U.S. GoldMining Inc.: Form 10-K for the period ended Dec 31, 2024
Filed with the SEC on Mar 27, 2025 and accepted by EDGAR at Mar 27, 2025, 17:03 ET.
Business
As filed, 15,844 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Business Overview
We are a United States domiciled exploration stage company and our sole project is currently the Whistler Project. The Whistler Project is a gold-copper exploration project located in the Yentna Mining District, approximately 170 km northwest of Anchorage, in Alaska. See “Item 2. Properties” for further information.
We were incorporated on June 30, 2015, in Alaska as “BRI Alaska Corp.” and on August 5, 2015, pursuant to an asset purchase agreement dated July 20, 2015, by and among us, GoldMining Inc. (“GoldMining”), Kiska Metals Corporation (“Kiska”) and Geoinformatics Alaska Exploration, Inc. (“Geoinformatics”), we acquired a 100% interest in the Whistler Project and certain related assets. On September 8, 2022, we redomiciled to Nevada and changed our name to “U.S. GoldMining Inc.”.
Our sole subsidiary is US GoldMining Canada Inc., a company incorporated under the laws of British Columbia, Canada, and which is wholly-owned by us.
We are a subsidiary of GoldMining, a Toronto Stock Exchange and NYSE American listed precious metals exploration and development company that was incorporated in 2009 and whose disclosed strategy is to expand its property portfolio through accretive transactions of resource stage gold projects and to advance its properties towards development. As of the date hereof, GoldMining owns 9,878,261 shares of common stock, par value $0.001 per share (the “Common Stock”), representing approximately 79.3% of our outstanding Common Stock, and warrants (the “Warrants”) to purchase 122,490 shares of Common Stock.
Our principal executive offices are located at 1188 West Georgia Street, Suite 1830, Vancouver, British Columbia, Canada V6E 4A2 and our head operating offices are located at 301 Calista Court, Suite 200, Office 203, Anchorage, Alaska, 99518. Our website address is www.us.goldmining.com (http://www.us.goldmining.com). The information contained on, or that can be accessed through, our website is not a part of this Annual Report.
Our shares of Common Stock and warrants to purchase shares of Common Stock are listed on the Nasdaq Capital Market under the symbols “USGO” and “USGOW,” respectively.
General Development of Business
In April 2023, we completed our initial public offering (the “IPO”), pursuant to which we issued 2,000,000 units (the “Units”) at an initial offering price of $10.00 per Unit for gross proceeds of $20,000,000. Each Unit was comprised of one share of Common Stock and one Warrant, with each Warrant entitling the holder thereof to acquire one share of Common Stock at an exercise price of $13.00. Each Warrant is immediately exercisable for a three-year period after the date of issuance.
Prior to our IPO, we were a wholly-owned subsidiary of GoldMining and acquired the Whistler Project in 2015 from Kiska. Prior to our IPO, we had not completed any material exploration of the Whistler Project. For a description of exploration activities of past operators please see “Item 2. Properties”.
After completion of our IPO, on May 30, 2023, we announced that we had mobilized a field team to execute our initial 2023 confirmatory exploration program at the Whistler Project. On August 21, 2023, we announced commencement of our 2023 Phase 1 Drilling Project at the Whistler Project. The program was designed as part of a multi-phase program with the goal of expanding and increasing confidence in existing deposits and potentially testing prospective exploration targets in proximity to areas with known Mineral Resource estimates. Phase I was proposed to include 5,000 m of drilling. On January 16, 2024, we announced results from four initial confirmatory drill holes covering 2,234 m at the Whistler Project. Drilling was paused thereafter for the winter break.
We recommenced the exploration program on June 27, 2024, for the 2024 field season. During 2024, we completed six diamond core holes for 4,006 m, bringing the total drill production meterage for 2023 and 2024 to 6,240 m. Four drill holes for 2,782 m were completed at the Whistler Deposit, and two drill holes for 1,224 m were completed at the Raintree Deposit located approximately one kilometer east of the Whistler Deposit.
See “Item 2. Properties” for further information.
Our Strategy
Our strategy is to enhance and grow the value of our asset base, with a focus on exploring and advancing the Whistler Project in Alaska. Our longer-term strategy may include seeking out compelling acquisition opportunities that enhance the value of our assets and demonstrate potential for significant growth through exploration and development.
Our management team and board of directors have extensive combined mining sector related experience, including exploration, development, operating and capital markets experience. We intend to capitalize on this significant experience as we seek to advance the Whistler Project and otherwise grow our business, following best practices with a dedication to safety, the environment and sustainable development for local communities.
As part of our strategy, we expect to utilize a cost-efficient business model by operating with an efficient, highly experienced team and calling upon third-party resources to supplement our skill set as opportunities and needs may arise. This strategy should enable us to maintain a high degree of flexibility in our cost structure. We believe it will also help to ensure that our business model is scalable and allows us to seek new growth opportunities in a cost effective and value enhancing manner.
Competition
The mining industry in general is extremely competitive in all of its phases, and we compete with many companies possessing greater financial and technical resources. Competition in the precious metals mining industry is primarily for: mineral rich properties that can be developed and produced economically; technical expertise to find, develop, and operate such properties; labor to operate the properties; and capital for the purpose of funding such properties. Many competitors not only explore for and mine precious metals, but also conduct refining and marketing operations on a global basis. Such factors may result in us being unable to acquire desired properties, to recruit or retain qualified employees or to acquire the capital necessary to fund our operations and develop mining properties. Existing or future competition in the mining industry could materially adversely affect our Company’s prospects for mineral exploration and success in the future. See “Item 1A. Risk Factors”.
Sustainability
We are committed to responsible exploration and mining practices. Oversight for our sustainability policies and practices and management of sustainability-related risks is provided by the board of directors. The board of directors has delegated oversight of certain sustainability responsibilities to its committees and management, including the Sustainability Committee, which oversees the Company’s goals, strategies, compliance and commitments related to sustainability.
Our Health and Safety (“H&S”) Policy is complemented by our site-specific operational guidelines. As a part of our H&S management program, we have identified H&S risks to workers, contractors, visitors and other stakeholders, and we have developed prevention measures in the form of operational protocols and procedures. We have trained all workers on their respective H&S procedures and protocols, and we monitor the effectiveness of these measures. All injuries are recorded, and reports are analyzed and tracked on a regular basis to identify ways to improve the safety and well-being of our people.
We aspire to be stewards of the environment while advancing the Whistler Project and are committed to employing strong environmental risk management practices. We have established and follow operational procedures that identify environmental risks, sets out controls and mitigation plans, and minimizes environmental impacts.
All exploration activities are conducted in a manner that prevents undue degradation to land and water resources. Our activities to-date have had minor impact on plant and wildlife habitats, as exploration is taking place on 17-acres of previously disturbed land. There are no species listed as threatened or endangered in the project area. We have conducted environmental baseline studies, including water quality, fish species, wetland and wildlife studies. We take care to ensure water quality and fish are protected during water diversion for its use in drilling, including screening of water intakes and pumps.
We are investing in Alaska through partnering with local suppliers and contractors and supporting local initiatives important to the community. We have commenced community consultations to share with stakeholders our plans for the Whistler Project, prioritizing meeting with community organizations, native groups and government.
Government Regulation
Our exploration and development activities are subject to various national, state, and local laws and regulations in the United States, which govern prospecting, development, mining, production, exports, taxes, labor standards, occupational health, waste disposal, protection of the environment, mine safety, hazardous substances, disclosure requirements and other matters. We have obtained or have pending applications for those licenses, permits or other authorizations currently required to conduct our exploration and development programs. We believe that we are in compliance in all material respects with applicable mining, health, safety and environmental statutes and regulations in the United States. There are no current orders or directions relating to us with respect to the foregoing laws and regulations. For a more detailed discussion of the various government laws and regulations applicable to our operations and potential negative effects of these laws and regulations, see also “Item 1A. Risk Factors”.
The exploration and development of a mining prospect is subject to regulation by a number of federal and state government authorities. These include the U.S. Environmental Protection Agency (the “EPA”) and the United States Bureau of Land Management (“BLM”) as well as the various state environmental protection agencies. The regulations address many environmental issues relating to air, soil and water contamination and apply to many mining related activities including exploration, mine construction, mineral extraction, ore milling, water use, waste disposal and use of toxic substances. In addition, we are subject to regulations relating to labor standards, occupational health and safety, mine safety, general land use, export of minerals and taxation. Many of the regulations require permits or licenses to be obtained and the filing of Notices of Intent and Plans of Operations, the absence of which or inability to obtain will adversely affect the ability for us to conduct our exploration, development and operation activities. The failure to comply with the regulations and terms of permits and licenses may result in fines or other penalties or in revocation of a permit or license or loss of a prospect.
In order to conduct drilling and other exploration activities under the laws of Alaska, we submitted an Application for Permit to Mine (“APMA”) to Alaska’s Department of Natural Resources (“ADNR”) on June 30, 2022, and on September 22, 2022, the ADNR approved Multi-Year 2022-2026 Exploration and Reclamation Permit Number 2778 for Hardrock Exploration – Skwentna River – Yentna Mining District (the “Exploration Permit”) and *Reclamation Plan Approval Number 2778 (“***Reclamation Plan”**). On July 7, 2023, we received approval for amendments to the APMA, incorporating alterations to our exploration plans for 2023 and 2024. On August 6, 2024, we received approval for amendments to the APMA, incorporating alterations to our exploration plans for 2024. The Company expects to file amendment applications for APMA 2278 annually, as exploration results and strategy evolve, in order to ensure exploration programs are fully authorized. Prior to expiry of AMPA 2278 on December 31, 2026, the Company plans to apply for a new Exploration Permit.
Federal
On lands owned by the United States, mining rights are governed by the General Mining Law of 1872, as amended, which allows the location of mining claims on certain federal lands upon the discovery of a valuable mineral deposit and compliance with location requirements. The exploration of mining properties and development and operation of mines is governed by both federal and state laws. Federal laws that govern mining claim location and maintenance and mining operations on federal lands are generally administered by the BLM. Additional federal laws, governing mine safety and health, also apply. State laws also require various permits and approvals before exploration, development or production operations can begin. Among other things, a reclamation plan must typically be prepared and approved, with bonding in the amount of projected reclamation costs. The bond is used to ensure that proper reclamation takes place, and the bond will not be released until that time. Local jurisdictions may also impose permitting requirements (such as conditional use permits or zoning approvals). The Whistler Project does not incorporate any Federal lands.
Alaska
In Alaska, low impact, initial stage surface exploration such as stream sediment, soil and rock chip sampling do not require any permits. The State of Alaska requires an APMA exploration permit for all substantial surface disturbances such as trenching, road building and drilling. These permits are also reviewed by related state and federal agencies that can comment and require specific changes to the proposed work plans to minimize impacts on the environment. The permitting process for significant disturbances generally requires 30 days for processing and all work must be bonded. Due to the northern climate, exploration work in some areas of Alaska can be limited by excessive snow cover and cold temperatures. In general, surface sampling work is limited to May through September and surface drilling from March through November, although some locations afford opportunities for year round exploration operations and others, such as wetland areas, may only be explored while frozen in the winter. Mining is conducted in a number of locations in Alaska on a year round basis, both open pit and underground.
Employees
As of December 31, 2024, we had a total of nine employees, six of which were full time employees. We rely upon and engage consultants on a contract basis to provide services, management and personnel who assist us to carry on our administrative, stockholder communication and project exploration activities in the United States.
We use the services of independent consultants and contractors to perform various professional services, including land acquisition, legal, environmental and tax services. In addition, we utilize the services of independent contractors to perform construction, geological, exploration and drilling operation services and independent third-party engineering firms assist with the design, engineering, and cost optimization of the proposed large-scale complex.
Reports to Security Holders
We are subject to the informational requirements of the Exchange Act. Accordingly, we file annual reports, quarterly reports and proxy statements electronically with the SEC. The SEC maintains an internet site, at www.sec.gov (http://www.sec.gov), that contains reports, proxy and information statements and other information regarding issuers that file electronically with the SEC. Copies of such documents are also available on our website at www.us.goldmining.com (http://www.us.goldmining.com).
Risk factors
As filed, 62,273 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
You should carefully consider the following risk factors in addition to the other information included in this Annual Report on Form 10-K. Each of these risk factors could adversely affect our business, operating results and financial condition, as well as adversely affect the value of an investment in our shares of Common Stock or other securities. The risks described below are not the only ones facing us. Additional risks that we are not presently aware of, or that we currently believe are immaterial, may also adversely affect our business, operating results and financial condition. We cannot assure you that we will successfully address these risks and caution that other unknown risks may exist or may arise that may affect our business.
An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. The following risk factors, as well as risks not currently known to us, could materially adversely affect our future business, operations and financial condition and could cause them to differ materially from the estimates described in the forward-looking statements relating to us.
Risks Relating to our Business and Industry
Our success depends on the exploration development and operation of the Whistler Project, an exploration stage project which is currently our only project.
At present, our only mineral property is the interest that we hold in the Whistler Project, which is in the exploration stage. Unless we acquire or develop additional mineral properties, we will be solely dependent upon this property and our future success will be largely driven by our ability to explore and develop the Whistler Project successfully, including the results of such exploration and development efforts. If no additional mineral properties are acquired by us, any adverse development affecting our operations and further exploration or development of the Whistler Project may have a material adverse effect on our financial condition and results of operations.
Resource exploration and development is a high risk, speculative business.
The Whistler Project is at the exploration stage and is without identified Mineral Reserves. Mineral exploration and mine development are highly speculative in nature, involve many uncertainties and risks and are frequently unsuccessful. Mineral exploration is performed to demonstrate the dimensions, position and mineral characteristics of mineral deposits, estimate Mineral Resources, assess amenability of the deposit to mining and processing scenarios and estimate potential deposit size. Once mineralization is discovered, it may take a number of years from the initial exploration phases before mineral development and production is possible, during which time the potential feasibility of the Whistler Project may change adversely.
While the discovery of an ore body may result in substantial rewards, few mineral properties which are explored are ultimately developed into producing mines. Most exploration projects do not result in the discovery of commercially mineable deposits. Resource exploration and development is a speculative business, characterized by a number of significant risks including, among other things, unprofitable efforts resulting not only from the failure to discover mineral deposits but also from finding mineral deposits that, though present, are insufficient in quantity or quality to return a profit from production. The marketability of minerals acquired or discovered by us may be affected by numerous factors which are beyond our control and which cannot be accurately predicted, such as market fluctuations, the proximity and capacity of milling facilities, mineral markets and processing equipment, and such other factors as government regulations, including regulations relating to allowable production, importing and exporting of minerals, and environmental protection, the combination of which factors may result in our not receiving an adequate return of investment capital.
There is no assurance that our mineral exploration and development activities will result in any discoveries of commercial bodies of ore. The long-term profitability of our operations will in part be directly related to the costs and success of our exploration programs, which may be affected by a number of factors. Substantial expenditures are required to establish reserves through drilling and to develop the mining and processing facilities and infrastructure at any site chosen for mining. Although substantial benefits may be derived from the discovery of a major mineralized deposit, no assurance can be given that minerals will be discovered in sufficient quantities to justify commercial operations or that funds required for development can be obtained on a timely basis.
Additionally, significant capital investment is required to discover commercial ore and to commercialize production from successful exploration effort and maintain mineral concessions and other rights through payment of applicable taxes, advance royalties and other fees. The commercial viability of a mineral deposit is dependent on a number of factors, including, among others: (i) deposit attributes such as size, grade and proximity to infrastructure; (ii) current and future metal prices; and (iii) governmental regulations, including those relating to prices, taxes, royalties, land tenure, land use, importing and exporting of minerals and necessary supplies and environmental protection. The complete impact of these factors, either alone or in combination, cannot be entirely predicted and their impact may result in our not achieving an adequate return on invested capital.
There is no certainty that the expenditures made by us towards the search for and evaluation of mineral deposits will result in discoveries of commercial quantities of ore.
Mineral Resource estimates are based on interpretation and assumptions and could be inaccurate or yield less mineral production under actual conditions than is currently estimated. Any material changes in these estimates could affect the economic viability of the Whistler Project, our financial condition and ability to be profitable.
The estimates for Mineral Resources contained herein are estimates only and no assurance can be given that the anticipated tonnages and grades will be achieved. There are numerous uncertainties inherent in estimating Mineral Resources, including many factors beyond our control. Such estimation is a subjective process, and the accuracy of any Mineral Resource estimate is a function of the quantity and quality of available data and of the assumptions made and judgments used in engineering and geological interpretation. In addition, there can be no assurance that gold recoveries in small scale laboratory tests will be duplicated in larger scale tests under on-site conditions or during production, if any. If our actual Mineral Resources are less than current estimates or if we fail to develop our Mineral Resource base through the realization of identified mineralized potential, our results of operations or financial condition may be materially and adversely affected. Evaluation of Mineral Resources occurs from time to time and they may change depending on further geological interpretation, drilling results and metal prices. The category of Inferred Mineral Resource is often the least reliable Mineral Resource category and is subject to the most variability. We regularly evaluate our Mineral Resources and consider the merits of increasing the reliability of its overall Mineral Resources.
We have no history of earnings or mineral production, and there are currently no known commercial quantities of Mineral Reserves on the Whistler Project.
We have no history of earnings or mineral production and may never engage in mineral production. There are currently no known commercial quantities of Mineral Reserves on the Whistler Project. Development of the Whistler Project and any other projects we may acquire in the future will only follow upon obtaining satisfactory results of further exploration work and geological and other studies. Exploration and the development of natural resources involve a high degree of risk and few properties which are explored are ultimately developed into producing properties. There is no assurance that our exploration and development activities will result in any discoveries of commercial bodies of ore. The long-term profitability of our operations will be in part directly related to the cost and success of our exploration programs, which may be affected by a number of factors. Even if commercial quantities of minerals are discovered, the Whistler Project may not be brought into a state of commercial production. The commercial viability of a mineral deposit once discovered is also dependent on various factors, including particulars of the deposit itself, proximity to infrastructure, metal prices, and availability of power and water to permit development.
Further, we are subject to many risks common to mineral exploration companies, including under-capitalization, cash shortages, limitations with respect to personnel, financial and other resources and the lack of revenues. There is no assurance we will be successful in achieving a return on stockholder’s investment and the likelihood of success must be considered in light of its early-stage operations.
Mining and project development is inherently risky and subject to conditions or events some of which are beyond our control, and which could have a material adverse effect on our business.
Our activities related to the exploration and development of the Whistler Project and any other projects we may acquire in the future are subject to hazards and risks inherent in the mining industry. These risks, include, but are not limited to, rock falls, rock bursts, collapses, seismic activity, flooding, environmental pollution, mechanical equipment failure, facility performance issues, and periodic disruption due to inclement or hazardous weather conditions. Such risks could result in personal injury or fatality, damage to equipment or infrastructure, environmental damage, delays, suspensions or permanent cessation of activities, monetary losses and possible legal liability.
Our current or future mining, processing, development and exploration activities depend on adequate infrastructure. Mining, processing, development and exploration activities depend, to one degree or another, on adequate infrastructure. Reliable roads, bridges, power sources and water supply are important determinants that affect capital and operating costs. Unusual or infrequent weather phenomena, sabotage and government or other interference in the maintenance or provision of such infrastructure could adversely affect our operations, financial condition and results of operations.
The development of the Whistler Project or any other projects we may acquire in the future into an operating mine will be subject to all of the risks associated with establishing and operating new mining operations.
If the development of the Whistler Project or any other projects we may acquire in the future is found to be economically feasible and we seek to develop an operating mine, the development of such a mine will require obtaining permits and financing the construction and operation of the mine itself, processing plants and related infrastructure. As a result, we will be subject to certain risks associated with establishing new mining operations, including:
- uncertainties in timing and costs, which can be highly variable and considerable in amount, of the construction of mining and processing facilities and related infrastructure;
- we may find that skilled labor, mining equipment and principal supplies needed for operations, including explosives, fuels, chemical reagents, water, power, equipment parts and lubricants are unavailable or available at costs that are higher than we anticipated;
- we will need to obtain necessary environmental and other governmental approvals and permits and the receipt of those approvals and permits may be delayed or extended beyond what we anticipated, or that the approvals and permits may contain conditions and terms that materially impact our ability to operate a mine;
- we may not be able to obtain the financing necessary to finance construction and development activities or such financing may be on terms and conditions costlier than anticipated, which may make mine development activities uneconomic;
- we may suffer industrial accidents as part of building or operating a mine that may subject us to significant liabilities;
- we may suffer mine failures, shaft failures or equipment failures which delay, hinder or halt mine development activities or mining operations;
- our mining projects may suffer from adverse natural phenomena such as inclement weather conditions, floods, droughts, rock slides and seismic activity;
- we may discover unusual or unexpected geological and metallurgical conditions that could cause us to have to revise or modify mine plans and operations in a materially adverse manner; and
- the exploration, development or operation of projects may become subject to opposition from nongovernmental organizations, environmental groups or local groups, which may delay, prevent, hinder or stop development activities or operations.
In addition, we may find that the costs, timing and complexities of developing the Whistler Project or any other future projects to be greater than we anticipated. Cost estimates may increase significantly as more detailed engineering work is completed on a project. It is common in mining operations to experience unexpected costs, problems and delays during construction, development and mine start-up. Accordingly, our activities may not result in profitable mining operations at our mineral properties.
Our growth strategy and future exploration and development efforts may be unsuccessful.
In order to grow our business and pursue our long-term growth strategy, we may seek to acquire additional mineral interests or merge with or invest in new companies or opportunities. A failure to make acquisitions or investments may limit our growth. In pursuing acquisition and investment opportunities, we face competition from other companies having similar growth and investment strategies, many of which may have substantially greater resources than us. Competition for these acquisitions or investment targets could result in increased acquisition or investment prices, higher risks and a diminished pool of businesses, services or products available for acquisition or investment. Additionally, if we lose or abandon our interest in any of our mineral projects, there is no assurance that we will be able to acquire another mineral property of merit or that such an acquisition would be approved by applicable regulators.
Increasing attention to environmental, social and governance matters and conservation measures may adversely impact our business.
Increasing attention to, and societal expectations on companies to address, climate change and other environmental and social impacts and investor and societal expectations regarding voluntary environmental, social and governance (“ESG”) disclosures may result in increased costs and reduced access to capital. While we may announce various voluntary ESG targets in the future, such targets are aspirational. Also, we may not be able to meet such targets in the manner or on such a timeline as initially contemplated, including, but not limited to, as a result of unforeseen costs or technical difficulties associated with achieving such results.
In addition, organizations that provide information to investors on corporate governance and related matters have developed ratings processes for evaluating companies on their approach to ESG matters. Unfavorable ESG ratings could lead to increased negative investor sentiment toward us and could impact our access to and costs of capital. Additionally, to the extent ESG matters negatively impact our reputation, we may not be able to compete as effectively to recruit or retain employees, which may adversely impact our business. Increased focus by stakeholders, regulators and others on ESG related matters may result in increased permitting requirements and delays in the future. Additionally, we may become subject to misinformation campaigns related to ESG and other matters which may require substantial management time and expense to address and could negatively impact community sentiment regarding the applicable project or delay expected development timelines.
We rely on information technology systems and any inadequacy, failure, interruption or security breaches of those systems may harm our reputation and ability to effectively operate our business.
Our operations depend on information technology (“IT”) systems. These IT systems could be subject to network disruptions caused by a variety of sources, including computer viruses, security breaches and cyber-attacks, as well as disruptions resulting from incidents such as cable cuts, damage to physical plants, natural disasters, terrorism, fire, power loss, vandalism and theft. Our operations also depend on the timely maintenance, upgrade and replacement of networks, equipment, IT systems and software, as well as pre-emptive expenses to mitigate the risks of failures. Any of these and other events could result in IT system failures, delays and/or increase in capital expenses. The failure of IT systems or a component of information systems could, depending on the nature of any such failure, adversely impact our reputation and results of operations.
Although to date we have not experienced any material losses relating to cyber-attacks or other information security breaches, there can be no assurance that we will not incur such losses in the future. Our risk and exposure to these matters cannot be fully mitigated because of, among other things, the evolving nature of these threats. As a result, cyber security and the continued development and enhancement of controls, processes and practices designed to protect systems, computers, software, data and networks from attack, damage or unauthorized access remain a priority. As cyber threats continue to evolve, we may be required to expend additional resources to continue to modify or enhance protective measures or to investigate and remediate any security vulnerabilities.
The mining industry is intensely competitive in all of its phases, and we compete with many companies possessing greater financial and technical resources.
The mining industry is intensely competitive in all of its phases, and we compete with many companies possessing greater financial and technical resources. Competition in the precious metals mining industry is primarily for: (i) mineral rich properties that can be developed and produced economically; (ii) technical expertise to find, develop, and operate such properties; (iii) labor to operate the properties; and capital for the purpose of funding such properties. Many competitors not only explore for and mine precious metals but conduct refining and marketing operations on a global basis. Such competition may result in being unable to acquire desired properties, to recruit or retain qualified employees or to acquire the capital necessary to fund its operations and develop mining properties. Existing or future competition in the mining industry could materially adversely affect our prospects for mineral exploration and success in the future.
Risks Related to Economic and Market Conditions
Global financial markets can have a profound impact on the global economy in general and on the mining industry in particular.
Many industries, including the precious metals mining industry, are impacted by volatile market conditions. Global financial conditions remain subject to sudden and rapid destabilization in response to economic shocks. A slowdown in the financial markets or other economic conditions, including but not limited to consumer spending, employment rates, business conditions, inflation, fluctuations in fuel and energy costs, consumer debt levels, lack of available credit, the state of financial markets, interest rates and tax rates may adversely affect our growth and financial condition.
Any sudden or rapid destabilization of global economic conditions could impact our ability to obtain equity or debt financing in the future on favorable terms or at all. In such an event, our operations and financial condition could be adversely affected.
The volatility in gold and other commodity prices may adversely affect any future operations and, if warranted, our ability to develop our properties.
We are exposed to commodity price risk. The price of gold or other commodities fluctuates widely and may be affected by numerous factors beyond our control, including, but not limited to, the sale or purchase of commodities by various central banks and financial institutions, interest rates, exchange rates, inflation or deflation, global and regional supply and demand, and political and economic climates and conditions of major mineral-producing countries around the world.
Declines in the market price of gold, base metals and other minerals may adversely affect our ability to raise capital or attract joint venture partners in order to fund our ongoing operations and meet obligations under option and other agreements underlying our mineral interests. Commodity price declines could also reduce the amount we would receive on the disposition of the Whistler Project to a third party. In addition, the decision to put a mine into production and to commit the funds necessary for that purpose must be made long before the first revenue from production would be received. A decrease in the price of gold may prevent a property from being economically mined or result in the write-off of assets whose value is impaired as a result of lower gold prices.
We may be adversely affected by the effects of inflation.
Increased inflation has resulted in, and may continue to result in, higher interest rates and capital costs, shipping costs, supply shortages, increased costs of labor, weakening exchange rates, and other similar effects. Our ability to conduct exploration of the Whistler Project is dependent on the acquisition of goods and services at a reasonable cost, such as drilling equipment and skilled labor, assay laboratory testing in a timeframe that allows us to execute on follow-up exploration phases expeditiously, and aircraft (fixed wing and helicopter) charter service availability to mobilize labor, position equipment and supply exploration campaigns. If we are unable to take effective measures in a timely manner to mitigate the impact of the inflation, the scope of our exploration of the Whistler Project may decrease and our business, financial condition, and results of operations could be adversely affected.
The impacts of changes in the trade policies, including proposed tariffs or other trade barriers, of the United States, or other nations, may adversely impact our business, financial condition and results of operations.
In early February 2025, the United States announced additional 25% tariffs on all goods originating from Canada and Mexico, and an additional 10% tariff on goods imported from China. While certain pauses were announced on many of these tariffs, we cannot currently predict when or if such tariffs will take effect or their duration. These tariffs, along with any new tariffs adopted by the United States or retaliatory measures by other countries could materially increase the cost of equipment and other goods necessary for our exploration and development plans. Further, there is a risk that the tariffs imposed by the United States on other countries may trigger a broader global trade war. The extent and impacts thereof are still uncertain, but they may negatively impact global economic conditions, which could materially adversely impact our ability to access capital to finance our exploration and development plans.
Our results of operations could be affected by currency fluctuations.
We maintain accounts in currencies including the United States dollars and Canadian dollars. We conduct our business using both the aforementioned currencies depending on the location of the operations in question and the payment obligations involved. Accordingly, the results of our operations are subject to currency exchange risks. To date, we have not engaged in any formal hedging program to mitigate these risks. The fluctuations in currency exchange rates may significantly impact our financial position and results of operations in the future.
Risks Relating to Financial Matters
We have negative cash flows from operating activities.
We had negative cash flow from operating activities in the period from our incorporation until the date of this Annual Report. Given that we have no operating revenues, and do not anticipate generating operating revenues for the foreseeable future, we expect that expenditures to fund operating activities will be provided by financings. There is no assurance that future financings can be completed on acceptable terms or at all, and our failure to raise capital when needed could limit our ability to continue our operations in the future.
We will require additional financing to fund exploration and, if warranted, development and production. Failure to obtain additional financing could have a material adverse effect on our financial condition and results of operation and could cast uncertainty on our ability to continue our operations in the future.
Even if the results of exploration are encouraging, we may not have sufficient funds to conduct the further exploration that may be necessary to determine whether or not a commercially minable deposit exists on any portion of the Whistler Project. While we may generate additional working capital through further equity offerings, there is no assurance that any such funds will be available on acceptable terms, or at all. If available, future equity financing may result in substantial dilution to stockholders. At present it is impossible to determine what amounts of additional funds, if any, may be required.
There will be significant hazards associated with our activities, some of which may not be fully covered by insurance. To the extent we must pay the costs associated with such risks, our business may be negatively affected.
In the course of exploration, development and production of mineral properties, certain risks, and in particular, unexpected or unusual geological operating conditions including rock bursts, cave-ins, fires, flooding and earthquakes may occur. Such occurrences could result in damage to mineral properties or facilities thereon, personal injury or death, environmental damage to our properties or the properties of others, delays in mining, monetary losses and possible legal liability.
Although we maintain insurance to protect against certain risks in such amounts as we consider being reasonable, our insurance will not cover all of the potential risks associated with our operations. We may also be unable to maintain insurance to cover certain risks at economically feasible premiums. In addition, insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Should such liabilities arise, they could reduce or eliminate any future profitability and result in increasing costs and a decline in the value of our securities.
Moreover, insurance against risks such as environmental pollution or other hazards as a result of exploration and production is not generally available to companies in the mining industry on acceptable terms. As a result, we may become subject to liability for pollution or other hazards that may not be insured against. Losses from these events may cause us to incur significant costs that could have a material adverse effect upon our financial performance and results of operations.
Capital and operating cost estimates made in respect of our current and future development projects and mines may not prove to be accurate.
Capital and operating cost estimates made in respect of our current and future development projects and mines may not prove to be accurate. Capital and operating costs are estimated based on the interpretation of geological data, feasibility studies, anticipated climatic conditions and other factors. Any of the following events, among the other events and uncertainties described herein, could affect the ultimate accuracy of such estimates: (i) unanticipated changes in grade and tonnage of ore to be mined and processed; (ii) incorrect data on which engineering assumptions are made; (iii) delay in construction schedules and unanticipated transportation costs; (iv) the accuracy of major equipment and construction cost estimates; (v) labor negotiations; (vi) changes in government regulation (including regulations regarding prices, cost of consumables, royalties, duties, taxes, permitting and restrictions on production quotas on exportation of minerals); and (vii) title claims.
Risks Relating to Permitting, Regulatory and other Legal Matters
We may be unsuccessful in obtaining necessary permits to explore, develop or mine the Whistler Project in a timely manner or at all.
Exploration, development and mining activities will require certain permits and other governmental approvals. We may be unsuccessful in obtaining such permits and approvals on a timely basis, or on favorable terms or at all.
The State of Alaska requires that an APMA be submitted to obtain permits for all exploration, mining, or transportation of equipment and maintaining a camp. These permits are reviewed by related state and federal agencies that can comment on and require specific changes to proposed work plans to minimize impacts on the environment. We have submitted an APMA to the ADNR for the issuance of permits that will allow for future exploration work on the property in connection with the Whistler Project and on September 22, 2022, the ADNR approved the Exploration Permit and Reclamation Plan. On July 7, 2023, we received approval for amendments to the APMA, incorporating alterations to our exploration plans, in 2023 and 2024.
Any failure to obtain permits and other governmental approvals could delay or prevent us from completing contemplated activities as planned which could negatively impact our financial condition and results of operations.
Additionally, any failure to comply with applicable laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, the installation of additional equipment, or remedial actions. Parties engaged in mining operations may be required to compensate those suffering loss or damage by reason of mining activities and may be subject to civil or criminal fines or penalties for violations of applicable laws or regulations.
Amendments to current laws, regulations and permits governing operations and activities of mining companies, or a more stringent implementation thereof, could have a material adverse impact on us and cause increases in exploration expenses, capital expenditures or other costs, or abandonment or delays in the exploration and development of new mining properties.
We may not be able to obtain all required permits and licenses to place any of our properties into future production.
We may not be able to obtain all required permits and licenses to place any of our properties into production. Our future operations may require permits from various governmental authorities and will be governed by laws and regulations governing prospecting, development, mining, production, export, taxes, labor standards, occupational health, waste disposal, land use, environmental protections, mine safety and other matters. There can be no guarantee that we will be able to obtain all necessary licenses, permits and approvals that may be required to undertake exploration activity or commence construction or operation of mine facilities at the Whistler Project. Additionally, there can be no assurance that all permits and licenses we may require for future exploration or possible future development will be obtainable at all or on reasonable terms or that there will be no change in regulatory requirements.
The validity of our title to the Whistler Project and future mineral properties may be disputed by others claiming title to all or part of such properties.
The acquisition of title to mineral properties is a very detailed and time-consuming process. Title to, and the area of, mineral concessions may be disputed. Although we believe we have taken reasonable measures to ensure proper title to our interests in our properties, there is no guarantee that title to any such properties will not be challenged or impaired. Third parties may have valid claims underlying portions of our interests, including prior unregistered liens, agreements, transfers or claims and title may be affected by, among other things, undetected defects. In addition, we may be unable to operate on such properties as permitted or to enforce its rights with respect to such properties.
We are subject to various laws and regulations, and the costs associated with compliance with such laws and regulations may cause substantial delays and require significant cash and financial expenditure, which may have a material adverse effect on our business.
We are subject to various laws and regulations. The costs associated with compliance with such laws and regulations may cause substantial delays and require significant cash and financial expenditure, which may have a material adverse effect on us or the development of the Whistler Project and any other projects we may acquire in the future.
We rely on various counsel, consultants and advisors in respect of legal, environmental compliance, banking, financing and tax matters in order to ensure compliance with material legal, regulatory and governmental developments as they pertain to and affect our operations. Nevertheless, we may fail to comply with a legal or regulatory requirement, which may lead to the revocation of certain rights or to penalties or fees and in enforcement actions thereunder, including orders issued by regulatory or judicial authorities causing operations to cease or be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment, or remedial actions.
Parties engaged in exploration operations may be required to compensate those suffering loss or damage by reason of the exploration activities and may have civil or criminal fines or penalties imposed for violations of applicable laws or regulations and, in particular, environmental laws. Any of the foregoing may have a material adverse effect on us or the development of the Whistler Project and any other projects we may acquire in the future.
Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations.
Our activities are subject to environmental regulations in the jurisdiction in which we operate. Environmental legislation generally provides for restrictions and prohibitions on spills, releases or emissions into the air, discharges into water, management of waste, management of hazardous substances, protection of natural resources, antiquities and endangered species and reclamation of lands disturbed by mining operations. Certain types of operations require the submission and approval of environmental impact assessments. Environmental legislation is evolving in a manner involving stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and a heightened degree of responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations and future changes in these laws and regulations may require significant capital outlays, cause material changes or delays in our current and planned operations and future activities and reduce the profitability of operations. It is possible that future changes in these laws or regulations could have a significant adverse impact on the Whistler Project or some portion of our business, causing us to re-evaluate those activities at that time.
Examples of current U.S. federal laws which may affect our current operations and may impact future business and operations include, but are not limited to, the following:
The Comprehensive Environmental, Response, Compensation, and Liability Act (“CERCLA”), and comparable state statutes, impose strict, joint and several liability on current and former owners and operators of sites and on persons who disposed of or arranged for the disposal of hazardous substances found at such sites. It is not uncommon for the government to file claims requiring cleanup actions, demands for reimbursement for government-incurred cleanup costs, or natural resource damages, or for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by hazardous substances released into the environment. The Federal Resource Conservation and Recovery Act (“RCRA”), and comparable state statutes, govern the disposal of solid waste and hazardous waste and authorize the imposition of substantial fines and penalties for noncompliance, as well as requirements for corrective actions. CERCLA, RCRA and comparable state statutes can impose liability for clean-up of sites and disposal of substances found on exploration, mining and processing sites long after activities on such sites have been completed.
The Clean Air Act (“CAA”) restricts the emission of air pollutants from many sources, including mining and processing activities. Our mining operations may produce air emissions, including fugitive dust and other air pollutants from stationary equipment, storage facilities and the use of mobile sources such as trucks and heavy construction equipment, which are subject to review, monitoring or control requirements under the CAA and state air quality laws. New facilities may be required to obtain permits before work can begin, and existing facilities may be required to incur capital costs in order to remain in compliance. In addition, permitting rules may impose limitations on our production levels or result in additional capital expenditures in order to comply with the regulations.
The National Environmental Policy Act (“NEPA”) requires federal agencies to integrate environmental considerations into their decision-making processes by evaluating the environmental impacts of their proposed actions, including issuance of permits to mining facilities, and assessing alternatives to those actions. If a proposed action could significantly affect the environment, the agency must prepare a detailed statement known as an Environmental Impact Statement (“EIS”). The U.S. Environmental Protection Agency (“EPA”), other federal agencies, and any interested third parties will review and comment on the scoping of the EIS and the adequacy of and findings set forth in the draft and final EIS. We are required to undertake the NEPA process for the Whistler Project permitting. The NEPA process can cause delays in issuance of required permits or result in changes to a project to mitigate its potential environmental impacts, which can in turn impact the economic feasibility of a proposed project or the ability to construct or operate the Whistler Project or other properties and may make them entirely uneconomic.
The Clean Water Act (“CWA”), and comparable state statutes, impose restrictions and controls on the discharge of pollutants into waters of the United States. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of a permit issued by the EPA or an analogous state agency. The CWA regulates storm water mining facilities and requires a storm water discharge permit for certain activities. Such a permit requires the regulated facility to monitor and sample storm water run-off from its operations. The CWA and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the United States unless authorized by an appropriately issued permit. The CWA and comparable state statutes provide for civil, criminal and administrative penalties for unauthorized discharges of pollutants and impose liability on parties responsible for those discharges for the costs of cleaning up any environmental damage caused by the release and for natural resource damages resulting from the release.
The Safe Drinking Water Act (“SDWA”) and the Underground Injection Control (“UIC”) program promulgated thereunder, regulate the drilling and operation of subsurface injection wells. The EPA directly administers the UIC program in some states and in others the responsibility for the program has been delegated to the state. The program requires that a permit be obtained before drilling a disposal or injection well. Violation of these regulations or contamination of groundwater by mining related activities may result in fines, penalties, and remediation costs, among other sanctions and liabilities under the SDWA and state laws. In addition, third party claims may be filed by landowners and other parties claiming damages for alternative water supplies, property damages, and bodily injury.
Legislation has been proposed that would significantly affect the mining industry and our business.
In recent years, members of the United States Congress have repeatedly introduced bills which would supplant or alter the provisions of the U.S. General Mining Law. If adopted, such legislation, among other things, could eliminate or greatly limit the right to a mineral patent, impose federal royalties on mineral production from unpatented mining claims located on U.S. federal lands, result in the denial of permits to mine after the expenditure of significant funds for exploration and development, reduce estimates of Mineral Reserves and reduce the amount of future exploration and development activity on U.S. federal lands, all of which could have a material and adverse effect on our ability to operate and its cash flow, results of operations and financial condition.
Litigation or legal proceedings could expose us to significant liabilities and have a negative impact on our reputation or business.
From time to time, we may be party to various claims and litigation proceedings. All industries, including the mining industry, are subject to legal claims, with and without merit. Defense and settlement costs of legal claims can be substantial, even with respect to claims that have no merit. Due to the inherent uncertainty of the litigation process, the resolution of any particular legal proceeding to which we may become subject could have a material effect on our financial position, results of operations or our mining, project development operations and may divert our management’s attention.
Human Resources and Related Risks
We rely on third-party contractors.
As we continue with the exploration and advancement of the Whistler Project and any other projects we may acquire in the future, timely and cost-effective completion of work will depend largely on the performance of our contractors. If any of these contractors or consultants do not perform to accepted or expected standards, we may be required to hire different contractors to complete tasks, which may impact schedules and add costs to the Whistler Project and any other projects we may acquire in the future, and in some cases, lead to significant risks and losses. A major contractor default or the failure to properly manage contractor performance could have an adverse effect on our results.
We are dependent on key personnel and the absence of any of these individuals could adversely affect our business. We may experience difficulty attracting and retaining qualified personnel.
Our success is or will be dependent on a relatively small number of key management personnel, employees and consultants. Such skills and knowledge include the areas of permitting, geology, drilling, metallurgy, logistical planning, engineering and implementation of exploration programs, as well as finance and accounting. The loss of the services of one or more of such key management personnel could have a material adverse effect on our business. Our ability to manage our exploration and future development activities, and hence our success, will depend in large part on the efforts of these individuals. We face intense competition for qualified personnel, and there can be no assurance that we will be able to attract and retain such personnel.
Certain of our directors and officers also serve as directors and officers of other companies involved in natural resource exploration and development, which may cause them to have conflicts of interest.
Certain of our directors and officers also serve as directors and/or officers of other companies involved in natural resource exploration and development and, consequently, there exists the possibility for such directors and officers to be in a position of conflict. In addition, Alastair Still, the Chief Executive Officer of GoldMining, is also a director of the Company. Tim Smith, our Chief Executive Officer, is also Vice President, Exploration for GoldMining. As a result of their positions with GoldMining, they may have a potential conflict of interest with respect to ongoing matters relating to the Whistler Project. Additionally, the time and attention our directors and officers serving as directors and/or officers of other companies are required to dedicate to such positions could limit their ability to focus on our business and impact our business.
We expect that any decision made by any of such directors and officers involving our business will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to our best interests and our stockholders’ best interests, but there can be no assurance in this regard.
Risks Relating to Our Securities and Corporate Structure
We may issue additional shares of our Common Stock from time to time for various reasons, resulting in the potential for significant dilution to existing stockholders.
We are authorized to issue up to 300,000,000 shares of our Common Stock, and as such, we may issue additional shares of our Common Stock from time to time for various reasons, including, but not limited to, for the purposes of raising capital (including to fund exploration and development work) or acquiring additional interests. We may also issue additional shares of our Common Stock pursuant to equity incentive plans from time to time. These further issuances of our shares of Common Stock may have a depressive effect on the price of our shares of Common Stock and will dilute the voting power of our existing stockholders and the potential value thereof.
We may in the future enter into transactions with related parties and such transactions present possible conflicts of interest.
We may in the future enter into transactions with related parties and such transactions present possible conflicts of interest. GoldMining, or other related parties may have interests in such transactions that do not align with the interests of our security holders. There can be no assurance that we may have been able to achieve more favorable terms, including as to value and other key terms, if such transaction had not been with a related party.
We may in the future enter into transactions with entities in which our board of directors and other related parties hold ownership interests. Material transactions with related parties, if any, will be reviewed and approved by our Audit Committee, which is comprised solely of independent directors. Nevertheless, there can be no assurance that any such transactions will result in terms that are more favorable to us than if such transactions are not entered into with related parties. Furthermore, we may achieve more favorable terms if such transactions had not been entered into with related parties and, in such case, these transactions, individually or in the aggregate, may have an adverse effect on our business, financial position and results of operations.
If we fail to maintain effective internal controls over financial reporting, the price of our securities may be adversely affected.
We may fail to maintain the adequacy of our internal controls over financial reporting as such standards are modified, supplemented or amended from time to time, and we cannot ensure that we will conclude on an ongoing basis that it has effective internal controls over financial reporting. Our failure to satisfy the requirements of applicable legislation on an ongoing, timely basis could result in the loss of investor confidence in the reliability of its financial statements, which in turn could harm our business and negatively impact the trading price and market value of its shares or other securities. In addition, any failure to implement required new or improved controls, or difficulties encountered in their implementation, could harm our operating results or cause it to fail to meet its reporting obligations.
We may fail to maintain the adequacy of its disclosure controls. Disclosure controls and procedures are designed to ensure that the information required to be disclosed by us in reports filed with securities regulatory agencies is recorded, processed, summarized and reported on a timely basis and is accumulated and communicated to our management, as appropriate, to allow timely decisions regarding required disclosure.
No evaluation can provide complete assurance that our financial and disclosure controls will detect or uncover all failures of persons within the Company to disclose material information otherwise required to be reported. A control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance with respect to the reliability of financial reporting and financial statement preparation. The effectiveness of our controls and procedures could also be limited by simple errors or faulty judgements. No material weaknesses have been identified for the year-ended December 31, 2024. If we identify or are unable to successfully remediate any future material weakness in our internal control over financial reporting, the accuracy and timeliness of our financial reporting may be adversely affected.
We are an “emerging growth company”, and any decision on our part to comply only with certain reduced reporting and disclosure requirements applicable to emerging growth companies could make our securities less attractive to investors.
We are an “emerging growth company”, as defined in the JOBS Act. For as long as we continue to be an “emerging growth company”, we may choose to take advantage of exemptions from various reporting requirements applicable to other public companies that are not “emerging growth companies”, including, but not limited to, not being required to have our independent registered public accounting firm audit our internal control over financial reporting under Section 404 of the Sarbanes-Oxley Act, reduced disclosure obligations regarding executive compensation in our periodic reports and exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved. We could be an “emerging growth company” for up to five years following the completion of our IPO. However, if our non-convertible debt issued within a three-year period exceeds $1.0 billion or revenues exceeds $1.235 billion, or the market value of our Common Stock that is held by non-affiliates exceeds $700 million on the last day of the second fiscal quarter of any given fiscal year, we would cease to be an emerging growth company as of the following fiscal year. Even after we no longer qualify as an emerging growth company, we may still qualify as a “smaller reporting company”, which would allow us to take advantage of many of the same exemptions from disclosure requirements, including not being required to comply with the auditor attestation requirements of Section 404 of the Sarbanes-Oxley Act and reduced disclosure obligations regarding executive compensation in our periodic reports and proxy statements. Investors could find our securities less attractive if we choose to rely on these exemptions. If some investors find our securities less attractive as a result of any choices to reduce future disclosure, there may be a less active trading market for our Common Stock and our share price may be more volatile.
A small number of our stockholders could significantly influence our business.
As of the date of this Annual Report, GoldMining owns approximately 79.3% of our outstanding Common Stock. As such, GoldMining is able to exercise significant influence over matters requiring stockholder approval, including the election of directors and approval of significant corporate transactions, such as a merger or other sale of us or our assets. This concentration of ownership may make it more difficult for other stockholders to effect substantial changes, may have the effect of delaying, preventing or expediting, as the case may be, a change in control and may adversely affect the market price of our securities. Further, the possibility that GoldMining or any other significant stockholders may sell all or a large portion of their securities in a short period of time could adversely affect the trading price of our shares of Common Stock. Also, the interests of such stockholder may not be in the best interests of all stockholders.
We are a “controlled company” within the meaning of the Nasdaq Capital Market corporate governance requirements. As a result, we qualify for exemptions from certain U.S. corporate governance requirements and such exemptions could have an adverse effect on our public stockholders.
GoldMining controls a majority of the shares of our Common Stock. As a result, we are a “controlled company” within the meaning of the Nasdaq Capital Market corporate governance requirements. The Nasdaq Capital Market corporate governance requirements provides that a company of which more than 50% of the voting power for the election of directors is held by an individual, a group or another company, is a “controlled company” and may elect not to comply with certain corporate governance requirements, including the requirements:
- that we have a Compensation Committee that is composed entirely of independent directors with a written charter addressing the committee’s purpose and responsibilities;
- that our Nominating and Corporate Governance Committee be composed entirely of independent directors with a written charter addressing the committee’s purpose and responsibilities, or if no such committee exists, that our director nominees be selected or recommended by independent directors constituting a majority of the board of director’s independent directors in a vote in which only independent directors participate; and
- for an annual performance evaluation of the Nominating and Corporate Governance and Compensation Committees.
We have elected to rely on the “controlled company” exemption provided in the Nasdaq Capital Market corporate governance requirements to permit our Compensation Committee to include a non-independent director, and we could elect to rely on other exemptions in the future. Our status as a controlled company could cause our securities to look less attractive to certain investors or otherwise harm the trading price of our shares of Common Stock.
The market price of our securities may be volatile, which could result in substantial losses for investors purchasing our securities.
The market price of our securities could be subject to significant fluctuations. In addition, securities markets worldwide have experienced, and are likely to continue to experience, significant price and volume fluctuations. This market volatility, as well as general economic, market or political conditions, could subject the market price of our securities to wide price fluctuations regardless of our operating performance. Some of the factors that may cause the market price of our securities to fluctuate include:
- price and volume fluctuations in the global stock markets from time to time;
- changes in operating performance and stock market valuations of other companies in our industry;
- sales of our securities by us or GoldMining;
- failure of securities analysts and credit rating agencies to maintain coverage of us, changes in financial estimates by securities analysts and credit rating agencies who follow us, or our failure to meet these estimates or the expectations of investors;
- the financial projections we may provide to the public (in the event we decide to provide any such projections), any changes in those projections or our failure to meet those projections;
- rumors and market speculation involving us or other companies in our industry;
- actual or anticipated changes in our results of operations or fluctuations in our results of operations;
- litigation involving us, our industry or both, or investigations by regulators into our operations or those of our competitors;
- new laws or regulations or new interpretations of existing laws or regulations applicable to our business;
- changes in tax laws and regulations, changes in trade policies, as well as accounting standards, policies, guidelines, interpretations or principles;
- any significant change in our management team;
- general economic conditions and slow or negative growth of our markets; and
- other risk factors described in this section of the Annual Report.
In addition, stock markets have historically experienced substantial price and volume fluctuations. Broad market and industry factors may harm the market price of our securities. Hence, the market price of our securities could fluctuate based upon factors that have little or nothing to do with us, and these fluctuations could materially reduce the market price of our securities regardless of our operating performance. In the past, following periods of volatility in the market price of a company’s securities, securities class action litigation has been instituted against that company. If we were involved in any similar litigation, we could incur substantial costs, our management’s attention and resources could be diverted and it could harm our business, operating results and financial condition.
Our shares of Common Stock and Warrants are equity interests and would be subordinate to future issuances by us of either indebtedness or shares of preferred stock.
Our shares of Common Stock and Warrants are equity interests and do not constitute indebtedness. As such, they will rank junior to any indebtedness we may incur and to other non-equity claims against us and our assets available to satisfy claims against us, including in a liquidation. Additionally, holders of our shares of Common Stock are subject to the prior dividend and liquidation rights of holders of our shares of preferred stock, to the extent we issue shares of preferred stock in the future and the shares of preferred stock remain outstanding at that time. Our board of directors is authorized to issue classes or series of shares of preferred stock without any action on the part of the holders of our shares of Common Stock and we are permitted to incur debt. Upon liquidation, lenders and holders of any outstanding debt securities and shares of preferred stock would receive distributions of our available assets prior to holders of our shares of Common Stock.
Additionally, any potential issuance of shares of preferred stock in the future may delay or prevent a change in control of us, discourage bids for our shares of Common Stock at a premium over the market price and adversely affect the market price and other rights of the holders of our shares of Common Stock.
We do not anticipate paying cash dividends, and accordingly, stockholders must rely on share appreciation for any return on their investment.
We have never paid any dividends on our shares of Common Stock. We currently intend to retain our future earnings, if any, to fund the development and growth of our businesses and do not anticipate that we will declare or pay any cash dividends on our shares of Common Stock in the foreseeable future.
U.S. civil liabilities may not be enforceable against our directors, our officers or certain experts named in this Annual Report. Similarly, it may be difficult for investors to enforce civil liabilities against us, our directors and officers residing outside of the United States.
We are incorporated under the laws of Nevada and have an office in Canada. Many of our directors and officers, as well as certain experts named herein, reside outside of the United States, and a portion of their assets are located outside the United States. As a result, it may be difficult for investors to effect service of process within the United States upon such directors, officers or experts or to enforce judgments obtained against such persons, in U.S. courts, in any action, including actions predicated upon the civil liability provisions of U.S. federal securities laws or any other laws of the United States.
Cybersecurity
As filed, 5,737 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
We maintain programs and technologies to ensure that our information systems are effective and prepared for data privacy and cybersecurity risks, including regular oversight of our security programs for monitoring internal and external threats to ensure the confidentiality and privacy of our data. As the volume and complexity of cyber-attacks continue to evolve, we continue to enhance our security capabilities by continued investment in cyber technologies, further developing our internal cybersecurity personnel and educating our workforce regarding cyber-security and leveraging emerging technologies.
Risk Management and Strategies
Our board of directors have adopted a Cybersecurity Policy to serve as a standard for setting, reviewing and implementing our cybersecurity goals, objectives and targets. Our Cybersecurity Policy serves as a framework within which risks the confidentiality, integrity or availability of our assets within our information technology network and infrastructure (“Cyberspace”), and applies to all of our directors, officers, employees, consultants and contractors. We regularly perform evaluations of our security program and continue to implement controls aligned with industry guidelines to identify threats, detect attacks and protect data. Our risk management strategy is focused on three areas: (i) technology, being our hardware and software systems; (ii) processes, being our cybersecurity reporting, testing and other processes; and (iii) people, which refers to our internal cybersecurity personnel, external service providers and individual training and human interaction within our information technology and cybersecurity processes.
When reviewing third-party information technology service providers, our engagement process customarily includes, among other things, a review of such providers’ cybersecurity measures.
We periodically undertake cybersecurity audits, the results of which are reported to our Audit Committee. We have also implemented security monitoring programs designed to alert us of any suspicious activity and have developed an incident response program in the event of a security breach.
We implement various training programs periodically to ensure that our employees and other personnel comply with internal processes and to enhance their cybersecurity awareness. Members of our board of directors and management overseeing our information security risk management approach are provided with opportunities for continuing education in cybersecurity and evolving cybersecurity risks in order to better understand and evaluate our preparedness.
See also “Item 1A. Risk Factors – Risks Related to our Business and Industry – We rely on information technology systems and any inadequacy, failure, interruption or security breaches of those systems may harm our reputation and ability to effectively operate our business”.
Governance
Our board of directors oversees our Cybersecurity Policy primarily through the Audit Committee. The Audit Committee is responsible for the implementation of our oversight, programs, procedures and policies related to cybersecurity, cybersecurity risks, information security and data privacy, including reviewing our cybersecurity-related disclosures in our annual securities filings, monitoring (on an ongoing basis) the implementation and effectiveness of our Cybersecurity Policy and assessing potential risks to our Cyberspace and our risk exposure, resiliency of our processes, industry trends and best practices and any relevant cybersecurity and digital technology metrics. The Audit Committee reports regularly to our board of directors concerning the matters covered under the policy and advises our board of directors of any developments that it believes should have our board of directors’ consideration.
Our chief executive officer and chief financial officer oversee the details of our information security risk management approach and may appoint team leads from various departments from time to time to assist with certain aspects of our cybersecurity risk mitigation strategy.
Management is required to report to the Audit Committee on our strategy, risks, metrics and operations relating to cybersecurity and information security matters. Management is responsible for ensuring that personnel are provided with adequate resources and trainings to fully understand the guidelines and expectations for cybersecurity. Members of our management team may be asked by our chief financial officer to assist with IT security investigations in the event of a breach of our Cybersecurity Policy. Upon becoming aware of a potential violation of our policy or a breach of cybersecurity, the member of management must immediately document the violation and request the individual surrender possession of any devices that may have suffered a security breach. If any member of management that is unaware of the best course of action in dealing with an IT-related matter is required to contact our third-party IT representative.
All of our employees, consultants and contractors are encouraged to exercise professional judgement in using computing devices and network resources connected to the Cyberspace, and are strictly prohibited from certain acts enumerated in our Cybersecurity Policy including, among other things, access for non-business purposes, disabling our security features and requirement, exporting information or technologies without consent and password sharing.
Violations or breaches of our Cybersecurity Policy or the associated schedules, standards or guidelines may result in suspension and/or discipline up to and including termination, in addition to administrative sanctions or legal actions.
Properties
As filed, 36,873 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Our sole exploration and development property is the Whistler Project, located in the Yentna Mining District of Alaska, approximately 170 km northwest of Anchorage.
We also lease and maintain an office at 301 Calista Court, Suite 200, Office 203, Anchorage, Alaska, 99518. We also maintain office space at 1188 West Georgia Street, Suite 1830, Vancouver, British Columbia, Canada, V6E 4A2. We do not currently own any real estate. We believe that we have adequate space for our anticipated needs and that suitable additional space will be available at commercially reasonable prices as needed.
The Whistler Project
The following information is primarily condensed and extracted from the S-K 1300 Report. Readers should refer to the full text of the S-K 1300 Report, attached hereto as Exhibit 96.1, for further information regarding the Whistler Project.
Project Description, Location and Access
The Whistler Project is a gold-copper exploration project located in the Yentna Mining District of Alaska, approximately 170 km (105 miles) northwest of Anchorage.
As of the date hereof, the Whistler Project comprises 377 State of Alaska mining claims covering an aggregate area of approximately 217.5 km2. The center of the property is located at 152.566° longitude west and 61.983° latitude north. The Whistler Project is located in the drainage of the Skwentna River. Elevation varies from about 400 masl in the valley floors to over 5,000 masl in the highest peaks.
An all-season camp facility exists near the confluence of Portage Creek and the Skwentna River, approximately 15 km southeast of the Rainy Pass Hunting Lodge. The camp is serviced with a 1,000 m gravel airstrip for wheel-based aircraft. The camp is equipped with kitchen and messing facility, ablutions facility, accommodations for up to 24 personnel, a maintenance workshop, water well and potable water filtration system, septic field system, diesel generators, office and core logging and sampling facility and a satellite communications link, tent structures on wooden floors, and several wood-framed buildings.
The following map sets forth the location of the Whistler Project and shows the proposed alignment of the West Susitna Access Road.
Royalties and Encumbrances
We acquired rights to the Whistler Project and certain related assets in August 2015 for a total cost of approximately $1.32 million pursuant to an asset purchase agreement dated July 20, 2015, by and among us, GoldMining, Kiska and Geoinformatics. Pursuant to such agreement, we acquired rights and assumed obligations under several related underlying agreements. The related underlying agreements on the Whistler Project are listed below:
1. 2.75% net smelter return (“NSR”) over all 377 claims and extending outside the current claims over an Area of Interest defined by the maximum historical extent of claims held on the Whistler Project to Osisko Mining (USA) Inc. (“OM”) pursuant to an Amended and Restated Net Smelter Returns Royalty Deed dated December 16, 2014, granted by Geoinformatics (as assumed by us on August 5, 2015) in favour of MF2 LLC (as assumed by OM). Gold Royalty U.S. Corp. holds a right to buy down the royalty percentage from 2.75% to 2.0% upon payment to OM of a one-time payment of $5,000,000. The royalty was subsequently assigned to Nevada Select Royalty, Inc. (a subsidiary of Gold Royalty Corp.).
2. 2.0% net proceeds royalty interest over an Area of Interest specified by standard township sub-division overlying the Whistler and Raintree West deposits to Sandstorm Gold Ltd. pursuant to an agreement dated October 1, 1999, between us (the ultimate successor-in-interest to Kent Turner, Jr.) and Sandstorm Gold Ltd. (the ultimate successor-in-interest to Cominco American Incorporated).
3. 1.0% NSR over the Whistler Project to Gold Royalty U.S. Corp. pursuant to a Net Smelter Returns Royalty Agreement dated January 11, 2021, between us and Gold Royalty U.S. Corp.
History
Mineral exploration in the Whistler area was initiated by Cominco in 1986 and continued through 1989. During this period, the Whistler and the Island Mountain gold-copper porphyry occurrences were discovered and partially tested by drilling. In 1990, Cominco ceased exploration and all cores from the Whistler region were donated to the State of Alaska and the property was allowed to lapse.
In 1999, Kent Turner staked 25 State of Alaska mining claims at Whistler and leased the property to Kennecott. From 2004 through 2006, Kennecott conducted extensive exploration of the Whistler region, including geological mapping, soil, rock and stream sediments sampling, ground Induced Polarization survey, and the evaluation of the Whistler gold-copper occurrence with fifteen core boreholes (7,948 m) and reconnaissance core drilling at other targets in the Whistler region (4,184 m). Over that period Kennecott invested over $6.3 million in exploration.
In June 2007, Geoinformatics announced the conditional acquisition of the Whistler Project as part of a strategic alliance with Kennecott.
From 2007 through 2008, Geoinformatics drilled twelve holes totaling 5,784 m on the Whistler Deposit and six holes totaling 1,841 m on other exploration targets in the Whistler area. Drilling by Geoinformatics on the Whistler Deposit was done to infill the deposit to sections spaced at 75 m and to test for the north and south extensions of the deposit. Exploration drilling by Geoinformatics in the Whistler area targeted geophysical anomalies in the Raintree and Rainmaker areas, using the same basic porphyry exploration model as Kennecott.
In 2009, Kiska was formed by the merger of Geoinformatics and Rimfire Minerals Corporation. In total, Kiska completed 224 line-km of 3D Induced Polarization geophysics, 40 line-km of 2D IP geophysics, 327 line-km of cut-line, geological mapping on the 3D IP grid, detailed mapping of significant Au-Cu prospects, collection of 109 rock samples and 61 soil samples, 8,660 m of diamond drilling from 23 drillholes (all greater than 200 m in total length), petrographic analysis of mineralization at Island Mountain, a preliminary review of metallurgy at the Whistler Resource, and metallurgical testing of mineralization from the Discovery Breccia at Island Mountain. In August of 2010, Kiska delivered a report to Kennecott summarizing the results of the completed Trigger Program. In September of 2010, Kennecott informed Kiska that it would not exercise its back-in right on the Whistler Project and hence retained a 2% NSR on the property.
From this point forward, Kiska continued to drill and explore the Whistler Project for the duration of the 2010 and 2011 field seasons. The majority of this work included shallow grid drilling (25 m to 50 m top of bedrock drilling) in the Whistler area (also referred to as the Whistler Corridor), conventional step-out drilling from prospects in the Whistler area, step-out drilling at the Island Mountain deposit, an airborne EM survey of the Island Mountain area, reconnaissance drilling at Muddy Creek, and minor infill drilling at the Whistler Deposit, followed by the publication of an updated resource estimate.
Commencing 2014, the Alaska State Government has studied a ‘Roads to Resources’ initiative. The Alaska Industrial Development and Export Authority (“AIDEA”) has published several studies since 2014 to assess potential road routes and alternatives, and to assess economic benefits of constructing a public access road from Palmer/Wasilla to the Susitna Mining District in the Alaska Range. On October 27, 2021, AIDEA announced the receipt of $8.5 million in funds for the advancement of predevelopment work for the West Susitna Access Road (“WSAR”) project, which would extend into areas west of Cook Inlet in Southcentral Alaska in the vicinity of the Whistler Project. During 2022 - 2024, AIDEA undertook road engineering investigations to support road design and test alternatives, environmental baseline surveys and archaeological surveys, and stakeholder consultation. In 2023, the Alaska Department of Transportation and Public Facilities (the “DOT”) subsequently announced that it has included the first 25 miles of the proposed WSAR within its State Transportation Infrastructure Plan, and in 2024, the DOT commenced stakeholder engagement ahead of planned project permitting and potential construction commencement in 2025.
Geological Setting, Mineralization and Deposit Types
Geological Setting
The Whistler Project is located in the Alaska Range. The Alaska Range is a continuation of the Pacific Coastal Mountains extending in an arc across the northern Pacific, and represents a long-lived continental arc characterized by multiple magmatic events ranging in age from about 76 Ma to 30 Ma and associated with a wide range of base and precious metals hydrothermal sulphide bearing mineralization. The geology of the Whistler Project is characterized by a thick succession of Cretaceous to early Tertiary (ca. 97 to 65 Ma) volcano-sedimentary rocks intruded by a diverse suite of plutonic rocks of Jurassic to mid-Tertiary age.
Two main intrusive suites are important in the Whistler Project area:
- The Whistler Igneous Suite comprises alkali-calcic basalt-andesite, diorite and monzonite intrusive rocks with an age of approximately 76 Ma with restricted extrusive equivalent. These intrusions are commonly associated with gold-copper porphyry-style mineralization (the “Whistler Deposit”).
- The Composite Suite intrusions vary in composition from peridotite to granite and their ages span from 67 to about 64 Ma. Gold-copper veinlets and pegmatitic occurrences are characteristics of the composite plutons (e.g. the Mt. Estelle prospect, the Muddy Creek prospect).
We acquired the project for its potential to host magmatic hydrothermal gold and copper mineralization. Magmatic hydrothermal deposits represent a wide clan of mineral deposits formed by the circulation of hydrothermal fluids into fractured rocks and associated with the intrusion of magma into the crust.
Mineralization and Deposit Types
The Whistler Deposit and prospects in the Whistler Area (Raintree West, Raintree North and Rainmaker) display a common pattern of alteration, vein paragenesis, and mineralization styles that suggest these spatially separate porphyry centres share a common genetic association. These features are hosted by, and genetically linked to, pulses of diorite porphyry intrusive bodies that are nested in pipe-like centres. Geophysical inversion models of the airborne magnetic data suggest that these pipes represent hypabyssal apophyses (stocks and dykes) emanating from a deep causative batholith. That these porphyry centres are genetically associated is corroborated by common alteration assemblages, vein types, mineralization styles and paragenetic relationships. At the Whistler Deposit, the earliest Diorite Porphyry phase (Main Stage Whistler Diorite Porphyry) is associated with the main stage of gold-copper mineralization, whereas subsequent phases are less mineralized, and thus are either weak metal contributors or diluting bodies.
The Whistler Deposit is hosted within the Whistler Intrusive Suite, a composite of diorite stocks and dykes that divide the suite broadly into an early Main Stage Porphyry (“MSP”), a later Intermineral Porphyry Suite (“IMP”) and a late intrusive phase referred to as the Late-Stage Porphyry (“LSP”). Gold and copper mineralization is characterized by abundant disseminated sulphide and quartz + sulphide vein stockworks (including classic porphyry diagnostic ‘A’, ‘B’, ‘D’, and ‘M’ type veins), and potassic alteration which is variably overprinted by later phyllic alteration. The early-stage MSP suite is most strongly altered, veined and mineralized, with the IMP being less intensely altered and veined but remaining consistently mineralized, and the late or post-mineralization LSP generally containing below cut-off grade or being unmineralized. In addition, a robust core of higher-grade mineralization is recognized within the deposit that correlates with intense alteration and B-veining within MSP and IMP in the eastern part of the intrusive suite.
The High-Grade Core contains inner zones of strong potassic and magnetite alteration (see below), which is dominantly overprinted by pervasive chlorite-sericite alteration and local phyllic alteration. This domain is also defined by the consistent occurrence and highest concentration of M-veins and mineralized quartz veins (A- and B-veins), which generally range in volume from 1 to 5%. Local higher-grade mineralization occurs in zones of high-density quartz vein stockwork (locally >20% quartz vein volume) and quartz + magnetite + chalcopyrite cemented hydrothermal breccias.
Mineralization at Raintree West occurs as two main types: 1) early, porphyry-style gold-copper mineralization hosted by diorite porphyry stocks and consisting of quartz and magnetite stockwork veining, with vein and disseminated chalcopyrite associated with potassic alteration, and 2) later cross-cutting silver-gold-lead-zinc mineralization in quartz-carbonate veins that contain pyrite, sphalerite, galena, and chalcopyrite, with occasional banded epithermal-like textures. The early gold-copper mineralization is best developed within, and controlled by, early diorite porphyry intrusions (akin to MSP at the Whistler Deposit), whereas the later silver-gold-lead-zinc veins surround and locally overprint the porphyry mineralization and are most abundant in the host volcanic rocks in zones of strong to intense phyllic alteration vertically above and adjacent to the diorite porphyries.
The Island Mountain deposit area is host to several mineralized zones interpreted to represent a cluster of individual porphyry centres within this large intrusive complex. These include the Breccia, Cirque and Howell Zones, and other prospects defined by surface geochemistry and geophysical anomalies that require further field assessment. Exploration activity and the majority of diamond drilling by Kiska have concentrated on mineralization associated within the Breccia Zone on the southwest slope of Island Mountain. There, at least three styles of significant gold and copper mineralization are currently recognized: 1) gold-copper mineralization hosted by K-feldspar altered monzonitic intrusive breccia, 2) gold-copper mineralization hosted by intrusive and hydrothermal breccias associated with strong sodic-calcic alteration, and 3) gold-only mineralization associated with vein and disseminated pyrrhotite.
The Muddy Creek area represents an additional exploration target with the potential to host a bulk tonnage, intrusion-related gold deposit. Gold mineralization at Muddy Creek is hosted throughout the core of the monzonitic plutonic complex and is controlled by northwest-striking and steeply southwest-dipping, mm- to locally cm-wide veinlets of sulphides and quartz, manifest as rusty-weathering sub-parallel fracture sets, commonly spaced a metre or more apart. These veinlets may contain any combination of chalcopyrite, arsenopyrite, pyrite, stibnite, pyrrhotite and native gold, with minor amounts of galena, sphalerite and molybdenite. Moderate sericitic alteration is typically restricted to cm-wide selvages to these veins, whereas the bulk of the interleaving rock is relatively unaltered and unmineralized. The Muddy Creek prospect may share geological similarities with the Korbel deposit owned by Nova Minerals Limited located 12 miles north.
Exploration
We recommenced exploration work at the Whistler Project in 2023. Prior to this, we had not completed field-based exploration work at the Whistler Project since acquiring the Whistler Project in 2015.
Our strategy is to enhance and grow the value of our asset base, with a focus on exploring to grow the in situ mineral deposits, and to advance mining, environmental and heritage studies on the Whistler Project towards delineation of a mining business case, optimizing bulk mineable near surface deposits.
We are fully permitted to undertake our planned exploration activities. On June 30, 2022, we submitted an APMA to the ADNR in order to commence exploration field work activities in 2023. On September 22, 2022, the ADNR approved the Exploration Permit and Reclamation Plan. On July 7, 2023, we received approval for amendments to the APMA, incorporating alterations to our exploration plans, in 2023 and 2024. On August 6, 2024, we received approval for amendments to the APMA, incorporating alterations to our exploration plans for 2024. The Exploration Permit allows us to conduct exploration including drilling, operate and maintain a camp including storage of fuel, and to transport people, equipment and consumables to the Whistler Project. The Company expects to file amendment applications for APMA 2278 annually, as exploration results and strategy evolve, in order to ensure exploration programs are fully authorized. Prior to expiry of AMPA 2278 on December 31, 2026, the Company plans to apply for a new Exploration Permit.
Drilling
A total of 72,480 m of diamond drilling in 261 holes are documented in the Whistler database for drilling on the Whistler Project by Cominco, Kennecott, Geoinformatics, Kiska and us from 1986 to the end of 2023. Of these drillholes 23,334 m in 53 holes have been drilled in the Whistler Deposit area, 5,190 m in 58 holes have been drilled in the Raintree area, and 15,572 m in 40 holes comprise the Island Mountain resource area. There are 29,385 m in 110 holes in areas outside the three aforementioned mineral resource areas.
In 2024, we drilled six diamond core holes for 4,006 m at the Whistler Project, including four drill holes for 2,782 m completed at the Whistler Deposit, and two drill holes for 1,224 m completed at the Raintree Deposit. Subsequently, drilling completed across the project now totals 76,486 m.
Sampling, Analysis and Data Verification
There is no available documentation about sampling and analysis by Cominco. Previous operators Kennecott, Geoinformatics, and Kiska used industry standard practices to collect, handle and assay soil, rock and core samples collected during the period 2004-2011. These procedures are documented in detailed reports describing pertinent aspects of the exploration data collection and management.
All assay samples were assayed at either the Alaska Assay Laboratory (2004 and 2009) in Fairbanks, Alaska, or the accredited laboratory of ALS Minerals (formerly ALS-Chemex), a division of ALS Limited, a global company that provides testing, inspection and certification services, in Vancouver, British Columbia for all other years. Sample preparation was accomplished in Alaska, either at the Alaska Assay Lab or ALS-Minerals preparation lab in Anchorage, Alaska. Samples were assayed for gold by fire assay and a suite of elements including silver and copper by aqua regia or multi-acid digestion and inductively coupled plasma atomic emission spectroscopy. Operators Kennecott, Geoinformatics, and Kiska used industry standard quality control practices during exploration at Whistler. The S-K 1300 Technical Report discloses that analysis of the QA/QC data indicates the assay data is of sufficient quantity and quality for resource estimation.
Sue Bird, P.Eng., of MMTS, visited the Whistler Project site on September 14, 2022, and again on August 6, 2024. No observations contradicting previously published information were made. In the opinion of the QP, sampling preparation, analysis, and security by previous operators are consistent with industry standard practices. Review and analysis of the assay database and QA/QC data shows the assay database is of sufficient quality for resource estimation.
Mineral Processing and Metallurgical Testing
Metallurgical testing had been carried out in three phases starting with the 2004/2005 preliminary testing in Salt Lake City under the general supervision of Kennecott and culminating in the two phases under Kiska conducted at G&T Laboratories in Kamloops during 2010 to 2012.
Whistler Deposit preliminary metallurgical testwork included gravity concentration or flotation to recover the copper and gold. From the metallurgical testwork results and subsequent analysis it appears that the Whistler Deposit is metallurgically amenable to a conventional flotation route to produce saleable high quality copper concentrates with gold credits, despite the low head grade, and that the levels of recovery and upgrade for both copper and gold are relatively insensitive to feed grade. We believe that there are no processing factors or deleterious elements that could have a significant effect on potential economic extraction.
The preliminary testing indicated that the Island Mountain material tested is amenable to copper recovery by flotation and that the gold is relatively free milling. The results indicate that in the range of 90% of the potential gold may be recoverable by either whole ore leaching or a combination of flotation and leaching of the tailings.
Further flotation work is expected to improve both potential copper and gold recoveries to concentrate.
For both deposits further metallurgical development and assessment work is required to develop the best flowsheet with respect to capital and operating costs, metal recoveries and overall economics.
As of the date hereof, no metallurgical testing has been carried out on rocks from the Raintree West Deposit, however, given the similarities in geological setting, host rock, mineralization and alteration between Raintree West and the Whistler Deposits, we have assumed that metallurgical processes and metal recoveries determined for the Whistler Deposit are a reasonable approximation for the Raintree West Deposit at this time.
Metal recoveries reported for the Whistler Project resource estimate include 83% for copper, 70% for gold and 65% for silver with silver grades below 10 g/t and 0% for silver grades above 10 g/t.
Mineral Resource Estimates
The following table sets forth the Mineral Resource estimate detailed in the S-K 1300 Technical Report, with an effective date of September 12, 2024.
| Class | Deposit | Cut-off Value (US$/t) | ROM Tonnage (ktonnes) | In situ Grades NSR (US$/t) | AuEqv (g/t) | Au (g/t) | Cu (%) | Ag (g/t) | In situ Metal AuEqv (koz) | Au (koz) | Cu (mlbs) | Ag (koz) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Indicated | Whistler Pit | 10 | 282,205 | 22.84 | 0.68 | 0.41 | 0.16 | 1.89 | 6,201 | 3,724 | 999 | 17,166 |
| Raintree Pit | 10 | 8,905 | 21.08 | 0.63 | 0.46 | 0.08 | 4.81 | 180 | 131 | 16 | 1,378 | |
| Indicated Open Pit | varies | 291,410 | 22.79 | 0.68 | 0.41 | 0.16 | 1.98 | 6,381 | 3,855 | 1,015 | 18,544 | |
| Raintree UG | 25 | 3,064 | 34.41 | 1.03 | 0.79 | 0.13 | 4.49 | 101 | 78 | 9 | 443 | |
| Total Indicated | varies | 294,474 | 22.91 | 0.68 | 0.42 | 0.16 | 2.01 | 6,482 | 3,933 | 1,024 | 18,987 | |
| Inferred | Whistler Pit | 10 | 18,224 | 21.01 | 0.63 | 0.40 | 0.13 | 1.75 | 368 | 233 | 54 | 1,025 |
| Island Mountain Pit | 10 | 124,529 | 18.21 | 0.54 | 0.45 | 0.05 | 1.02 | 2,180 | 1,817 | 139 | 4,084 | |
| Raintree Pit | 10 | 15,056 | 23.12 | 0.69 | 0.55 | 0.06 | 4.36 | 335 | 267 | 21 | 2,112 | |
| Inferred Open Pit | varies | 157,809 | 19.00 | 0.57 | 0.45 | 0.06 | 1.42 | 2,883 | 2,317 | 214 | 7,221 | |
| Raintree UG | 25 | 40,432 | 32.81 | 0.98 | 0.76 | 0.12 | 3.31 | 1,275 | 994 | 103 | 4,300 | |
| Total Inferred | varies | 198,241 | 21.82 | 0.65 | 0.52 | 0.07 | 1.81 | 4,158 | 3,311 | 317 | 11,521 |
Notes to Table 1:
(1) The Mineral Resource estimate for the Whistler, Island Mountain, and the upper portions of the Raintree West deposits have been confined by an open pit with “reasonable prospects of economic extraction” using the following assumptions:
- Metal prices of US$1,850/oz Au, US$4.00/lb Cu and US$23/oz Ag;
- Payable metal of 95% payable for Au and Ag, and 96.5% payable for Cu;
- Refining costs for Au of US$8.00/oz, for Ag of US$0.60/oz and for Cu of US$0.05/lb;
- Offsite costs for Au of US$77.50/wmt, for Ag of US$3.50/wmt and for Cu of US$55.00/wmt;
- Royalty of 3% NSR;
- Pit slopes are 50 degrees;
- Mining cost of US$2.25/t for waste and mineralized material; and
- Processing, general and administrative costs of US$7.90/t.
(2) The lower portion of the Raintree West Deposit has been constrained by a mineable shape with “reasonable prospects of eventual economic extraction” using a US$25.00/t cut-off.
(3) Metallurgical recoveries are: 70% for Au, 83% for Cu, and 65% Ag for Ag grades below 10g/t. The Ag recovery is 0% for values above 10g/t for all deposits.
(4) The NSR equations are: below 10g/t Ag: NSR (US$/t)=(100%-3%)*((Au*70%*US$54.646/t) + (Cu*83%*US$3.702*2204.62 + Ag*65%*US$0.664)), and above 10g/t Ag: NSR (US$/t)=(100%-3%)*((Au*70%*US$56.646g/t) + (Cu*83%*US$3.702*2204.62))
(5) The Au Equivalent equations are: below 10g/t Ag: AuEq=Au + Cu*1.771 +0.0113Ag, and above 10g/t Ag: AuEq=Au + Cu*1.771
(6) The specific gravity for each deposit and domain ranges from 2.76 to 2.91 for Island Mountain, 2.60 to 2.72 for Whistler with an average value of 2.80 for Raintree West.
(7) The SEC definitions for Mineral Resources in S-K 1300 were used for Mineral Resource classification which are consistent with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (CIM (2014) definitions).
(8) Numbers may not add due to rounding.
Fiscal Year Ended 2024 Updates
At the start of the 2024 summer field season, we recommenced the drilling program at the Whistler Project. Our initially planned exploration programs over the 2023 and 2024 field seasons consisted of up to 10,000 m of core drilling, which is reduced from the initial target of 15,000 m drilling, in order to allow us to determine actual costs of drilling while we re-established field operations. We intend to complete the balance of the 10,000 m drilling in 2025.
Additional surface exploration includes geological mapping, soil geochemical sampling, geophysical data reprocessing, geological data processing and interpretation. In addition, supporting work includes collection of mine planning and mineral processing information including metallurgical, geotechnical and hydrogeological data. Environmental baseline data collection, as well as archaeological and heritage land use studies were initiated in 2023, with additional baseline survey and archaeological surveys conducted in 2024. We have also engaged in stakeholder consultation with respect to both the present and ongoing exploration activity and the potential for future mine development of the Whistler Project.
On August 21, 2023, we announced the commencement of a confirmatory drill program (the “Drilling Program”). The Drilling Program is intended to advance the underlying geologic model to support an updated Mineral Resource estimate for the Whistler Project in preparation for a potential preliminary economic assessment. During the 2023 field season, four diamond core drill holes were completed for a total of 2,234 m at the Whistler Project.
On June 27, 2024, we announced the recommencement of the Drilling Program for the 2024 field season. During 2024 we completed six diamond core holes for 4,006 m, bringing the total drill production meterage for 2023 and 2024 to 6,240 m. During 2024, four drill holes for 2,782 m were completed at the Whistler Deposit, and two drill holes for 1,224 m were completed at the Raintree Deposit located approximately one km east of the Whistler Deposit.
The HQ and NQ diamond drill core from the Drilling Program were logged and sampled at the Whistler field camp facility, supervised by qualified geologists (P.Geo. designation) from our lead exploration consultant, Equity Exploration Ltd., and supervised by our QPs, Tim Smith (MSc., P.Geo.). Samples were collected from NQ/HQ diameter core by sawing the drill core in half, with one-half sent to Bureau Veritas Commodities Canada Ltd. (“BV”) in Fairbanks, Alaska, for sample preparation, then to BV’s analytical laboratory in Vancouver, Canada for assaying, and the other half of the core is retained at the site for future reference. Sample lengths downhole were generally 2.0 m, except where samples were taken to honor geological contacts.
BV is a certified commercial laboratory and is independent of us. We have implemented a quality assurance and quality control program for the sampling and analysis of drill core samples, including duplicates, mineralized standards and blank samples for each batch of core samples. The gold analyses were completed by lead collection fire assay fusion with AAS finish (FA430 method) on 30 grams test weight. Copper, silver and other base metals assays (total suite of 45 elements) were assayed by 4-acid digestion and ICP-MS analysis (MA200 method) on 0.25 grams test weight.
The following table sets out the assay intercepts reported from the Drilling Program.
| Hole Number | Interval From (m) | Interval To (m) | Core Length (m) | Gold Grade (g/t) | Copper Grade (%) | Silver Grade (g/t) | AuEq (g/t)* | Lead Grade (%) | Zinc Grade (%) |
|---|---|---|---|---|---|---|---|---|---|
| WH23-03-EXT | 0.41 | 717.00 | 716.59 | 0.68 | 0.15 | 1.40 | 0.93 | - | - |
| Including | 7.00 | 659.46 | 652.46 | 0.73 | 0.16 | 1.50 | 1.00 | - | - |
| Including | 131.00 | 307.00 | 176.00 | 1.24 | 0.19 | 1.66 | 1.55 | - | - |
| And | 373.50 | 423.00 | 49.50 | 0.92 | 0.10 | 1.82 | 1.10 | - | - |
| And | 441.00 | 457.00 | 16.00 | 1.03 | 0.20 | 1.64 | 1.36 | - | - |
| And | 480.00 | 501.00 | 21.00 | 0.80 | 0.35 | 2.11 | 1.37 | - | - |
| And | 523.00 | 539.00 | 16.00 | 0.83 | 0.30 | 1.14 | 1.31 | - | - |
| And | 575.00 | 632.00 | 57.00 | 1.07 | 0.17 | 1.18 | 1.36 | - | - |
| WH23-03-EXT | 698.03 | 717.00 | 18.97 | 0.52 | 0.11 | 1.02 | 0.70 | - | - |
| WH24-01 | 107.00 | 109.00 | 2.00 | 0.45 | - | 8.60 | 0.58 | 0.61 | 3.07 |
| WH24-01 | 147.00 | 151.00 | 4.00 | 0.28 | - | 7.10 | 0.42 | 0.44 | 1.20 |
| WH24-01 | 159.00 | 161.00 | 2.00 | 0.64 | - | 4.50 | 0.72 | 0.29 | 1.59 |
| WH24-01 | 249.00 | 266.00 | 17.00 | 0.33 | 0.07 | 41.97 | 0.45 | 0.33 | 0.75 |
| Including | 249.00 | 253.00 | 4.00 | 0.78 | 0.22 | 171.55 | 1.12 | 1.19 | 2.53 |
| WH24-01 | 280.60 | 300.00 | 19.40 | 0.31 | - | 1.81 | 0.38 | 0.12 | 0.40 |
| Including | 284.00 | 286.00 | 2.00 | 1.23 | - | 4.70 | 1.32 | 0.37 | 1.27 |
| WH24-01 | 311.00 | 372.38 | 61.38 | 0.36 | 0.09 | 4.43 | 0.53 | 0.14 | 0.39 |
| Including | 321.00 | 362.00 | 41.00 | 0.41 | 0.11 | 5.43 | 0.61 | 0.15 | 0.49 |
| WH24-02 | 227.00 | 500.96 | 273.96 | 0.48 | 0.12 | 0.86 | 0.71 | - | - |
| Including | 291.00 | 444.00 | 153.00 | 0.65 | 0.14 | 0.74 | 0.90 | - | - |
| Including | 291.00 | 411.00 | 120.00 | 0.72 | 0.16 | 0.83 | 1.00 | - | - |
| Including | 297.00 | 337.00 | 40.00 | 0.82 | 0.25 | 1.13 | 1.28 | - | - |
| And | 357.00 | 377.00 | 20.00 | 0.96 | 0.16 | 0.93 | 1.26 | - | - |
| WH24-03 | 40.00 | 52.74 | 12.74 | 1.30 | 0.35 | 2.37 | 1.96 | - | - |
| 385.08 | 525.00 | 139.92 | 0.21 | 0.14 | 0.97 | 0.47 | - | - | |
| Including | 401.00 | 429.00 | 28.00 | 0.41 | 0.24 | 1.74 | 0.85 | - | - |
| 643.00 | 679.00 | 36.00 | 0.08 | 0.12 | 1.08 | 0.29 | - | - | |
| 731.00 | 767.00 | 36.00 | 0.20 | 0.11 | 1.23 | 0.40 | - | - | |
| 868.00 | 917.00 | 49.00 | 0.18 | 0.05 | 1.90 | 0.28 | - | - | |
| WH24-04 | 91.00 | 682.00 | 591.00 | 0.37 | 0.15 | 1.48 | 0.66 | - | - |
| Including | 224.00 | 682.00 | 458.00 | 0.46 | 0.16 | 1.66 | 0.75 | - | - |
| Including | 260.00 | 308.00 | 48.00 | 0.61 | 0.34 | 2.19 | 1.23 | - | - |
| And | 406.00 | 456.00 | 50.00 | 0.73 | 0.13 | 1.50 | 0.98 | - | - |
| WH24-05 | 306.00 | 325.00 | 19.00 | 0.79 | 0.03 | 17.70 | 0.87 | 0.73 | 1.72 |
| 489.00 | 508.50 | 19.50 | 0.33 | 0.02 | 7.76 | 0.41 | 0.51 | 1.20 | |
| 603.50 | 773.00 | 169.50 | 0.77 | 0.04 | 15.38 | 0.86 | 0.40 | 0.86 | |
| Including | 635.00 | 773.00 | 138.00 | 0.89 | 0.05 | 17.57 | 0.99 | 0.44 | 0.95 |
| Including | 635.00 | 661.00 | 26.00 | 1.36 | 0.06 | 15.38 | 1.48 | 0.69 | 1.61 |
| And | 681.00 | 715.00 | 34.00 | 1.49 | 0.08 | 19.95 | 1.65 | 0.81 | 1.35 |
| Including | 699.00 | 715.00 | 16.00 | 2.90 | 0.14 | 38.59 | 3.16 | 1.47 | 2.38 |
| And | 755.00 | 773.00 | 18.00 | 1.70 | 0.13 | 66.33 | 1.93 | 0.62 | 1.84 |
| Including | 763.00 | 773.00 | 10.00 | 2.82 | 0.22 | 113.74 | 3.21 | 1.00 | 3.00 |
30
Notes:
WH23-03-EXT drilled down-plunge to test the deeper extents of mineralization within the Whistler Deposit eastern high-grade core, therefore the mineralized intervals reported are not representative of true width. The mineralized intercepts within WH24-01 are estimated to be approximately two-thirds of true width. WH24-02 and WH24-03 drilled oblique to dip and strike to test the vertical profile of mineralization, therefore the mineralized intervals reported are not representative of true width. WH24-04 tested obliquely across strike and to depth to test the vertical profile of mineralization, thus the mineralized intervals reported are estimated to be approximately half to two-thirds of true width. WH24-05 tested obliquely across strike and dip, thus mineralized intervals reported are estimated to be approximately two-thirds of true width.
Specifically, for drilling reported prior to the 2024 Mineral Resource estimate update (WH23-03-EXT and WH24-01): below 10g/t Ag: AuEq=Au + Cu*1.5733 +0.0108Ag, and above 10g/t Ag: AuEq=Au + Cu*1.5733. For drilling reported subsequent to the 2024 Mineral Resource estimate update (WH24-02, -03, -04 & -05): below 10g/t Ag: AuEq=Au + (Cu%*1.771) + (Ag*0.0113), and above 10g/t Ag: AuEq=Au + (Cu%*1.771). AuEq calculations do not include Pb and Zn as it is unknown whether these metals can be recovered.
The following table sets out the drill locations and depths for the Drilling Program:
| Hole Number | Easting Meters (UTM Zone 18) | Northing Meters (UTM Zone 18) | Elevation (masl) | Depth (m) | Azimuth (Degrees) | Dip (Degrees) | Status |
|---|---|---|---|---|---|---|---|
| WH23-01 | 518,782 | 6,871,260 | 886.0 | 467.87 | 140.80 | -49.0 | All assays received |
| WH23-02 | 518,779 | 6,871,253 | 886.0 | 605.64 | 229.20 | -60.1 | All assays received |
| WH23-03-EXT | 518,776 | 6,871,253 | 886.0 | 874.50 | 189.20 | -82.9 | All assays received |
| WH23-04 | 520,193 | 6,869,142 | 352.0 | 560.83 | 134.80 | -78.0 | All assays received |
| WH24-01 | 520,494 | 6,871,260 | 497.0 | 445.77 | 14.63 | -46.9 | All assays received |
| WH24-02 | 518,452 | 6,871,362 | 849.0 | 716.30 | 135.43 | -75.2 | All assays received |
| WH24-03 | 518,746 | 6,871,335 | 859.0 | 961.9 | 309.69 | -80.1 | All assays received |
| WH24-04 | 518,680 | 6,871,248 | 876.0 | 832.20 | 185.85 | -78.0 | All assays received |
| WH24-05 | 520,495 | 6,871,258 | 497.0 | 777.85 | 184.37 | -55.3 | All assays received |
31
The following map sets forth the location of the Whistler Deposit drilling with gold and copper histograms plotted (left and right respectively; see legend). Drill traces for the 2023 and 2024 drill holes are shown in bold (with prefix “WH23” and “WH24”) and gold and copper assay histograms are highlighted. Drilling is overlain on a geological interpretation of the host diorite porphyry (cut at 200 m below surface) to illustrate the overall geometry of mineralized porphyry phases (pale purple) and non-mineralized LSP phases (darker purple).
We are working to delineate the geometry, extents and continuity of the MSP and IMP suites, which serves to focus drilling on opportunities to expand mineralization where the potentially mineralized porphyry phases remain under-explored. In addition, the technical team has identified the presence of a robust core of higher-grade mineralization within the Whistler Deposit that correlates with intense alteration and veining within the MSP in the eastern part of the deposit, and in 2024 we interpreted and confirmed via drilling the presence of a high grade core in the western part of the Whistler Deposit. Optimizing the geological model to improve confidence in the delineation of the MSP and IMP is a key focus of the Drilling Program as it will improve confidence in distribution and continuity of mineralization, and in particular higher-grade zones within the Whistler Deposit.
We plan to recommence the remainder of the previously announced approximate 10,000 m drilling program at the Whistler Project at the start of the 2025 summer field season.
Legal proceedings
As filed, 431 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
From time to time, we may become involved in legal proceedings or be subject to claims arising in the ordinary course of our business. We are not currently a party to any material proceedings. Regardless of outcome, such proceedings or claims can have an adverse impact on us because of defense and settlement costs, diversion of resources and other factors, and there can be no assurances that favorable outcomes will be obtained.
Management's discussion and analysis
As filed, 52,273 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Management’s Discussion and Analysis
For the year ended December 31, 2024
General
The management’s discussion and analysis of the financial condition and results of operations of U.S. GoldMining Inc. for the year ended December 31, 2024 (the “MD&A”), is intended to provide the reader with a review of the factors that affected our performance during the periods presented, including matters that have affected our reported financial condition and results of operations, and matters that are reasonably likely, based on management’s assessment, to have a material impact on future operations and results.
Unless the context otherwise requires, references to “U.S. GoldMining”, “the Company”, “we”, “us” and “our” refer to U.S. GoldMining Inc., a Nevada corporation and references to “$” or “dollars” are to United States dollars.
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our audited consolidated financial statements for the fiscal year ended December 31, 2024, and related notes appearing at the end of this Annual Report on Form 10-K. Some of the information contained in this discussion and analysis or set forth elsewhere in this Annual Report on Form 10-K, including information with respect to our plans and strategy for our business, includes forward-looking statements that involve risks and uncertainties. As a result of many factors, including those factors set forth in the “Risk Factors” section of this Annual Report on Form 10-K, our actual results could differ materially from the results described in, or implied by, the forward-looking statements contained in the following discussion and analysis. A copy of this Annual Report on Form 10-K will be available under our profiles at www.sec.gov (http://www.sec.gov) and at www.sedarplus.ca (http://www.sedarplus.ca).
Cautionary Note Regarding Forward-Looking Statements
This Annual Report includes forward-looking statements and forward-looking information within the meaning of Canadian securities laws and the Private Securities Litigation Reform Act of 1995, collectively referred to as “forward-looking statements”. Forward-looking statements include statements that relate to our plans, objectives, goals, strategies, future events, future revenue or performance, capital expenditures, financing needs and other information that is not historical information. Forward-looking statements can often be identified by the use of terminology such as “subject to”, “believe”, “anticipate”, “plan”, “target”, “expect”, “intend”, “estimate”, “project”, “outlook”, “may”, “will”, “should”, “would”, “could”, “can”, the negatives thereof, variations thereon and similar expressions, or by discussions of strategy. In addition, any statements that refer to expectations, beliefs, plans, projections, objectives, performance or other characterizations of future events or circumstances, including any underlying assumptions, are forward-looking. In particular, forward-looking statements include, but are not limited to, statements about:
- our expectations regarding raising capital and developing the Whistler Project;
- our planned exploration activities on the Whistler Project and the goals thereof; and
- our estimates regarding future liquidity requirements and the need for additional financing in the future.
These forward-looking statements are based on our opinions, estimates and assumptions in light of our experience and perception of historical trends, current conditions and expected future developments, as well as other factors that we currently believe are appropriate and reasonable in the circumstances, including that:
- the timing and ability to obtain requisite operational, environmental and other licenses, permits and approvals, including extensions thereof will occur and proceed as expected;
- current gold, silver, base metal and other commodity prices will be sustained, or will improve;
- the proposed development of the Whistler Project will be viable operationally and economically and will proceed as expected;
- any additional financing required by us will be available on reasonable terms or at all; and
- the Company will not experience any material accident, labor dispute or failure of plant or equipment.
Despite a careful process to prepare and review the forward-looking statements, there can be no assurance that the underlying opinions, estimates and assumptions will prove to be correct.
Forward-looking statements are necessarily based on a number of opinions, estimates and assumptions that we considered appropriate and reasonable as of the date such statements are made, are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause the actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements, including but not limited to the risk factors described in greater detail under Item 1A. Risk Factors in our Annual Report. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward-looking statements.
These factors should not be construed as exhaustive and should be read with other cautionary statements in this document. Although we have attempted to identify important risk factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other risk factors not presently known to us or that we presently believe are not material that could also cause actual results or future events to differ materially from those expressed in such forward-looking statements. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking statements, which speaks only as of the date made. The forward-looking statements contained in this document represent our expectations as of the date of this Annual Report (or as the date they are otherwise stated to be made) and are subject to change after such date. However, we disclaim any intention or obligation or undertaking to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required under applicable securities laws.
Business Overview
We are a United States domiciled exploration stage company and our sole project is currently the Whistler Project. The Whistler Project is a gold-copper exploration project located in the Yentna Mining District, approximately 105 miles (170 km) northwest of Anchorage, in Alaska.
We were incorporated on June 30, 2015, in Alaska as “BRI Alaska Corp.”. On September 8, 2022, we redomiciled to Nevada and changed our name to “U.S. GoldMining Inc.”. We are a subsidiary of GoldMining Inc. (“GoldMining”), a company organized under the laws of Canada and listed on the Toronto Stock Exchange and NYSE American. As of the date hereof, GoldMining owns 9,878,261 shares of our common stock, par value $0.001 per share (the “Common Stock”), representing 79.3% of the outstanding shares of our Common Stock and warrants (the “Warrants”) to purchase up to 122,490 additional shares of our Common Stock, exercisable at a price of $13.00 per share until April 24, 2026.
Our principal executive offices are located at 1188 West Georgia Street, Suite 1830, Vancouver, British Columbia, Canada V6E 4A2, our registered office is 3773 Howard Hughes Pkwy #500s Las Vegas, NV 89169 and our head operating office is located at 301 Calista Court, Suite 200, Office 203, Anchorage, Alaska, 99518. Our website address is www.us.goldmining.com (http://www.us.goldmining.com).
On April 24, 2023, we completed our initial public offering (the “IPO”) of Units, with each Unit consisting of one share of Common Stock and one Warrant. Our shares of Common Stock and Warrants are listed on the Nasdaq Capital Market under the symbols “USGO” and “USGOW”, respectively.
Recent Developments
2023 and 2024 Field Programs
On August 21, 2023, we announced the commencement of a confirmatory 2023 Phase 1 Drilling Program at the Whistler Project (the “2023 Whistler Program”). Phase 1 of the confirmatory program comprised up to an initial 5,000 m of the budgeted drilling program. Three confirmatory drill holes were completed at the Whistler Deposit and one exploration drill hole at the Rainmaker target for a total of 2,234 m, which was completed by mid-November, at which time the program was paused for winter break.
On January 16, 2024, we announced initial results from the 2023 Whistler Program, which confirmed the continuity of the near-surface high-grade core at the Whistler deposit, and extended mineralization to the southwest and to depth.
On June 27, 2024, we announced the re-commencement of drilling at Whistler Project for the 2024 field season (the “2024 Whistler Program”). The exploration program was focused on additional confirmatory infill and step-out drilling within the Whistler and Raintree West deposits. Surface exploration activities were also completed with the objective to identify drill targets within the broader Whistler Orbit, a porphyry mineral system containing multiple intrusive centers (termed a ‘porphyry cluster’), with potential to discover additional gold and copper mineralized deposits.
On September 30, 2024, we announced initial assay results from the first two diamond drill holes completed of our 2024 Whistler Program. The previous best intercept of continuous high-grade mineralization intersected in drilling at the Whistler Project during the 2023 Whistler Program, comprising 547 m at 1.06 g/t AuEq, was further deepened in the 2024 Whistler Program (drill hole number WH23-03-EXT) and the mineralized intercept was extended to 652.5 m at 1.00 g/t AuEq. We also announced confirmation and extension of porphyry style mineralization in the Raintree West deposit (WH24-01).
On October 7, 2024, we announced an updated mineral resource estimate for the Whistler Project, which included a 117% increase in resources classified as Indicated Mineral Resource.
On November 18, 2024, we announced additional diamond core drill results from the 2024 Whistler Program diamond core drilling program including confirmation of continuity of high-grade mineralization in the western portion of the Whistler deposit (WH24-02).
On February 3, 2025, we announced additional diamond core drill results from the 2024 Whistler Program diamond core drilling program, including multiple broad intercepts of high-grade mineralization expanding the western high-grade zone within the Whistler deposit (WH24-03), and additional deep drilling in the northern portion of the deposit which confirmed mineralization through the deposit and intersected geological features indicative of nearby high grade mineralization at higher levels in the northern portion of the deposit (WH24-04).
On February 10, 2025, we announced new assay results from WH24-05 which was drilled adjacent to the Raintree West deposit as part of the 2024 Whistler Program, including confirmatory diamond core drilling completed at the Whistler Project. The drilling intercepted multiple zones of high-grade gold and silver polymetallic mineralization approximately 500 m south of any prior drilling at the Raintree West deposit.
At-The-Market Equity Program
On May 15, 2024, we filed a shelf registration statement on Form S-3 with the SEC, covering the offering, issuance and sale of up to $40 million of a variety of securities including our common stock, preferred stock, warrants and/or units. Additionally, we entered into an At the Market Offering Agreement with a syndicate of agents for the ATM facility (the “ATM Program”). Pursuant to the ATM Program, the Company may sell up to $5.5 million shares of common stock from time to time through the sales agents. A fixed cash commission rate of 2.5% of the gross sales price per share of common stock sold under the ATM Program will be payable to the agents in connection with any such sales. During the year ended December 31, 2024, we sold 55,576 shares of common stock under the ATM Program for gross proceeds of $603,235, with aggregate commissions paid to the agents and other share issuance and settlement costs of $17,513.
Change of Fiscal Year End
On February 9, 2024, our board of directors approved a change of our fiscal year end from November 30 to December 31, effective beginning with the next fiscal year, which began on January 1, 2024, and ended on December 31, 2024 (the “Fiscal 2024”). As a result of the change in fiscal year, there was a one-month transition period began on December 1, 2023, and ended on December 31, 2023 (the “Transition Period”). For the purposes of this discussion and analysis we have presented the income statement for the year ended December 31, 2023, in order to provide a comparison to the year ended December 31, 2024. The statements of operations and comprehensive loss for the year ended December 31, 2023, were derived as follows:
| Operating expenses | Year Ended November 30 2023 | Plus Month Ended December 31 (Transition period) 2023 | Less Month Ended December 31 2022 (Unaudited) | Year Ended December 31 2023 (Unaudited) |
|---|---|---|---|---|
| Exploration expenses | $5,054,500 | $67,629 | $48,292 | $5,073,837 |
| General and administrative expenses | 4,670,248 | 204,484 | 130,860 | 4,743,872 |
| Accretion | 21,051 | 1,440 | 1,684 | 20,807 |
| Depreciation | 30,959 | 8,286 | - | 39,245 |
| Total operating expenses | 9,776,758 | 281,839 | 180,836 | 9,877,761 |
| Loss from operations | (9,776,758) | (281,839) | (180,836) | (9,877,761) |
| Other income (expenses) | ||||
| Interest income | 426,919 | 50,597 | - | 477,516 |
| Foreign exchange income (loss) | (1,801) | (1,755) | 3,642 | (7,198) |
| Net loss for the year/ period before tax | $(9,351,640) | $(232,997) | $(177,194) | $(9,407,443) |
| Current income tax expense | (4,937) | - | - | (4,937) |
| Net loss for the year/ period | $(9,356,577) | $(232,997) | $(177,194) | $(9,412,380) |
| Loss per share | ||||
| Basic and diluted | $(0.82) | $(0.02) | $(0.02) | $(0.81) |
| Weighted average shares outstanding | ||||
| Basic and diluted | 11,480,346 | 12,398,709 | 10,135,001 | 11,672,606 |
Results of Operations
Year ended December 31, 2024, compared to year ended December 31, 2023
| Selected operating results | Year Ended December 31 2024 | 2023 (Unaudited) | Change |
|---|---|---|---|
| Net loss for the year | $(8,487,081) | $(9,412,380) | $925,299 |
| Loss from operations | (8,893,070) | (9,877,761) | 984,691 |
| Exploration expenses | 5,802,549 | 5,073,837 | 728,712 |
| General and administrative expenses | 2,946,723 | 4,743,872 | (1,797,149) |
| Depreciation | $125,593 | $39,245 | $86,348 |
For the year ended December 31, 2024, we recorded a net loss of $8,487,081 (or $0.68 per share), compared to $9,412,380 (or $0.81 per share) for the year ended December 31, 2023. The decrease in net loss was primarily due to the decrease of general and administrative expenses, partially offset by the increase of costs associated with our 2024 Whistler Program.
For the year ended December 31, 2024, we had exploration expenses of $5,802,549, compared to $5,073,837 for the year ended December 31, 2023. The increase was primarily related to the 2024 Whistler Program and included drilling, fees to third party vendors that provided geological and environmental work, regulatory and community stakeholder engagements and other technical services, and camp and field support costs. During the year ended December 31, 2024, exploration expenses primarily consisted of:
(i) drilling expenses of $2,339,526, compared to $1,733,859 for the year ended December 31, 2023. The increased expenses during the year ended December 31, 2024, were primarily for the 2024 Whistler Program;
(ii) consulting fees of $1,287,697, compared to $1,486,392 for the year ended December 31, 2023. Such expenses were primarily for consulting fees paid to third parties for the planning and management of our exploration programs at the Whistler Project, including database management, geological interpretation and modelling. In addition, consulting fees to third parties to conduct environmental baseline, and regulator, community and other stakeholder engagements;
(iii) camp and field support expenses of $1,269,067, compared to $933,112 for the year ended December 31, 2023. The camp and field support expenses during the year ended December 31, 2024, were primarily for camp costs, including equipment maintenance, camp management labor and supplies for the 2024 Whistler Program, as well as work to support maintenance of the existing access road between camp and drilling sites at the Raintree and Whistler deposits, construction of new trails and drill pads, and stakeholder engagement to support the Alaska state led future access road, and;
(iv) transportation, travel and other exploration expenses of $906,259, compared to $920,474 for the year ended December 31, 2023. Such expenses were primarily for fuel consumption, aircraft charter costs to transport crews, equipment and supplies to the Whistler Project.
For the year ended December 31, 2024, general and administrative expenditures were $2,946,723, compared to $4,743,872 for the year ended December 31, 2023. During the year ended December 31, 2024, general and administrative expenditures primarily consisted of:
(i) consulting, corporate development and investor relations expenses of $879,454, compared to $1,776,683 for the year ended December 31, 2023. Comparatively, during the year ended December 31, 2023, the expenses were higher for building initial corporate brand awareness of the new company after completion of the IPO;
(ii) professional fees of $689,400, compared to $1,626,422 for the year ended December 31, 2023. Comparatively, during the year ended December 31, 2023, the professional fees were primarily for legal, audit, accounting and tax services relating to the Company’s preparation and execution of the IPO;
(iii) management fees, salaries and benefits of $382,935, compared to $317,245 for the year ended December 31, 2023;
(iv) stock-based compensation expenses of $331,896, which consisted of $9,394 related to the award of restricted shares, $308,827 related to the fair value of stock options and restricted stock units (“RSUs”) issued by us to management, directors, consultants and employees, and $13,675 for GoldMining personnel, allocated for their time spent on our affairs, compared to $432,838 for the year ended December 31, 2023. The allocated costs from GoldMining were treated as a capital contribution, as there is no obligation or intent regarding the repayment of such amounts by the Company;
(v) filing, listing, dues and subscriptions expenses of $141,826, compared to $185,728 for the year ended December 31, 2023;
(vi) office administrative and insurance expenses of $474,775, compared to $369,385 for the year ended December 31, 2023; and
(vii) travel, website design and hosting expenses of $46,437, compared to $35,571 for the same period of 2023.
For the year ended December 31, 2024, depreciation expenses were $125,593, compared to $39,245 for the year ended December 31, 2023. The increase was primarily due to depreciation of camp structures, which were renovated and made available for their intended use in July 2023, and for new equipment acquired.
For the year ended December 31, 2024, our loss from operations was $8,893,070, compared to $9,877,761 for the year ended December 31, 2023. The decrease primarily resulted from the decrease in general and administrative expenses, partially offset by costs associated with the 2024 Whistler Program.
Transition Period
| Selected operating results | One Month Ended December 31 2023 | 2022 (Unaudited) | Change |
|---|---|---|---|
| Net loss for the period | $(232,997) | $(177,194) | $(55,803) |
| Loss from operations | (281,839) | (180,836) | (101,003) |
| Exploration expenses | 67,629 | 48,292 | 19,337 |
| General and administrative expenses | 204,484 | 130,860 | 73,624 |
| Depreciation | $8,286 | $- | $8,286 |
For the one month ended December 31, 2023, we recorded a net loss of $232,997 ($0.02 per share), compared to a net loss of $177,194 ($0.02 per share) for the one month ended December 31, 2022. The increase was primarily due to increased office, insurance, and investor relations expenditures after completion of the IPO and costs associated with the Whistler Project exploration program.
For the one month ended December 31, 2023, we had exploration expenses of $67,629, compared to $48,292 for the one month ended December 31, 2022. The increase was primarily related to the 2023 Whistler Program which started in 2023 and included drilling, consulting fees to vendors that provided geological and environmental work, regulatory and community stakeholder engagements and other technical services, and maintenance costs. During the one month ended December 31, 2023, exploration expenses primarily consisted of:
(i) drilling expenses of $38,907, compared to $nil for the one month ended December 31, 2022. Drilling expenses primarily related to the storage of drilling equipment during the winter break and drill core sample analysis. The 2023 Whistler Program, which was the Company’s inaugural drilling program, didn’t start until the summer of 2023;
(ii) consulting fees of $22,112, compared to $34,720 for the one month ended December 31, 2022;
(iii) transportation, travel and other exploration expenses of $6,027, compared to $350 for the one month ended December 31, 2022; and
(iv) camp maintenance expenses of $583, compared to $13,222 for the one month ended December 31, 2022. During the one month ended December 31, 2022, camp maintenance expenses were primarily for work to support an access road to the Whistler Project.
For the one month ended December 31, 2023, general and administrative expenditures were $204,484, compared to $130,860 for the one month ended December 31, 2022. During the one month ended December 31, 2023, general and administrative expenditures primarily consisted of:
(i) professional fees of $55,495, compared to $94,256 during the one month ended December 31, 2022. During the one month ended December 31, 2022, professional fees were primarily for legal, audit, accounting and tax services during the preparation and execution of our IPO;
(ii) stock-based compensation expenses of $19,509, which consisted of $1,760, related to the award of restricted shares, $12,134 related to the fair value of stock options issued by us to management, directors, and employees, and $5,615 for GoldMining personnel, allocated for their time spent on our affairs, compared to $10,502 during the one month ended December 31, 2022. The allocated costs from GoldMining were treated as a capital contribution, as there is no obligation or intent regarding the repayment of such amounts by the Company;
(iii) management fees, salaries and benefits of $30,784, compared to $14,306 during the one month ended December 31, 2022; The increase was primarily due to the hiring of additional staff in connection with the increase in operations post-IPO;
(iv) consulting, corporate development and investor relations expenses of $43,026, compared to $9,249 during the one month ended December 31, 2022. The increase was mainly for building corporate brand awareness after completion of the IPO;
(v) filing, listing, dues and subscriptions expenses of $8,327, compared to $1,194 during the one month ended December 31, 2022;
(vi) office administrative and insurance expenses of $45,012, compared to $1,179 during the one month ended December 31, 2022. The increase was primarily for directors’ and officers’ insurance expenses during this period as a result of completion of our IPO; and
(vii) travel, website design and hosting expenses of $2,331, compared to $174 during the one month ended December 31, 2022.
For the one month ended December 31, 2023, depreciation expenses were $8,286, compared to $nil for the one month ended December 31, 2022. The increase was due to depreciation of camp structures and equipment acquired after completion of the IPO.
For the one month ended December 31, 2023, our loss from operations was $281,839, compared to $180,836 for the one month ended December 31, 2022. The increase was primarily the result of a higher level of activity after completion of the IPO.
Year ended December 31, 2024, compared to year ended November 30, 2023
| Selected operating results | Year Ended December 31 2024 | Year Ended November 30 2023 | Change |
|---|---|---|---|
| Net loss for the year | $(8,487,081) | $(9,356,577) | $869,496 |
| Loss from operations | (8,893,070) | (9,776,758) | 883,688 |
| Exploration expenses | 5,802,549 | 5,054,500 | 748,049 |
| General and administrative expenses | 2,946,723 | 4,670,248 | (1,723,525) |
| Depreciation | $125,593 | $30,959 | $94,634 |
39
For the year ended December 31, 2024, we recorded a net loss of $8,487,081 (or $0.68 per share), compared to $9,356,577 (or $0.82 per share) for the year ended November 30, 2023. The decrease in net loss was primarily due to the decrease of general and administrative expenses, partially offset by the increase of costs associated with our 2024 Whistler Program.
For the year ended December 31, 2024, we had exploration expenses of $5,802,549, compared to $5,054,500 for the year ended November 30, 2023. The increase was primarily related to the 2024 Whistler Program and included drilling, fees to third party vendors that provided geological and environmental work, regulatory and community stakeholder engagements and other technical services, and camp and field support costs. During the year ended December 31, 2024, exploration expenses primarily consisted of:
(i) drilling expenses of $2,339,526, compared to $1,694,952 for the year ended November 30, 2023. The increased expenses during the year ended December 31, 2024, were primarily for the 2024 Whistler Program;
(ii) consulting fees of $1,287,697, compared to $1,499,000 for the year ended November 30, 2023. Such expenses were primarily for consulting fees paid to third parties for the planning and management of our exploration programs at the Whistler Project, including database management, geological interpretation and modelling. In addition, consulting fees to third parties to conduct environmental baseline, and regulator, community and other stakeholder engagements;
(iii) camp and field support expenses of $1,269,067, compared to $945,751 for the year ended November 30, 2023. The camp and field support expenses during the year ended December 31, 2024, were primarily for camp costs, including equipment maintenance, camp management labor and supplies for the 2024 Whistler Program, as well as work to support maintenance of the existing access road between camp and drilling sites at the Raintree and Whistler deposits, construction of new trails and drill pads, and stakeholder engagement to support the Alaska state led future access road, and;
(iv) transportation, travel and other exploration expenses of $906,259, compared to $914,797 for the year ended November 30, 2023. Such expenses were primarily for fuel consumption, aircraft charter costs to transport crews, equipment and supplies to the Whistler Project.
For the year ended December 31, 2024, general and administrative expenditures were $2,946,723, compared to $4,670,248 for the year ended November 30, 2023. During the year ended December 31, 2024, general and administrative expenditures primarily consisted of:
(i) consulting, corporate development and investor relations expenses of $879,454, compared to $1,742,904 for the year ended November 30, 2023. Comparatively, during the year ended November 30, 2023, the expenses were higher for building initial corporate brand awareness of the new company after completion of the IPO;
(ii) professional fees of $689,400, compared to $1,665,183 for the year ended November 30, 2023. Comparatively, during the year ended November 30, 2023, the professional fees were primarily for legal, audit, accounting and tax services relating to the Company’s preparation and execution of the IPO;
(iii) management fees, salaries and benefits of $382,935, compared to $300,767 for the year ended November 30, 2023;
(iv) stock-based compensation expenses of $331,896, which consisted of $9,394 related to the award of restricted shares, $308,827 related to the fair value of stock options and RSUs issued by us to management, directors, consultants and employees, and $13,675 for GoldMining personnel, allocated for their time spent on our affairs, compared to $423,831 for the year ended November 30, 2023. The allocated costs from GoldMining were treated as a capital contribution, as there is no obligation or intent regarding the repayment of such amounts by the Company;
(v) filing, listing, dues and subscriptions expenses of $141,826, compared to $178,595 for the year ended November 30, 2023;
(vi) office administrative and insurance expenses of $474,775, compared to $325,551 for the year ended November 30, 2023; and
(vii) travel, website design and hosting expenses of $46,437, compared to $33,417 for the year ended November 30, 2023.
For the year ended December 31, 2024, depreciation expenses were $125,593, compared to $30,959 for the year ended November 30, 2023. The increase was primarily due to depreciation of camp structures, which were renovated and made available for their intended use in July 2023, and for new equipment acquired.
For the year ended December 31, 2024, our loss from operations was $8,893,070, compared to $9,776,758 for the year ended November 30, 2023. The decrease primarily resulted from the decrease in general and administrative expenses, partially offset by costs associated with the 2024 Whistler Program.
Liquidity and Capital Resources
| As at December 31, 2024 | As at December 31, 2023 | As at November 30, 2023 | |
|---|---|---|---|
| Cash and cash equivalents | $3,880,747 | $11,203,893 | $11,401,338 |
| Working capital(1) | 3,697,987 | 11,293,443 | 11,493,428 |
| Total assets | 5,149,151 | 12,776,013 | 13,023,753 |
| Total current liabilities | 420,241 | 475,378 | 513,075 |
| Accounts payable | 185,251 | 118,610 | 197,978 |
| Accrued liabilities | 28,983 | 149,812 | 112,048 |
| Total non-current liabilities | 283,775 | 300,139 | 297,967 |
| Stockholders’ equity | $4,445,135 | $12,000,496 | $12,212,711 |
(1) Working capital is the difference between the total current assets and total current liabilities.
Prior to the completion of our IPO, capital resources consisted primarily of cash advanced and/or contributed from GoldMining. On April 24, 2023, we completed our IPO and issued 2,000,000 Units at a price of $10.00 per Unit for net proceeds in an aggregate amount of approximately $19.1 million after deducting underwriting fees and offering costs. In May 2023 we repaid GoldMining $1,680,925, for amounts previously advanced to us by GoldMining.
As of December 31, 2024, we had cash and cash equivalents of $3,880,747 (December 31, 2023: $11,203,893; November 30, 2023: $11,401,338) and restricted cash of $86,261 (December 31, 2023: $87,756; November 30, 2023: $86,870). The decrease in cash was primarily a result of exploration expenditures associated with our 2024 exploration program at the Whistler Project. We had other receivables of $7,419 (December 31, 2023: $152,716; November 30, 2023: $115,113). We had inventories of $34,858 ($27,249 as of December 31, 2023, and November 30, 2023), which included fuels held at the Whistler Project camp site. We had prepaid expenses of $108,943 as of December 31, 2024 (December 31, 2023: $297,207; November 30, 2023: $375,933). The decrease in prepaid expenses was primarily as a result of the decrease of prepaid insurance and corporate development expenses.
As of December 31, 2024, we had current liabilities of $420,241 compared to $475,378 as of December 31, 2023, and $513,075 as of November 30, 2023. Current liabilities as of December 31, 2024, consisted of: (i) accounts payable of $185,251, compared to $118,610 as of December 31, 2023, and $197,978 as of November 30, 2023; (ii) accrued liabilities of $28,983, compared to $149,812 as of December 31, 2023, and $112,048 as of November 30, 2023; the decrease of accounts payable and accrued liabilities was a result of the timing of payment due to the completion the 2024 Whistler Program in September 2024, compared to the completion of 2023 Whistler Program in November 2023; (iii) current portion of lease liabilities of $25,144, compared to $21,057 as of December 31, 2023, and $17,268 as of November 30, 2023; and (iv) other payables of $180,863, which consisted of withholding tax payables and income tax payables, compared to $185,899 as of December 31, 2023, and $185,781 as of November 30, 2023.
We have not generated any revenue from operations and the only sources of financing to date have been through advances from GoldMining, the IPO and our ATM program. Our ability to meet our obligations and finance exploration activities depends on our ability to generate cash flow through the issuance of shares of Common Stock pursuant to private placements, public offerings, including under the ATM Program, and short-term or long-term loans. Capital markets may not be receptive to offerings of new equity from treasury or debt, whether by way of private placements or public offerings. This may be further complicated by the limited liquidity for our shares of Common Stock, restricting access to some institutional investors. Our growth and success is dependent on external sources of financing which may not be available on acceptable terms, or at all.
As of December 31, 2024, we did not have any off-balance sheet arrangements.
Summary of Cash Flows
Year ended December 31, 2024, compared to years ended December 31, 2023, and November 30, 2023
The Condensed Consolidated Statement of Cash Flows for the year ended December 31, 2024, is presented below for reference in comparison to the years ended December 31, 2023, and November 30, 2023:
| Years Ended December 31, 2024 | December 31, 2023(Unaudited) | November 30, 2023 | |
|---|---|---|---|
| Net cash used in operating activities | $(7,752,629) | $(9,188,731) | $(9,428,815) |
| Net cash used in investing activities | (171,836) | (979,523) | (979,523) |
| Net cash provided by financing activities | 599,824 | 21,304,932 | 21,842,038 |
| Net change in cash, cash equivalents and restricted cash | (7,324,641) | 11,136,678 | 11,433,700 |
| Cash, cash equivalents and restricted cash, beginning of year | 11,291,649 | 154,971 | 54,508 |
| Cash, cash equivalents and restricted cash, end of year | $3,967,008 | $11,291,649 | $11,488,208 |
Operating Activities
Net cash used in operating activities during the year ended December 31, 2024, was $7,752,629, compared to $9,188,731 during the year ended December 31, 2023 ($9,428,815 during the year ended November 30, 2023). An increase in prepaid expenses providing cash of $188,264 in the year ended December 31, 2024, compared to a decrease in prepaid expenses used cash of $243,966 in the year ended December 31, 2023 ($307,963 in the year ended November 30, 2023). The increase in cash flows from prepaid expenses during the year ended December 31, 2024, was primary the result of lower prepaid corporate development expenses. An increase in other receivables providing cash of $145,297 in the year ended December 31, 2024, compared to a decrease in other receivables used cash of $84,716 in the year ended December 31, 2023 ($47,113 in the year ended November 30, 2023). A decrease in accrued liabilities used cash of $120,829 in the year ended December 31, 2024, compared to an increase in accrued liabilities providing cash of $128,590 in the year ended December 31, 2023 ($85,126 in the year ended November 30, 2023). An increase in accounts payable providing cash of $66,641 in the year ended December 31, 2024, compared to a decrease in accounts payables used cash of $65,580 in the year ended December 31, 2023 ($268,149 in the year ended November 30, 2023).
Significant operating expenditures during the years ended December 31, 2024, December 31, 2023, and the year ended November 30, 2023, included general and administrative expenses and exploration expenditures.
Investing Activities
Net cash used in investing activities during the year ended December 31, 2024, was $171,836, which related to the purchase of equipment, compared to $979,523 during each of the years ended December 31, 2023, and November 30, 2023, each of which comprised of $866,140 related to the construction of camp structures, and $113,383 related to the purchase of equipment.
Financing Activities
For the year ended December 31, 2024, net cash provided by financing activities was $599,824, which was primarily comprised of the net proceeds of $585,722 from the ATM Program, proceeds received from warrant exercises of $3,900, and $10,202 allocated personnel costs from GoldMining, compared to $21,304,932 during the year ended December 31, 2023 ($21,842,038 during the year ended November 30, 2023). The net cash provided by financing activities during the year ended December 31, 2023, primarily comprised of net proceeds of $19,056,223 from the IPO, proceeds from warrant exercises of $3,363,204, withholding taxes received on return of capital of $53,935, allocated personnel costs from GoldMining of $41,690, and advances from GoldMining of $470,805, partially offset by $1,680,925 for repayment of advances from GoldMining. The net cash provided by financing activities during the year ended November 30, 2023, primarily comprised of net proceeds of $19,056,223 from the IPO, proceeds from warrant exercises of $3,363,204, withholding taxes received on return of capital of $53,935, allocated personnel costs from GoldMining of $46,459, and advances from GoldMining of $1,003,142, partially offset by $1,680,925 for repayment of advances from GoldMining.
Commitments Required to Keep Whistler Project in Good Standing
We are required to make annual land payments to the Department of Natural Resources of Alaska in the amount of $230,605 in 2025 and thereafter, to keep the Whistler Project in good standing. Additionally, we have an annual labor requirement of $135,200 for 2025 and thereafter, for which a cash-in-lieu payment equal to the value of the annual labor requirement may be made instead. We have excess labor carry forwards of $61,674 expiring in 2026, $1,736,956 expiring in 2027, and $4,572,319 expiring in 2028, of which up to $135,200 can be applied each year to meet our annual labor requirements. The Whistler Project is in good standing as of the date of this Annual Report.
Future Commitments
On November 27, 2020, GoldMining agreed to cause us to issue a 1.0% net smelter return (“NSR”) royalty on its Whistler Project to Gold Royalty U.S. Corp. (a subsidiary of Gold Royalty Corp.). We also assigned certain buyback rights relating to an existing third party royalty on the Whistler Project such that Gold Royalty U.S. Corp. has a right to acquire a 0.75% NSR (including an area of interest) on the Whistler Project for $5,000,000 pursuant to such buyback rights. The royalty was subsequently assigned to Nevada Select Royalty, Inc. (a subsidiary of Gold Royalty Corp.).
In August 2015 we acquired rights to the Whistler Project and associated equipment pursuant to an asset purchase agreement by and among the Company, GoldMining, Kiska Metals Corporation (“Kiska”) and Geoinformatics Alaska Exploration Inc (“Geoinformatics”). Pursuant to such agreement, we acquired rights and assumed obligations under two related underlying agreements. The first underlying agreement is a Royalty Purchase Agreement between Kiska, Geoinformatics and MF2 LLC. (“MF2”), dated December 16, 2014. This agreement grants MF2 a 2.75 percent NSR royalty over the Whistler Project area. The MF2 royalty was subsequently assigned to Osisko Mining (USA) Inc. The second underlying agreement is an earlier agreement between Cominco American Incorporated and Mr. Kent Turner (whose rights and obligations thereunder were assumed by the Company) dated October 1, 1999. This agreement concerns a 2.0 percent net profit interest to Teck Resources, recently purchased by Sandstorm Gold, in connection with an area of interest specified by standard township sub-division.
Transactions with Related Parties
During the periods presented, we shared personnel, including key management personnel, office space, equipment, and various administrative services with other companies, including GoldMining. Costs incurred by GoldMining were allocated between its related subsidiaries based on an estimate of time incurred and use of services and are charged at cost. During the year ended December 31, 2024, the allocated costs from GoldMining to the Company were $23,877 ($6,888 and $100,807 for the one month ended December 31, 2023, and the year ended November 30, 2023, respectively). Out of the allocated costs, $13,675 for the year ended December 31, 2024, were noncash stock-based compensation costs ($5,615 and $54,348 for the one month ended December 31, 2023, and the year ended November 30, 2023, respectively). The allocated costs from GoldMining were treated as a capital contribution, as there is no obligation or intent regarding the repayment of such amounts by us.
For the year ended December 31, 2024, the amounts advanced to the Company or paid on its behalf by GoldMining were $nil ($nil and $1,003,142 for the one month ended December 31, 2023, and year ended November 30, 2023, respectively). In May 2023 the Company repaid GoldMining $1,680,925, for amounts previously advanced to the Company. The amount paid represented the full amount of the outstanding loan from GoldMining at the time.
During the year ended December 31, 2024, stock-based compensation costs included $5,861 ($1,127 and $31,127 during the one month ended December 31, 2023, and the year ended November 30, 2023, respectively), in amounts incurred for a co-chairman and director of GoldMining for performance based restricted shares granted in September 2022.
During the year ended December 31, 2024, the Company incurred $142,140, and during the one month ended December 31, 2023 and the year ended November 30, 2023, $33,125 and $233,978, respectively, in general and administrative expenses related to website design, video production, website hosting services and marketing services paid to Blender Media Inc. (“Blender”), a company whose principal is an immediate family member of a co-chairman and director of GoldMining. Blender is a design and marketing agency that provides services to numerous publicly traded companies.
Related party transactions are based on the amounts agreed to by the parties. During the year ended December 31, 2024, Transition Period and the year ended November 30, 2023, we did not enter into any contracts or undertake any commitment or obligation with any related parties other than as described herein.
Our Audit Committee is charged with reviewing and approving all related party transactions and reviewing and making recommendations to our board of directors, or approving any contracts or other transactions with any of our current or former executive officers. The Charter of the Audit Committee sets forth our written policy for the review of related party transactions.
Outstanding Securities
As of the date hereof, we have 12,462,174 shares of Common Stock outstanding. In addition, we have outstanding stock options issued under our long-term incentive plan to purchase 303,550 shares of Common Stock at an exercise price of $10 per share, 11,287 outstanding RSUs and outstanding Warrants to purchase 1,740,992 shares of Common Stock at an exercise price of $13 per share. The exercise of stock options and Warrants is at the discretion of their respective holders and, accordingly, there is no assurance that any of the stock options or warrants will be exercised in the future.
Critical Accounting Estimates and Judgments
The preparation of these financial statements in conformity with U.S. GAAP requires management to make judgments and estimates and form assumptions that affect the reported amounts of assets and liabilities at the date of the financial statements and reported amounts of income and expenses during the year. On an ongoing basis, management evaluates its judgments and estimates in relation to assets, liabilities, income and expenses. Management uses historical experience and various other factors it believes to be reasonable under the given circumstances as the basis for its judgments and estimates. Actual outcomes may differ from these estimates under different assumptions and conditions.
Information about judgments made in applying accounting policies that have the most significant effects on the amounts recognized in the financial statements is as follows:
Asset retirement obligation
An asset retirement obligation represents the present value of estimated future costs for the rehabilitation of our mineral property. These estimates include assumptions as to the future activities, cost of services, timing of the rehabilitation work to be performed, inflation rates, exchange rates and interest rates. The actual cost to rehabilitate a mineral property may vary from the estimated amounts because there are uncertainties in factors used to estimate the cost and potential changes in regulations or laws governing the rehabilitation of a mineral property. Management periodically reviews the rehabilitation requirements and adjusts the liability as new information becomes available and will assess the impact of new regulations and laws as they are enacted.
Allocation of expenses from GoldMining
For the year ended December 31, 2024, Transition Period, and year ended November 30, 2023, certain general administrative expenses, including employment related expenditures for services and support functions provided by GoldMining, were allocated on a pro-rata basis considered by GoldMining to be a reasonable reflection of the utilization of services provided to us.
Restricted Shares and RSUs
The fair values of restricted shares and RSUs are measured at the grant date and recognized over the period during which the restricted shares and RSUs vest. When restricted shares are conditional upon the achievement of a performance condition, the Company estimates the length of the expected vesting period at the grant date, based on the most likely outcome of the performance condition. The fair value of the restricted shares is determined based on the fair value of the shares of Common Stock on the grant date, adjusted for minority stockholder discount, liquidity discount and other applicable factors that are generally recognized by market participants.
The fair values of restricted shares and RSUs are recognized as an expense over the vesting period based on the best available estimate of the number of restricted shares and RSUs expected to vest; that estimate will be revised if subsequent information indicates that the number of restricted shares and RSUs expected to vest differs from previous estimates.
Stock Options
We grant stock options to certain of our directors, officers, employees and consultants. We use the Black-Scholes option-pricing model to determine the grant date fair value of stock options. The fair value of stock options granted to employees is recognized as an expense over the vesting period with a corresponding increase in equity. An individual is classified as an employee when the individual is an employee for legal or tax purposes, provides services that could be provided by a direct employee, or has authority and responsibility for planning, directing and controlling our activities, including non-executive directors. The fair value is measured at grant date and recognized over the period during which the options vest. Forfeitures are accounted for as they occur.
The Black-Scholes option-pricing model uses as inputs the fair value of our shares of Common Stock and assumptions we make for the volatility of our shares of Common Stock, the expected term of our stock options, the risk-free interest rate for a period that approximates the expected term of our stock options and our expected dividend yield. We have historically been a private company and continue to lack sufficient company-specific historical and implied volatility information. Therefore, we estimate our expected share volatility based on the historical volatility of a publicly traded set of peer companies and expect to continue to do so until such time as we have adequate historical data regarding the volatility of our own traded share price.
Recently Issued Accounting Pronouncements
In November 2023 the Financial Accounting Standards Board (the “FASB”) issued Accounting Standards Update (“ASU”) 2023-07, the amendments “improve reportable segment disclosure requirements, primarily through enhanced disclosures about significant segment expenses”. In addition, the amendments enhance interim disclosure requirements, clarify circumstances in which an entity can disclose multiple segment measures of profit or loss, provide new segment disclosure requirements for entities with a single reportable segment, and contain other disclosure requirements. The adoption of ASU 2023-07 in the current year did not have a material effect on our financial statements.
In December 2023 the FASB issued ASU 2023-09, Income Taxes (Topic 740): Improvements to Income Tax Disclosures. The ASU expands public entities’ income tax disclosures by requiring disaggregated information about a reporting entity’s effective tax rate reconciliation as well as information on income taxes paid. The standard is intended to benefit investors by providing more detailed income tax disclosures that would be useful in making capital allocation decisions. The ASU will be effective for annual periods beginning after December 15, 2024. The guidance will be applied on a prospective basis with the option to apply the standard retrospectively. Early adoption is permitted. Management is currently evaluating the impact of this guidance on our financial statements.
JOBS Act
In April 2012 the JOBS Act was enacted. Section 107 of the JOBS Act provides that an “emerging growth company” can take advantage of the extended transition period provided in Section 7(a)(2)(B) of the Securities Act of 1933, as amended, for complying with new or revised accounting standards. Thus, an emerging growth company can delay the adoption of certain accounting standards until those standards would otherwise apply to private companies.
We continue the process of evaluating the benefits of relying on other exemptions and reduced reporting requirements under the JOBS Act. Subject to certain conditions, as an emerging growth company, we may rely on certain of these exemptions, including without limitation, providing an auditor’s attestation report on our system of internal controls over financial reporting pursuant to Section 404(b) of the Sarbanes-Oxley Act. We will remain an emerging growth company until the earlier of: (i) the last day of the fiscal year in which we have total annual gross revenue of $1.235 billion or more; (ii) the last day of the fiscal year following the fifth anniversary of the date of the completion of our IPO; (iii) the date on which we have issued more than $1.0 billion in nonconvertible debt during the previous three years; or (iv) the date on which we are deemed to be a large accelerated filer under the rules of the SEC.
Controls and procedures
As filed, 2,762 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Evaluation of Disclosure Controls and Procedures
Our management, with the participation of our Principal Executive Officer and Principal Financial Officer, has evaluated the effectiveness of disclosure controls and procedures (as such term is defined in Rules 13a-15(e) and 15d-15(e) under the United States Securities Exchange Act of 1934, as amended (the “Exchange Act”) and, as of December 31, 2024, our Principal Executive Officer and Principal Financial Officer have concluded that, as of the end of the period covered by this Annual Report, our disclosure controls and procedures were effective.
It should be noted that any system of controls is based in part upon certain assumptions designed to obtain reasonable (and not absolute) assurance as to its effectiveness, and there can be no assurance that any design will succeed in achieving its stated goals.
Management’s Annual Report on Internal Control over Financial Reporting
Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Exchange Act Rules 13a-15(f) and 15d-15(f).
Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of the effectiveness of internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies and procedures may deteriorate over time.
Our management, including our chief executive officer and chief financial officer, has assessed the effectiveness of our internal control over financial reporting as of December 31, 2024, based on the criteria established in the “2013 Internal Control—Integrated Framework” issued by the Committee of Sponsoring Organizations of the Treadway Commission in 2013. Based on its assessment and the above referenced criteria, our management has concluded that, as of December 31, 2024, the Company’s internal control over financial reporting was effective.
This Annual Report does not include an attestation report of our registered public accounting firm on internal control over financial reporting because we do not qualify as an accelerated or a large accelerated filer (as defined in Rule 12b-2 of the Exchange Act).
Changes in Internal Control over Financial Reporting
There have been no changes in our internal control over financial reporting (as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act) that occurred during our last completed fiscal quarter, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2024-12-31. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Operating income | 12 months2024-01-01 to 2024-12-31 | −$8.9m | us-gaap:OperatingIncomeLoss |
| Income tax | 12 months2024-01-01 to 2024-12-31 | $5.0k | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 12 months2024-01-01 to 2024-12-31 | −$8.5m | us-gaap:NetIncomeLoss |
| Diluted EPS | 12 months2024-01-01 to 2024-12-31 | −$0.68 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 12 months2024-01-01 to 2024-12-31 | −$0.68 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 12 months2024-01-01 to 2024-12-31 | 12,407,646 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 12 months2024-01-01 to 2024-12-31 | −$7.8m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 12 months2024-01-01 to 2024-12-31 | $171.8k | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | At period end2024-12-31 | $3.9m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2024-12-31 | $4.1m | us-gaap:AssetsCurrent |
| Total assets | At period end2024-12-31 | $5.1m | us-gaap:Assets |
| Current liabilities | At period end2024-12-31 | $420.2k | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2024-12-31 | $704.0k | us-gaap:Liabilities |
| Shareholders' equity | At period end2024-12-31 | $4.4m | us-gaap:StockholdersEquity |
Source: SEC EDGAR, the filing index for accession 0001641172-25-000962. Last ingested by Listed: Nov 6, 2026, 17:39 ET. Listed shows no prices and gives no investment advice.