Unless the context requires otherwise in this Annual Report, the terms “SHI,” “Soluna,” the “Company,” “we,” “us,” and “our” refer to Soluna Holdings, Inc. together with its consolidated subsidiaries, “SDI” refers to Soluna Digital, Inc. “SCI” refers to Soluna Computing, Inc., formerly known as EcoChain, Inc., “Soluna Cloud” or “Cloud” refer to Soluna Cloud, Inc., and “SEI” refers to Soluna Energy, Inc. Other trademarks, trade names, and service marks used in this Annual Report are the property of their respective owners.

Overview

Our mission is to make renewable energy a global superpower by using computing as a catalyst.

We develop, own, and operate digital infrastructure for energy-intensive computing applications by colocating data centers with renewable energy power plants. We refer to this model as Renewable Computing™.

Renewable Computing™ is designed to address two converging market conditions: increasing curtailment of renewable energy generation and growing demand for power-intensive computing applications, including artificial intelligence (“AI”), high-performance computing (“HPC”), and Bitcoin mining. By locating our data centers near renewable generation assets, we seek to convert underutilized energy into economically productive computing capacity.

We utilize two distinct data center designs to serve different computing markets. For our Bitcoin mining and hosting business, we deploy a modular data center design optimized for flexible, large-scale digital asset operations. For AI and HPC workloads, we are developing an AI-ready data center design intended to support higher-density compute environments and customer requirements associated with advanced computing infrastructure.

Our facilities are managed by MaestroOS™ (“MaestroOS”), our proprietary software platform, which analyzes factors such as local power pricing, weather conditions, grid demand, and market signals to optimize operating performance and power consumption across our operating assets.

Our business model is intended to enhance the monetization of renewable generation assets while supporting scalable digital infrastructure growth. We work with renewable energy developers and power partners to access low-cost or otherwise constrained energy resources. Our data centers operate on a behind-the-meter basis, enabling them to draw electricity directly from the co-located renewable power plant and from the grid through the plant’s existing interconnection and substation infrastructure. By accessing both sources of power, our facilities are able to meet their energy needs while maintaining operating flexibility. In certain markets, our facilities also participate in demand response programs that support grid reliability.

A key element of our strategy is the colocation of data centers directly with renewable generation assets. By building behind the meter at renewable generation sites, we are able to access both on-site generation and existing grid interconnection infrastructure, which we believe can improve power economics and accelerate development timelines.

With a repeatable development approach and an expanding pipeline of projects, we are seeking to scale a differentiated digital infrastructure platform that supports renewable power utilization, flexible computing capacity, and long-term value creation.

We operate across multiple business lines and currently or plan to generate revenue from four primary sources:

Bitcoin Mining Business – We mine Bitcoin through proprietary operations and joint ventures at our data centers.

Bitcoin Hosting Business – We provide hosting and colocation services to third-party Bitcoin mining customers at our modular data centers.

HPC Business – Through Soluna HPC, Inc., we are developing AI-ready data center leasing and hosting capabilities for AI and HPC workloads, beginning with Project Kati 2, which is being engineered for more than 300 MW of capacity in partnership with Metrobloks, LLC ("Metrobloks").

Demand Response Business – We leverage our data center infrastructure to provide demand response services to grid operators and utilities.

In 2025, our execution strategy was centered around four key initiatives:

Project Optimization – Enhancing the profitability, operating efficiency, and customer mix of our operating data centers, while improving customer satisfaction.

Pipeline Expansion – Increasing the number of curtailment assessments completed with power partners, advancing additional projects toward shovel-ready status, and executing further project term sheets.

Launch HPC – Advancing our entry into the AI and HPC market through project development activities, customer engagement, and strategic infrastructure partnerships.

Capital Formation – Pursuing financing opportunities to support key growth initiatives, including Project Dorothy 2 (“D2”) and Project Kati.

Lines of Business

Bitcoin Hosting Business

We provide colocation and hosting services to third-party Bitcoin mining customers at our data centers. Customers typically contract for capacity based on their power requirements. Our customer base includes several large-scale Bitcoin mining operators. Contracts generally range from 12 to 24 months in duration.

We offer three primary commercial structures:

  • Fixed-Fee Model – Customers pay a fixed fee based on energy consumed.
  • Profit-Share Model – Customers pay a share of the profits from their mining activity, with power costs generally passed through.
  • Fixed-Fee Service Agreement Model – Customers pay a fixed fee for managed Bitcoin mining capacity and hashrate over the term of the service agreement.

In 2025 and 2024, our Bitcoin Hosting Business accounted for approximately 57% and 50% of total revenue, respectively. Revenue in this business has been concentrated among a limited number of customers. In 2025, two customers accounted for 59% of hosting revenue and 34% of total revenue. In 2024, one customer accounted for 56% of hosting revenue and 28% of total revenue. That customer terminated its agreement during the fourth quarter of 2024. As of March 2025, we had replaced 100% of the lost hosting capacity with minimal operational disruption.

Bitcoin Mining Business

We engage in proprietary Bitcoin mining, a process that validates transactions and secures the Bitcoin blockchain. This process uses specialized computing equipment to solve complex cryptographic algorithms. Miners compete to solve these algorithms, and the first to do so is awarded a predetermined number of newly issued Bitcoins (the “Block Reward”), together with the transaction fees associated with that block.

We participate in one or more mining pools, which are collaborative networks of miners that combine computing power to improve the probability of earning rewards. Block Rewards earned by the pool are distributed among participants based on each participant’s proportional contribution. We believe this model reduces revenue volatility as compared to operating on a solo mining basis.

Mining operations are energy-intensive and require significant computational resources. We operate data centers using both proprietary and third-party hardware and software. MaestroOS is used to optimize performance, manage power consumption, and improve operating efficiency.

Revenue from Bitcoin mining consists of Block Rewards and transaction fees and is recognized upon receipt in accordance with applicable accounting guidance. Upon receipt, digital assets are promptly converted into U.S. dollars through the Coinbase cryptocurrency exchange.

Mining profitability is affected by several factors, including the market price of Bitcoin, global network hash rate, mining difficulty, electricity and infrastructure costs, and mining pool fees. In addition, Bitcoin undergoes a periodic halving event, approximately every four years, that reduces the Block Reward and may adversely affect future revenue. For the years ended December 31, 2025 and 2024, our Bitcoin Mining Business represented approximately 38% and 45% of total revenue, respectively.

High Performance Computing Business

Our HPC business is being developed through Soluna HPC, Inc. and is focused on data center leasing and hosting solutions for AI and other HPC workloads, with an initial target customer base of Hyperscalers and Neoclouds, and enterprise customers over time.

Unlike our Bitcoin mining and hosting operations, which use a modular data center design, our HPC business is based on an AI-ready data center design intended to support higher-density compute environments and the infrastructure requirements of AI and HPC customers.

We are currently advancing infrastructure projects intended to support AI and HPC workloads. These activities include site and feasibility studies, power and land procurement, engineering and design work, customer engagement, and evaluation of potential financing and partnership structures.

Our first planned large-scale HPC development is Project Kati 2, which is being engineered for more than 300 MW of capacity in partnership with Metrobloks. We expect Project Kati 2 to serve as the initial platform for Soluna HPC, Inc.’s leasing and hosting business. We are also advancing additional projects from our development pipeline that are in various stages of evaluation, engineering, and development.

In March 2025, we terminated our prior agreement with Hewlett Packard Enterprise Company (“HPE”), which had supported our earlier GPU-as-a-Service offering. Following that termination, we refocused our HPC strategy on the development of dedicated data center infrastructure for third-party leasing and hosting.

Demand Response Business

We provide demand response services to grid operators and utilities by using our data centers as dispatchable energy resources. In certain markets in which we operate, our data centers participate in ancillary services and other demand response programs that support grid reliability.

Under these programs, we commit to reduce a facility’s power consumption to a predetermined level when called upon by the grid operator. In return, we receive compensation for maintaining this dispatch capability, provided we satisfy applicable performance requirements. These requirements typically include minimum uptime and availability thresholds during a measurement period, which is often monthly.

For the years ended December 31, 2025 and 2024, our Demand Response Business represented approximately 4% and 6% of total revenue, respectively.

Operations and Project Pipeline

As of December 31, 2025, we operate approximately 123 MW of capacity across two active sites located in Murray, Kentucky and Silverton, Texas. An additional 83 MW is under construction and 100+ MW is in development at our Kati project site, and as of December 31, 2025, we had over 900 MW of facilities in advanced development or near shovel-ready status. In total, our project pipeline includes approximately 4.3 gigawatts (GW) of renewable energy-powered data center developments.

A summary of our pipeline, current and anticipated operating locations are as follows (as of December 31, 2025):

Project Name Location MW Status Line of Business Power Source
Sophie Murray, KY 25 Operating Bitcoin Hosting Grid / Hydro
Dorothy 1A Silverton, TX 25 Operating Bitcoin Hosting Wind
Dorothy 1B Silverton, TX 25 Operating Bitcoin Mining Wind
Dorothy 2 Silverton, TX 48 Operating Bitcoin Hosting Wind
Grace Silverton, TX 2 Development HPC Wind
Kati 1 Willacy County, TX 83 In Construction Bitcoin Hosting Wind
Kati 2 Willacy County, TX 100+ Development AI or HPC Wind
Rosa Snyder, TX 187 Development Bitcoin Hosting / AI or HPC Wind
Hedy Cameron County, TX 120 Development Bitcoin Hosting / AI or HPC Wind
Ellen Cameron County, TX 100 Development Bitcoin Hosting / AI or HPC Wind
Annie Lamar, TX 74 Development Bitcoin Hosting / AI or HPC Solar
Fei Childress County, TX 100 Development Bitcoin Hosting / AI or HPC Solar
Gladys Nueces County, TX 150 Development Bitcoin Hosting / AI or HPC Wind

We manage our data center operations using MaestroOS. MaestroOS continuously monitors and analyzes a variety of real-time signals, including local electricity prices, weather conditions, Bitcoin market metrics, and grid demand signals, to optimize facility performance. In addition, MaestroOS is used to coordinate and execute our participation in demand response programs.

We finance the development and construction of our data centers through a combination of public equity offerings, debt instruments, and partnerships with project-level capital providers. As of December 31, 2025, we had four primary project-level financing partners:

  • Spring Lane Capital (“SLC”) – a private venture capital firm with approximately $450 million in assets under management, focused on sustainability-oriented infrastructure. On May 3, 2022, SLC committed $35 million to finance Soluna’s Project Dorothy 1A (“D1A”). On July 22, 2024, SLC committed an additional $30 million to support the development of D2. On July 22, 2025, SLC committed $20.0 million for the first phase of the construction on Project Kati, subject to customary conditions.
  • Navitas West Texas Investments SPV, LLC (“Navitas”) – an investment vehicle organized by Navitas Global, a private equity firm focused on sustainable Bitcoin mining. On May 9, 2023, we entered into a strategic partnership with Navitas to support mining operations at Project Dorothy 1B (“D1B”).
  • Galaxy Digital, LLC (“Galaxy”) – a financial services and investment management innovator in the digital asset and blockchain technology sectors. On March 12, 2025, Soluna SW LLC (the “SW Borrower”), a Delaware limited liability company and subsidiary of Soluna SW Holdings LLC (“SW Holdings”, and together with the SW Borrower, the “SW Loan Parties”), entered into a five-year term loan facility in the principal amount of $5.0 million.
  • Generate Capital (“Generate”) – a leading infrastructure investment firm. On September 12, 2025, we entered into an up to $100.0 million credit facility with Generate, and as of December 31, 2025, we had drawn approximately $17.0 million to fund refinancing and construction of active data center projects.

Project Dorothy

During 2023, we transitioned our flagship data center Project Dorothy from construction to operations. This data center is co-located with Briscoe Wind Farm (“Briscoe”), a 150 MW wind power generation facility in Silverton, Texas. The project comprises three phases: D1A (25 MW), and D1B (25 MW), and D2 (48 MW).

Project Dorothy is registered in one of the ERCOT’s Demand Response Services (“DRS”) programs. This designation positioned Project Dorothy as a contributor to grid flexibility and resilience in the Texas power market, while also enabling us to diversify our revenue streams.

Under the DRS program, we commit to maintaining a specified level of curtailment capacity—measured as load reduction availability—on a monthly basis. When called upon by ERCOT, we are required to reduce the facility’s power consumption by the committed amount. In exchange, we receive compensation for maintaining this curtailment readiness, regardless of whether an actual dispatch occurs.

Participation in the program allows us to generate incremental revenue and offset power costs at Project Dorothy, enhancing its cost-efficiency. As a result, the facility ranks among the lowest-cost operators in the sector.

Project Dorothy 1A

D1A is focused on Bitcoin Hosting for some of the industry’s hyperscale miners. For 2025, D1A completed all customer deployments and executed fleet upgrades across multiple hosting partners, driving measurable hashrate growth throughout the year.

D1A was constructed in partnership with SLC, a leading venture capital firm focused on sustainability solutions. SLC owns approximately 85% of the Class B Membership Units of D1A, while we own 15% of the Class B Membership Units of D1A and own 100% of the Class A Membership Units of D1A. After SLC achieves an 18% Internal Rate of Return hurdle, Soluna retains 50% of the profits on D1A.

Project Dorothy 1B

D1B is focused on proprietary Bitcoin Mining. D1B is co-owned by Navitas, which owns approximately 49% of D1B, while we own the remaining 51%. In 2025, fleet consolidation and reinvestment at D1B resulted in the deployment of 1,000 upgraded S19 XP miners, delivering hashrate gains and a strong competitive position heading into 2026.

Project Dorothy 2

Project Dorothy 2 is a 48 MW expansion of the Company’s Dorothy campus, which construction and commissioning were completed in 2025. The project was developed and energized in three phases (16 MW, 14 MW, and 18 MW), with initial commissioning beginning in the first quarter of 2025 and each phase brought online sequentially throughout the year, enabling customer deployments and revenue generation upon energization. By mid-August 2025, 32 MW was operational, with the remaining capacity commissioned in the fourth quarter. Construction was completed in November 2025, and the facility transitioned to full operations with all capacity deployed, operating at full capacity for the first full month in December 2025. Project Dorothy 2 is fully contracted with a mix of new and existing customers, including Blockware, Compass Mining, and a large-scale mining partner, and generates revenue through Bitcoin hosting and participation in demand response programs. D2 features a superior financial waterfall structure and enhanced management and development fees for Soluna compared to D1A, allowing us to benefit from improved income once the facility is operational.

Project Grace

Project Grace is a 2 MW project located at the D2 site focused on next generation data center designs for AI. It contemplates new direct liquid cooling technologies, proprietary building and power designs – called Helix. The Company is collaborating with Siemens, a leading technology company in electrification, automation and digitalization, to develop solutions addressing power demand fluctuations associated with AI workloads.

Project Sophie

Project Sophie is a 25 MW data center, based in Murray, Kentucky connected to the grid (“Sophie”). The project has a Power Purchase Agreement (“PPA”) that requires the curtailment of the site during certain hours of the day to help balance the Kentucky grid. We own 100% of the facility, which was completed in 2021.

Sophie is focused on Bitcoin Hosting of multiple large customers. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through. During 2025, Sophie completed three consecutive expansion agreements with long-standing hyperscale mining customers, reflecting sustained demand and high satisfaction with our hosting customers. In addition, Sophie closed a new 3.3 MW partnership with KULR Technology Group in October 2025, diversifying the customer base and expanding the site's renewable-powered computing footprint.

Project Kati 1

Project Kati 1 is the first phase of the Company’s data center campus under development in Willacy County, Texas, co-located with a 272.6 MW wind farm. Project Kati 1 comprises 83 MW dedicated to Bitcoin hosting. Construction began on September 18, 2025, and on July 22, 2025, the Company finalized a contribution agreement with Spring Lane Capital for the initial 35 MW of capacity, with initial energization expected in the first half of 2026. Galaxy Digital has been secured as the initial customer for the project.

Project Kati 2

Project Kati 2 is the second phase of development at the Company’s Kati site in Willacy County, Texas, and is focused on supporting AI and high-performance computing workloads. The project is being advanced through a joint venture with Metrobloks to develop an initial phase of 100 MW+ of AI and HPC capacity, with the potential to expand to a larger multi-hundred-megawatt deployment. The campus is designed to leverage behind-the-meter integration with renewable energy and support customers requiring large-scale, high-density compute infrastructure with accelerated time to power.

Project Rosa

We are developing Project Rosa in Snyder, Texas, which is expected to be up to 187 MW of data center capacity for AI and Bitcoin Hosting and other computing-intensive applications. It will be co-located with a 242.5 MW wind farm. We have signed term sheets for both power and land purchase agreements in connection with this project.

Project Hedy

We have signed a term sheet for power for Project Hedy, a new 120 MW data center co-located with a 200 MW wind farm in South Texas. The wind farm is owned by a new power partner–a multinational conglomerate that focuses on developing and managing sustainable infrastructure solutions, with a strong emphasis on renewable energy, water management, and services, aiming to contribute to a low-carbon economy and a better planet.

Project Ellen

We have signed a term sheet for power for Project Ellen, a new 100 MW data center co-located with a 145 MW wind farm in South Texas. The wind farm is owned by a new power partner—a leader in renewable energy and sustainable infrastructure both in the U.S. and internationally. Project Ellen will be developed in two 50MW phases, leveraging wind energy to drive sustainable computing at scale.

Project Annie

We have signed a term sheet for power for Project Annie, a new 74 MW data center which will be co-located with a 114 MW solar farm in Northeast Texas. The solar farm is owned by a new power partner–a leader in renewable energy and sustainable infrastructure both in the U.S. and internationally.

Project Fei

We have signed a term sheet for power for Project Fei, a 100 MW data center in development which will be co-located with a 240 MW utility-scale solar farm, Soluna’s second solar-based project to date. Being developed in partnership with a global leader in energy infrastructure investment, Project Fei will convert underutilized solar energy into clean, high-performance computing power. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Project Gladys

We have signed a term sheet for power for Project Gladys, a 150 MW facility in development which will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer managing over $40 billion in assets and more than 80 energy facilities nationwide. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Our Growth Strategy

Our growth strategy is focused on expanding our pipeline of renewable energy-powered data center projects and accelerating their development through joint ventures, co-ownership structures, and other strategic partnerships. Over time, we intend to increase our ownership stake in these projects to enhance long-term value.

Our renewable energy project pipeline—currently estimated at over 4.3 gigawatts (GW)—represents our most valuable strategic asset. We believe this pipeline has the potential to support the development of over 300 MW of new digital infrastructure annually over the next six to eight years.

In parallel with new project development, we are refining our operational model across existing sites to position ourselves as a partner of choice for both AI/HPC colocation and Bitcoin Hosting.

We continue to grow our pipeline by increasing the number of Curtailment Assessments completed with power generation partners. These assessments serve as a precursor to securing exclusive power purchase agreements (PPAs), acquiring or leasing land, and executing other pre-construction development activities necessary to advance projects to shovel-ready status.

In 2026, we are focused on advancing the following key initiatives:

  • Grow Pipeline: Expand Soluna’s Renewable Computing(™) pipeline by advancing projects in our 4.3 GW+ power pipeline to shovel-ready status and securing behind-the-meter access to curtailed energy resources. Enable scalable capacity with accelerated speed to power.
  • Develop AI: Advance Project Kati 2 with Metrobloks to shovel-ready and tenant-ready. Build a pipeline of AI-ready campuses designed for rapid deployment from the 4.3GW+ pipeline through joint ventures.
  • Optimize Projects: Energize Project Kati 1. Enhance profitability across operating data centers through higher uptime, operational efficiency, and disciplined cost management, thereby strengthening long-term asset value and improving overall customer satisfaction.
  • Capital Formation: Executing a disciplined capital strategy to fund pipeline growth, AI data center development, and construction. Leveraging project-level financing and strategic capital partnerships to scale data center development while maintaining balance sheet flexibility.

Competition

We operate in a highly competitive sector characterized by a growing number of participants and increasing capital investment. Our approach to sourcing renewable energy focuses on curtailed or underutilized power, which is typically priced below market rates. This enables us to offer competitively priced, sustainability-aligned computing solutions.

We believe one of our key strategic advantages is our model of co-locating data centers directly with renewable power generation assets. By building behind the meter, we are able to bypass long interconnection queues and source electricity directly from the generation site. This structure not only improves power economics, but also accelerates time-to-market—an increasingly important factor for companies with large, time-sensitive computing workloads such as AI and HPC.

We believe this combination of low-cost power access, grid efficiency, and sustainability focus positions us as a differentiated provider in the digital infrastructure space.

Our emerging HPC Business competes with leading data center firms such as Applied Digital, Digital Realty, NeoCloud companies such as Crusoe, CoreWeave, Lambda, FluidStack and Nebius. While some of these companies are much larger than we are today, we believe our competitive advantage lies in our ability to source renewable energy for the growth of this business faster and at better costs than our competitors.

Our Bitcoin Hosting Business competes with a large number of other hosting operators. We compete with public and private companies including: BitFuFu, Canaan, Cango, Blockstream, Blockware (who we have a dual relationship with), Foundry, Compass Mining (who we have a dual relationship with), Hut 8, Bitdeer, and Core Scientific. Our success in our hosting operations depends on our ability high quality data center facilities, best-in-class services, and industry leading power prices.

Our proprietary Bitcoin Mining Business competes globally to complete new blocks and earn Bitcoin rewards.

We may compete with the following publicly traded Bitcoin mining companies: Riot Platforms, Marathon Digital Holdings, Core Scientific, Cipher Mining, Hut 8 Mining, Hive Blockchain Technologies, Bitfarms, Bitdeer Technologies Group, Cleanspark, IREN, Bit Digital, TeraWulf, and Greenidge Generation Holdings.

Key competitive factors include our number of miners, mining difficulty, operational efficiency, and the fiat value of rewards. Bitcoin mining has shifted from individual participants to large-scale, industrial facilities. Mining pools allow participants to combine processing power and share rewards based on contributed hash power. We also compete for new miners, capital, and technological advancements to enhance mining efficiency.

Many of our competitors offer more locations in more markets worldwide and have well-established international operations. Many of our competitors may have significant advantages over us, including greater name recognition, longer operating histories and higher operating margins, pre-existing relationships with current or potential customers, the capacity to provide the same or additional products and services at a lower cost, more significant marketing budgets and other financial and operational resources, more robust internal controls and systems, and better established, more extensive scale and lower cost suppliers and supplier relationships.

We face significant competition from our competitors, and we expect such competition to continue to increase, which could significantly harm our business, financial condition, and results of operations. If we cannot compete successfully against our current and future competitors, we may not be able to retain and grow our customer base, and our business and prospects may be harmed.

Intellectual Property

We seek protection for our intellectual property as appropriate. To establish and protect our proprietary rights, we rely upon a combination of patent, copyright, trade secret and trademark laws and contractual restrictions such as confidentiality agreements and intellectual property assignment agreements.

As of the date of this Annual Report, Soluna has two issued US patents, three pending US patent applications with the U.S. Patent and Trademark Office, and four pending non-US patent applications. The non-US jurisdictions include Australia, Canada, China, European Patent Office ("EPO"), and Japan. Among other things, concepts in these patents/patent applications generally relate to modular architecture, cooling technology, data center control, simulation, variable power consumption and local co-optimization of power generation supply with demand. Specifically, the two issued patents

(US11,974,415 and US12,250,794) focus on the layout of modular data center buildings on a site, which is crucial for thermal efficiency.

We meet regularly with IP counsel to manage the portfolio and determine strategies to pursue protection of additional technologies. We maintain company policies requiring our employees, contractors, consultants and other third parties to enter into confidentiality and proprietary rights agreements to control access to our proprietary information. While there is no assurance that our pending applications will result in issued patents, we believe that our intellectual property portfolio provides us with a competitive advantage in our industry.

We also rely on trade secrets, proprietary know-how, and contractual agreements to protect our technology. However, our ability to maintain and enforce our intellectual property rights may be subject to challenges, including the risk of third-party disputes, opposition proceedings, and evolving patent laws in various jurisdictions. Loss of key patent rights or failure to obtain additional protections could adversely impact our business and competitive position.

We also hold a registered trademark for our Company name, Soluna.

We have developed a proprietary software system called MaestroOS™ to enable the automation, management, and operations of critical elements of our data centers. We have a dedicated team that engages in activities to continue to enhance the MaestroOS to drive innovation and growth in its business. MaestroOS incorporates software components licensed to the general public under open-source software licenses. We obtain many components from software developed and released by contributors to independent open-source components of our platform. Open-source licenses grant licensees broad permissions to use, copy, modify and redistribute those open-source components of our platform. As a result, open-source development and licensing practices can limit the value of our software copyright assets.

Environmental

Data centers, including those used for Bitcoin mining and AI workloads, are receiving increasing scrutiny regarding energy usage, carbon intensity, water consumption, land use and grid impacts. We seek to mitigate these concerns by colocating flexible computing loads with renewable energy resources and designing our facilities to use power and water more efficiently. However, the environmental benefits of our model may vary over time and depend on factors outside our control, including renewable resource availability, curtailment patterns, grid conditions, operating patterns and third-party assumptions and methodologies.

We may also face changing environmental laws, permitting requirements, water-use restrictions, emissions standards, climate-related disclosure obligations and other regulatory requirements that could increase costs, delay projects, require additional capital expenditures or limit operations. In addition, extreme weather, drought, heat, flooding and other climate-related events could reduce power availability, impair cooling efficiency, limit water access or disrupt our facilities. As AI and other high-density computing workloads expand, concerns over energy and water use may intensify, which could lead to additional public scrutiny, adverse publicity, permit challenges or operating restrictions. If we are unable to manage these risks effectively, our business, financial condition and results of operations could be materially adversely affected.

Existing or Potential Governmental Regulations

Cryptocurrency mining and related large-load computing activities are subject to an evolving regulatory framework at both the federal and state levels. Although the United States has not adopted a comprehensive federal statute governing cryptocurrency mining, federal and state agencies, grid operators, and policymakers have increased their focus on digital assets, electricity consumption, grid reliability, interconnection, environmental impacts, and related infrastructure planning. As a result, the regulatory environment applicable to our business is becoming more active and, in some respects, more prescriptive. The impact of future legislation, rulemaking, market rules, or enforcement actions on our operations remains uncertain and may vary by jurisdiction.

A substantial portion of our operations, including our Project Dorothy facilities, are located in Texas, which has historically maintained a comparatively favorable environment for digital asset mining and other large flexible loads. At the same time, Texas has increased its oversight of these facilities. In particular, Texas law and Public Utility Commission of Texas (“PUCT”) rules now require certain virtual currency mining facilities in the ERCOT region that receive retail electric service and meet specified large-load and interruptibility thresholds to register with the PUCT. Existing facilities subject to the rule were required to register by February 1, 2025, and new facilities generally must register promptly after beginning service. In addition, ERCOT and the PUCT continued during 2025 and early 2026 to evaluate and refine interconnection processes for large loads, including potential batch-study frameworks and related rule revisions intended to address study efficiency, transparency, cost allocation, and system reliability. These processes may affect the timing, cost, operating flexibility, or energization of existing and future projects, and we may experience delays or additional compliance burdens as those requirements evolve.

At the federal level, policy developments in 2025 generally reflected a more supportive posture toward digital assets and domestic infrastructure buildout, but they also signaled the potential for increased oversight. In January 2025, President Trump issued an executive order directing a federal working group to recommend a regulatory framework for digital assets. In March 2025, the President issued an executive order establishing a Strategic Bitcoin Reserve and a United States Digital Asset Stockpile. In July 2025, the White House released the working group’s report on digital financial technology. During the same period, the federal government also increased its focus on electricity demand growth and infrastructure associated with large computing loads. For example, FERC in February 2025 initiated proceedings addressing colocation arrangements involving large loads such as AI-enabled data centers, and later opened a rulemaking process addressing the interconnection of large loads to the interstate transmission system, including questions regarding upgrade costs, reliability standards, and treatment of pending requests. Separately, the White House and the Department of Energy launched initiatives in 2025 aimed at accelerating permitting and power infrastructure needed to support AI-related demand growth. While many of these developments may benefit large-scale computing infrastructure, they could also result in new requirements, changed cost-allocation rules, expanded reporting obligations, or longer development timelines.

Although recent federal policy signals have generally been constructive for digital assets and large-scale computing infrastructure, the long-term regulatory trajectory remains uncertain. Other jurisdictions have taken or may take a more restrictive approach. For example, New York has continued to examine the environmental impacts of proof-of-work mining following its prior restrictions on certain fossil-fuel-based mining activity. We do not operate in New York, but similar legislation, permitting restrictions, environmental review requirements, grid-related rules, or market reforms in Texas or other jurisdictions could materially increase our costs, limit our operating flexibility, delay development, or otherwise adversely affect our business, financial condition, and results of operations. We continue to monitor legislative, regulatory, and market-rule developments at the federal, state, and ERCOT levels. For additional information on regulatory risks, see the section titled “Risk Factors” in this Annual Report.

Human Capital Resources

As of December 31, 2025, we had fifty-five (55) employees, including fifty-one (51) full-time employees, one (1) part-time employee, and three (3) full-time consultants. Of these employees, thirteen were in finance, twenty-six in operations, two in marketing, two in corporate development, six in information technology and engineering, two in human capital, two in power, and two executives. The operations personnel include both individuals directly involved in the strategy of our data centers as well as data center maintenance and supervisory roles. Certain positions within our organization require industry-specific technical knowledge. We have been successful in attracting and retaining qualified technical personnel for these positions.

None of our employees are subject to a collective bargaining agreement and we believe our relations with our employees to be positive, as reflected in our low voluntary turnover rate.

Diversity, Equity, and Inclusion

We support diversity and inclusion by ensuring a workplace where employees can thrive, and our policies are designed to promote equality and respect for everyone. Diverse backgrounds, experiences and opinions are encouraged and welcomed. In support of such diversity and inclusion, we act in accordance with our Code of Ethics and Business Conduct and our Non-Discrimination and Anti-Harassment Policy to create a safe environment free from discrimination or harassment that respects the human rights of our employees. We strive to achieve a workplace where opportunities for success are created and available for everyone equally.

Company History, Information and Organization

Soluna Holdings, Inc. (“SHI”), formerly known as Mechanical Technology, Incorporated, which was originally incorporated in the State of New York in 1961, reincorporated in the State of Nevada on March 24, 2021, and is headquartered in Albany, New York. Effective November 2, 2021, the Company changed its name from “Mechanical Technology, Incorporated” (or “MTI”) to “Soluna Holdings, Inc.” On October 29, 2021, Soluna Callisto Holdings, Inc. merged into Soluna Computing, Inc. (“SCI”), a private green data center development company and a subsidiary of SHI. MTI Instruments, Inc., a subsidiary of SHI, was sold on April 11, 2022. On March 23, 2021, our common stock commenced trading on the Nasdaq Stock Market LLC (“Nasdaq”). We formed a wholly owned subsidiary of SHI on December 31, 2023, Soluna Digital, Inc. (“Soluna Digital,” or “SDI”). Effective December 31, 2023, SCI transferred substantially all of its assets to SHI or its subsidiaries, including SDI.

Additional Information

We file or furnish periodic reports and amendments thereto, including our annual reports on Form 10-K, proxy statements, quarterly reports on Form 10-Q, current reports on Form 8-K, proxy statements and other information with the SEC. These reports, and any amendments thereto, as filed with the SEC, can be accessed, free of charge, on the SEC’s website www.sec.gov (http://www.sec.gov). These documents may also be accessed on our website: http://www.solunacomputing.com through a link in the “Investors” section. The contemplated documents are placed on our website as soon as practicable after their filing with the SEC. The information posted on our website is not incorporated by reference into this Annual Report.

Risk factors

As filed, 121,340 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

An investment in our securities is highly speculative and involves a high degree of risk. We face a variety of risks that may affect our operations or financial results and many of those risks are driven by factors that we cannot control or predict. You should carefully consider the risks described below together with all of the other information in this Annual Report, including our consolidated financial statements and the related notes and the information described in the section entitled “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in our other filings with the SEC. If any of the risks described below occur, our business, financial condition, results of operations and prospects could be materially adversely affected. In that case, the market price of our common stock would likely decline, and investors could lose all or a part of their investment. Only those investors who can bear the risk of loss of their entire investment should consider an investment in our securities. Additional risks and uncertainties not presently known to us or that we currently deem immaterial may also impair our operations.

Summary Risk Factors

  • Our recurring losses from operations will require additional capital to support our business and objectives and grow our business.
  • We have a limited operating history, and we may not recognize operating income in the future.
  • We have financed our strategic growth primarily by issuing new shares of our common stock in public offerings and the issuance of debt, and plan to raise additional capital through similar offerings in the future, and our inability to do so on favorable terms may adversely affect our operations and the market price of our securities.
  • If we cannot achieve or maintain profitability, stockholders could lose all or part of their investment.
  • Our level of existing debt may negatively impact our liquidity, restrict our operations and ability to respond to business opportunities, and increase our vulnerability to adverse economic and industry conditions.
  • We may be unable to meet our remaining obligations under the terminated HPE Agreement (as defined below) which could lead to a default under that agreement.
  • Joint ventures, joint ownership and strategic partner arrangements and other projects pose unique challenges, and we may not be able to fully implement or realize synergies, expected returns or other anticipated benefits associated with such projects.
  • We may not be able to timely complete our future strategic growth initiatives or within our anticipated costs estimates, if at all.
  • Our business plan is heavily dependent upon acquisitions and strategic alliances and our ability to identify, acquire or ally on appropriate terms, and successfully integrate and manage any acquired companies or alliances will impact our financial condition and operating results.
  • We are subject to risks associated with our need for significant electrical power.
  • Global economic and geopolitical events, policies and conflicts may adversely affect our business, financial condition and results of operations.
  • We may not be able to continue to develop our technology and keep pace with technological developments, or otherwise compete with other companies, many of which have greater resources and experience.
  • If we fail to effectively manage our growth, our business, financial condition, and results of operations could be harmed.
  • Our new services and changes to existing services could fail to attract or retain users or generate revenue and profits, or otherwise adversely affect our business.
  • We have concentrated our operations and, thus, are particularly exposed to changes in the regulatory environment, market conditions and natural disasters in the state of Texas where our data centers are located.
  • Our success depends on external factors affecting the Bitcoin industry.
  • Our profitability depends in-part on Bitcoin prices and the stability of Digital Asset markets, which are highly volatile and largely unregulated.
  • Regulatory changes or actions may alter the nature of an investment in us or restrict the use of cryptocurrencies in a manner that adversely affects our business, prospects, or operations.
  • Security breaches and irreversible transactions could result in the loss of our cryptocurrencies.
  • Uncertainty around the adoption, use, and global demand for cryptocurrencies could adversely affect our business.
  • Because most of our and our hosted customers’ miners are designed specifically to mine Bitcoin and may not be readily adaptable to mining other cryptocurrencies, a sustained decline in Bitcoin’s value could adversely affect our business and results of operations.
  • Our data center business could be harmed by prolonged power outages, power and fuel shortages, capacity constraints and increases in power costs.
  • Our reliance on a third-party pool service provider for our mining revenue payouts may have a negative impact on our operations. The same may be true in the case of our hosted customers.
  • Declining block rewards, reliance on transaction fees, and network forks could adversely affect our mining operations.
  • Climate change and evolving regulations could adversely impact our business.
  • We may be affected by price fluctuations in the wholesale and retail power markets.
  • The development and acceptance of competing blockchain platforms or technologies may cause consumers to use alternative distributed ledgers or other alternatives.
  • We may be unable to secure, develop, finance, construct, commission and operate HPC and AI data center projects on the timetable or economics we expect.
  • Our HPC and AI data center business is subject to rapid changes in customer requirements, technology standards and infrastructure design, which may increase costs, delay development or make our facilities less competitive.
  • We may be unable to procure, install or integrate specialized equipment required for HPC and AI workloads, including electrical, cooling, networking and other long-lead-time components, on acceptable terms or at all.
  • Tariffs, trade restrictions, import duties, export controls and other changes in trade policy may increase our capital costs, disrupt our supply chain and adversely affect the development and operation of our data centers..
  • Our business has and is expected to continue to have significant customer concentration.
  • Failure to attract, grow and retain a diverse and balanced customer base, including key magnet customers, could harm our business and operating results.
  • We are heavily dependent on our senior management, and a loss of a member of our senior management team could cause the market prices of our securities to suffer.
  • We depend upon third-party suppliers for power, and we are vulnerable to service failures and price increases by such suppliers and to volatility in the supply and price of power in the open market.
  • Our business model depends upon the demand for data centers.
  • Insiders continue to have substantial control over the Company.
  • We are subject to complex environmental, health and safety laws and regulations that may expose us to significant liabilities for penalties, damages or costs of remediation or compliance.
  • Provisions in our Articles (as defined below), our Bylaws (as defined below), and Nevada law may discourage a takeover attempt even if a takeover might be beneficial to our stockholders.
  • If we are unable to protect our information systems against service interruption or failure, misappropriation of data or breaches of security, our operations could be disrupted, we could be subject to costly government enforcement actions and private litigation and our reputation may be damaged.
  • We incur significant costs as a result of operating as a public company.
  • We may become involved in litigation arising in the ordinary course of our business that may materially adversely affect us.
  • The market price of our securities is likely to be volatile, which may cause investment losses for our shareholders.
  • Because there has been limited precedent set for financial accounting of Bitcoin and other cryptocurrency assets, the determination that we have made for how to account for cryptocurrency assets transactions may be subject to change.
  • If we are not able to comply with the applicable continued listing requirements or standards of Nasdaq, Nasdaq could delist our common stock or Series A Preferred Stock or broker-dealers may be discouraged from effecting transactions in shares of our securities.
  • Substantial blocks of our common stock may be sold into the market as a result of our being party to the SEPA (as defined below) and you may experience immediate and substantial dilution in the net tangible book value per share of our common stock.
  • It is not possible to predict the actual number of shares we will sell under the SEPA, or the actual gross proceeds resulting from those sales.

Risks Relating to the Company and its Growth Strategy

Our recurring losses from operations will require additional capital to support our business and objectives and grow our business.

We have incurred recurring losses since inception and, as of December 31, 2025, had an accumulated deficit of approximately $367.7 million. We anticipate operating losses to continue for the foreseeable future as we grow our business, and it is possible we will never achieve profitability.

Until such time as we can generate substantial revenue, we expect to finance our working capital requirements through a combination of equity offerings and debt financing. To the extent that we raise additional capital through the sale of equity or convertible debt securities, your ownership interest will be diluted, and the terms of these securities may include liquidation or other preferences that adversely affect your rights as a common stockholder. Debt financing and preferred equity financing, if available, may involve agreements that include covenants limiting or restricting our ability to take specific actions, such as incurring additional debt, making acquisitions or capital expenditures, or declaring dividends. If we are unable to raise additional funds through equity or debt financings or other arrangements when needed, we may be required to scale back or curtail our operations or expansion efforts, including limiting our ability to expand our hosting and cryptocurrency business to a larger-scale operation.

We have a limited operating history and we may not recognize operating income in the future.

We began our cryptocurrency and computer hosting operations in January 2020 and therefore our business is subject to all the risks inherent in a business with limited operating history in a rapidly developing and changing industry. Furthermore, in 2024 we began to implement a strategy to move into the HPC/AI hosting business to provide green energy to power-intensive AI applications, in an attempt to leverage our expertise in advanced data processing applications. This is a new strategic direction for the Company and we have no prior history of operations in either of these lines of business, from which we can evaluate our future operating performance in this segment. We have not yet been able to confirm that our business model can or will be successful over the long term, and we may not ever recognize operating income from this business. Our projections have been developed internally and may not prove to be accurate and our operating results will likely fluctuate moving forward as we focus on growing our operations. We may need to make business decisions that could adversely affect our operating results, such as modifications to our business structure or operations. There can be no assurance that we will be successful in either of these lines of business, which could significantly adversely affect our ability to scale the growth of our customer base or increase our revenue, which could have a material adverse effect on our results of operations in the future.

Given our status as an early operating stage company, without positive operating income, there is a substantial risk regarding our ability to succeed. You should consider our business and prospects in light of these risks and the risks and difficulties that we will encounter as we continue to develop our business model. We may not be able to address these risks and difficulties successfully, which would materially harm our business and operating results, and we could be forced to terminate our business, liquidate our assets and dissolve, and you could lose part or all of your investment.

We have financed our strategic growth primarily by issuing new shares of our common stock in public offerings and the issuance of debt, and plan to raise additional capital through similar offerings in the future, and our inability to do so on favorable terms may adversely affect our operations and the market price of our securities.

We have raised capital to finance the strategic growth of our business through public offerings of our common stock and the issuance of debt, and plan to raise additional capital through similar offerings to fund current and future expansion initiatives. We may not be able to secure additional debt or equity financing on favorable terms, if at all, which could hinder our growth and adversely impact our operations. In 2022 and 2023, a number of digital asset platforms and exchanges filed for bankruptcy and/or became the subjects of investigation by various governmental agencies for, among other things, fraud. These disruptions in the crypto asset market may impact our ability to obtain favorable financing. If we raise additional equity financing, stockholders may experience dilution of their ownership interests, and the per share value of our common stock could decline. If we are unable to generate sufficient cash flows to support our strategic growth, we may be required to adopt one or more alternatives, such as reducing or delaying investments or capital expenditures, selling assets, or obtaining additional equity financing on terms that may be onerous or highly dilutive. Furthermore, as we engage in debt financing, in the event of bankruptcy, the holders of any debt we issue would likely have priority over the holders of shares of our common stock in terms of order of payment preference. We may be required to accept terms that restrict our ability to incur additional debt or take other actions, including accepting terms that require us to maintain specified liquidity or other ratios that could otherwise not be in the interests of our stockholders.

If we cannot achieve or maintain profitability, stockholders could lose all or part of their investment.

We intend to continue scaling our company to increase our customer base and implement initiatives, including new business lines. As a result, we will incur increased costs associated with growth, expanding our customer base and being a public company. Our efforts to grow our business may be costlier than we expect, or the revenue growth rate may be slower than we expect and may not result in increased profitability in the short term or at all. As we pivot towards new markets such as the HPC/AI hosting business, our limited experience in these areas may impact our ability to accurately assess our prospects. The likelihood of our success must be considered in light of the expenses, difficulties, complications, problems, and delays frequently encountered in connection with the expansion of a business and operating a business in a competitive industry. There can be no assurance that we will ever operate profitably, and if we do, there can be no assurance that we would be able to maintain profitability. If we cannot achieve or maintain profitability, our stockholders could lose all or a part of their investment.

Our level of existing debt may negatively impact our liquidity, restrict our operations and ability to respond to business opportunities, and increase our vulnerability to adverse economic and industry conditions.

We currently use debt as part of our capital structure and may take on more debt in the future.

On June 20, 2024, we issued a $12.5 million secured promissory note, with approximately $7.8 million of principal outstanding as of December 31, 2025. This note, along with accrued interest, is due on June 20, 2027.

On March 12, 2025, Soluna SW, LLC, a subsidiary of Soluna Digital, Inc. (“SSW”), entered into a $5 million term loan with Galaxy Digital LLC under a loan agreement that matures on March 12, 2030, with approximately $4.6 million of principal outstanding as of December 31, 2025.

On September 12, 2025, we caused our subsidiaries, Soluna DVSL ComputeCo, LLC , Soluna DVSL II ComputeCo, LLC, and Soluna KK I ComputeCo, LLC (collectively, the “Borrowers”) to enter into a Credit and Guaranty Agreement (the “Credit Agreement”) with Generate Lending, LLC, as administrative agent and collateral agent (the “Agent”), and Generate Strategic Credit Master Fund I-A, L.P. (the “Lender”). The Credit Agreement provides for senior secured term loan commitments in an aggregate principal amount of up to $35.5 million, comprised of (i) Tranche A-1 ($5.5 million), (ii) Tranche A-3 ($11.5 million), and (iii) Tranche B ($18.5 million). In addition, the Credit Agreement permits the Borrowers to request one or more Additional Tranche Loan Commitments (as defined in the Credit Agreement), in the aggregate amount of up to $64.5 million, subject to the approval of the Lender and the Agent, for project-level financing of eligible projects. As of December 31, 2025, we have drawn $17.0 million and have approximately $16.2 million in principal outstanding.

Our current level of debt could limit our flexibility and pose risks to our business. It may:

  • Restrict our ability to raise new financing or make strategic investments;
  • Require significant cash flows to cover interest and principal payments;
  • Impose covenants that limit our ability to pay dividends, repurchase shares, make acquisitions, incur additional debt, or create liens;
  • Make us more vulnerable to downturns or limit our ability to pursue growth opportunities.

Our ability to manage our debt depends on our financial performance, which is subject to business and market conditions. If we fail to meet our debt obligations or violate covenants, lenders could declare defaults and accelerate repayment. This could trigger defaults on other obligations and, in the case of secured debt, lead to foreclosure on our assets. As of December 31, 2025, the Borrowers were not in compliance with the minimum Forward Contracted Debt Service Coverage Ratio covenant under the Credit Agreement. On March 26, 2026, the Agent provided a limited waiver of this covenant. There is no guarantee that we will be granted waivers in the future if we fail to meet our debt obligations or violate covenants.

We also provide guarantees for certain subsidiary debts. If called upon, we may need to cover those obligations, which could impact our cash position and require us to seek additional funding—potentially on unfavorable terms.

To manage our debt, we may pursue refinancing options, which could include issuing new shares or convertible securities. This could dilute existing stockholders and reduce the market value of our stock.

Soluna AL CloudCo, LLC, a wholly owned subsidiary of Soluna Cloud, Inc. may be unable to meet its remaining obligations under the terminated HPE Agreement which could lead to a default under that agreement.

On March 24, 2025, Soluna AL CloudCo, LLC. notified Hewlett Packard Enterprise Company ("HPE") of its termination of the HPC & AI Cloud Services Agreement and HPE-Soluna Greenlake Statement of Work, dated June 18, 2024, entered into between Soluna AL CloudCo, LLC, a subsidiary of Soluna Cloud, Inc. (“CloudCo”), and HPE (together with the associated Statement of Work, the “HPE Agreement”). Under the HPE Agreement, we agreed to pay HPE an aggregate of $34 million payable over 36 months beginning June 2024, with $10.3 million pre-paid in June 2024 at contract execution and monthly payments of $667 thousand due until June 2027.

In accordance with the terms of the HPE Agreement, upon our notice of termination for convenience, the obligations under the HPE Agreement accelerated and the remaining payments of $19.3 million became immediately due and payable, including all upfront payments and monthly charges, plus any fees incurred for the terminated Services (as defined in the HPE Agreement). Due to the termination of the HPE Agreement, prepaid assets and other long-term assets were reduced by approximately $8.6 million, increased termination liability by approximately $20.0 million and recorded a loss on contract of approximately $28.6 million for the year ended December 31, 2024 to account for the termination and our contractual payments.

Subsequently, on March 26, 2025, HPE sent notice of its termination of the HPE Agreement for cause, effective immediately, due to CloudCo’s material breach of its payment obligations that remained uncured for more than thirty (30) days. This default could result in a range of actions that could include legal or collections actions by HPE against CloudCo, any and all of which could have a material adverse effect on our business, financial condition, and results of operations.

On December 3, 2025, the Company was contacted by and provided information to a third party collection agent in connection with the HPE claim. The agency contacted the Company on January 15, 2026 to inform the Company that its engagement had been terminated. As of December 31, 2025, no formal legal proceedings have commenced, and the outstanding contract liability was approximately $19.3 million.

We may be unable to refinance our indebtedness at maturity or the refinancing terms may be less favorable than the terms of our original indebtedness.

It is likely that we will need to refinance at least a portion of our outstanding debt as it matures. If we are unable to refinance or extend principal payments due at maturity or pay them with proceeds of other capital transactions, then our cash flow may not be sufficient in all years to repay all such maturing debt and to pay distributions. Further, if prevailing interest rates or other factors at the time of refinancing result in higher interest rates upon refinancing, then the interest expense relating to that refinanced indebtedness would increase. Refinancing our indebtedness may also require us to expense previous debt issuance costs or to incur new debt issuance costs.

Joint ventures, joint ownership and strategic partner arrangements and other projects pose unique challenges, and we may not be able to fully implement or realize synergies, expected returns or other anticipated benefits associated with such projects.

From time to time, and as we expand our operations into the cloud and HPC/AI hosting business, we may be involved in strategic joint ventures and other joint ownership and strategic partnership arrangements. As of December 31, 2025, we had four primary project-level capital partners: SLC (equity), Navitas (equity), Galaxy (debt) and Generate (debt). We may not always be in complete alignment with our joint venture, joint owner or strategic partner counterparties; we may have differing strategic or commercial objectives and may be outvoted by our joint venture or other strategic partners, or we may disagree on governance matters with respect to the joint venture entity or the jointly owned assets. As a result, when we enter into joint ventures, joint ownership, and strategic partnership arrangements, we may be subject to a number of risks. In some joint ventures and joint ownership arrangements we may not be responsible for the operation of projects and will rely on our joint venture. joint owner or strategic partner counterparties for such services. Joint ventures, joint ownership and strategic partnership arrangements may also require us to expend additional internal resources that could otherwise be directed to other projects. If we are unable to successfully execute and manage our existing and any proposed joint venture and joint owner arrangements, it could adversely impact our financial and operating results. Our inability to successfully execute and manage our joint venture/joint owner/strategic partner arrangements could also significantly impact our expansion strategy as we are heavily dependent on these arrangements to finance the expansion of our operations.

We may not be able to timely complete our future strategic growth initiatives or within our anticipated costs estimates, if at all.

Our strategic growth initiatives may require construction, expansion or conversion of associated power facilities, which may expose us to significant risks that we may otherwise not be exposed to, including risks related to: construction delays; lack of availability of parts and/or labor; increased prices as a result, in part, of inflation, and delays for data center equipment; labor disputes and work stoppages, including interruptions in work due to pandemics or other public health crises; unanticipated environmental issues and geological problems; delays related to permitting and approvals to commence operations from public agencies and utility companies; delays in site readiness leading to our failure to meet commitments made in connection with such expansion; and delay or halts related to evaluations of strategic growth initiatives.

All construction-related projects depend on the skill, experience, and attentiveness of our personnel throughout the design and construction process. Should a designer, general contractor, subcontractor or key supplier experience financial difficulties or other problems during the design or construction process, we could experience significant delays, increased costs to complete the project and/or other negative impacts to our expected returns.

If we are unable to mitigate these risks and complete our growth initiatives on schedule and within our anticipated costs, such delays or implementation failures may hinder our ability to realize anticipated benefits, and our business and financial condition may suffer as a result.

We may have difficulty in obtaining banking services for our cryptocurrency activities.

While the banking authorities in the United States do not prohibit banks from providing banking services to cryptocurrency-related businesses such us, the Federal Reserve, the FDIC, and the Office of the Comptroller of the Currency have issued directives to banks in the United States relating to their crypto-asset risks and as a result a significant number of banks have determined to limit such activities. Accordingly, we have had and may have in the future, difficulty in opening bank accounts, obtaining letters of credit and generally accessing the banking system for our operational needs.

Our business plan is heavily dependent upon acquisitions and strategic alliances and our ability to identify, acquire or ally on appropriate terms, and successfully integrate and manage any acquired companies or alliances will impact our financial condition and operating results.

As part of our growth strategy, we may seek to acquire other businesses or form strategic alliances and partnerships that expand our market presence, complement our offerings, or provide access to new technologies. We may also need to do so to remain competitive. However, we may not be able to identify suitable opportunities, negotiate favorable terms, secure necessary financing, or successfully complete or integrate any such transactions.

Even when successful, acquisitions and partnerships carry significant risks, including:

  • Failure to realize expected benefits or synergies;
  • Challenges integrating operations, systems, personnel, or cultures;
  • Disruption to ongoing operations and diversion of management time;
  • Loss of key employees, customers, or partners;
  • Incompatibility of business practices or internal controls;
  • Financial risks, including write-offs, increased expenses, or underperformance;
  • Entry into unfamiliar markets with greater competition;
  • Potential liabilities or unforeseen costs; and
  • Negative impacts on our financial results, including accounting and tax implications.

We may finance future deals by issuing equity or convertible debt, which could dilute existing stockholders or increase leverage.

Our strategic relationships, including those with SLC, Navitas, Galaxy and Generate or any future partnerships, must be well-managed to avoid harming our operations or results. There is no guarantee that any acquisition or alliance will achieve its intended goals or deliver the expected return, and differences in cost structures could cause fluctuations in our financial performance.

We are subject to risks associated with our need for significant electrical power.

Our operations currently require significant amounts of electrical power, and we anticipate our demand for electrical power will continue to grow as we continue to expand our mining fleet, and as we expand our business to implement our strategy to move into the cloud service business and HPC/AI hosting business. The fluctuating price of electricity required for our operations and to power our expansion may inhibit our profitability. If we are unable to continue to obtain sufficient electrical power on a cost-effective basis, we may not realize the anticipated benefits of our significant capital investments.

Global economic and geopolitical events, policies and conflicts may adversely affect our business, financial condition, and results of operations.

We may be exposed to price volatility and uncertainty in our supply chain due to geopolitical crises and economic downturns such as recessions, rising inflation, tariffs, social, political, and economic risks, conflicts and acts of war, sanctions and other restrictive actions by the United States and/or other countries. Changes in policy positions and priorities from the new U.S. government administration could increase this price volatility and uncertainty. Such crises will likely continue to influence our ability to do business in a cost-effective manner. Inflationary pressures, as well as disruptions in our supply chain, have increased the costs of goods, services, and personnel, which have in turn caused our capital expenditures and operating costs to rise. Additionally, these crises may discourage investment in Bitcoin and investors may shift their investments to less volatile assets. The effects of such global economic shifts, worsening inflationary issues, changes in policy, and geopolitical events could adversely affect our ability to access the capital and other financial markets, as such, we may be required to consider alternative sources of funding for our growth and operations which may increase our cost of capital. Such events and conditions could have a materially adverse effect on our business, operations, or financial results and the value of the Bitcoin we mine.

We may not be able to continue to develop our technology and keep pace with technological developments, or otherwise compete with other companies, many of which have greater resources and experience.

We currently lack the financial resources to compete directly with larger, well-funded companies in cryptocurrency mining and advanced data processing, including cloud, AI, and HPC data center operators. These markets attract major players with far greater capital and scale, making it difficult for us to expand or introduce new offerings.

Rapid changes in technology further increase this challenge. We may not be able to keep up with new developments, adopt new technologies quickly, or do so in a cost-effective way. Some of our equipment may become outdated, and upgrading or replacing it—especially mining hardware or advanced AI infrastructure—could be costly and time-consuming. Supply chain constraints, long lead times, and competition for key components like semiconductors could further limit our ability to stay current.

Implementing new technology may also lead to system disruptions or fail to deliver expected benefits. If we cannot adapt effectively, our competitiveness and growth prospects could suffer.

Additionally, other North American companies with greater access to low-cost energy may outcompete us in securing strategic acquisitions or partnerships. If we are unable to expand, innovate, or maintain our position in the market, it could negatively impact our business, financial condition, and the trading price of our securities.

If we fail to effectively manage our growth, our business, financial condition, and results of operations could be harmed.

We are an early operating stage company with a small management team and are subject to the strains of ongoing development and growth, which will place significant demands on our management and our operational and financial infrastructure. Although we may not grow as we expect, if we fail to manage our growth effectively or to develop and expand our managerial, operational, and financial resources and systems, our business and financial results could be materially harmed.

In addition, our failure to effectively manage our growth could damage our reputation, further limiting our growth and negatively affecting our operating results. Further, we cannot provide any assurance that we will successfully identify emerging trends and growth opportunities in this business sector, and we may lose out on opportunities. Such circumstances could have a material adverse effect on our business, prospects, or operations.

Our new services and changes to existing services could fail to attract or retain users or generate revenue and profits, or otherwise adversely affect our business.

Our ability to retain, increase, and engage our customer base and to increase our revenue depends heavily on our ability to continue to evolve our existing services and to create successful new services, both independently and in conjunction with developers or other third parties. We may introduce significant changes to our existing services or acquire or introduce new and unproven services, including using technologies with which we have little or no prior development or operating experience. These efforts, including the introduction of new services or changes to existing services, may result in new or enhanced governmental or regulatory scrutiny, litigation, ethical concerns, or other complications that could adversely affect our business, reputation, or financial results. If our new services fail to engage users or developers, or if our business plans are unsuccessful, we may fail to attract or retain users or to generate sufficient revenue, operating margin, or other value to justify our investments, and our business may be adversely affected.

We have concentrated our operations and, thus, are particularly exposed to changes in the regulatory environment, market conditions and natural disasters in the state of Texas where our data centers are located.

We currently operate data centers in Texas, which generated the majority of our revenue in both 2024 and 2025. Our growth plans also focus on new projects in Texas, making our business highly dependent on the state’s regulatory environment, market conditions, and exposure to weather events or natural disasters.

Texas has supported Bitcoin mining through favorable regulations and economic incentives, but this has also led to increased competition for suitable sites and skilled labor. Our operations could be impacted by construction delays, rising costs for equipment or labor, supply chain disruptions, or disputes with contractors.

In 2022, ERCOT—the operator of Texas’ power grid—began requiring large-scale digital asset miners to apply for grid connection approval and established a task force to review how large flexible loads (like Bitcoin data centers) interact with the grid. This has led to delays for some miners in getting energized, and we could face similar delays in the future.

If Texas were to change its policies, increase taxes, or reduce its support for Bitcoin mining, our concentration in the state could significantly affect our business, financial condition, and results of operations.

Risks Related to our Bitcoin Mining and Hosting Business

Our success depends on external factors affecting the Bitcoin industry.

Our success is closely tied to the health of the Bitcoin market, which is influenced by factors beyond our control. Historically, Bitcoin ownership has been concentrated among a small number of holders, often called “whales.” Although ownership has become more distributed, large holders still exist and could impact the market by selling large amounts of Bitcoin, which may reduce demand and drive down prices.

While more regulated and transparent exchanges have emerged, the Bitcoin market remains relatively new and less regulated than traditional financial markets. Some trading platforms may be more prone to technical issues, fraud, or unethical practices such as:

  • Wash trading (creating artificial trading volume),
  • Front-running (using early access to trade information for unfair advantage), and
  • Lack of transparency in ownership, governance, and compliance.

These issues may erode public trust in Bitcoin markets and lead to price volatility. A significant drop in the price or perceived reliability of Bitcoin could negatively impact our business and financial results.

Our profitability depends on Bitcoin prices and the stability of Digital Asset markets, which are highly volatile and largely unregulated.

Our ability to achieve and maintain profitability is closely tied to the market price of Bitcoin, which has historically been highly volatile and influenced by factors beyond our control. These include market speculation, global economic and political events, regulatory changes, energy prices, activity by large holders (“whales”), and technical or operational issues at major exchanges.

Digital asset exchanges—where Bitcoin and other cryptocurrencies are traded—are relatively new and largely unregulated. Many lack transparency in ownership, management, and compliance practices. This has led to market instability, particularly when major exchanges have collapsed, faced hacking incidents, or become subject to regulatory investigations. Notable examples include the collapse of FTX and scrutiny of Binance, which contributed to sharp price declines and increased negative publicity across the cryptocurrency industry. The price of Bitcoin has experienced substantial historical volatility, including its recent decline beginning in October 2025, and may continue to fluctuate widely due to a variety of factors, including the actions of malicious or manipulative actors, perceived or actual scarcity, political or economic developments, regulatory changes, and market speculation that may contribute to “bubble”-type price dynamics.

A lack of trust in digital asset exchanges or their closure—whether due to fraud, government action, or business failure—can further undermine public confidence in Bitcoin, increase market volatility, and negatively impact our business. These risks may continue to evolve in ways we cannot fully anticipate.

In addition, Bitcoin has a fixed supply of 21 million coins, with about 20.0 million already mined as of December 31, 2025. As block rewards decline through scheduled “halvings” and eventually phase out, our revenue from mining will increasingly rely on transaction fees. While these fees have grown, there is no guarantee they will be sufficient to support profitability in the long term.

Volatility also affects how much revenue we realize from converting mined Bitcoin into U.S. dollars and makes financial planning more difficult. A prolonged decline in Bitcoin prices could also affect the ability of our co-hosting customers to pay for services, reducing our revenue and delaying expansion.

If Bitcoin prices fall or fail to meet our expectations, or if instability in the broader digital asset market increases, our financial condition and results of operations could be materially and adversely affected.

Regulatory changes or actions may alter the nature of an investment in us or restrict the use of cryptocurrencies in a manner that adversely affects our business, prospects, or operations.

The regulatory environment for cryptocurrencies is evolving and uncertain. Governments around the world have taken varied approaches—some banning cryptocurrencies entirely, others permitting them with little restriction, and many (including the U.S.) applying complex and changing rules to mining, ownership, and trading.

In the U.S., regulatory momentum has increased. In January 2025, President Trump issued an executive order to create a federal framework for digital assets, and Congress has formed bipartisan working groups to pursue legislation on the topic. Discussions have included creating a national digital asset reserve that could include Bitcoin, and multiple states have proposed similar reserves. Additionally, in March 2025, the U.S. established the U.S. Bitcoin Strategic Reserve, which is reported to hold the largest Bitcoin reserve in the world, and at least twelve states have introduced legislation to create strategic Bitcoin reserves. Notably, in June 2025, the Governor of the State of Texas signed into law the Texas Strategic Bitcoin Reserve and Investment Act, making Texas the first state to formally establish such a reserve. In January 2026, new legislation was filed in Texas to expand the reserve's scope to include other major digital assets. While these developments may ultimately bring more clarity, their outcomes remain uncertain.

Past actions have shown that regulation can also become more restrictive. For example:

  • In November 2022, New York banned new fossil fuel permits for proof-of-work mining.
  • In January 2024, the SEC approved spot Bitcoin ETFs, leading to increased institutional adoption.
  • In February 2024, the EIA launched, then suspended, a survey to monitor electricity use in crypto mining. The long-term regulatory impact of that effort remains unclear.

Although some recent enforcement actions have been scaled back, future regulations—especially those targeting electricity use, financial reporting, or market oversight—could increase our compliance burden, restrict our operations, or affect demand for our services.

Given this uncertainty, we cannot predict how future laws or agency actions may impact our business. Even well-intentioned or positive regulatory initiatives could have unintended consequences that negatively affect our operations, financial condition, or growth prospects.

Our interactions with a blockchain may expose us to specially designated nationals (“SDNs”) or blocked persons and new legislation or regulation could adversely impact our business or the market for cryptocurrencies.

The Office of Foreign Assets Control (“OFAC”) of the U.S. Department of Treasury requires us to comply with its sanction program and not conduct business with persons named on its SDN list. However, because of the pseudonymous nature of blockchain transactions we may inadvertently and without our knowledge engage in transactions with persons named on OFAC’s SDN list. Our policy prohibits any transactions with such SDN individuals, but we may not be adequately capable of determining the ultimate identity of the individual with whom we transact with respect to selling cryptocurrency assets. We are unable to predict the nature or extent of new and proposed legislation and regulation affecting the cryptocurrency industry, or the potential impact of the use of cryptocurrencies by SDN or other blocked or sanctioned persons, which could have material adverse effects on our business and our industry more broadly. Further, we may be subject to investigation, administrative or court proceedings, and civil or criminal monetary fines and penalties as a result of any regulatory enforcement actions, all of which could harm our reputation and affect the value of our securities.

Security breaches and irreversible transactions could result in the loss of our cryptocurrencies.

Our operations rely on third-party platforms such as the Luxor mining pool and exchanges like Coinbase to store and manage our cryptocurrencies. Like others in the industry, we face risks from security breaches, including hacking, malware, or insider error. A successful attack on our systems or those of our partners could result in the theft or loss of our digital assets, compromise confidential information, disrupt operations, and damage our reputation.

Additionally, cryptocurrency transactions are typically irreversible. If coins are accidentally sent to the wrong address or stolen through fraud or theft, we may have no way to recover them. Any such losses—whether from security incidents or transactional errors—could negatively affect our business, financial condition, and results of operations, and may also impact investor confidence.

Uncertainty around the adoption, use, and global demand for cryptocurrencies could adversely affect our business.

Our business depends on the continued demand for, and value of, cryptocurrencies—particularly Bitcoin—which is influenced by a variety of factors, including adoption, usability, and global economic and geopolitical events. However, the future of cryptocurrency as a widely used payment method remains uncertain.

Despite growing awareness, cryptocurrencies face major adoption and scaling challenges. High transaction costs, slow processing times, and limited throughput have restricted their use in everyday transactions. Although efforts are underway to address these issues through protocol upgrades and second-layer technologies, there is no assurance that such solutions will succeed or gain broad acceptance. If these problems persist, demand for cryptocurrencies may decline, reducing the viability of mining and the need for services like ours.

Additionally, most cryptocurrency demand today is driven by investment and speculation rather than retail or commercial use. Widespread acceptance as a medium of exchange has not occurred—and may never occur. If adoption stalls or declines, the value of the cryptocurrencies we or our hosted customers mine could drop, impacting our revenues and growth prospects.

Geopolitical and economic events also create uncertainty. Crises can lead to sudden surges in demand, driving up prices temporarily, but also increasing the risk of sharp price declines once the crisis subsides. Alternatively, in times of global instability or economic downturns, investors may shift away from volatile assets like cryptocurrencies toward more traditional safe-haven investments, weakening demand further.

Taken together, these factors could materially impact our business, financial condition, and the long-term sustainability of our operations.

Because most of our and our hosted customers’ miners are designed specifically to mine Bitcoin and may not be readily adaptable to mining other cryptocurrencies, a sustained decline in Bitcoin’s value could adversely affect our business and results of operations.

We and our hosted customers have invested substantial capital in acquiring miners designed specifically to mine Bitcoin as efficiently and as rapidly as possible on our assumption that we will be able to use them to mine Bitcoin and generate revenue from our operations. Therefore, our mining and hosting operations focus primarily on mining Bitcoin, and our revenue is largely based on the value of Bitcoin. Accordingly, if the value of Bitcoin declines and fails to recover, for example, because of the development and acceptance of competing blockchain platforms or technologies, including competing cryptocurrencies which our miners or our customers’ miners may not be able to mine, the revenue we generate from our operations will likewise decline. Moreover, we may not be able to successfully repurpose our operations in a timely manner, if at all, if we or our customers decide to switch to mining a different cryptocurrency (or to another purpose altogether) following a sustained decline in Bitcoin’s value or if Bitcoin is replaced by another cryptocurrency. This could have a material adverse effect on our business, prospects, operations, and financial condition, as well as on the market value of our securities.

Our data center business could be harmed by prolonged power outages, power and fuel shortages, capacity constraints and increases in power costs.

Our data centers rely on consistent, high-capacity electricity supply, and any disruption—planned or unplanned—could negatively impact our operations and customer experience. Power outages caused by storms, fires, cyberattacks, utility failures, or infrastructure issues may lead to downtime and revenue loss. In some leased facilities, we may depend on landlords or utility providers to restore power, limiting our control in an outage.

While we may use backup generators and other measures to reduce downtime, they may not always be sufficient. Additionally, as customer equipment becomes more power-intensive, total energy consumption at our facilities may exceed original design expectations, potentially limiting available capacity and future growth.

We also face rising electricity costs driven by global energy market volatility, including supply disruptions from the Russia-Ukraine conflict, increased seasonal demand, and broader macroeconomic pressures. Over time, electricity prices may continue to rise due to climate change impacts, new environmental regulations, or our use of renewable energy. These cost increases could materially affect our financial condition, operating results, and cash flows.

Our properties may experience damages, including damages that are not covered by insurance.

Our properties are subject to a variety of risks relating to physical condition and operation, including:

  • the presence of construction or repair defects or other structural or building damage;
  • any noncompliance with or liabilities under applicable environmental, health or safety regulations or requirements or building permit requirements; and
  • any damage resulting from natural disasters, such as hurricanes, earthquakes, fires, floods, and windstorms.

For example, our facilities could be rendered inoperable, temporarily, or permanently, as a result of a fire or other natural disaster or by a terrorist or other attack on the site. The security and other measures we take to protect against these risks may not be sufficient. Additionally, our processing equipment could be materially adversely affected by a power outage, loss of access to the electrical grid, or loss by the grid of cost-effective sources of electrical power generating capacity. Given the power requirement, it would not be feasible to run miners on back-up power generators in the event of a power outage. Our insurance covers the replacement cost of any lost or damaged miners but does not cover any interruption of our mining activities; our insurance therefore may not be adequate to cover the losses we suffer as a result of any of these events. In the event of an uninsured loss, including a loss in excess of insured limits, at any of the mines in our network, such mines may not be adequately repaired in a timely manner or at all and we may lose some or all of the future revenues anticipated to be derived from such mines.

Our reliance on a third-party mining pool service provider for our mining revenue payouts may have a negative impact on our operations. The same may be true in the case of our hosted customers.

We currently rely on Luxor’s mining pool that supports Bitcoin to receive our mining rewards and fees from the network. Our mining pool has the sole discretion to modify the terms of our agreement at any time, and, therefore, our future rights and relationship with our mining pool may change. In general, mining pools allow miners to combine their computing power, increasing their chances of solving a block and getting paid by the network. The rewards are distributed by the mining pool operator, proportionally to our contribution to the mining pool’s overall mining power, used to generate each block. Should the mining pool operator’s system suffer downtime due to a cyber-attack, software malfunction, or similar issues, it will negatively impact our ability to mine and receive revenue. Furthermore, we and many other Bitcoin miners are dependent on the accuracy of the mining pool operator’s recordkeeping to accurately record the total processing power provided to the mining pool for a given Bitcoin mining application in order to assess the proportion of that total processing power we provided. While we have internal methods of tracking both our power provided and the total used by the mining pool, the mining pool operator uses its own recordkeeping to determine our proportion of a given reward. We and other miners have little means of recourse against the mining pool operator if we determine that the proportion of the reward that the mining pool operator pays out to us is incorrect, other than leaving the mining pool. If we are unable to consistently obtain accurate proportionate rewards from our mining pool operator, we may experience reduced reward for our efforts, which would have an adverse effect on our results of operations and financial condition.

Declining block rewards, reliance on transaction fees, and network forks could adversely affect our mining operations.

Our ability to generate revenue from Bitcoin mining depends on rewards received for solving new blocks. These rewards are designed to decrease over time through regularly scheduled “halvings.” For example, the most recent halving on April 19, 2024, reduced the reward from 6.25 to 3.125 Bitcoin per block. This process will continue roughly every four years until the total supply reaches 21 million Bitcoin, expected around the year 2140.

If the price of Bitcoin does not increase proportionally—or if mining difficulty does not decrease—halvings may reduce our mining revenue and profitability. This may also impact our hosted customers, whose ability to cover operating costs depends on the value of rewards earned. Over time, the Bitcoin network is expected to rely more on transaction fees instead of block rewards. However, if those fees are not high enough to support ongoing mining activity, it could reduce incentives to mine and weaken the network’s stability. Conversely, if transaction fees rise too high, users may avoid using Bitcoin, reducing transaction volume and fee opportunities.

If the aggregate computing power or hash rate on the Bitcoin network increases significantly, for proprietary Bitcoin mining, we may incur elevated capital expenses to maintain and upgrade our mining fleet in order to maintain market share.

In addition, we face risks from network “forks”, where a blockchain splits into two incompatible versions—usually due to changes in protocol adopted by only part of the network. Forks can lead to the creation of new cryptocurrencies and may cause confusion, market volatility, or incompatibility with existing mining equipment. If we are unable to support both versions or secure the economic benefit of the new asset, our operations and financial results could be negatively affected. Forks can also expose our systems to cybersecurity risks and disrupt mining activity.

Together, declining rewards, uncertain transaction fee dynamics, and network forks pose significant risks to our mining business, which could materially impact our revenue, profitability, and overall financial condition.

Climate change and evolving regulations could adversely impact our business.

Our operations depend heavily on access to reliable and cost-effective electricity. As a result, our business is exposed to both the physical effects of climate change and the potential for new environmental and energy regulations. Physical risks—such as extreme weather, water shortages, and temperature changes—could disrupt our data centers, damage infrastructure, or impair our ability to operate efficiently, particularly in regions like Texas where we have significant operations.

At the same time, the regulatory environment surrounding climate change is evolving rapidly. Governments at all levels are considering or enacting new legislation related to energy use, emissions, and environmental impact. We, along with our hosted customers, could face higher compliance costs for energy use, environmental monitoring, capital equipment upgrades, or operational changes. These rules may not distinguish between operations powered by renewable energy (as many of ours are) and those powered by fossil fuels, potentially putting us at a disadvantage despite our cleaner energy profile.

The lack of consistent regulation also creates uncertainty, especially as investor groups, policymakers, and the public increasingly scrutinize companies for their environmental practices.

Additionally, future regulatory changes could affect our business planning and capital investment decisions. For example, assumptions we have made about the regulatory landscape—such as for our Dorothy facility—may change, resulting in unexpected costs or challenges in execution. In Texas, we currently participate in demand response programs to reduce strain on the grid during high-demand periods. While beneficial today, future regulatory changes could impact our ability to participate in or benefit from such programs.

Given the uncertainty surrounding climate change policy and energy regulation, we cannot predict how these issues will evolve or the long-term effects on our operations. However, any of the risks described above could materially impact our financial condition, operating performance, and ability to compete.

We may be affected by price fluctuations in the wholesale and retail power markets.

While the majority of our power and hosting arrangements contain fixed power prices, some also contain certain price adjustment mechanisms in case of certain events. Furthermore, a portion of our power and hosting arrangements includes merchant power prices, or power prices reflecting market movements. Market prices for power, generation capacity and ancillary services are unpredictable. Over the past year, the market prices for power have generally been increasing, driven in part by the price increases in various commodities, including natural gas. Depending upon the effectiveness of any price risk management activity undertaken by us, an increase in market prices for power, generation capacity, and ancillary services may adversely affect our business, prospects, financial condition, and operating results. Long- and short-term power prices may fluctuate substantially due to a variety of factors outside of our control, including, but not limited to:

  • increases and decreases in generation capacity;
  • changes in power transmission or fuel transportation capacity constraints or inefficiencies;
  • volatile weather conditions, particularly unusually hot or mild summers or unusually cold or warm winters;
  • technological shifts resulting in changes in the demand for power or in patterns of power usage, including the potential development of demand-side management tools, expansion and technological advancements in power storage capability and the development of new fuels or new technologies for the production or storage of power;
  • federal and state power, market and environmental regulation and legislation; and
  • changes in capacity prices and capacity markets.

If we are unable to secure power supply at prices or on terms acceptable to us, it would have a material adverse effect on our business, financial condition, operating results, and prospects.

The development and acceptance of competing blockchain platforms or technologies may cause consumers to use alternative distributed ledgers or other alternatives.

The development and acceptance of competing blockchain platforms or technologies may cause consumers to abandon Bitcoin. As we exclusively mine Bitcoin, and expect to exclusively mine Bitcoin in the future, we could face difficulty adapting to emergent digital ledgers, blockchains or alternatives thereto. This could prevent us from realizing the anticipated profits from our investments. Such circumstances could have a material adverse effect on our business, prospects, or operations and potentially the value of any Bitcoin we mine or otherwise acquire or hold for our own account and therefore harm investors.

We have an evolving business model which is subject to various uncertainties.

As crypto assets and blockchain technologies become more widely available, we expect the services and products associated with them to evolve. Future regulations may require us and our co-hosting customers to change our or their business in order to comply fully with federal and state laws regulating crypto asset (including Ethereum and Bitcoin) mining. In order to stay current with the industry, our business model may need to continue to evolve as well. From time to time, we may modify aspects of our business model relating to our strategy. We cannot offer any assurance that these or any other modifications will be successful or will not result in harm to our business.

Risks Related to our HPC/AI Business

We may be unable to secure, develop, finance, construct, commission and operate HPC and AI data center projects on the timetable or economics we expect.

Our strategy includes the development and operation of data centers for high performance computing (“HPC”), artificial intelligence (“AI”) and other advanced compute workloads. These projects are capital-intensive, technically complex and depend on the successful coordination of site control, permitting, power availability, design, procurement, customer contracting, financing, construction, commissioning and operations. Each stage involves substantial uncertainty and may be affected by factors outside our control, including regulatory approvals, market conditions, customer timing, contractor performance, supply chain disruptions, labor availability and the cost and availability of capital. Delays, cost overruns or operating shortfalls could increase our capital needs, defer revenue, reduce expected returns or cause us to abandon projects. If we are unable to execute these projects on the timetable or economics we expect, our business, financial condition and results of operations could be materially adversely affected.

Our HPC and AI data center business is subject to rapid changes in customer requirements, technology standards and infrastructure design, which may increase costs, delay development or make our facilities less competitive.

The markets for HPC and AI infrastructure are evolving rapidly. Customer requirements may change quickly with respect to power density, cooling architecture, rack design, network configuration, resiliency standards, security and deployment timelines. Advances in semiconductors, systems architecture, model efficiency and data center design may also change the infrastructure needed to support these workloads. As a result, facilities designed based on current assumptions may require redesign, retrofitting or additional capital to remain commercially attractive. If we do not anticipate and respond to these changes in a timely and cost-effective manner, our development timelines may be extended, our costs may increase and our facilities may become less competitive.

We may be unable to procure, install or integrate specialized equipment required for HPC and AI workloads, including electrical, cooling, networking and other long-lead-time components, on acceptable terms or at all.

The development and operation of HPC and AI data centers depend on the timely availability of specialized equipment and materials, including transformers, switchgear, generators, cooling systems, liquid cooling components, network equipment, fiber infrastructure, control systems and other critical components. Many of these items have long lead times, are available from a limited number of suppliers or are subject to allocation, pricing pressure, transportation constraints or import-related disruptions. Even when equipment is available, installation and integration may be delayed by design changes, contractor performance, site conditions, commissioning issues or interoperability challenges. Failure to procure, install or integrate this equipment on schedule and on acceptable terms could delay project completion, increase costs, limit capacity, impair performance or reduce profitability.

Tariffs, trade restrictions, import duties, export controls and other changes in trade policy may increase our capital costs, disrupt our supply chain and adversely affect the development and operation of our data centers.

Our business depends on equipment, materials and components that may be sourced, directly or indirectly, from foreign manufacturers or suppliers, including electrical equipment, cooling systems, generators, transformers, switchgear, networking equipment, semiconductors, servers and other specialized infrastructure. Changes in tariffs, import duties, trade restrictions, export controls, sanctions, customs rules or other trade policies may increase the cost of these items, reduce availability, lengthen delivery times or otherwise disrupt our supply chain. These measures may also increase our suppliers’ and contractors’ costs and create broader market uncertainty that delays customer decisions or infrastructure investment. If we cannot mitigate these impacts through pricing, sourcing alternatives or contractual protections, our capital expenditures, operating costs, development timelines and project economics could be materially adversely affected.

Risks Related to our Company Generally

Our business has and is expected to continue to have significant customer concentration.

We generate a large portion of our revenue from a small number of customers. If we were to lose one or more of our large customers, our operating results could suffer dramatically. There can be no assurance that if we lose a major customer in the future, we will be able to successfully replace such customer in a timely manner, or at all, without any significant impact to our results of operations.

We expect that the limited number of customers will continue to account for a high percentage of our revenue for the foreseeable future. In addition, demand for our services generated by these customers may fluctuate significantly from quarter to quarter. The concentration of our customer base increases risks related to the financial condition of our customers, and the deterioration in financial condition of a single customer or the failure of a single customer to perform its obligations could have a material adverse effect on our results of operations and cash flow. If a subset or all of our customers were to experience harm or loss due to unforeseen circumstances, it could negatively impact their businesses. In the event that any of our customers experience a decline in their equipment usage for any reason, or decide to discontinue the use of our facilities, we may be compelled to lower our lease prices or risk losing a significant customer. Such developments could adversely affect our profit margins and financial position, leading to a negative impact on our revenue and operating results.

Failure to attract, grow and retain a diverse and balanced customer base, including key magnet customers, could harm our business and operating results.

Our ability to attract, grow and retain a diverse and balanced customer base, consisting of enterprises, cloud service providers, network service providers, and digital economy customers, some of which we consider to be key magnets drawing in other customers, may affect our ability to maximize our revenues. Dense and desirable customer concentrations within a facility enable us to better generate significant interconnection revenues, which in turn increases our overall revenues. In the future, our ability to attract customers to our data centers will depend on a variety of factors, including our product offerings, the presence of carriers, the overall mix of customers, the presence of key customers attracting business through ecosystems, the data center’s operating reliability and security and our ability to effectively market our product offerings. Our inability to develop, provide or effectively execute any of these factors may hinder the development, growth and retention of a diverse and balanced customer base and adversely affect our business, financial condition, and results of operations.

We are heavily dependent on our senior management, and a loss of a member of our senior management team could cause the market prices of our securities to suffer.

If we lose the services of John Belizaire, our Chief Executive Officer and member of our board of directors, and/or certain key employees, we may not be able to find appropriate replacements on a timely basis, and our business could be adversely affected. We do not currently maintain key life insurance policies on these officers or key employees. Our existing operations and continued future development depend to a significant extent upon the performance and active participation of these individuals and certain key employees. We may not be successful in retaining the services of these individuals, and if we were to lose any of these individuals, we may not be able to find appropriate replacements on a timely basis and our financial condition and results of operations could be materially adversely affected.

We depend upon third-party suppliers for power, and we are vulnerable to service failures and price increases by such suppliers and to volatility in the supply and price of power in the open market.

Our data centers depend on third-party utility providers for electricity. If these providers fail to deliver sufficient power—due to supply shortages, outages, or delays in adding new capacity—our operations and customer service could be disrupted. Power outages, even temporary ones, may exceed the limits of our backup systems, potentially damaging equipment, harming customer relationships, and impacting our ability to generate revenue.

We are also exposed to rising and unpredictable energy costs. Power prices may increase due to fuel cost volatility (e.g., natural gas or coal), carbon regulations, grid modernization fees, recovery charges from extreme weather events, or geopolitical instability. Higher power costs at specific sites could make those data centers less competitive compared to others with cheaper electricity.

In some cases, we have entered long-term power purchase agreements (PPAs) for renewable energy and credits at fixed prices. If market prices fall, we may pay more under these agreements than we would on the open market. Additionally, disruptions to our renewable energy suppliers—such as from extreme weather or equipment failure—could limit our access to renewable energy or credits.

Any of these issues—supply failures, price increases, or contract imbalances—could materially affect our business, operations, and financial results.

Our confidentiality agreements with employees and others may not adequately prevent disclosure of our trade secrets and other proprietary information, which could limit our ability to compete.

In addition to the protection afforded by patents, we rely on trade secrets to protect much of our proprietary technology and processes. Despite such protection, however, it is possible that a third party may copy or otherwise obtain and use our proprietary information without our authorization and trade secrets can be difficult to protect. Policing unauthorized use of our intellectual property and trade secrets is difficult, particularly in light of the global nature of the Internet and because the laws of other countries may afford us little or no effective protection of our intellectual property. Potentially expensive litigation may be necessary in the future to enforce our intellectual property rights, to protect our trade secrets, to determine the validity and scope of the proprietary rights of others or to defend against claims of infringement or invalidity. Additionally, we enter into confidentiality and intellectual property assignment agreements with our employees, consultants, and other advisors. These agreements generally require that the other party keep confidential and not disclose to third parties’ confidential information developed by the party under such agreements or made known to the party by us during the course of the party’s relationship with us. Our employees, consultants, and other advisors, however, may not honor these agreements and enforcing a claim that a party illegally obtained and is using our trade secrets is difficult, expensive and time-consuming and the outcome is unpredictable. Our failure to obtain and maintain trade secret protection could adversely affect our competitive position.

We may not be able to compete with other companies, some of which have greater resources and experience.

We may not be able to compete successfully against present or future competitors. We do not have the resources to compete with larger providers of similar products or services at this time. The crypto asset industry (mining and hosting) as well as the cloud and AI/HPC industry has attracted various high-profile and well-established operators, some of which have substantially greater liquidity and financial resources than we do. With the limited resources we have available, we may experience great difficulties in expanding and improving our services and product offerings to remain competitive. Competition from existing and future competitors, particularly those that have access to competitively priced energy, could result in our inability to secure acquisitions and partnerships that we may need to expand our business in the future. This competition from other entities with greater resources, experience and reputations may result in our failure to maintain or expand our business, as we may never be able to successfully execute our business plan. If we are unable to expand and remain competitive, our business could be negatively affected which would have an adverse effect on our business, results of operations, financial condition, and the trading price of our common stock, which would harm our investors.

Our business model depends upon the demand for data centers.

We intend to be in the business of owning, leasing and operating data centers. A reduction in the demand for data center space, power or connectivity would have an adverse effect on our business and financial condition. We are susceptible to general economic slowdowns as well as adverse developments in the data center, internet and data communications and broader technology industries. Any such slowdown or adverse development could lead to reduced corporate information technology (“IT”) spending or reduced demand for data center space. Reduced demand could also result from business relocations, including to markets that we do not currently serve. Changes in industry practice or in technology could also reduce demand for the physical data center space we provide. In addition, our customers may choose to develop new data centers or expand their own existing data centers or consolidate into data centers that we do not own or operate, which could reduce demand for our data centers or result in the loss of one or more key customers. If any of our key customers were to do so, it could result in a reduction in our revenues and/or put pressure on our pricing. If we lose a customer, we may not be able to replace that customer at a competitive rate or at all. Mergers or consolidations could further reduce the number of our customers and potential customers and make us more dependent on a more limited number of customers. If our customers merge with or are acquired by other entities that are not our customers, they may discontinue or reduce the use of our data centers in the future. Our financial condition, results of operations, cash flows and ability to satisfy our debt service obligations could be materially adversely affected as a result of any or all of these factors.

We rely on highly skilled personnel and the continuing efforts of our executive officers and, if we are unable to retain, motivate or hire qualified personnel, our business may be severely disrupted. In addition, increased labor costs and the unavailability of skilled workers could hurt our business, financial condition, and results of operations.

Our performance largely depends on the talents, knowledge, skills, know-how and efforts of highly skilled individuals Our future success depends on our continuing ability to identify, hire, develop, motivate, and retain highly skilled personnel for all areas of our organization. Our continued ability to compete effectively depends on our ability to attract, among others, new technology developers and to retain and motivate our existing contractors. If one or more of our key personnel are unable or unwilling to continue in their present positions, we may not be able to replace them readily, if at all. In such cases, our business may be severely disrupted, and we may incur additional expenses to recruit and retain new officers or other key personnel. In addition, if any of our executives or key personnel joins a competitor or forms a competing company, we may lose customers.

In addition, we compete with other businesses in our industries and other similar employers to attract and retain qualified personnel with the technical skills and experience required to successfully operate our businesses. The demand for skilled workers is high and the supply is limited, and a shortage in the labor pool of skilled workers or other general inflationary pressures or changes in applicable laws and regulations could make it more difficult for us to attract and retain personnel and could require us to enhance our wage and benefits packages, which could increase our operating costs.

Insiders continue to have substantial control over the Company.

As of December 31, 2025, the Company’s directors and executive officers held the current right to vote approximately 23% of the Company’s outstanding voting stock. In addition, the Company’s directors and executive officers have the right to acquire additional shares of our common stock by exercising their equity awards under our equity compensation plans, which could increase their voting percentage significantly. As a result, many of the Company’s officers and directors acting together, may have the ability to exert significant control over the Company’s decisions and control the management and affairs of the Company, and also to determine the outcome of matters submitted to stockholders for approval, including the election or removal of a director, and any merger, consolidation, or sale of all or substantially all of the Company’s assets. Accordingly, this concentration of ownership may harm the future market prices of our securities by:

  • delaying, deferring, or preventing a change in control of the Company;
  • impeding a merger, consolidation, takeover, or other business combination involving the Company; or
  • discouraging a potential acquirer from making a tender offer or otherwise attempting to obtain control of the Company.

We are subject to complex environmental, health and safety laws and regulations that may expose us to significant liabilities for penalties, damages or costs of remediation or compliance.

We are subject to various federal, state, local and foreign environmental, health and safety laws and regulations. These laws and regulations govern matters such as: the emission and discharge of hazardous materials into the ground, air, or water; the generation, use, storage, handling, treatment, packaging, transportation, exposure to, and disposal of hazardous and biological materials, including recordkeeping, reporting and registration requirements; and the health and safety of our employees. We may incur significant additional costs beyond those currently contemplated to comply with these regulatory requirements. Further, if we fail to comply with these requirements we may be exposed to fines, penalties and/or interruptions in our operations that could have a material adverse effect on our business, operating results, and financial condition. Certain environmental laws may impose strict, joint and several liability for costs required to clean up and restore sites where hazardous substances have been disposed or otherwise released into the environment, even under circumstances where the hazardous substances were released by prior owners or operators, or the activities conducted and from which a release emanated complied with applicable law. Please see “We could incur significant costs related to environmental matters, including from government regulation, private litigation, and existing conditions at some of our properties” below for more detail.

Further, existing regulations, particularly in the environmental area, could be revised or reinterpreted, or new laws and regulations could be adopted or become applicable to us or our facilities and future changes in environmental laws and regulations could occur, including potential regulatory and enforcement developments related to air emissions, any of which could result in significant additional costs. Any of the foregoing could have a material adverse effect on our results of operations and financial condition.

We could incur significant costs related to environmental matters, including from government regulation, private litigation, and existing conditions at some of our properties.

We may face costs or obligations related to environmental laws and regulations, including for investigating or cleaning up contamination on our properties, even if the issue was caused by prior owners or operators. U.S. environmental laws, like

Comprehensive Environmental Response, Compensation, and Liability Act of 1980, can hold current or past property owners liable for contamination, regardless of fault, and these costs can be significant.

That said, we typically conduct environmental assessments on our project sites, and to date, we have not identified any material issues. Most of our sites have historically been farmland or similar low-risk uses. While these assessments do not include full subsurface testing or asbestos surveys, no significant concerns have been found.

We may also be subject to permitting requirements, including for air quality when installing backup diesel generators, or for water usage in certain markets. Climate-related risks—such as droughts, flooding, or regulations around energy efficiency—may increase over time and could affect data center development or operations. However, at present, we have not encountered any significant environmental obstacles.

Provisions in our Articles (as defined below), our Bylaws (as defined below), and Nevada law may discourage a takeover attempt even if a takeover might be beneficial to our stockholders.

Provisions contained in our Articles of Incorporation (as amended, the “Articles”) and our Bylaws (the “Bylaws”) could make it more difficult for a third party to acquire us if we have become a publicly traded company. Provisions of our Articles and Bylaws impose various procedural and other requirements, which could make it more difficult for stockholders to effect certain corporate actions. For example, our Articles authorize our Board to determine the rights, preferences, privileges, and restrictions of unissued series of preferred stock without any vote or action by our stockholders. Thus, our Board can authorize and issue shares of preferred stock with voting or conversion rights that could adversely affect the voting or other rights of holders of our other series of capital stock. These rights may have the effect of delaying or deterring a change of control of our company. Additionally, our Bylaws establish limitations on the removal of directors and on the ability of our stockholders to call special meetings.

For a more complete understanding of these provisions, please refer to the Nevada Revised Statutes (“NRS”) and our Articles and Bylaws filed with the SEC. Though we are not currently, in the future we may become subject to Nevada’s control share law. A corporation is subject to Nevada’s control share law if it has more than 200 stockholders, at least 100 of whom are stockholders of record and residents of Nevada, and it does business in Nevada or through an affiliated corporation. The law focuses on the acquisition of a “controlling interest” which means the ownership of outstanding voting shares sufficient, but for the control share law, to enable the acquiring person to exercise the following proportions of the voting power of the corporation in the election of directors: (i) one-fifth or more but less than one-third; (ii) one-third or more but less than a majority; or (iii) a majority or more. The ability to exercise such voting power may be direct or indirect, as well as individual or in association with others.

The effect of the control share law is that the acquiring person, and those acting in association with it, obtains only such voting rights in the control shares as are conferred by a resolution of the stockholders of the corporation, approved at a special or annual meeting of stockholders. The control share law contemplates that voting rights will be considered only once by the other stockholders. Thus, there is no authority to strip voting rights from the control shares of an acquiring person once those rights have been approved. If the stockholders do not grant voting rights to the control shares acquired by an acquiring person, those shares do not become permanent non-voting shares. The acquiring person is free to sell its shares to others. If the buyers of those shares themselves do not acquire a controlling interest, their shares do not become governed by the control share law. If control shares are accorded full voting rights and the acquiring person has acquired control shares with a majority or more of the voting power, any stockholder of record, other than an acquiring person, who has not voted in favor of approval of voting rights is entitled to demand fair value for the redemption of such stockholder’s shares. Nevada’s control share law may have the effect of discouraging takeovers of the corporation.

In addition to the control share law, Nevada has a business combination law which prohibits certain business combinations between Nevada corporations and “interested stockholders” for two years after the “interested stockholder” first becomes an “interested stockholder,” unless our Board approves the combination in advance or thereafter by both the Board and 60% of the disinterested stockholders. For purposes of Nevada law, an “interested stockholder” is any person who is (i) the beneficial owner, directly or indirectly, of ten percent or more of the voting power of the outstanding voting shares of the corporation, or (ii) an affiliate or associate of the corporation and at any time within the two previous years was the beneficial owner, directly or indirectly, of ten percent or more of the voting power of the then outstanding shares of the corporation. The definition of the term “business combination” is sufficiently broad to cover virtually any kind of transaction that would allow a potential acquirer to use the corporation’s assets to finance the acquisition or otherwise to benefit its own interests rather than the interests of the corporation and its other stockholders. The effect of Nevada’s business combination law is to potentially discourage parties interested in taking control of us from doing so if it cannot obtain the approval of our Board.

General Risk Factors

We may become subject to claims of infringement or misappropriation of the intellectual property rights of others, which could prohibit us from selling our products, require us to obtain licenses from third parties or to develop non-infringing alternatives, and subject us to substantial monetary damages and injunctive relief.

While we believe our current offerings—including Bitcoin hosting, renewable energy curtailment, and demand response services—do not infringe on others’ intellectual property, there is a risk that third parties could claim otherwise. For example, we may receive claims alleging that our services infringe on existing or future patents, including in areas where patent applications may still be pending and not yet publicly known.

Defending against such claims could result in legal costs or require us to modify our offerings or obtain licenses, which may not always be feasible or cost-effective. Although we believe this risk is currently low, any disputes could potentially impact our operations or financial condition if they were to arise.

If we are unable to protect our information systems against service interruption or failure, misappropriation of data or breaches of security, our operations could be disrupted, we could be subject to costly government enforcement actions and private litigation and our reputation may be damaged.

We rely heavily on complex information systems—both internal and from third-party providers—to run our operations, manage data, and support our customers and employees. These systems store sensitive information, including personal and financial data, and are critical to our day-to-day activities.

Our systems face constant threats, including hacking, phishing, malware, ransomware, and other cyberattacks, as well as risks from human error, software bugs, and system failures. Some threats may come from sophisticated or state-sponsored actors and may not be detected until after they cause harm. Third-party vendors who handle data or support our systems may also introduce risk if they fail to follow proper security practices.

A security breach or system failure could lead to loss or theft of data, service disruptions, reputational damage, regulatory penalties, legal liability, and costly repairs. It could also result in the loss of customers or increased security and insurance expenses. Even with insurance coverage, the financial and reputational impact of a significant cybersecurity incident could materially affect our business and financial results.

Our risk management process may not identify all risks that we are subject to and will not eliminate all risk.

Our Enterprise Risk Management (“ERM”) process seeks to identify and address significant risks. Our ERM process uses the most recent integrated risk framework in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission to assess, manage, and monitor risks. We believe that risk-taking is an inherent aspect of the pursuit of our growth and performance strategy. Our goals are to proactively manage risks in a structured approach in conjunction with strategic planning, with the intent to preserve and enhance shareowner value, and to manage prudently, rather than wholly avoiding, risks. We can mitigate risks and their impact on the Company, however, only to a limited extent, and no ERM process can identify all risks that we may face. Therefore, there may be risks that we are currently unaware of, that may develop in the future or that we currently consider immaterial. Further, our management of risks may prove inadequate. The emergence of risks of which we were unaware or are unable to manage could have a material adverse effect on our business, financial condition, results of operations and prospects,

Our officers and directors are indemnified against certain conduct that may prove costly to defend.

Our Articles and Bylaws generally provide broad indemnification to our officers and directors against judgments, fines, amounts paid in settlement and expenses, including attorneys’ fees actually incurred in connection with most actions or proceedings to which they are or are threatened to be made a party that relates to their service as an officer or director, except as limited as set forth therein. We are also obligated to advance expenses as they are incurred by a director or officer in defending an action or proceeding prior to final disposition upon receipt of an undertaking by the applicable person to repay such advanced amount if the advancement is ultimately found to not be permitted by law or otherwise.

In addition, the NRS provides that no director or officer is individually liable for damages as a result of an act or failure to act in his or her capacity as a director or officer except if (i) the presumption that such director or officer acted in good faith, on an informed basis and with a view to the interests of the Company is rebutted, and (ii) it is proven that such director’s or officer’s act or failure to act constituted a breach of his or her fiduciary duties as a director or officer, and such breach involved intentional misconduct, fraud or a knowing violation of law. Consequently, subject to the applicable provisions of the NRS and to certain limited exceptions in the Articles and Bylaws, the Company’s officers and directors will not be liable to the Company or to its stockholders for monetary damages resulting from their conduct as an officer or director. As a result, we may have to spend significant resources indemnifying our officers and directors or paying for damages caused by their conduct.

We incur significant costs as a result of operating as a public company.

As a public company, we incur significant legal, accounting, and other expenses. For example, we are subject to the information and reporting requirements of the Securities Act of 1933, as amended (the “Securities Act”), the Exchange Act and other federal securities laws, rules and regulations related thereto, including compliance with the Sarbanes-Oxley Act of 2002 (the “Sarbanes-Oxley Act”), and the Dodd-Frank Wall Street Reform and Consumer Protection Act. In addition, the Nasdaq listing requirements and other applicable securities rules and regulations impose various requirements on public companies. Our management and other personnel are required to devote a substantial amount of time to these compliance initiatives. Moreover, these rules and regulations significantly increase our legal and financial compliance costs and make some activities more time-consuming and costly. Among other things, we are required to:

  • maintain and evaluate a system of internal controls over financial reporting in compliance with the requirements of Section 404(a) of the Sarbanes-Oxley Act and the related rules and regulations of the SEC and the Public Company Accounting Oversight Board;
  • maintain policies relating to disclosure controls and procedures;
  • prepare and distribute periodic reports in compliance with our obligations under federal securities laws; institute a more comprehensive compliance function, including with respect to corporate governance; and
  • involve, to a greater degree, our outside legal counsel, and accountants in the above activities.

The costs of preparing and filing annual and quarterly reports, proxy statements and other information with the SEC and furnishing audited reports to stockholders is expensive and compliance with these rules and regulations involves a material increase in regulatory, legal, and accounting expenses and the attention of our board of directors and management. In addition, being a public company makes it more expensive for us to obtain director and officer liability insurance. In the future, we may be required to accept reduced coverage or incur substantially higher costs to obtain this coverage. These factors could also make it more difficult for us to attract and retain qualified executives and members of our board of directors. Furthermore, if we are unable to satisfy our obligations as a public company, we could be subject to fines, sanctions and other regulatory action and potentially civil litigation

Certain natural disasters or other external events, including climate change or mechanical failures, could harm our business, financial condition, results of operations, cash flows, and prospects.

As with any business, we could experience disruptions due to mechanical failure, human error, physical or electronic security breaches, war, terrorism, fire, earthquake, pandemics, hurricane, flood, and other natural disasters, sabotage, and vandalism. Our systems may be susceptible to damage, interference, or interruption from modifications or upgrades, power loss, telecommunications failures, computer viruses, ransomware attacks, computer denial of service attacks, phishing schemes, or other attempts to harm or access our systems. Such disruptions could materially and adversely affect our business and our financial condition, operating results, cash flows, and prospects.

We may become involved in litigation arising in the ordinary course of our business that may materially adversely affect us.

From time to time, we may become involved in various legal proceedings relating to matters incidental to the ordinary course of our business, including intellectual property, commercial, product liability, employment, class action, whistleblower and other litigation and claims, and governmental and other regulatory investigations and proceedings. Attending to such matters can be time-consuming, divert management’s attention and resources, cause us to incur significant expenses or liability or require us to change our business practices. Because of the potential risks, expenses, and uncertainties of litigation, we may, from time to time, settle disputes, even where we believe that we have meritorious claims or defenses, and we cannot assure you that the results of any of these actions will not have a material adverse effect on our business. Adverse outcomes in any current or future proceedings that we are involved in or claims against us could result in significant liabilities, monetary damages, fines, or injunctive relief, which may materially impact our financial condition, results of operations, or cash flows. Additionally, the uncertainty surrounding litigation and the potential for adverse publicity related to such matters could harm our reputation and brand image, affecting customer confidence and investor perception.

If we fail to maintain effective internal controls, we may not be able to report financial results accurately or on a timely basis, or to detect fraud, which could have a material adverse effect on our business or share price.

As a public company, we are required to maintain internal control over financial reporting and to report any material weaknesses in those controls. A material weakness is defined as a deficiency, or combination of deficiencies, in internal control over financial reporting such that there is a reasonable possibility that a material misstatement of annual or interim financial statements will not be prevented or detected and corrected on a timely basis.

Our management evaluated the effectiveness of our disclosure controls and procedures as defined in Rule 13a-15 and 15d-15(e) under the Exchange Act, as of December 31, 2025. Based on this evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures were not effective at a reasonable assurance level as of December 31, 2025. See “Item 9A Controls and Procedures.”

Effective internal controls are necessary for us to provide reasonable assurance with respect to our financial reports and to effectively prevent financial fraud. Pursuant to the Sarbanes-Oxley Act, we are required to periodically evaluate the effectiveness of the design and operation of our internal controls. Internal controls over financial reporting may not prevent or detect misstatements because of inherent limitations, including the possibility of human error or collusion, the circumvention or overriding of controls, or fraud. If we fail to maintain an effective system of internal controls, our business and operating results could be harmed, and we could fail to meet our reporting obligations, which could have a material adverse effect on our business and our share price. Additionally, for as long as we are a “smaller reporting company” under the U.S. securities laws, our independent registered public accounting firm will not be required to attest to the effectiveness of our internal control over financial reporting pursuant to Section 404 of the Sarbanes-Oxley Act. An independent assessment of the effectiveness of internal control over financial reporting could detect problems that management’s assessment might not. Undetected material weaknesses in our internal control over financial reporting could lead to further financial statement restatements and require us to incur the expense of remediation.

If we fail to maintain proper disclosure controls and procedures or have additional material weaknesses in our internal control over financial reporting, we may be unable to accurately report our financial results or report them within the timeframes required by law or any stock exchange regulations, and we could lose investor confidence in the accuracy and completeness of our financial reports, which would cause the price of our common stock to decline. Failure to maintain effective internal control over financial reporting also could potentially subject us to sanctions or investigations by the SEC or other regulatory authorities or stockholder lawsuits, which could require additional financial and management resources.

If our estimates or judgments relating to our critical accounting policies are based on assumptions that change or prove to be incorrect, our results of operations could fall below the expectations of investors, resulting in a decline in the market price of our common stock.

The preparation of financial statements in conformity with accounting principles generally accepted in the United States of America (“US GAAP”) requires management to make estimates and assumptions that affect the amounts reported in our financial statements. Significant assumptions and estimates used in preparing our financial statements include those related to assets, liabilities, revenue, expenses, and related disclosures. We base our estimates on historical experience and on various other assumptions that we believe to be reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets, liabilities, equity, revenue, and expenses that are not readily apparent from other sources. Our results of operations may be adversely affected if our assumptions change or if actual circumstances differ from those in our assumptions, which could cause our results of operations to fall below the expectations of investors, resulting in a decline in the market price of our common stock.

Public health crises, such as pandemics, epidemics, or widespread outbreaks of infectious disease, have had, and could in the future have, an adverse effect on our business, financial condition, and results of operations.

The occurrence of pandemics, epidemics, or widespread outbreaks of infectious diseases, as well as the imposition of related public health measures and travel and business restrictions or other actions that may be taken by governmental authorities in an effort to contain such pandemics, epidemics, or outbreaks, have had, and could in the future have, a material adverse effect on our business. Future pandemics and similar events could materially increase our costs, severely negatively impact business development, net income, and other results of operations, and impact our liquidity position. The duration of any such impacts cannot be predicted, and such impacts may also have the effect of heightening many of the other material risks we face.

Changes in accounting rules and regulations, or interpretations thereof, could result in unfavorable accounting charges or require us to change our compensation policies.

Accounting methods and policies for companies such as ours, including policies governing revenue recognition, leases, research and development and related expenses, and accounting for stock-based compensation, are subject to review, interpretation and guidance from our auditors and relevant accounting authorities, including the SEC. Changes to accounting methods or policies, or interpretations thereof, may require us to reclassify, restate or otherwise change or revise our historical financial statements, including those contained in this Annual Report.

Risks Related to Our Securities

The market price of our securities are likely to be volatile, which may cause investment losses for our shareholders.

The market price of our securities has been and is likely to continue to be volatile, and investors in our securities may experience a decrease, which could be substantial, in the value of their securities or the loss of their entire investment in the Company for a number of reasons, including reasons unrelated to our operating performance or prospects. The market price of our securities could be subject to wide fluctuations in response to a broad and diverse range of factors, including those described elsewhere in this “Risk Factors” section as well as the following:

  • announcements by us regarding liquidity, significant acquisitions, equity investments and divestitures, addition or loss of significant customers and contracts, capital expenditure commitments and litigation;
  • our issuance of securities or debt, particularly if in connection with acquisition activities;
  • the sale of a significant number of shares of our common stock by shareholders;
  • recent changes in financial condition or results of operations, such as in earnings, revenues, or other measure of company value;
  • general market and economic conditions; and
  • announcements of technological innovations or new product introductions by us or our competitors.
  • Further, broad market and industry factors may have a material adverse effect on the market price of our securities regardless of our actual operating performance.

In addition, stock markets have experienced in the past and may in the future experience a high level of price and volume volatility, and the market prices of equity securities of many companies have experienced in the past and may in the future experience wide price fluctuations not necessarily related to the operating performance of such companies. These broad market fluctuations may adversely affect the market price of our securities.

We have issued, and may continue to issue, new shares of our common stock, which has a dilutive effect on existing stockholders.

In 2025, we have primarily financed our strategic growth through at-the-market (“ATM”) offerings and other issuances of our common stock. Our ATM programs allow us to raise capital as needed by selling newly issued shares into the existing trading market at prevailing market prices. We expect to continue using ATM offerings and other equity issuances to fund development plans, support capital-intensive expansion initiatives, and pursue strategic growth opportunities. However, the issuance of additional shares of our common stock dilutes the ownership interests of existing stockholders, and future equity sales could further dilute existing holdings and reduce the market price of our common stock. Any such dilution may adversely affect the value of an investment in our securities.

Finally, our relatively small public float and daily trading volume have in the past caused, and may in the future result in, significant volatility in the price of our securities. As of December 31, 2025, we had approximately 75,063,284 shares of our common stock outstanding held by non-affiliates and 3,239,854 shares of our 9.0% Series A Cumulative Perpetual Preferred Stock, par value $0.001 per share (the “Series A Preferred Stock”), outstanding held by non-affiliates. Our daily trading volume for the year ended December 31, 2025, averaged approximately 5,166,232 shares of common stock and 18,012 shares of Series A Preferred Stock.

Because there has been limited precedent set for financial accounting of Bitcoin and other cryptocurrency assets, the determination that we have made for how to account for cryptocurrency assets transactions may be subject to change.

Because there has been limited precedent set for the financial accounting of cryptocurrencies and related revenue recognition and no official guidance has yet been provided by the FASB or the SEC, it is unclear how companies may in the future be required to account for cryptocurrency transactions and assets and related revenue recognition. A change in regulatory or financial accounting standards could result in the necessity to change our accounting methods and restate our financial statements. Such a restatement could adversely affect the accounting for our newly mined cryptocurrency rewards and more generally negatively impact our business, prospects, financial condition, and results of operations. Such circumstances would have a material adverse effect on our ability to continue as a going concern or to pursue our new strategy at all, which would have a material adverse effect on our business, operations and prospects, as well as potentially on the value of any cryptocurrencies we hold or expect to acquire for our own account, and harm our investors

If we are not able to comply with the applicable continued listing requirements or standards of Nasdaq, Nasdaq could delist our common stock or Series A Preferred Stock or broker-dealers may be discouraged from effecting transactions in shares of our securities.

Our common stock has been listed on Nasdaq since March 2020, and our Series A Preferred Stock since August 2021. To maintain these listings, we must continue to meet Nasdaq’s financial and corporate governance standards, including requirements for stock price, stockholders’ equity, and board independence. While we are currently in compliance, our share price has previously fallen below Nasdaq’s minimum, and there is no guarantee we will continue to meet all listing requirements. On May 8, 2025, we received notice from Nasdaq indicating that we were not in compliance with the requirement to maintain a minimum bid price of $1.00 per share for continued listing on Nasdaq (the “minimum closing bid price requirement”). We were provided an initial compliance period of 180 calendar days from the date of the notice, or until November 4, 2025, to regain compliance with the minimum closing bid price requirement, pursuant to Nasdaq Rule 5810(c)(3)(A). On October 3, 2025, we received formal written notice from Nasdaq indicating that we had regained compliance with the minimum closing bid price requirement and that this matter is now closed.

If we are unable to maintain our Nasdaq listings, our securities may be delisted and quoted on over-the-counter (OTC) markets instead. This would likely reduce the liquidity, market price, and visibility of our stock, and could make it more difficult for investors to sell their shares.

Delisting may also limit our ability to raise capital or use our stock as consideration for acquisitions. In addition, if our common stock trades below $5.00 per share and is no longer listed on a national exchange, it could be classified as a “penny stock.” This would subject trading in our stock to additional regulatory requirements, which could discourage broker-dealers from making a market in our shares and make it harder for investors to buy or sell our stock.

The rights of holders of our Series A Preferred Stock and Series B Preferred Stock (as defined below) rank senior to the rights of the holders of our common stock.

The rights of the holders of shares of our Series A Preferred Stock and Series B Convertible Preferred Stock, par value $0.001 per share (the “Series B Preferred Stock” together with the Series A Preferred Stock, the “Preferred Stock”), while such shares remain outstanding, rank senior to the rights of the holders of shares of our common stock as to dividends and payments upon liquidation, dissolution or winding up of our affairs. Upon liquidation, dissolution or winding up of our affairs, the holders of shares of our Series A Preferred Stock are entitled to receive a liquidation preference of the stated value per share of $25 and the holders of shares of our Series B Preferred Stock are entitled to receive a liquidation preference of the stated value per share of $100, plus all accrued but unpaid dividends, prior and in preference to any distribution to the holders of shares of our common stock or any other class of our equity securities junior to the Preferred Stock. In addition, the holders of the Series A Preferred Stock are entitled to receive, when, as and if declared by the board of directors, cumulative cash dividends at the annual rate of 9.0% of the $25.00 liquidation preference per year. Our holders of Series B Preferred Stock are entitled to receive an annual 10% dividend, which may be paid in cash or stock at our discretion at the earlier of (i) the date the Series B Preferred Stock is converted, or (ii) the Series B Dividend Termination Date (as defined in the Certificate of Designations of Preferences, Rights and Limitations for the Series B Preferred Stock).

These dividend payment obligations could impact our liquidity and reduce the amount of cash available to us for our working capital needs, capital expenditures, funding growth opportunities, acquisitions, and other general corporate purposes. Our obligations to the holders of Preferred Stock could also limit our ability to obtain additional financing or increase our borrowing costs, which could have an adverse effect on our financial condition. The preferential rights could also result in divergent interests between the holders of Preferred Stock and holders of our common stock.

We do not anticipate paying dividends on our common stock, and investors may lose the entire amount of their investment.

Cash dividends have never been declared or paid on our common stock, and we do not anticipate such a declaration or payment for the foreseeable future. Any future determination about the payment of dividends will be made at the discretion of our board of directors and will depend upon our earnings, if any, capital requirements, operating and financial conditions, contractual restrictions, including any loan or debt financing agreements, and on such other factors as our board of directors deems relevant. In addition, we may enter into agreements in the future that could contain restrictions on payments of cash dividends. We expect to use future earnings, if any, to fund business growth. Therefore, stockholders will not receive any funds absent a sale of their shares of our common stock. If we do not pay dividends, our common stock may be less valuable because a return on your investment will only occur if our stock price appreciates. We cannot assure stockholders of a positive return on their investment when they sell their shares of our common stock, nor can we assure that stockholders will not lose the entire amount of their investment.

If securities or industry analysts do not publish research or reports about our business, or if they issue an adverse or misleading opinion regarding our stock, our stock price and trading volume could decline.

The trading market for our common stock will be influenced by the research and reports that industry or securities analysts publish about us or our business. We do not currently have and may never obtain research coverage by securities and industry analysts. We cannot assure you that brokerage firms will provide analyst coverage of our company in the future or continue such coverage if started. In addition, investment banks may be less likely to agree to underwrite secondary offerings on our behalf than they might if we became a public reporting company by means of an underwritten initial public offering, because they may be less familiar with our company as a result of more limited coverage by analysts and the media, which could harm our ability to raise additional funding in the future. The failure to receive research coverage or support in the market for shares of our common stock will have an adverse effect on our ability to develop a liquid market for our common stock, which will negatively impact the trading price of our common stock.

In the event we obtain securities or industry analyst coverage, if any of the analysts who cover us issue an adverse or misleading opinion regarding us, or if our operating results fail to meet the expectations of analysts, our stock price would likely decline. If one or more of these analysts ceases coverage of us or fails to publish reports on us regularly, we could lose visibility in the financial markets, which in turn could cause our stock price or trading volume to decline.

Risks Related to the SEPA

Substantial blocks of our common stock may be sold into the market as a result of our being party to the SEPA and you may experience immediate and substantial dilution in the net tangible book value per share of our common stock.

The price of our common stock could decline if there are substantial sales of shares of our common stock, if there is a large number of shares of our common stock available for sale, or if there is the perception that these sales could occur.

Any issuances of shares of our common stock pursuant to the terms of the Standby Equity Purchase Agreement, dated August 12, 2024 (“SEPA”), between the Company and YA II PN, Ltd. (“YA”), will dilute the percentage ownership of stockholders and may dilute the per share projected earnings (if any) or book value of our common stock. Sales of a substantial number of shares of our common stock in the public market or other issuances of shares of our common stock, or the perception that these sales or issuances could occur, could cause the market price of our common stock to decline and may make it more difficult for you to sell your shares at a time and price that you deem appropriate. Additionally, the offering price per share of our common stock under the SEPA may or may not exceed the net tangible book value per share of our common stock outstanding prior to the offering under the SEPA.

It is not possible to predict the actual number of shares we will sell under the SEPA, or the actual gross proceeds resulting from those sales.

The SEPA provides that, during the term of the agreement, and subject to issuance and effective registration of the shares issued thereunder and certain obligations and limitations, we may, at our discretion, from time to time direct YA to purchase our shares of common stock from us in one or more purchases under the agreement, for a maximum aggregate purchase price of up to $25 million. The purchase price per share to be paid by YA for the shares of common stock that we may elect to sell to YA under the SEPA, if any, will fluctuate based on the market prices of our shares of common stock at the time we elect to sell shares to YA pursuant to the SEPA. Therefore, it is not possible for us to predict the number of shares of common stock that we will sell to YA under the SEPA, the purchase price per share that YA will pay for shares purchased from us under the SEPA, or the aggregate gross proceeds that we will receive from those purchases by YA under the SEPA.

Although we may, at our discretion, from time to time direct YA to purchase our shares of common stock from us in one or more purchases under the SEPA, we shall not effect any sales under the SEPA to the extent that after giving effect to such sale YA would beneficially own more than 9.99% of the Company’s outstanding common stock at the time of such issuance. Thus, the Company may not have access to the right to sell the full $25 million of shares of common stock to YA.

Cybersecurity

As filed, 4,933 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We, like other companies in our industry, face several cybersecurity risks in connection with our business. Our business strategy, results of operations, and financial condition have not, to date, been affected by risks from cybersecurity threats. During the reporting period, we have not experienced any material cyber incidents, nor have we experienced a series of immaterial incidents, which would require disclosure. We proactively approach cybersecurity through a systemized thorough process established by our internal Management and IT teams as well as external IT providers.

These processes are specifically designed to adapt to the evolving cybersecurity environment, enabling us to respond swiftly and effectively to new and emerging threats. Our cybersecurity initiative incorporates elements from multiple industry benchmarks, including frameworks from the National Institute of Standards and Technology and the Center for Internet Security.

We regularly assess the threat landscape and take a holistic view of cybersecurity risks with a layered cybersecurity strategy based on prevention, detection, and mitigation. Our internal IT team works closely with our external IT management provider to comprehensively evaluate cybersecurity risks. They focus on monitoring, identifying, and addressing significant cybersecurity issues in real-time by employing advanced software monitoring platforms for effective mitigation and management. In addition, we have several avenues to gather risk intelligence and potential threats identified by various services and capabilities to adjust our security strategy.

We also have Company-wide policies and procedures concerning cybersecurity and technology standards, including a Resource and Data Recovery policy. In addition, we have other policies related to endpoint and network protection, encryption standards, malware/ransomware protection, multi-factor authentication, operational security, and confidential information. These policies go through an internal review process and are approved by appropriate members of management.

We have invested in IT security, encompassing various strategies such as enhanced end-user training, implementing layered defense systems, identifying and safeguarding critical assets, bolstering monitoring and alert capabilities, and consulting with expert advisors. On the management front, our IT security team diligently oversees alert systems and routinely convenes to evaluate current threat levels, analyze trends, and strategize effective remediation methods.

In addition to assessing our own cybersecurity preparedness, we also consider and evaluate cybersecurity risks associated with the use of third-party vendors and service providers. The internal business owners of the hosted applications are required to review user access at least annually and provide a System and Organization Controls (“SOC”) 1 or SOC 2 report from the vendor. If a third-party vendor is unable to provide a SOC 1 or SOC 2 report, we take additional steps to assess their cybersecurity preparedness and assess our relationship on that basis.

Governance

Under the direction of the Company’s VP of Engineering and Director of Information Technology, with oversight from the Board, we maintain a security governance structure to evaluate and address cyber risk. The VP of Engineering and the Director of IT are responsible for developing and implementing our information security program. Our VP of Engineering has over a decade of experience in the Defense sector working directly with technology-driven Operational Security.

The Director of IT regularly oversees the Company’s cybersecurity program. This comprehensive review includes examining management’s initiatives to identify and detect potential threats, outlining planned responses and recovery strategies for potential incidents, evaluating recent improvements made to the Company’s security detection and response capabilities, and assessing management’s advancement along the cybersecurity strategic roadmap. The internal IT team also subscribes to various threat intelligence services to evaluate our security strategy or defense mechanism against such threats.

Our board of directors has ultimate oversight of our strategic and business risk management and, as such, has oversight responsibilities for risks and incidents relating to cybersecurity threats, including compliance with disclosure requirements, cooperation with law enforcement, and related effects on financial and other risks. Management is responsible for identifying, assessing, and managing material cybersecurity risks on an ongoing basis, establishing and updating processes to ensure such potential risks are monitored, putting in place appropriate mitigation measures, and will be providing regular reports on cybersecurity trends and risks, and should they arise, any material incidents with our board of directors.

Properties

As filed, 1,768 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

We lease approximately 3,478 square feet of office, in Albany, New York, which houses the corporate offices of SHI. The current lease agreement expires on December 31, 2027.

On March 4, 2021, Soluna SW, LLC acquired a 3.2-acre tract of real property located in Murray, Kentucky on which it has built an energy-efficient cryptocurrency mining facility, Project Sophie, that includes 22 buildings for data facility hosting.

On February 24, 2023, Soluna DV Services, LLC entered into a lease agreement for a 33.19-acre tract of land in Silverton, Texas. The agreement has an initial five-year term with the right to extend the term of the agreement for five additional one-year terms. The lease is associated with our Dorothy facilities for the purpose of constructing, installing, operating and maintaining modular data centers.

On April 3, 2025, Soluna KK Energy ServiceCo, LLC entered into a lease agreement for 50 acres of property located in Willacy County, Texas, for the purpose of constructing, installing, operating, and maintaining modular data centers and related facilities for a term of twenty-two years. This leased agreement will be used for Project Kati 1.

On October 1, 2025, Soluna KK Energy ServiceCo, LLC purchased 50 acres of property located in Willacy County, Texas for the purpose of constructing, installing, operating, and maintaining modular data centers and related facilities. This purchase of land will be used for Project Kati 2.

We believe these facilities are generally well-maintained and adequate for the Company’s current needs and for expansion, if required. Our business growth, however, is dependent on developing additional properties, and we believe our project pipeline is strong enough to support our current business plan.

As filed, 326 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

At any point in time, we may be involved in various lawsuits or other legal proceedings. Such lawsuits could arise from the sale of products or services or from other matters relating to our regular business activities, compliance with various governmental regulations and requirements, or other transactions or circumstances.

Management's discussion and analysis

As filed, 80,166 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

The following discussion of our financial condition and results of operations should be read in conjunction with our Consolidated Financial Statements and the related notes included elsewhere in this Annual Report. This discussion contains forward-looking statements, which involve risk and uncertainties. Our actual results could differ materially from those anticipated in the forward-looking statements as a result of certain factors, including those discussed in Item 1A: “Risk Factors” and elsewhere in this Annual Report.

Recent Developments

Appointment of Chief Financial Officer

On January 19, 2026, Michael Picchi was appointed as the CFO and Treasurer of the Company, effective April 1, 2026 (the “Effective Date”). Mr. Picchi began his employment with the Company on March 2, 2026, in the role of Head of Finance.

In conjunction with the appointment of a new CFO and Treasurer, the Company will accept David Michaels’ resignation from his position as interim CFO and Treasurer of the Company, effective immediately upon the effectiveness of the appointment of a new CFO and Treasurer.

2026 SEPA

On March 24, 2026, we entered into a Standby Equity Purchase Agreement (the “2026 SEPA”) with YA II PN, LTD., a Cayman Islands exempt limited company (“YA”). In accordance with the terms of the SEPA, YA has agreed to purchase up to an aggregate of $250.0 million of shares of common stock (the “2026 SEPA Shares”) from time to time subject to the limits and the conditions of the 2026 SEPA. Pursuant to the 2026 SEPA, we issued to YA a commitment fee of $250 thousand of shares of common stock (the “Commitment Shares”).

Project Specific Developments

Project Kati 1

In February 2026, we received approval from the Electric Reliability Council of Texas (“ERCOT”) to commence the initial energization and phased commissioning of Project Kati 1. This milestone represents the transition of the project from the development phase to operational status. The Company expects to begin recognizing hosting and/or mining revenue from this facility as capacity is ramped up throughout the first half of 2026. Project Kati 1 is the Company’s 83 MW wind-powered data center campus located in South Texas, specifically designed for high-density Bitcoin mining operations. The site’s energization is structured in two primary blocks: Kati 1A (48 MW) and Kati 1B (35 MW). Both blocks are being deployed utilizing a three-phase commissioning approach, with full energization of the 83 MW campus expected to be completed during 2026. Kati 1B includes a 12 MW deployment with Cormint Data Systems ("Cormint"), where Cormint will design, procure, and deliver eight modular data center units to enable efficient deployment by minimizing on-site labor and accelerating energization timelines. Powered entirely by the Las Majadas wind energy project, Project Kati represents one of Soluna’s largest sites to date and is designed to scale efficiently to support large industrial compute workloads.

Project Kati 2

We have signed a Memorandum of Understanding ("MOU") with Metrobloks, a data center developer and operator focused on AI-ready infrastructure, to enter into a co-development partnership to build Project Kati 2. The initial development will be a 100+ MW Critical IT ("CIT") AI and HPC data center at Soluna’s Project Kati 2 campus in Willacy County, Texas. This is expected to be the first phase of a larger campus, with an expansion roadmap supporting more than 300 MW of total CIT capacity.

Project Grace

We have entered a MOU with Siemens, a leading technology company in electrification, automation and digitalization. The project will deploy and validate a behind-the-meter power-and-controls approach to manage rapid, GPU-driven swings in power demand when running AI and high-performance computing workloads directly on renewable energy. The 2 MW pilot, expected to be deployed at Soluna’s Project Grace site in Texas, will integrate Siemens’ electrical infrastructure, controls, and monitoring through a structured commissioning process to document performance under fast load steps and variable compute demand, creating a repeatable blueprint for future behind-the-meter AI deployments at renewable generation sites.

2025 Financial Highlights:

  • $76 Million Unrestricted Cash Position — Reported at end of 2025, the record cash balance reflected the compounding effect of operating momentum, capital raises, at-the-market offerings, warrant exercises, and disciplined financial management, providing us with meaningful runway to execute on our construction and development pipeline.
  • $100 Million Credit Facility from Generate Capital — We closed a scalable credit facility up to $100 million in September, with $17.0 million drawn through December 31, 2025 funding for active project refinancing and construction. The facility provides a durable capital foundation for the 1 GW pipeline and its expansion.
  • $32 Million Registered Direct Offering — Closed in December, the offering strengthened our balance sheet heading into 2026, providing liquidity to support continued growth across operating sites and projects under construction.
  • $20 Million from Spring Lane Capital for Project Kati 1 — Secured in June and closed in July, the investment funded the first phase of Kati construction and demonstrated Spring Lane's conviction in our model, with a commitment to support up to $100 million across the broader pipeline.
  • $5 Million Non-Dilutive Debt Financing from Galaxy Digital — Secured in March, the five-year term loan is project-level secured with limited recourse to the parent company, validating the standalone cash flow strength of our infrastructure assets and our ability to attract institutional debt capital.

2025 Corporate Highlights

  • Surpassed 1 GW of Renewable-Powered Computing — With the addition of Projects Gladys and Fei in August, we crossed 1 GW of renewable-powered computing in operation, construction, and development, a landmark milestone reflecting the scalability of the behind-the-meter model.
  • Resolved NYDIG Claim — We reached a full settlement with NYDIG in September, clearing a significant overhang and restoring focus on long-term growth.
  • Project Kati Groundbreaking — The official groundbreaking on September 18, 2025 marked the start of construction on our largest project to date, a 166 MW wind-powered data center in Texas, and a tangible signal of our transition from developer to operator at scale.
  • Power Pipeline Grows to 4.3 GW — The long-term power pipeline expanded to 4.3 GW, driven by new curtailment assessments, active term sheet discussions, and development launches across multiple new projects, positioning us as a platform-scale infrastructure company.
  • Second Utility Patent Awarded — Our second utility patent was awarded in March, broadening the scope of its Modular Data Center patent and strengthening the intellectual property foundation of the Renewable Computing model.
  • 4 EH/s of Hash Rate Under Management — Surpassed in September following the commissioning of Dorothy 2 and fleet upgrades across all sites, this operational milestone directly underpins hosting revenue growth and demonstrates the scale of our managed computing infrastructure.

Consolidated Results of Operations

Results of Operations for the Year Ended December 31, 2025 Compared to the Year Ended December 31, 2024.

The following table summarizes changes in the various components of our net loss during the year ended December 31, 2025 compared to the year ended December 31, 2024.

(Dollars in thousands)

Year Ended December 31, 2025 Year Ended December 31, 2024 $ Change % Change
Cryptocurrency mining revenue $11,406 $17,027 (5,621) (33%)
Data hosting revenue 16,998 18,838 (1,840) (10%)
High-performance computing service revenue 28 16 12 75%
Demand response service revenue 1,285 2,140 (855) (40%)
Operating costs and expenses:
Cost of cryptocurrency mining revenue, exclusive of depreciation 7,411 7,499 (88) (1%)
Cost of data hosting revenue, exclusive of depreciation 9,104 9,377 (273) (3%)
Cost of high-performance computing service revenue 7 5,724 (5,717) (100%)
Cost of cryptocurrency mining revenue- depreciation 4,304 4,292 12 —%
Cost of data hosting revenue- depreciation 2,433 1,735 698 40%
General and administrative expenses, exclusive of depreciation and amortization 30,519 18,581 11,938 64%
Depreciation and amortization associated with general and administrative expenses 9,608 9,613 (5) —%
Loss on contract — 28,593 (28,593) (100%)
Impairment on fixed assets 12 130 (118) (91)%
Operating loss (33,681) (47,523) 13,842 (29%)
Other (expense) income, net (700) 304 (1,004) (330%)
Interest expense (4,835) (2,527) (2,308) 91%
Loss on sale of fixed assets and credit on equipment deposit (1,151) (31) (1,120) 3613%
Other finance expense (5,917) (3,661) (2,256) 62%
Fair value adjustment loss (23,681) (5,705) (17,976) 315%
Gain (loss) on debt extinguishment and revaluation, net 10,658 (1,644) 12,302 (748%)
Loss before income taxes (59,307) (60,787) 1,480 (2%)
Income tax benefit, net 2,316 2,487 (171) (7%)
Net loss (56,991) (58,300) 1,309 (2%)
Net loss (income) attributable to non-controlling interest, net 3,580 (5,034) 8,614 (171%)
Net loss attributable to Soluna Holdings, Inc. $(53,411) $(63,334) 9,923 (16%)

47

The following table summarizes the balances for the Project sites for cryptocurrency mining revenue, data hosting revenue, high-performance computing service revenue, demand response revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, cost of high-performance computing services, and cost of depreciation during the year ended December 31, 2025:

(Dollars in thousands)

Soluna Digital Project Dorothy 1B Project Dorothy 1A Project Dorothy 2 Project Sophie Other Soluna Digital Subtotal Soluna Cloud Project Ada Total
Cryptocurrency mining revenue $11,406 $— $— $— $— $11,406 $— $11,406
Data hosting revenue — 6,176 5,662 5,160 — 16,998 — 16,998
High-performance computing services — — — — — — 28 28
Demand response services 561 579 145 — — 1,285 — 1,285
Total revenue 11,967 6,755 5,807 5,160 — 29,689 28 29,717
Cost of cryptocurrency mining, exclusive of depreciation $7,411 $— $— $— $— $7,411 $— $7,411
Cost of data hosting revenue, exclusive of depreciation — 3,064 3,852 1,629 559 9,104 — 9,104
Cost of high-performance computing service revenue — — — — — — 7 7
Cost of cryptocurrency mining revenue- depreciation 4,304 — — — — 4,304 — 4,304
Cost of data hosting revenue- depreciation — 1,099 864 470 — 2,433 — 2,433
Total cost of revenue 11,715 4,163 4,716 2,099 559 23,252 7 23,259
Gross profit (loss) $252 $2,592 $1,091 $3,061 $(559) $6,437 $21 $6,458

48

The following table summarizes the balances for the Project sites for cryptocurrency mining revenue, data hosting revenue, high-performance computing service revenue, demand response revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, cost of high-performance computing services, and cost of depreciation during the year ended December 31, 2024:

(Dollars in thousands)

Soluna Digital Project Dorothy 1B Project Dorothy 1A Project Dorothy 2 Project Sophie Other Soluna Digital Subtotal Soluna Cloud Project Ada Total
Cryptocurrency mining revenue $17,027 $— $— $— $— $17,027 $— $17,027
Data hosting revenue — 13,742 — 5,096 — 18,838 — 18,838
High-performance computing services — — — — — — 16 16
Demand response services 152 139 — — 1,849 2,140 — 2,140
Total revenue 17,179 13,881 — 5,096 1,849 38,005 16 38,021
Cost of cryptocurrency mining, exclusive of depreciation $7,499 $— $— $— $— $7,499 $— $7,499
Cost of data hosting revenue, exclusive of depreciation — 7,252 — 2,059 66 9,377 — 9,377
Cost of high-performance computing service revenue — — — — — — 5,724 5,724
Cost of cryptocurrency mining revenue- depreciation 4,292 — — — — 4,292 — 4,292
Cost of data hosting revenue- depreciation — 1,162 — 573 — 1,735 — 1,735
Total cost of revenue 11,791 8,414 — 2,632 66 22,903 5,724 28,627
Gross profit (loss) $5,388 $5,467 $— $2,464 $1,783 $15,102 $(5,708) $9,394

Cryptocurrency Mining Revenue: Cryptocurrency mining revenue decreased during the year ended December 31, 2025, compared to 2024, primarily driven by the April 2024 halving event which reduced block rewards by 50%. Average Hashprice declined year-over-year by 21.5% resulting in lower revenues. We earned 113.2 Bitcoins in 2025 compared to 274 in 2024. Average monthly hashrate was lower in 2025 by approximately 10.7% impacting revenue by $1.8 million versus prior year, the decrease in earned Bitcoin was driven by the halving event. The market price impact resulted in a $3.8 million revenue unfavorable versus prior year.

Data Hosting Revenue: Hosting revenue decreased for the year ended December 31, 2025, compared to 2024, driven by two primary factors. First, the April 2024 Bitcoin Halving reduced the effective dollar value per Petahash ("PH") per day, lowering yields across both fixed-fee and profit-sharing contracts. Second, the exit of a major 20 MW customer in December 2024 resulted in a shift in our contract mix. While this capacity was fully backfilled by March 2025, the new customers were onboarded under a profit-sharing structure which, while providing higher upside potential, resulted in a lower baseline revenue yield compared to the prior fixed-fee model. These declines were partially offset by the phased energization of the D2 facility, which began contributing to revenue in the third quarter of 2025.

Demand Response Service: Demand response service revenue decreased for the year ended December 31, 2025, compared to 2024, reflecting both unfavorable market conditions and operational constraints. Lower average ERCOT clearing prices per MW reduced the overall economic incentive per event. Operationally, our program participation was limited by planned outages at the Dorothy site related to the Project Dorothy 2 ("D2") substation interconnection. These factors collectively resulted in lower capacity bids and decreased total revenue from curtailment services.

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation: Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas.

Cost of cryptocurrency mining revenue decreased slightly for the year ended December 31, 2025, compared to 2024. This variance was primarily driven by lower electricity consumption and associated operating expenses, reflecting a marginal reduction in total power utilization during the period.

Cost of Data Hosting Revenue, exclusive of depreciation: Cost of data hosting revenue includes utility charges, site overhead expenses, and other charges.

Cost of data hosting revenue decreased for the year ended December 31, 2025, compared to 2024. This decline was primarily driven by a transition in the customer contract mix, as the Company moved from fixed-rate volume arrangements to electricity pass-through contracts. This shift reduced the Company’s direct exposure to power costs for those hosting arrangements. The decrease was partially offset by the phased energization of D2 beginning in the second quarter of 2025, which resulted in higher total megawatt ("MW") capacity and an associated increase in operating expenses during the second half of the year.

Cost of High-Performance Computing Services: Cost of High-Performance Computing Services represents the direct production expenses associated with providing AI and HPC processing capabilities. For the year ended December 31, 2024, this cost totaled approximately $5.7 million, which was related to the agreement executed with HPE effective July 1, 2024, to acquire access to essential datacenter and cloud services necessary for supporting our AI and HPC processes.

Cost of High-Performance Computing Services was not material for 2025 due to the termination of the HPE contract.

Cost of Data Hosting Revenue- depreciation: Cost of data hosting revenue-depreciation increased mainly due to D2 becoming energized during fiscal year 2025.

General and Administrative Expenses, exclusive of depreciation and amortization: General and administrative expenses, exclusive of depreciation and amortization include cash and non-cash compensation, benefits, and related costs in support of our general corporate operations, including general management, finance and accounting, human resources, marketing, information technology, corporate development, and legal services.

  • Stock-based compensation expense increased by $5.2 million to approximately $10.4 million for the year ended December 31, 2025. The growth was primarily driven by $3.7 million in new equity awards granted to directors, officers, and employees during 2025, and a $2.5 million increase attributable to the full-year expense impact of 2024 grants. Additionally, the Company recognized $0.8 million related to modifications of vesting terms for certain grants and a reduction in the estimated forfeiture rate from 10% to 5%. These increases were partially offset by $1.8 million in savings resulting from the forfeiture of unvested awards due to employee departures and the impact of awards that reached full vesting during the prior year.
  • Salaries and benefits expense increased approximately $4.3 million for the year ended December 31, 2025, primarily due to performance-based and year-end bonuses for fiscal year 2025, as well as cost-of-living and merit-based salary adjustments for management and employees.
  • Legal fees increased approximately $1.7 million for the year ended December 31, 2025, primarily due to expenses related to Project Kati structuring costs that were not incurred in the comparable prior-year period, business development of pipeline projects, expenses related to corporate governance and compliance driven by growth in organizational structure and debt, and current year changes in primary counsel.
  • Professional and consulting fees increased approximately $0.8 million related to increases noted in contracted services, debt consulting charges, and business development costs associated with pipeline growth.
  • Investor relations expense increased approximately $0.8 million for the year ended December 31, 2025, compared to the same period in 2024, primarily due to an increase in the number and scope of investor outreach and marketing campaigns conducted during the period.
  • Provision for credit losses decreased approximately $0.8 million for the year ended December 31, 2025, as no credit losses were recognized during the current period, compared to the prior year, which included specific loss provisions recorded on outstanding receivables.
  • All other fluctuations within general and administrative expenses for the period were not material to the overall results of operations.

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the year ended December 31, 2025 and the year ended December 31, 2024 in which the balances totaled approximately $9.6 million and $9.6 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.

Loss on contract: Due to CloudCo’s termination of the HPE Agreement on March 24, 2025, and HPE’s subsequent termination of the HPE Agreement on March 26, 2025, and the acceleration of the remaining unpaid amounts of the contract in accordance with Section 8(h)(ii) of the HPE Agreement, a Type 1 Subsequent Event for the year ended December 31, 2024, we have recognized a liability for the remainder of the HPE Agreement on the consolidated balance sheet of our subsidiary CloudCo, and corresponding loss on contract on our consolidated income statement, in line with the terms and conditions of the HPE Agreement and relevant accounting standards. CloudCo also recognized a loss on the termination of the HPE Agreement for $28.6 million representing the remaining obligations for the year ended December 31, 2024, and a contract liability in the same amount. In addition, the outstanding balance of the prepaid deposit of $8.6 million was offset to the liability, leaving a net liability balance of $20.0 million as of December 31, 2024, in which another $0.7 million was paid, leaving an outstanding balance of $19.3 million as of December 31, 2025.

Interest expense: Interest expense for the year ended December 31, 2025, was approximately $4.8 million, compared to approximately $2.5 million for the year ended December 31, 2024. This increase is primarily attributable to the new debt facilities entered into during fiscal years 2024 and 2025, including the Green Cloud secured loan and additional secured loan agreements, the Galaxy loan, the Generate loan, and the equipment loan. The expense for the current period also includes the amortization of deferred financing costs associated with these new facilities, partially offset by the full payoff of the Navitas loan and extinguishment of the NYDIG equipment financing. Further details on the components of interest expense are presented in the table below.

(Dollars in thousands)

Year Ended December 31, 2025 Year Ended December 31, 2024 $ Change
Green Cloud secured loan and Additional secured loan $1,350 $901 $449
Generate loan 1,111 — 1,111
NYDIG equipment financing 1,084 1,453 (369)
Galaxy loan 694 — 694
Equipment loan 252 35 217
Interest on financing lease liability 71 — 71
Spring Lane financing cost 244 — 244
Other 27 — 27
Navitas term loan 2 138 (136)
Interest expense $4,835 $2,527 $2,308

Loss on sale of fixed assets and credit on equipment deposit: During the year ended December 31, 2025, we recognized a loss of approximately $1.2 million mainly related to the forfeiture of an equipment credit that had been recorded in prior periods. The credit was restricted for use on future equipment purchases for D2 and Project Kati through September 1, 2025. We did not execute an order prior to the expiration date, and no extension was granted; therefore, the credit was forfeited, and therefore had a loss of approximately $780 thousand. In addition, approximately $371 thousand of miners were disposed of due to aging and replaced with the purchase of new miners for the year ended December 31, 2025. The loss on sale of fixed assets for the year ended December 31, 2024 was not material.

Other financing expense: We incurred approximately $5.9 million in financing expenses for the year ended December 31, 2025, primarily related to consent fees associated with the SEPA, draws under the At the Market Offering Agreement entered into with H.C. Wainwright & Co., LLC (the "ATM Agreement") on April 29, 2025, and transaction costs incurred in connection with the July 2025 financing.

For the year ended December 31, 2024, other financing expense totaled approximately $3.7 million which was comprised primarily of a $1.0 million general release agreement with our former placement agent; approximately $1.9 million in consent fees, waiver fees, and other financing expenses in relation to the SEPA and related consents for the SEPA on October 1, 2024; a conversion debt inducement expense of approximately $388 thousand; and an extension fee expense of approximately $325 thousand.

Fair value adjustment, net: For the year ended December 31, 2025, we recognized a fair value adjustment loss of approximately $23.7 million related to the revaluation of the Series A and Series B warrants issued in connection with the July 2025 financing, which were classified as liabilities and exercised during the year ended 2025. The loss also includes a $14.7 million fair value adjustment related to the revaluation of outstanding warrant liabilities throughout 2025. These losses were primarily driven by the increase in the Company’s stock price between July and October 2025, which resulted in a higher intrinsic value relative to the warrants’ original fair value. Additionally, we incurred an approximate $9.1 million loss representing the excess of the fair value of warrants issued in connection with the July 2025 financing over the related proceeds received, and $0.1 million in fair value adjustments related to timing differences between SEPA draws and share issuances. These losses were partially offset by a gain of approximately $0.2 million from the revaluation of the Generate common warrant during the period.

For the year ended December 31, 2024, we recognized a net fair value adjustment loss of approximately $5.7 million, primarily related to the issuance and repricing of additional warrants with modified exercise features pursuant to the Fourth Amendment Agreement with the Noteholders, dated February 28, 2024 (the “Fourth Amendment”). As a result of these modifications, the warrants were reassessed and classified as warrant liabilities, requiring recurring fair value measurement each reporting period. The initial issuance and repricing resulted in a fair value adjustment loss of approximately $5.9 million, which was partially offset by revaluation gains recognized through May 30, 2024, the date of the Company’s Annual Shareholder meeting . Upon shareholder approval, the cap-containment provision was removed, and since all other criteria for equity classification were met, the remaining warrant liability was reclassified to equity. Additionally, the Company recognized a gain on revaluation of approximately $0.3 million related to the Soluna Cloud warrants, which were subsequently written off during the period.

Gain (loss) on Debt Extinguishment and Revaluation, net: For the year ended December 31, 2025, we recognized a net gain on extinguishment of debt of approximately $10.7 million. The gain primarily related to the settlement of the NYDIG equipment financing loan and related interest obligations in September 2025, as well as the Assignment and Assumption Agreement for the Additional Notes executed on March 14, 2025. These gains were partially offset by a loss on extinguishment resulting from the satisfaction and redemption of the Project Kati equipment loan through the issuance of Class B Membership Interests in Project Kati, which were valued at approximately three and three-tenth times the original borrowing amount.

For the year ended December 31, 2024, we recognized a net loss on debt extinguishment and revaluation of approximately $1.6 million. On February 28, 2024, we entered into the Fourth Amendment, which reduced the conversion price and resulted in the issuance of new warrants and the repricing of existing warrants with revised exercise features. As a result, the Company recorded a gain on revaluation of convertible notes of approximately $1.3 million during the first quarter of 2024 (as of February 28 and March 31, 2024), primarily driven by changes in conversion assumptions, payout features, annualized volatility, and stock price conditions at the respective valuation dates. A subsequent fair value assessment as of June 30, 2024 resulted in a loss on revaluation of approximately $4.0 million, reflecting changes in conversion and payout assumptions and stock price volatility compared to conversion terms available to noteholders at that date. The convertible notes were remeasured again as of September 30, 2024, resulting in a gain of approximately $2.3 million, primarily due to the decline in the Company’s stock price, which offset prior-quarter fair value losses. In the fourth quarter of 2024, we had additional conversions and ultimately fully converted the convertible notes payable creating an additional $247 thousand gain on debt extinguishment. As of December 31, 2024, no convertible notes remain outstanding. In addition to these fair value adjustments, we recognized a loss on debt extinguishment of approximately $1.4 million related to the satisfaction and redemption of the D2 equipment loan through the issuance of Class B Membership Interests in the D2 project, which were valued at approximately three times the original borrowing amount.

Other (expense) income, net: Other expense, net increased by approximately $1.0 million year for the ended December 31, 2025 compared to December 31, 2024. For the year ended December 31, 2025, we incurred a loss compensation cost of approximately $713 thousand in relation to the Las Majadas wind farm due to outages during certain points of the year. For the year ended December 31, 2024, we had other income of approximately $304 thousand related mainly to a gain on settlement of litigation with Atlas Technology Group LLC (“Atlas”) of approximately $254 thousand, in addition to some small additional other income items.

Income Tax Benefit: Income tax benefit for the year ended December 31, 2025 was approximately $2.3 million, compared to approximately $2.5 million for the year ended December 31, 2024. The balances were mainly related to deferred tax amortization impact of acquiring an asset in a transaction that is not a business combination when the amount paid exceeds the tax basis on the acquisition date. As such, we are required to adjust the value of the strategic contract pipeline by approximately $10.9 million at inception date (October 29, 2021), which was recorded as a deferred tax liability and this amount will be amortized over the life of the asset. For the years ended December 31, 2025 and 2024, we amortized approximately $2.2 million in each year, respectively.

Net income attributable to non-controlling interest: We incurred a net loss attributable to non-controlling interest for the year ended December 31, 2025 compared to a net income attributable to non-controlling interest for the year ended December 31, 2024. The decrease related mainly due the variances in gross profit related to D1A and D1B noted above mainly due to the halving event in April 2024 and the increase in profit sharing fees for data hosting for the year ended December 31, 2025, which created an approximate $5.7 million variance between periods in non-controlling interest. In addition, we incurred a loss of approximately $1.7 million associated with the satisfaction of equipment loan through membership interest at Project Kati, in addition to Project Kati costs of approximately $2.0 million, in which no revenue had been generated yet for the year ended December 31, 2025, and no comparable costs were noted for the year ended December 31, 2024. The change at D2 was a gain of approximately $873 thousand, due to site energization which began in the second quarter of 2025 in which costs exceeded the revenue by approximately $1.0 million. For the year ended December 31, 2024, D2 had a loss on non-controlling interest due to the satisfaction in an equipment loan creating a loss of approximately $1.4 million and additional costs of $500 thousand.

Non-GAAP Measures

To supplement our consolidated financial statements included in this Annual Report presented under U.S. generally accepted accounting principles (“GAAP”), we are presenting certain non-GAAP financial measures. We are providing these non-GAAP financial measures to disclose additional information to facilitate the comparison of past and present operations by providing perspective on results absent one-time or significant non-cash items. We utilize these measures in the business planning process to understand expected operating performance and to evaluate results against those expectations. We believe that these non-GAAP financial measures, when considered together with our GAAP financial results, provide management and investors with an additional understanding of our business operating results regarding factors and trends affecting our business and provide a reasonable basis for comparing our ongoing results of operations.

These non-GAAP financial measures are provided as supplemental measures to our performance measures calculated in accordance with GAAP and therefore, are not intended to be considered in isolation or as a substitute for comparable GAAP measures. Further, these non-GAAP financial measures have no standardized meaning prescribed by GAAP and are not prepared under any comprehensive set of accounting rules or principles. Because of the non-standardized definitions of non-GAAP financial measures, we caution investors that the non-GAAP financial measures as used by us in this Annual Report have limits in their usefulness to investors and may be calculated differently from, and therefore may not be directly comparable to, similarly titled measures used by other companies. Further, investors should be aware that when evaluating these non-GAAP financial measures, these measures should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items. In addition, from time to time in the future there may be items that we may exclude for purposes of our non-GAAP financial measures and we may in the future cease to exclude items that we have historically excluded for purposes of our non-GAAP financial measures. Likewise, we may determine to modify the nature of the adjustments to arrive at our non-GAAP financial measures. Investors should review the non-GAAP reconciliations provided below and not rely on any single financial measure to evaluate our business.

EBITDA and Adjusted EBITDA

In addition to financial measures calculated in accordance with GAAP, we also use “EBITDA” and “Adjusted EBITDA.” “EBITDA” is defined as earnings before interest, taxes, and depreciation and amortization. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation costs, loss on sale of fixed assets and credit on deposit, loss on debt extinguishment and revaluation, fair value adjustments, placement agent release expense, loss on contract, provision for credit losses, convertible note inducement expense and impairment on fixed assets. Management believes that EBITDA and Adjusted EBITDA results in a performance measurement that represents a key indicator of our business operations of cryptocurrency mining, hosting customers engaged in cryptocurrency mining, demand service revenue, and high-performance computing services.

We believe EBITDA and Adjusted EBITDA can be important financial measures because they allow management, investors, and the Board to evaluate and compare our operating results, including our return on capital and operating efficiencies, from period-to-period by making such adjustments. Non-GAAP financial measures are subject to material limitations as they are not in accordance with, or a substitute for, measurements prepared in accordance with GAAP. For example, we expect that stock-based compensation costs, which is excluded from the non-GAAP financial measures, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers, and directors. Similarly, we expect that depreciation and amortization of fixed assets will continue to be a recurring expense over the term of the useful life of the assets.

EBITDA and Adjusted EBITDA are provided in addition to and should not be considered to be substitutes for, or superior to net income, the comparable measure calculated in accordance with GAAP. Further, EBITDA and Adjusted EBITDA should not be considered as alternatives to revenue growth, net income, or any other performance measure calculated in accordance with GAAP, or as alternatives to cash flow from operating activities as a measure of our liquidity. EBITDA and Adjusted EBITDA have limitations as analytical tools, and you should not consider such measures either in isolation or as substitutes for analyzing our results as reported under GAAP.

Reconciliations of EBITDA and Adjusted EBITDA to net loss, the most comparable GAAP financial metric, for historical periods are presented in the table below:

(Dollars in thousands)

Years Ended December 31, 2025 2024
Net loss from continuing operations $(56,991) $(58,300)
Interest expense 4,835 2,527
Income tax (benefit) expense (2,316) (2,487)
Depreciation and amortization 16,345 15,640
EBITDA (38,127) (42,620)
Adjustments: Non-cash items
Stock-based compensation costs 10,566 5,311
Loss on sale of fixed assets and credit on equipment deposit 1,151 31
(Gain) loss on debt extinguishment and revaluation, net (10,658) 1,644
Placement agent release expense — 1,000
Fair value on placement agent warrant 146 —
Fair value adjustment loss 23,681 5,705
Loss on contract — 28,593
Provision for credit losses — 760
Convertible note inducement expense — 388
Impairment on fixed assets 12 130
Adjusted EBITDA $(13,229) $942

54

The following table represents the EBITDA and Adjusted EBITDA activity between each three-month period from January 1, 2025 through December 31, 2025.

(Dollars in thousands)

Three months ended March 31, 2025 Three months ended June 30, 2025 Three months ended September 30, 2025 Three months ended December 31, 2025 Year ended December 31, 2025
Net loss from continuing operations $(7,354) $(7,780) $(25,787) $(16,070) $(56,991)
Interest expense, net 838 1,196 1,212 1,589 4,835
Income tax (benefit) expense from continuing operations (425) (608) (666) (617) (2,316)
Depreciation and amortization 3,879 3,989 4,119 4,358 16,345
EBITDA (3,062) (3,203) (21,122) (10,740) (38,127)
Adjustments: Non-cash items
Stock-based compensation costs 1,847 1,942 1,882 4,895 10,566
Loss on sale of fixed assets and credit on equipment deposits — 22 780 349 1,151
Fair value on placement agent warrant and financing fees — — 146 — 146
Fair value adjustment loss 118 — 22,047 1,516 23,681
Impairment on fixed assets — 12 — — 12
Gain on debt extinguishment and revaluation, net (551) — (10,107) — (10,658)
Adjusted EBITDA $(1,648) $(1,227) $(6,374) $(3,980) $(13,229)

55

The following table represents the EBITDA and Adjusted EBITDA activity between each three-month period from January 1, 2024 through December 31, 2024.

(Dollars in thousands)

Three months ended March 31, 2024 Three months ended June 30, 2024 Three months ended September 30, 2024 Three months ended December 31, 2024 Year ended December 31, 2024
Net loss from continuing operations $(2,544) $(9,145) $(8,093) $(38,518) $(58,300)
Interest expense, net 424 449 821 833 2,527
Income tax (benefit) expense from continuing operations (548) (649) (547) (743) (2,487)
Depreciation and amortization 3,926 3,909 3,916 3,889 15,640
EBITDA 1,258 (5,436) (3,903) (34,539) (42,620)
Adjustments: Non-cash items
Stock-based compensation costs 661 1,368 1,257 2,025 5,311
Loss on sale of fixed assets 1 21 — 9 31
Provision for credit losses — 244 367 149 760
Convertible note inducement expense — — — 388 388
Placement agent release expense — — — 1,000 1,000
Loss on contract — — — 28,593 28,593
Impairment on fixed assets 130 — — — 130
Fair value loss (gain) adjustment 4,333 1,600 (328) 100 5,705
(Gain) loss on debt extinguishment and revaluation, net (1,236) 4,000 (875) (245) 1,644
Adjusted EBITDA $5,147 $1,797 $(3,482) $(2,520) $942

Adjusted EBITDA decreased for the year ended December 31, 2025 compared to December 31, 2024 primarily driven by increases in general and administrative expenses, exclusive of depreciation, stock-based compensation costs, and provision for credit losses of approximately $7.4 million for the comparable periods. The general and administrative expense increase was driven by increases in 2025 salary and bonus expenses of $4.3 million, professional and legal fees of $2.5 million, and investor relations of $0.8 million for the year ended December 31, 2025 compared to the year ended December 31, 2024. We also incurred other financing costs increases of approximately $2.2 million for the year ended December 31, 2025 compared to the year ended December 31, 2024, due to Preferred B holder consent fees for draws under the ATM, the SEPA, and July 2025 financing, in which fees in the prior year were lower for comparable expenses such as SEPA consents and other financing expense items.

In addition, for the year ended December 31, 2025 compared to year ended December 31, 2024 , there was a decrease in revenue of approximately $8.3 million primarily in Cryptocurrency mining and data hosting revenue following the April 2024 Bitcoin halving and a customer ramp-up of 20 MW through the first quarter of 2025, partially offset by approximately $6.1 million decline in cost of revenue, excluding depreciation, largely due to no costs associated with high-performance computing services for 2025.

Liquidity and Capital Resources

Several key indicators of our liquidity are summarized in the following table:

(Dollars in thousands)

Years Ended December 31, 2025 2024
Cash $76,423 $7,843
Restricted cash 12,420 2,610
Working capital (deficit) 42,938 (34,378)
Net loss (56,991) (58,300)
Net cash used in operating activities (9,149) (5,069)
Purchase of property, plant and equipment and deposits on equipment (31,719) (13,277)

As of December 31, 2025, we had a consolidated accumulated deficit of approximately $367.7 million and we had positive working capital of approximately $42.9 million. As of December 31, 2025, we had total debt outstanding of approximately $26.8 million as summarized further below in the Debt table. In addition, we had outstanding commitments related to Soluna Digital Inc. (“SDI”) of approximately $27.0 million in capital expenditures related to Project Kati. In addition, due to CloudCo’s termination of the HPE Agreement on March 24, 2025, and HPE’s termination of the HPE Agreement on March 26, 2025, and the acceleration of the remaining unpaid amounts of the contract in accordance with Section 8(h)(ii) of the HPE Agreement, we have recognized a liability for the remainder of the HPE Agreement on the balance sheet of our subsidiary, CloudCo, of approximately $19.3 million. As of December 31, 2025, we had $76.4 million of cash available to fund our operations.

Based on business developments, including changes in production levels, staffing requirements, and network infrastructure improvements, we will require additional capital equipment in the foreseeable future. We are focused on developing and monetizing green cryptocurrency mining facilities, as well as facilities capable of hosting customers engaged in cryptocurrency mining, and data centers to provide specialized AI Cloud and colocation services.

In 2025, we had the following capital raise activities:

  • At the Market Offering Agreement (the “ATM Agreement”) with H.C. Wainwright & Co., LLC (“Wainwright”), as sales agent, pursuant to which we may offer and sell, from time to time, through Wainwright, up to $87.65 million. As of December 31, 2025, we had drawn approximately $34.2 million in net proceeds pursuant to the ATM Agreement.
  • Standby Equity Purchase Agreement (the “SEPA”) with YA II PN, LTD., a Cayman Islands exempt limited company (“YA”). In accordance with the terms of the SEPA, YA has agreed to purchase up to $25 million in aggregate gross purchase price of newly issued fully paid shares of our common stock from time to time subject to the limits and the conditions of the SEPA. As of December 31, 2025, approximately $6.2 million has been drawn on the SEPA.
  • In July 2025, we entered into a securities purchase agreement pursuant to which we received gross proceeds of $5.0 million from a public offering of common stock. In connection with this offering, we issued warrants, and as of December 31, 2025, we received approximately $10.0 million in gross proceeds from the exercise of such warrants.
  • In December 2025, we entered into a securities purchase agreement to which we received gross proceeds of approximately $32.0 million from a public offering of common stock.

We plan to continue funding operations, including working capital and operating deficits, from operating cash flows and cash flow debt and equity financings, including the ATM Agreement, SEPA, July 2025 financing, December 2025 financing, and others to be closed as needed consistent with management’s plans.

The Company is dependent on generating profitable operations in the future and/or obtaining the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. In the near term, management is evaluating and implementing different strategies to obtain financing to fund the Company’s expenses and growth to achieve a level of revenue adequate to support the Company’s current cost structure. Financing strategies may include, but are not limited to, stock issuances, project level equity, debt borrowings, partnerships and/or collaborations. If the Company is unable to meet its financial obligations, it could be forced to restructure or refinance, seek additional equity capital or sell its assets. The Company might then be unable to obtain such financing or capital or sell its assets on satisfactory terms. There can be no assurance that additional financing will be available to the Company when needed or, if available, that it can be obtained on commercially reasonable terms. If the Company is not able to obtain the additional financing on a timely basis, if and when it is needed, it will be forced to delay or scale down some or all of its development activities or perhaps even cease the operation of its business.

Operating Activities

Net cash used in operating activities from operations was approximately $9.1 million for the year ended December 31, 2025. We had a net loss of approximately $57.0 million, which was offset by non-cash items of approximately $40.2 million. Non-cash items included approximately $6.9 million of depreciation expense, $9.5 million of amortization expenses, $23.7 million in fair value adjustments mainly related to warrants being exercised, and $10.6 million of stock compensation expenses. These non-cash items were offset with a deferred tax benefit of $2.3 million and gain on extinguishment of debt of approximately $10.7 million. The change in asset and liabilities of $7.6 million mainly relates to increase in accrued expense and interest of $4.3 million in relation to increase in construction fees for Project Kati and D2 , legal fees, financing costs, and bonus accrual. In addition, there was a $2.0 million increase in accounts payable due to timing and billing of invoices, and a $3.0 million increase in customer deposits due to new contract agreements being entered into. The other changes in assets and liabilities of approximately $1.7 million mainly related to increase in accounts receivable and other current assets related to timing and billing amounts of invoices, deferred revenue in relation to a revenue contract, in addition to the payment made of $0.7 million to HPE in January 2025, offset by a decrease in other long-term assets of $1.7 million in relation to receipt of Briscoe deposit in January 2025 and increase in customer deposits for hosting agreements.

Net cash used in operations was approximately $5.1 million during the year ended December 31, 2024. We had a net loss for the year ended December 31, 2024 of approximately $58.3 million. Results included cost of revenue in connection with the HPE Agreement for $5.7 million. Non-cash items included approximately $6.2 million of depreciation expense and $9.5 million of amortization expenses, approximately $28.6 million on loss on contract, $5.3 million of stock compensation expenses, $1.6 million of loss on debt extinguishment and revaluation, $5.7 million in fair value adjustment losses, $2.0 million in debt issuance costs, $760 thousand in provision for credit losses, and $351 thousand amortized deferred financing costs. These non-cash items were offset with a deferred tax benefit of $2.5 million. The change in assets and liabilities is mainly due to an increase in prepaid expenses and other long term assets by $8.1 million due to a prepayment of an arrangement with HPE of $10.3 million that was being amortized over the life of the agreement and a decrease in customer deposits and other liabilities of $1.7 million due to timing of deposits applied in December 2024, offset by an increase in accrued expenses and accounts payable of approximately $5.5 million in relation to NYDIG interest, and related bills associated with D2 and Project Kati. The other changes in assets and liabilities were not material.

Investing Activities

Net cash used in investing activities during the year ended December 31, 2025 was approximately $31.9 million consisting mainly of capital expenditures of $28.1 million, which consist of additions to property, plant, and equipment offset with transfers from deposits on equipment, and $3.7 million deposit on equipment purchases. Net cash used in investing activities during the year ended December 31, 2024 was approximately $13.2 million consisting mainly of capital expenditures of $8.9 million and increase in deposits on equipment of $4.4 million, primarily related to the development of D2.

Financing Activities

(Dollars in thousands)

Years Ended December 31, 2025 Gross Proceeds Reductions Net Proceeds 2024 Gross Proceeds Reductions Net Proceeds
Debt issuance and principal payments $23,885 $(9,466) $14,419 $14,470 $(4,949) $9,521
Contributions from non-controlling interest 29,559 — 29,559 14,735 — 14,735
Distributions to non-controlling interest (8,654) (8,654) — (8,270) (8,270)
Proceeds from warrant exercises 10,272 — 10,272 2,332 — 2,332
Payment on warrant redemption — (452) (452) — — —
Payment on finance lease liability — (118) (118) — — —
Payment on cost to acquire stock — (75) (75) — — —
July and December SPA 36,988 (2,876) 34,112 — — —
ATM and SEPA 41,664 (1,335) 40,329 — — —
Net cash provided by financing activities $142,368 $(22,976) $119,392 $31,537 $(13,219) $18,318

Net cash provided by financing activities was approximately $119.4 million for the year ended December 31, 2025 consisting mainly of $23.9 million of debt issuance proceeds, $40.3 million of net proceeds from SEPA draws and ATM Agreement settlements, net proceeds of $34.1 million from the July and December financings , $10.3 million net proceeds from warrant exercises, and $29.6 million of contributions from non-controlling interest, offset with cash distributions to non-controlling interest members of approximately $8.7 million and payments on debt and deferred financing costs of approximately $9.5 million to the Green Cloud secured loan, Generate principal and debt issuance costs, Galaxy principal and deferred financing costs, CloudCo additional secured loan, and the Navitas term loan.

For the year ended December 31, 2024, funds from financing activities were used to fund an initial deposit for the HPE Agreement, fund construction of D2, continued project pipeline development and general operating cash. Net cash provided by financing activities was approximately $18.3 million consisting mainly of proceeds from financing of approximately $14.5 million in which $13.75 million was from 2024 secured loan financing in June and July, and $720 thousand was drawn down for equipment financing. In addition, there was $2.3 million in warrants exercised, as well as $14.7 million in contributions of non-controlling membership interest. Offsetting the net cash provided by financing activities was $8.3 million in cash distributions to non-controlling interest members, and payments of $4.9 million relation to Navitas loan, the June and July 2024 note agreements, and payments in relation to the convertible holders.

Debt

(Dollars in thousands)

Years Ended December 31, 2025 2024
Generate loan $13,926 $—
Green Cloud Secured Loan 7,473 10,983
Galaxy loan 4,283 —
Equipment loan 1,075 —
NYDIG Equipment Financing — 9,183
Navitas Term Loan — 137
CloudCo Additional Secured Loan — 1,202
Total Debt $26,757 $21,505

On September 12, 2025, the Company caused its subsidiaries Soluna DVSL ComputeCo, LLC (“Dorothy 1A Borrower”), Soluna DVSL II ComputeCo, LLC (“Dorothy 2 Borrower”), and Soluna KK I ComputeCo, LLC (“Tranche B Borrower” and collectively with Dorothy 1A Borrower and Dorothy 2 Borrower, the “Borrowers”) to enter into a Credit and Guaranty Agreement (the “Credit Agreement”) with Generate Lending, LLC, as administrative agent and collateral agent (the “Agent”), and Generate Strategic Credit Master Fund I-A, L.P. (the “Lender”). The Credit Agreement provides for senior secured term loan commitments in an aggregate principal amount of up to $35.5 million, comprised of (i) Tranche A-1 ($5.5 million), (ii) Tranche A-3 ($11.5 million), and (iii) Tranche B ($18.5 million). In addition, the Credit Agreement permits the Borrowers to request one or more Additional Tranche Loan Commitments (as defined in the Credit Agreement), in the aggregate amount of up to $64.5 million, subject to the approval of the Lender and the Agent, for project-level financing of eligible projects. As of December 31, 2025, the Borrowers borrowed approximately $17 million under the Credit Agreement, comprised of Tranche A-1 loans and Tranche A-3 loans. The Company can draw upon Tranche B from September 12, 2025 until October 31, 2026, subject to the conditions set forth in the Credit Agreement. The maturity date for the Tranche A and Tranche B loans is the earlier of (i) payment of outstanding principal, interest, and fees and (ii) September 12, 2030. Additional Tranche Loan Commitments will have maturity dates as set forth in their respective amendments to the Credit Agreement. As of December 31, 2025, the outstanding principal balance is approximately $16.2 million.

As of December 31, 2025, the Borrowers were not in compliance with the minimum Forward Contracted Debt Service Coverage Ratio covenant under the Credit Agreement. On March 26, 2026, the Agent provided a limited waiver of this covenant.

On March 12, 2025, the SW Borrower, a Delaware limited liability company and subsidiary of SW Holdings, itself a subsidiary of SDI, a Nevada corporation and wholly owned subsidiary of the Company, entered into the Galaxy Loan Agreement with SW Holdings and Galaxy Digital LLC. The Galaxy Loan Agreement provides for a term loan facility in the principal amount of $5.0 million (the “Term Loan Facility”). The Term Loan Facility bears interest at a rate of 15.0% per annum, subject to an increase of 5.0% (for a total of 20.0%) in the event an Event of Default has occurred and is continuing. The Term Loan Facility matures on March 12, 2030 and includes scheduled payments over a five-year term. As of December 31, 2025, the outstanding principal balance is approximately $4.6 million as we were compliant with all debt covenants.

On June 20, 2024, pursuant to the terms and subject to the conditions of a Note Purchase Agreement (the "June SPA") by and among (i) Soluna AL CloudCo, LLC, a Delaware limited liability company ("CloudCo") and indirect wholly owned subsidiary of the Company, (ii) Soluna Cloud, Inc., a Nevada corporation, indirect wholly owned subsidiary of the Company, and parent of CloudCo ("Soluna Cloud"), (iii) the Company and (iv) the accredited investor named therein (the "Investor"), CloudCo issued to the Investor a secured promissory note in a principal amount equal to $12.5 million (the “Green Cloud Secured Note”). The Green Cloud Secured Note accrues interest at a rate 9.0% per annum, subject to adjustment upon an event of default. The Green Cloud Secured Note matures on June 20, 2027. On July 12, 2024, the Company, CloudCo, Soluna Cloud, and the Investor entered into a First Amendment to the Note Purchase Agreement. Additional Notes were issued to additional accredited investors (the “Additional Investors”) for $1.25 million (“Soluna CloudCo Additional Secured Note”) on July 12, 2024 and are subject to the same terms and conditions as the June SPA financing. On October 1, 2024, CloudCo, Soluna Cloud and the Company entered into assignment and assumption agreements (the “Assignment Agreements”) with the Additional Investors with respect to an aggregate of $1.25 million of notes issued by CloudCo. Pursuant to the Assignment Agreements, the Company will be able to purchase such notes for a purchase price of $750 thousand, or 60% of face value. The assignment and assumption will be effective once all conditions of the agreement are met including fulfilling the purchase price. The assignment and assumption occurred on March 14, 2025, therefore we extinguished the remaining third-party outstanding debt on the Additional Note, and a gain on extinguishment of the debt of approximately $551 thousand was recorded. In relation to the Green Cloud Secured Note, as of December 31, 2025, the Company had an outstanding principal balance of approximately $7.8 million.

On May 16, 2024, the SL Borrowing – 1, LLC, an affiliate of the Company (the “SDI Borrower"), entered into a loan (the "Equipment Loan Agreement" and the "Loan") with Soluna2 SLC Fund II Project Holdco LLC (the "Lender"). The Equipment Loan Agreement provides for the SDI Borrower to borrow, from time to time, up to $4.0 million, as further amended on February 28, 2025, to be used to purchase necessary equipment for the progression of D2 and Project Kati. Any loans made under the Equipment Loan Agreement have a maturity date of May 16, 2027 and bear interest at a rate of 15% per annum. The Equipment Loan Agreement includes customary covenants for loans of this nature, as well as a multiple on invested capital provision, which requires us to pay, in addition to principal and interest, an amount equal to the difference of (i) the greater of (a) the principal amount of the Loan being repaid plus all interest previously paid or simultaneously being paid to Lender in respect of such principal of the Loan, and (b) the principal amount of the Loan being repaid multiplied by three, minus (ii) the sum of the principal amount of the Loan being repaid plus all interest previously paid or simultaneously being paid to Lender in respect of such principal of the Loan. On March 21, 2025, the SDI Borrower drew down $250 thousand of the Loan with the Lender, in relation to Project Kati. In addition, on June 11, 2025 and July 16th, the SDI Borrower drew down an additional $269.2 thousand and $291.4 thousand of the Loan with the Lender, in relation to Project Kati. The total amount of equipment loans of $810.6 thousand was outstanding prior to the assignment of equipment and payoff of the loan. The SDI Borrower shall repay the Loans under these Borrowing Requests with a different MOIC Payment than as defined in the Equipment Loan Agreement. The MOIC Payment for these Borrowing Requests only, shall be an amount equal to the difference of (i) the greater of (a) the principal amount of the Loan being repaid plus all interest previously paid or simultaneously being paid to Lender in respect of such principal of the Loan, and (b) the principal amount of the Loan being repaid multiplied by three and three tenths (3.3), minus (ii) the sum of the principal amount of the Loan being repaid plus all interest previously paid or simultaneously being paid to Lender in respect of such principal of the Loan. As of the date prior to the payoff, the Company had approximately $180.6 thousand in Accrued interest payable in relation to the MOIC and 15% interest accruing on the Loan that was outstanding. On August 1, 2025, the SDI Borrower satisfied and repaid the Borrowing amount in full by issuing the SLC Class B Membership Interests in Soluna KKSL JVCo LLC (“Kati”) project for 3.3 times the membership units ($810.6 thousand payoff equal to fair value of approximately $2.7 million for Class B membership units issued to SLC), as part of the contribution agreement between the parties. Through initial contributions of $810.6 thousand (debt repayment), SLC received 2,675 Class B Membership units, which constituted a 100% initial membership interest of Kati. The redemption of debt through equity created approximately a $1.7 million loss on debt extinguishment for the year ended December 31, 2025. On October 1, 2025, the Borrower, and Soluna2 Kati Project Holdco LLC ("Kati Lender"), entered into a borrowing request of $1.075 million to cover the purchase of land to support construction of Project Kati Phase 2 under the terms of the Equipment Loan Agreement. For the land purchase, the MOIC payment was revised to replace 3.00 with 1.00. The $1.075 million remains outstanding as of December 31, 2025.

On May 9, 2023, Soluna DV ComputeCo, LLC ("DVCC") and Navitas West Texas Investments SPV, LLC entered into a 2-year Loan Agreement for $2.05 million. The unpaid principal balance of the Term Loan shall bear interest at per annum rate equal to 15%. As of December 31, 2025, the Navitas loan has been fully paid off.

On January 14, 2022, the Company effected an initial drawdown under the Master Equipment Finance Agreement (“MEFA”) with NYDIG in the aggregate principal amount of approximately $4.6 million at 14% interest, followed by an additional drawdown of $9.8 million on January 26, 2022. On December 20, 2022, Soluna MC Borrowing 2021-1 LLC (“Borrower”), an indirect subsidiary of the Company, received a Notice of Acceleration and Repossession (the “NYDIG Notice”) from NYDIG with respect to the MEFA Obligations under the MEFA were ring-fenced to the Borrower and its direct parent, Soluna MC LLC, and the Company was not party to any guaranty or other support agreement. On February 23, 2023, NYDIG foreclosed on the collateral, repossessing assets valued at approximately $3.4 million, of which approximately $560 thousand was first used to pay off accrued interest and penalties. On December 7, 2023, NYDIG filed a motion for summary judgment seeking approximately $10.3 million for unpaid principal, interest, and penalties. Following court proceedings, the parties agreed that the total outstanding loan principal balance would be approximately $9.2 million (the "Agreed Judgment Amount"). On September 29, 2025, the Borrower, Soluna MC, LLC (together with Borrower, the “NYDIG Defendants”) and NYDIG entered into a Settlement Agreement (the “Settlement Agreement”), pursuant to which the NYDIG Defendants and NYDIG agreed to fully settle and resolve the Agreed Judgment Amount and all other matters relating to the NYDIG loans in exchange for the NYDIG Defendant's agreement to make certain settlement payments to NYDIG in accordance with the Settlement Agreement. Upon payment, NYDIG agreed to release the NYDIG Defendants and their affiliates from all related claims, other than obligations under the Settlement Agreement. The Company has recorded a gain on extinguishment of debt for the outstanding principal and accrued interest and penalties. As of December 31, 2025, the Settlement Agreement amount has been fully paid and satisfied.

Critical Accounting Policies and Use of Estimates

The prior discussion and analysis of our financial condition and results of operations is based upon our consolidated financial statements, which have been prepared in accordance with GAAP. Note 2 of the Consolidated Financial Statements included in this Annual Report includes a summary of our most significant accounting policies. The preparation of these consolidated financial statements requires management to make estimates and judgments that affect the reported amounts of assets, liabilities, revenue, expenses, and related disclosure of assets and liabilities. On an ongoing basis, we evaluate our estimates and judgments, including those related to revenue recognition, income taxes and share-based compensation. We base our estimates on historical experience and on various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying values of assets and liabilities that are not readily apparent from other sources. Actual results may differ from these estimates under different assumptions or conditions. Periodically, our management reviews our critical accounting estimates with the Audit Committee of our Board of Directors.

The significant accounting policies that we believe are most critical to aid in fully understanding and evaluating our consolidated financial statements include the following:

Revenue Recognition

We have entered into customer hosting contracts whereby we provide hosting services which include, electrical power to cryptocurrency mining customers, other utilities, and management of hosting facilities. Customer contracts can be a combination of a stated fixed amount per megawatt-hour (“MWh”) (“Contract Capacity”), a percentage of the profit share of the daily net income from the customer’s mining operations, or a combination thereof. Some contracts also include pass-through expenses which are not recognized in revenue. The actual monthly amounts are calculated after the close of each month and billed to the customers.

Cryptocurrency revenue consists of revenue recognized from our cryptocurrency mining facilities. Revenue is recognized at the cryptocurrency’s realized cash value based upon the rates at cryptocurrency exchanges where we are registered. Cryptocurrencies are earned through participation with mining pool operators where the company provides hash rate services to the mining pool. The consideration received is payable in BitCoin based on a published formula Cryptocurrency is converted to U.S. dollars on a daily basis.

Starting in December 2023, we began providing emergency demand response solutions to ERCOT pursuant to a contractual commitment over defined service delivery periods. This contract includes a single promise to stand ready, on a monthly basis, to deliver a set amount of curtailment (committed capacity) per month when and if called upon by ERCOT. The Company believes that an output measure based on the monthly contractual MW stand-ready obligation is the best representation of the “transfer of value” to the customer. Accordingly, the Company recognizes monthly revenue based on the proportion of committed stand-ready capacity obligation that has been fulfilled to date.

Fair Value Measurement

The estimated fair value of certain financial instruments, including cash, accounts receivable and short-term debt approximates their carrying value due to their short maturities and varying interest rates. “Fair value” is the price that would be received to sell an asset or transfer a liability in an orderly transaction between market participants at the measurement date. We utilize valuation techniques that maximize the use of observable inputs and minimize the use of unobservable inputs. Based on the observability of the inputs used in the valuation methods, we are required to provide the following information according to the fair value accounting standards. These standards established a fair value hierarchy as specified that ranks the quality and reliability of the information used to determine fair values. Financial assets and liabilities are classified and disclosed in one of the following three categories:

Level 1: Quoted market prices in active markets for identical assets or liabilities, which includes listed equities.
Level 2: Observable market-based inputs or unobservable inputs that are corroborated by market data. These items are typically priced using models or other valuation techniques. These models are primarily financial industry-standard models that consider various assumptions, including the time value of money, yield curves, volatility factors, as well as other relevant economic measures.
Level 3: These use unobservable inputs that are not corroborated by market data. These values are generally estimated based upon methodologies utilizing significant inputs that are generally less observable from objective sources.

The fair value hierarchy also requires an entity to maximize the use of observable inputs and minimize the use of unobservable inputs when measuring fair value. Assets and liabilities measured at fair value are classified in their entirety based on the lowest level of input that is significant to the fair value measurement.

We had warrants issued during 2024 and 2025 for purposes of equity financing and debt exchanges. Some of the warrants were considered freestanding equity-classified instruments due to their detachable and separately exercisable features and meet the indexation criteria within derivative accounting. Accordingly, those warrants were presented as a component of Stockholders’ Equity in accordance with derivative accounting. Other warrants did not meet equity classification and were recorded as a liability until such warrants were exercised or an amendment to the warrant agreement occurred. We used a Black-Scholes simulation module in performing its fair value assumptions in relation to warrants issued during the course of the year. Inherent in a Black-Scholes simulation are assumptions related to expected stock-price volatility, expected life, risk-free interest rate and dividend yield.

On October 1, 2024, we modified the Series B Preferred Stock Agreement, in order to obtain consent from holders, which led to extinguishment accounting. We recorded a deemed dividend between the fair value of the modified preferred stock against the carrying value of the original preferred stock. The fair value of the modified preferred stock considered the conversion price of the preferred stock, assumption on the lockup expiration date, and closing price of the common stock on the lockup expiration date using daily volatility.

Consistent with the guidance in purchase accounting, the value of the Strategic Pipeline Contract, see Note 5, as of the acquisition date of October 2021 was estimated using an expected value approach, which probability-weights various future outcomes and uses certain Level 3 inputs.

As of December 31, 2025, and 2024, the fair values of cash and cash equivalents, accounts receivable, prepaid expenses and other current assets, accounts payable, and accrued expenses approximated their carrying values because of the short-term nature of these instruments.

Share-Based Payments

We award restricted stock to our employees and directors under the 2021 Plan and the Soluna Holdings, Inc. Amended and Restated 2023 Stock Incentive Plan (the “2023 Plan,” together with the 2021 Plan, the “Plans”). The benefits provided under these plans are share-based payments and we account for stock-based awards exchanged for employee service in accordance with the appropriate share-based payment accounting guidance. Stock-based compensation represents the cost related to stock-based awards granted to employees and directors. We measure stock-based compensation cost at grant date based on the estimated fair value of the award and recognize the cost as expense on a straight-line basis in accordance with the vesting of the options (net of estimated forfeitures) over the option’s requisite service period. We estimate the fair value of stock-based awards on the grant date using a Black-Scholes valuation model. We use the fair value method of accounting with the modified prospective application, which provides for certain changes to the method for valuing share-based compensation. The valuation provisions apply to new awards and to awards that are outstanding on the effective date and subsequently modified.

The determination of the fair value of share-based payment awards on the date of grant using an option-pricing model is affected by our stock price as well as assumptions regarding a number of complex and subjective variables. These variables include our expected stock price volatility over the term of the awards, actual and projected employee stock option exercise behaviors, risk-free interest rate, and expected dividends.

Theoretical valuation models and market-based methods are evolving and may result in lower or higher fair value estimates for share-based compensation. The timing, readiness, adoption, general acceptance, reliability, and testing of these methods is uncertain. Sophisticated mathematical models may require voluminous historical information, modeling expertise, financial analyses, correlation analyses, integrated software and databases, consulting fees, customization, and testing for adequacy of internal controls.

For purposes of estimating the fair value of stock options granted using the Black-Scholes model, we use the historical volatility of our stock for the expected volatility assumption input to the Black-Scholes model, consistent with the accounting guidance. The risk-free interest rate is based on the risk-free zero-coupon rate for a period consistent with the expected option term at the time of grant. The expected option term is calculated based on our historical forfeitures and cancellation rates.

Income Taxes

We are subject to income taxes in the U.S. (federal and state). As part of the process of preparing our consolidated financial statements, we calculate income taxes for each of the jurisdictions in which we operate. This involves estimating actual current taxes due together with assessing temporary differences resulting from differing treatment for tax and accounting purposes that are recorded as deferred tax assets and liabilities, loss carryforwards, and tax credit carryforwards, for which income tax benefits are expected to be realized in future years. Deferred tax assets are reported net of a valuation allowance when it is more likely than not that a tax benefit will not be realized. The effect on deferred taxes of a change in tax rates is recognized in the period that includes the enactment date.

Significant management judgment is required in determining our provision for income taxes, our deferred tax assets and liabilities, and any valuation allowance recorded against our net deferred tax assets. We considered all available evidence, both positive and negative, such as historical levels of income and future forecasts of taxable income amongst other items in determining our valuation allowance. In addition, our assessment requires us to schedule future taxable income in accordance with accounting standards that address income taxes to assess the appropriateness of a valuation allowance, which further requires the exercise of significant management judgment.

We account for taxes in accordance with the asset and liability method of accounting for income taxes. Under this method, we must recognize the tax benefit from an uncertain tax position only if it is more likely than not that the tax position will be sustained on examination by the taxing authorities, based on the technical merits of the position. The tax benefits recognized in the financial statements from such a position are measured based on the largest benefit that has a greater than 50% likelihood of being realized upon ultimate resolution. The impact of our reassessment of our tax positions for these standards did not have a material impact on its results of operations, financial condition, or liquidity.

We are also currently subject to audit in various jurisdictions, and these jurisdictions may assess additional income tax liabilities against us. Developments in an audit, litigation, or in applicable laws, regulations, administrative practices, principles, and interpretations could have a material effect on our operating results or cash flows in the period or periods in which such developments occur, as well as for prior and in subsequent periods.

Tax laws, regulations, and administrative practices in various jurisdictions may be subject to significant change, with or without notice, due to economic, political, and other conditions, and significant judgment is required in evaluating and estimating our provision and accruals for these taxes. There are many transactions that occur during the ordinary course of business for which the ultimate tax determination is uncertain. Our effective tax rates could be affected by numerous factors, such as intercompany transactions, earnings being lower than anticipated in jurisdictions where we have lower statutory rates and higher than anticipated in jurisdictions where we have higher statutory rates, the applicability of special tax regimes, losses incurred in jurisdictions for which we are not able to realize the related tax benefit, changes in foreign currency exchange rates, entry into new businesses and geographies, changes to our existing businesses and operations, acquisitions and investments and how they are financed, changes in our stock price, changes in our deferred tax assets and liabilities and their valuation, and changes in the relevant tax, accounting, and other laws, regulations, administrative practices, principles, and interpretations.

Impairment of long-lived assets

Management reviews long-lived assets, including finite lived intangible assets, property, plant and equipment, and other assets for impairment whenever events or changes in circumstances indicate that the carrying amount of an asset, asset group, or investment may not be recoverable.

Recent Accounting Pronouncements

A discussion of recently adopted and new accounting pronouncements is included in Note [2] of the Consolidated Financial Statements included in this Annual Report.

Controls and procedures

As filed, 6,430 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

(a) Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our Chief Executive Officer and Chief Financial Officer, evaluated the effectiveness of SHI’s disclosure controls and procedures as of December 31, 2025. The term “disclosure controls and procedures,” as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act, means controls and other procedures of a company that are designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is recorded, processed, summarized and reported, within the time periods specified in the SEC’s rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by a company in the reports that it files or submits under the Exchange Act is accumulated and communicated to the company’s management, including its principal executive and principal financial officers, as appropriate to allow timely decisions regarding required disclosure. We recognize that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving their objectives and we necessarily apply our judgment in evaluating the cost-benefit relationship of possible controls and procedures. Based on the evaluation of our disclosure controls and procedures as of December 31, 2025, our Chief Executive Officer and Chief Financial Officer concluded that, as of such date, our disclosure controls and procedures were not effective at the reasonable assurance level due to the following material weakness:

  • During the close of Soluna Holdings, Inc.’s Form 10-K for the year ended December 31, 2025, it was noted that certain control activities over balance sheet classification and presentation were not performed with sufficient precision aggregating to a material weakness. Specifically, errors were identified related to (i) the classification of current and long-term debt, (ii) a lease classification and valuation, and (iii) an overstatement in deposits on equipment and current liabilities. Although management corrected these errors prior to issuance of the filing, the nature and number of adjustments indicate that the Company’s controls over balance sheet classification and presentation were not operating effectively.

Notwithstanding the existence of this material weakness, management has concluded that the Company’s consolidated financial statements in its Annual Report on Form 10-K for the period ended December 31, 2025 are fairly stated in all material respects in accordance with generally accepted accounting principles in the United States of America.

Remediation:

Our Board of Directors and management take internal control over financial reporting and the integrity of our financial statements seriously. Management continues to work to improve its controls related to our material weaknesses. The remediation actions include: (i) enhancing design and documentation related to complex transactions and control activities, and (ii) developing robust review procedures to ensure the proper recording and reporting of the complex transactions. To achieve the timely implementation of the above, management has commenced the following actions and will continue to assess additional opportunities for remediation on an ongoing basis:

  • Implement more robust internal policies and procedures relating to balance sheet presentations, with a specific focus on establishing reliable controls over lease accounting to ensure the accuracy of financial reporting.

We cannot provide any assurance that these remediation efforts will be successful or that our internal control over financial reporting will be effective as a result of these efforts. In addition, we continue to evaluate and work to improve our internal control over financial reporting related to the identified material weakness, management may determine to take additional measures to address control deficiencies or determine to modify the remediation plan described above.

(b) Management’s Report on Internal Control Over Financial Reporting

Management of our Company is responsible for establishing and maintaining adequate internal control over financial reporting, as that term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f). Our internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Under the supervision and with the participation of our management, including the principal executive officer and principal financial officer, we conducted an evaluation of the effectiveness of our internal control over financial reporting using the criteria set forth in Internal Control-Integrated Framework (2013 version) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on our evaluation using the criteria set forth in Internal Control-Integrated Framework, Management has concluded that our internal control over financial reporting was not effective as of December 31, 2025.

This annual report does not include an attestation report of our registered public accounting firm regarding internal control over financial reporting. Our report was not subject to attestation by our independent registered public accounting firm pursuant to rules of the SEC that permit us to provide only Management’s Report in this annual report.

(c) Changes in Internal Control over Financial Reporting

There have been no changes in our internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act, during our fiscal quarter ended December 31, 2025, that have materially affected, or are reasonable likely to materially affect, our internal control over financial reporting.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2025-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Revenue12 months2025-01-01 to 2025-12-31$29.7mus-gaap:RevenueFromContractWithCustomerExcludingAssessedTax
Cost of revenue12 months2025-01-01 to 2025-12-31$23.3mus-gaap:CostOfRevenue
Gross profit12 months2025-01-01 to 2025-12-31$1.8mus-gaap:GrossProfit
Selling, general and administrative12 months2025-01-01 to 2025-12-31$40.1mus-gaap:SellingGeneralAndAdministrativeExpense
Operating income12 months2025-01-01 to 2025-12-31−$33.7mus-gaap:OperatingIncomeLoss
Interest expense12 months2025-01-01 to 2025-12-31$4.8mus-gaap:InterestExpenseNonoperating
Income tax12 months2025-01-01 to 2025-12-31−$2.3mus-gaap:IncomeTaxExpenseBenefit
Net income12 months2025-01-01 to 2025-12-31−$53.4mus-gaap:NetIncomeLoss
Diluted EPS12 months2025-01-01 to 2025-12-31−$2.38us-gaap:EarningsPerShareDiluted
Basic EPS12 months2025-01-01 to 2025-12-31−$2.38us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2025-01-01 to 2025-12-3129,048,848 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2025-01-01 to 2025-12-31−$9.1mus-gaap:NetCashProvidedByUsedInOperatingActivities
Capital expenditure12 months2025-01-01 to 2025-12-31$28.1mus-gaap:PaymentsToAcquirePropertyPlantAndEquipment
Share repurchases12 months2025-01-01 to 2025-12-31$75.0kus-gaap:PaymentsForRepurchaseOfCommonStock
Cash and equivalentsAt period end2025-12-31$76.4mus-gaap:Cash
Current assetsAt period end2025-12-31$92.1mus-gaap:AssetsCurrent
Total assetsAt period end2025-12-31$187.9mus-gaap:Assets
Current liabilitiesAt period end2025-12-31$49.2mus-gaap:LiabilitiesCurrent
Total liabilitiesAt period end2025-12-31$75.7mus-gaap:Liabilities
Long-term debtAt period end2025-12-31$17.9mus-gaap:LongTermDebtNoncurrent
Current portion of debtAt period end2025-12-31$8.9mus-gaap:LongTermDebtCurrent
Shareholders' equityAt period end2025-12-31$53.5mus-gaap:StockholdersEquity