through carbon capture and sequestration, a technology that is not presently commercially viable and, therefore, effectively preclude the construction of new coal-fired plants. The proposed standards for new gas-fired plants may also not be continuously achievable. The preclusion of new coal-fired plants and the compliance difficulties posed for new gas-fired plants could have a significant industry-wide impact.

In June 2014, the EPA issued a proposed regulation addressing carbon dioxide emissions from existing power plants. The existing plant proposal contains stringent, state-specific rate-based reduction goals to be achieved in two phases (2020-2029 and 2030 and beyond). The EPA believes it has offered some flexibility to the states as to how state compliance plans can be crafted, including the option to demonstrate compliance on a mass basis and through multi-state collaborations. The EPA is also proposing potential state plan extensions based on the type of plan filed (single or multi-state). PPL Energy Supply has analyzed the proposal and identified potential impacts and solutions in comments filed on December 1, 2014. PPL Energy Supply also submitted Supplemental Comments to FERC through EEI advocating for reliability coordination and relief in response to technical conferences hosted by FERC on the reliability implications of implementing this rule. The regulation of carbon dioxide emissions from existing plants could have a significant industry-wide impact depending on the structure and stringency of the final rule and state implementation plans.

Waters of the United States (WOTUS)

In April 2014, the EPA and the U.S. Army Corps of Engineers published a proposed rule that could greatly expand the Clean Water Act definition of Waters of the United States. If the definition is expanded as proposed, permits and other regulatory requirements may be imposed for many matters presently not covered (including vegetation management for transmission lines and activities affecting storm water conveyances and wetlands), the implications of which could be significant. The EPA plans to make certain changes to the proposed regulation based on comments received. The U.S. House and Senate are considering legislation to block this regulation. Until a final rule is issued, PPL Energy Supply cannot predict the outcome of the pending rulemaking. A final rule is expected by summer 2015.

Coal Combustion Residuals (CCRs)

On April 17, 2015, the EPA published its final rule regulating CCRs, imposing extensive new requirements, including location restrictions, design and operating standards, groundwater monitoring and corrective action requirements and closure and post-closure care requirements on CCR impoundments and landfills that are located on active power plants and not closed. Under the rule, the EPA will regulate CCRs as non-hazardous under Subtitle D of RCRA and allow beneficial use of CCRs, with some restrictions. The CCR rule will become effective on October 14, 2015. This self-implementing rule requires posting of compliance documentation on a publicly accessible website and is enforceable through citizen suits. PPL Energy Supply expects that its plants using surface impoundments for management and disposal of CCRs or the past management of CCRs and continued use to manage waste waters will be most impacted by this rule. The rule's requirements for covered CCR impoundments and landfills include commencement or completion of closure activities generally between three and ten years from certain triggering events. PPL Energy Supply also anticipates incurring capital or operation and maintenance costs prior to that time to address other provisions of the rule, such as groundwater monitoring and disposal facility modifications, or to implement various compliance strategies.

PPL Energy Supply is reviewing the rule and is still evaluating its financial and operational impact. It is expected that these requirements will result in increases to existing AROs which will be recorded in the second quarter of 2015. PPL Energy Supply is not yet able to determine an estimate of the expected increases to the existing AROs.

Effluent Limitation Guidelines (ELGs) and Standards

In June 2013, the EPA published proposed regulations to revise discharge limitations for steam electric generation wastewater permits. The proposed limitations are based on the EPA review of available treatment technologies and their capacity for reducing pollutants and include new requirements for fly ash and bottom ash transport water and metal cleaning waste waters, as well as new limits for scrubber wastewater and landfill leachate. The EPA's proposed ELG regulations also contain some requirements that would affect the inspection and operation of CCR facilities, if finalized as proposed. The proposal contains several alternative approaches, some of which could significantly impact PPL Energy Supply's coal-fired plants. The final regulation is expected to be issued by the third or fourth quarter of 2015. At the present time, PPL Energy Supply is unable to predict the outcome of this matter or estimate a range of reasonably possible costs, but the costs could be significant. Pending finalization of the ELGs, certain states (including Pennsylvania) and environmental groups are proposing more stringent technology-based limits in permit renewals. Depending on the final limits imposed, the costs of compliance could vary significantly from the current capital expenditures projections and costs could be imposed ahead of federal timelines.

Clean Water Act/316(b)

The EPA's final 316(b) rule for existing facilities, became effective in October 2014, and regulates cooling water intake structures and their impact on aquatic organisms. States are allowed considerable authority to make site-specific determinations under the rule. The rule requires existing facilities to choose between several options to reduce the impact to aquatic organisms that become trapped against water intake screens (impingement) and to determine the intake structure's impact on aquatic organisms pulled through a plant's cooling water system (entrainment). Plants already equipped with closed-cycle cooling, an acceptable option, would likely not incur substantial costs. Once-through systems would likely require additional technology to comply with the rule. Brunner Island (all units) are the only units expected to be impacted. PPL Energy Supply is evaluating compliance strategies but does not presently expect the compliance costs to be material.

MATS

In February 2012, the EPA finalized the MATS rule requiring fossil-fuel fired plants to reduce emissions of mercury and other hazardous air pollutants by April 16, 2015. The rule, was challenged by industry groups and states, and was upheld by the D.C. Circuit Court in April 2014. A group of states subsequently petitioned the U.S. Supreme Court to review this decision and on March 25, 2015 oral arguments were heard as to one issue - whether or not EPA unreasonably refused to consider costs when determining whether the MATS regulation was appropriate and necessary. A U.S. Supreme Court decision is expected by June 30, 2015. The rule provides for a three-year compliance deadline with the potential for one and two-year extensions as provided under the statute. PPL Energy Supply has completed installation or upgrading of relevant environmental controls at affected plants or has received compliance extensions, as applicable.

PPL Energy Supply believes that installation of chemical additive systems and other controls may be necessary at certain coal-fired plants in Pennsylvania, the capital cost of which is not expected to be significant. PPL Energy Supply continues to analyze the potential impact of MATS on operating costs. With respect to PPL Energy Supply's Montana plants, modifications to the air pollution controls installed at Colstrip are required, the cost of which is not expected to be significant. Operations were suspended and the Corette plant was retired in March 2015 due to expected market conditions and the costs to comply with the MATS requirements.

CSAPR

The EPA's CSAPR addresses the interstate transport of fine particulates and ozone by regulating emissions of sulfur dioxide and nitrogen oxide. In accordance with an October 2014 U.S. Court of Appeals decision, CSAPR establishes interstate allowance trading programs for sulfur dioxide and nitrogen oxide emissions from fossil-fueled plants in two phases: Phase 1 in 2015 and Phase 2 in 2017. Sulfur dioxide emissions are subject to an annual trading program and nitrogen oxide emissions are subject to annual and ozone season programs. Oral arguments pertaining to outstanding challenges to the EPA's CSAPR were heard before the D.C. Circuit Court during February 2015.

Although PPL Energy Supply does not anticipate incurring significant costs to comply with these programs, changes in market or operating conditions could result in impacts that are higher than anticipated.

Regional Haze

Under the EPA's regional haze programs (developed to eliminate man-made visibility degradation by 2064), states are required to make reasonable progress every decade through the application, among other things, of Best Available Retrofit Technology (BART) on power plants commissioned between 1962 and 1977. To date, the focus of regional haze regulation has been on the western U.S. As for the eastern U.S., the EPA determined that region-wide reductions under the CSAPR trading program could, in most instances, be utilized under state programs to satisfy BART requirements for sulfur dioxide and nitrogen oxides. However, the EPA's determination is being challenged by environmental groups and others.

In Montana, the EPA finalized a Federal Implementation Plan (FIP) of the Regional Haze Rules in September 2012, with stricter emissions limits for PPL Energy Supply's Colstrip Units 1 & 2 based on the installation of new controls (no limits or additional controls were specified for Colstrip Units 3 & 4), and stricter emission limits for the Corette plant (which are not based on additional controls). The cost of the additional controls for Colstrip Units 1 & 2 could be significant. PPL Energy Supply was meeting the stricter permit limits at Corette without any significant changes to operations, although other requirements led to the suspension of operations and retirement of Corette in March 2015 (see "MATS" discussion above). Both PPL Energy Supply and environmental groups have appealed the final FIP to the U.S. Court of Appeals for the Ninth Circuit and litigation is ongoing.

National Ambient Air Quality Standards

In 2008, the EPA revised the National Ambient Air Quality Standard for ozone. As a result, states in the ozone transport region (OTR), including Pennsylvania, are required by the Clean Air Act to impose additional reductions in nitrogen oxide emissions based upon reasonably available control technologies (RACT). The PADEP is finalizing a RACT rule in 2015 requiring some fossil-fueled plants to operate at more stringent nitrogen oxide emission rates. The EPA proposed to further strengthen the ozone standard in November 2014, which could lead to further nitrogen oxide reductions for PPL Energy Supply's fossil-fueled plants within the OTR. The EPA is under court order to finalize the standard by October 1, 2015. States are also obligated to address interstate transport issues associated with new ozone standards through the establishment of "good neighbor" state implementation plans for those states that are found to contribute significantly to another states' non-attainment. The EPA recently sent a policy memo to state agencies to facilitate the development of these plans for the 2008 standard, including modeling data showing which states are contributing. The implementation of such plans could have an impact on the structure and stringency of CSAPR Phase 2 reductions (discussed above) or it could lead to the development of a new ozone transport rule. Non-OTR states are working together to evaluate further nitrogen oxide reductions from fossil-fueled plants with SCRs. The nature and timing of any additional reductions resulting from these evaluations cannot be determined at this time.

In 2010, the EPA finalized a new, more stringent ambient air standard for sulfur dioxide and required states to identify areas that meet the standard and areas that are in "non-attainment". In July 2013, the EPA finalized non-attainment designations for part of Yellowstone County in Montana. Attainment is due by 2018. Pursuant to a consent decree between the EPA and Sierra Club approved on March 2, 2015, states are working to finalize designations for other areas by the 2017 or 2020 deadline depending on which designation methodology is used. PPL Energy Supply anticipates that some of the measures required for compliance with the CSAPR, the MATS, or the Regional Haze Rules (as discussed above), such as upgraded or new sulfur dioxide scrubbers at certain plants will help to achieve compliance with the new sulfur dioxide standard. If additional reductions were to be required, the financial impact could be significant. The short-term impact on the Corette plant from the EPA's final designation of part of Yellowstone County in Montana as non-attainment is not expected to be significant, as the plant's operations were suspended and the plant was retired in March 2015. In addition, MDEQ recently submitted a request to the EPA for a determination that this area is in attainment. If the EPA agrees with this request, then the deadlines associated with non-attainment would be suspended.

In December 2012, the EPA finalized a new, more stringent, annual National Ambient Air Quality Standard for fine particulates. The rules were challenged by the D.C. Circuit Court and upheld in May 2014. Final designations for the 2012 particulate standard were published in January 2015. Non-attainment areas in Pennsylvania and Kentucky were identified; however, the EPA recently approved state implementation plan revisions for both states that improved these classifications.

PPL Energy Supply's plants in Pennsylvania will not be expected to make further reductions towards achieving attainment.

New Accounting Guidance

See Notes 2 and 15 to the Financial Statements for a discussion of new accounting guidance adopted and pending adoption.

Application of Critical Accounting Policies

Financial condition and results of operations are impacted by the methods, assumptions and estimates used in the application of critical accounting policies. Certain accounting policies of PPL Energy Supply are particularly important to understand the reported financial condition or results of operations, and require management to make estimates or other judgments of matters that are inherently uncertain, including Defined Benefits, Loss Accruals, Income Taxes, Asset Impairments (Excluding Investments), AROs and Price Risk Management.

See "Item 7. Combined Management's Discussion and Analysis of Financial Condition and Results of Operations" in PPL Energy Supply's 2014 Form 10-K for a discussion of each critical accounting policy.

TALEN ENERGY HOLDINGS, INC.

TALEN ENERGY CORPORATION

Market risk

As filed, 138 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Reference is made to "Risk Management" in "Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations."

Controls and procedures

As filed, 2,445 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

(a) Evaluation of disclosure controls and procedures.

Talen Energy Holdings, Inc.'s and Talen Energy Corporation's principal executive officer and principal financial officer, based on his evaluation of PPL Energy Supply's (as predecessor to Talen Energy Holdings, Inc. and Talen Energy Corporation, collectively "the Companies") disclosure controls and procedures (as defined in Rules 13a-15(e) or 15d-15(e) of the Securities Exchange Act of 1934) has concluded that, as of March 31, 2015, the Companies' disclosure controls and procedures are effective to ensure that material information relating to the Companies and their consolidated subsidiaries is recorded, processed, summarized and reported within the time periods specified by the SEC's rules and forms, particularly during the period for which this quarterly report has been prepared. The aforementioned principal officer has concluded that the disclosure controls and procedures are also effective to ensure that information required to be disclosed in reports filed under the Exchange Act is accumulated and communicated to management, including the principal executive and principal financial officers, to allow for timely decisions regarding required disclosure.

(b) Change in internal controls over financial reporting.

Talen Energy Holdings, Inc. and Talen Energy Corporation's principal executive officer and principal financial officer has concluded that there were no changes in PPL Energy Supply's (as predecessor to Talen Energy Holding, Inc. and Talen Energy Corporation) internal control over financial reporting during the first fiscal quarter that have materially affected, or are reasonably likely to materially affect, the Companies' internal control over financial reporting.

Following the announcement of the transaction of the spin off from PPL to form Talen Energy, management determined the appropriate staffing for Talen Energy and for PPL and its subsidiaries (including PPL Energy Supply). During the three months ended March 31, 2015, staffing changes, including the consolidation of certain positions and transition of responsibilities, resulted in changes in certain individuals responsible for executing internal controls. However, changes to system applications, business processes and the associated internal controls were not significant. Management has taken steps to minimize the risk from the changes in individuals executing internal controls.

Risk factors

As filed, 138 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

There have been no material changes in risk factors from those disclosed in "Item 1.A Risk Factors" of PPL Energy Supply's 2014 Form 10-K.