Bimergen Energy Corporation (the “Company”, “we” or “us”) was incorporated under the laws of Delaware on March 4, 1998. In connection with the Company’s planned expansion of its business following the completion of the acquisition of Bitech Mining Corporation, a Wyoming corporation (“BTM”), the Company amended to its Certificate of Incorporation on April 29, 2022 to change its corporate name to Bitech Technologies Corporation. On January 28, 2025, the Company filed a Certificate of Amendment to its Certificate to Incorporation to: (i) effect a reverse stock split of its common stock, par value $0.001 per share (the “Common Stock”) at a ratio of 1 post-split share for every 140 pre-split shares; and (ii) to change the name of the Company to Bimergen Energy Corporation.

We are a renewable energy project developer dedicated to enabling the clean energy transition and providing critical grid stability via solutions across a range of applications through our portfolio of utility-scale Battery Energy Storage System (BESS) and solar development projects. In April 2024, we acquired a portfolio of development-stage BESS and solar energy projects from Emergen Energy LLC (“Emergen”), making us the project owner of 23 development stage utility-scale BESS projects with an estimated cumulative storage capacity of 1.965 gigawatts (GW) and 13 development stage solar energy projects with an anticipated cumulative generation capacity of 1.640 GW (collectively, the “Development Projects”) once constructed and operational.

Our primary business objective is to become a grid-balancing operator by developing, commercializing, and operating a diversified portfolio of BESS and solar energy projects. We aim to leverage by partnering with advanced BESS technologies and Energy Management Systems (EMS) to address the critical challenges associated with the integration of renewable energy into the electrical grid, particularly the imbalance between energy supply and demand caused by the intermittent nature of solar and wind resources. This approach aligns with the increasing demand for grid stability in regions with high penetration of renewable energy, where imbalances between peak solar generation and peak energy demand create revenue opportunities through energy storage and dispatch. We plan to store excess energy generated during periods of low demand and dispatch it during peak demand periods, thereby enhancing grid stability and efficiency. Upon reaching commercial operation, we hope to play a key role in stabilizing grid demand and supporting renewable energy integration through energy arbitrage and ancillary services.

Core Business in Battery Energy Storage Systems (BESS)

Our core business is anchored in the development and operation of BESS projects, which are strategically designed to mitigate the energy imbalances and power deficits observed in markets with substantial solar and wind energy generation. This event, often depicted by the grid balancing, highlights the timing mismatch between peak renewable energy generation and peak electricity demand. As renewable energy production peaks during daylight hours and declines in the evening when energy demand is highest, supplemental energy supply sources become increasingly critical. Our BESS projects are positioned to address this imbalance by storing surplus energy during periods of low demand and releasing it during high-demand periods, capturing value from daily price fluctuations. By purchasing and storing energy during low-cost, high-supply hours and selling it during high-demand periods when prices are at their peak, known as energy arbitrage trading, our BESS systems will provide critical support to compensate for the lack of supply from the current outdated energy grid infrastructure.

In addition to energy arbitrage, our BESS assets are positioned to provide essential grid services, including frequency regulation, voltage support, and emergency backup during grid outages. Frequency regulation refers to the rapid response to changes in grid frequency, maintaining stability and preventing potential grid failures. Voltage control enhances the quality and reliability of power supplied to consumers. The rapid response capabilities also maintain stability for key infrastructure during outages via immediate response to fluctuations in voltage and frequency. By reducing demand imbalances at peak times, known as peak shaving, we hope to flatten the energy demand and lower electricity costs for consumers. By integrating advanced EMS controls, we aim to optimize the dispatch timing and increase the overall economic value of stored energy, delivering both reliable performance efficient operation in dynamic market conditions. Our systems will enable more flexible and adaptive grid operations, accommodating dynamic energy flows and diverse generation sources. These ancillary services both relieve grid stress, offer additional potential revenue streams, and maximize likelihood of punctual project development within budget and ensure product quality standards. We believe we are well- positioned to leverage our existing relationships to secure multi-year customer contracts prior to project construction and integrate cutting-edge battery technologies as they are developed into future developments. Our systems will also be capable of deferred infrastructure upgrades, which reduce the need for expensive grid infrastructure upgrades by efficiently managing local supply and demand.

We expect our BESS projects to be located alongside traditional power transmission lines or near large offtakers with high energy demands, enhancing grid stability and reducing energy costs. These locations are suitable for battery storage facilities of approximately thirty acres and undergo environmental studies and assessments to ensure feasibility. While the letters of intent the Company has entered into or negotiated for these projects are for specific locations, the Company’s development plans are not dependent on the landowner or address, but, rather, are county based. The Company believes it could adjust its plans to find a similar, suitable location if it is unable to negotiate a definitive agreement to develop a project with the landowner.

We maintain strong relationships with tier-one battery and equipment suppliers, utilities, and power purchasers to optimize transmission efficiency and lower consumer costs. We believe these partnerships may also help us secure regulatory support, ensure timely project development within budget, and uphold high product quality standards. Our strategic position allows us to secure multi-year customer contracts before project construction and integrate emerging battery technologies into future developments. Additionally, our systems are designed to enable deferred infrastructure upgrades, reducing the need for costly grid enhancements by efficiently managing local supply and demand.

Development Projects and Operational Progress

Our portfolio of Development Projects includes approximately 3.6 GW of alternating current (GWAC) power capacity across various regions served by Independent System Operators (ISOs) such as ERCOT, WECC, PJM, and MISO. These regions have been selected strategically based on favorable market conditions, grid infrastructure, and regulatory environments conducive to renewable energy integration. In connection with the Emergen transaction, we have secured rights to comprehensive “Work Product” Intangible assets essential for project development, including but not limited to: feasibility studies determining capacity and compatibility, establishing a production model of the project parameters, identifying any curtailment for the project, power flow site verification and substation identification, permitting and regulatory compliance documentation, engineering designs, equipment procurement plans, site preparation guidelines, and noting project specific challenges.

Subsequent to positive feasibility studies is the process of legal formation, analyzing and negotiating site control/surface and materials, and identifying engineering requirements for construction, identifying and negotiating interconnection to the grid, identifying tax abatements, and identifying permitting and study requirements, and noting additional project specific challenges. These assets provide a robust foundation for advancing our projects through the development lifecycle efficiently and effectively. We are in the process of negotiating grid interconnection agreements, ensuring compliance with applicable grid codes and standards, registering our projects for market participation, and coordinating with ISOs to align dispatch and grid service requirements. In addition, we are actively engaging with these ISOs to address cybersecurity compliance and to develop comprehensive monitoring and reporting frameworks, which are essential for maintaining operational integrity and grid support.

Our Redbird and Wildfire projects are currently the most advanced within our portfolio and are ready to proceed to the financing and construction phases. We are actively pursuing project-level debt and equity financing to fund the construction and/or operationalization of these projects. Upon securing financing, of which there can be no assurance we will be able to do so or do so on terms favorable to us, we intend to execute binding agreements with key counterparties, initiate site preparation activities, and commence construction in accordance with our development timelines. As part of the rights to the Work Product and continued development, we identify and negotiate with the appropriate counterparts in the specific project, but do not enter into binding contracts until specific project financing is obtained so as to not create liabilities before project financing is secured. We recognize the importance of managing risks associated with project development, including regulatory, technical, financial, and market risks. Our approach involves conducting thorough feasibility studies, engaging in proactive stakeholder consultations, and maintaining flexibility in project planning. We do not enter into binding contracts related to site control, equipment procurement, or construction until project-specific financing is secured, mitigating financial exposure. The next steps for these projects will include executing contracts with key counterparties, purchasing equipment, and initiating the construction process. Our current project pipeline consists of multiple BESS initiatives, with an estimated development timeline spanning eight to nine years.

BESS Market

The Battery Energy Storage Systems (BESS) industry is young but has experienced significant growth in the United States, driven by the integration of renewable energy, the need for grid stability, and various economic and policy incentives. According to Energy Storage News in March 2024, BESS installations “surged” with a 96% increase in cumulative capacity in 2023.

According to the U.S. Energy Information Administration (EIA) report in January 2024, the U.S. battery storage capacity has been growing since 2021 and could increase by 89% by the end of 2024 if developers bring all of the energy storage systems they have planned on line by their intended commercial operation dates. Developers currently plan to expand U.S. battery capacity to more than 30 gigawatts (GW) by the end of 2024, a capacity that would exceed those of petroleum liquids, geothermal, wood and wood waste, or landfill gas.

Battery Energy Storage Systems (BESS) play a crucial role in managing the grid, and their importance is expected to increase as more electrification and AI data centers are installed across the United States and the world. In June 2024, Bloomberg data revealed electricity demands from AI data centers are outstepping the available power supply in many parts of the world as AI wreaks havoc on global power systems. The sharp increase in demand for AI clusters has resulted in a notable emphasis on data center capacity, placing significant strain on the power grid, generation capabilities, and environmental concerns. With this surge in demand for electricity, there is a corresponding need for efficient storage systems to balance supply and demand on the grid. The current benefits of BESS towards the grids are as follows:

  • Grid Stability: BESS provides grid stabilization by balancing supply and demand, reducing the likelihood of blackouts and enhancing the reliability of the electrical grid.
  • Renewable Energy Integration: BESS allows for the efficient integration of renewable energy sources like solar and wind by storing excess energy and releasing it when needed.
  • Peak Shaving: BESS helps reduce peak demand charges for utilities and consumers by discharging stored energy during high-demand periods.
  • Reduction of Fossil Fuel Dependence: By enabling more renewable energy use, BESS decreases the reliance on fossil fuel-based power generation, reducing greenhouse gas emissions.
  • Emergency Backup: BESS provides critical backup power during emergencies and natural disasters, ensuring continuous power supply for essential services.

As we progress towards optimizing BESS operations for the future, several advantages become apparent:

  • Grid Decentralization: Future BESS deployments will support a more decentralized grid, empowering local communities with greater energy independence and resilience.
  • Cost Reduction: Advances in battery techs and economies of scale will continue to drive down the costs of BESS, making it more accessible and cost-effective for widespread use.
  • Enhanced Renewable Penetration: With improved storage capabilities, BESS will support even higher levels of renewable energy penetration, facilitating the transition to a fully renewable energy grid.
  • Electric Vehicle (EV) Integration: BESS will play a crucial role in managing the increased demand from EVs, enabling efficient charging infrastructure and energy management.

The BESS market is projected to grow exponentially, making it a massive and lucrative market. However, despite its rapid growth, there are currently limited players involved in this sector. Management believes this situation presents an opportunity for companies with extensive development and operating experience like Bimergen Energy today to enter and capitalize on this expanding market. As the US continues to transition towards cleaner energy sources, BESS systems will become even more critical in ensuring a stable and resilient power grid while reducing carbon emissions. We believe it is an exciting time for the BESS industry with immense potential for growth and innovation.

A report released in May 2024 by Aurora Energy Research on the use of Battery Energy Storage Systems (BESS) in the ERCOT Market stated that these facilities have played a crucial role in Texas’ energy supply by providing dependable and affordable power during periods of high demand.

In February 2024, Canary Media issued a report stating that Texas will add more grid batteries in any other states in 2024. Due to its affordable land and thriving market, which are highly desirable for energy storage companies, the state of Texas is expected to surpass California in battery installations this year. In May 2024, the media company added that Texas rolled into 2024 with some 5.1 gigawatts of energy storage online, second only to mighty California. However, the U.S. Energy Information Administration (EIA) predicts Texas will complete another 6.4 gigawatts this year, outstripping California’s 5.2 gigawatts of new construction.

As a new technology enabler, we offer an array of advanced green energy technology solutions embedded with advanced BESS application for enterprises with projects applying our in-house technology innovation using system integration approach, aiming to generate scalable technology revenue.

Emergen Energy Acquisition

On April 14, 2024, the Company, Emergen Energy LLC, a Delaware limited liability company (“Emergen”), Bridgelink Development, LLC, a Delaware limited liability company (“Bridgelink”) and C & C Johnson Holdings LLC, the sole member of Bridgelink (“C&C”) entered into a Membership Interest Purchase Agreement (the “MIPA”) (the “Business Combination”).

On April 24, 2024 (the “Closing”) the Company completed the acquisition of Emergen pursuant to the MIPA whereby the Company issued 1,587,300 unregistered shares of its common stock to Emergen’s sole member, C&C Johnson Holdings LLC (“C&C”) in exchange for 100% of Emergen’s equity interests. C&C is controlled by Cole Johnson who became our President and a director following the Closing as well as the President of the Company’s BESS and Solar Divisions. In addition, Emergen became a wholly owned subsidiary of the Company with C&C’s owning approximately 31.3% of the Company’s issued and outstanding shares of the Company’s capital stock.

Originally, in a letter agreement executed and disclosed in January 2024 the above acquisition was contingent upon the parties entering into a definitive agreement which would contain certain conditions to close, including a commitment for a capital investment or other financing transaction of not less than $50,000,000 (the “Capital Infusion”) prior to closing. This Capital Infusion condition was negotiated out of the acquisition definitive agreement.

Emergen holds a portfolio of battery energy storage system (“BESS”) projects identified in the MIPA with a cumulative storage capacity estimated at 1.965 gigawatts (GW) upon completion of the construction of such project (the “BESS Development Projects”) and rights to develop a portfolio of solar energy development projects with a cumulative capacity estimated at 3.840 GW upon completion of construction of such project (the “Solar Development Projects,” together with the BESS Development Projects, collectively, the “Development Projects”). The Company agreed that following the Closing, the Company would take all commercially reasonable steps necessary to uplist the Company to the NASDAQ stock exchange. The Company’s uplist to NASDAQ in connection with the consummation of the offering contemplated in this prospectus will satisfy the terms set forth in the Closing.

We plan to raise the working capital and project specific financing we need to commence the Development Projects through future debt and equity financing. As of the date of this prospectus we have not established a reasonable expectation of both financing and completion of any of the Development Projects.

Development Projects are the result of a significant amount of feasibility studies determining capacity and compatibility, establishing production model of the project parameters, identifying any curtailment for the project, power flowsite verification and substation identification, and noting project specific challenges. Subsequent to positive feasibility studies is the development process of legal formation, analyzing and negotiating site control/surface and materials, identifying engineering requirements before construction, identifying and negotiating interconnection to the grid, identifying tax abatements, identifying permitting and study requirements, and noting project specific challenges. We identify and negotiate with the appropriate counterparts in the specific project but do not enter into binding contracts until specific project financing is obtained. Currently we have no binding contracts for our development projects.

Through Emergen, Bimergen Energy management will determine which projects will be developed and when, how financing arrangements will be pursued and accepted, and whether a project may be sold instead of developed, and the criteria for establishing the sale price.

Emergen was formed on April 4, 2024 and had no operating activity but held the Development Projects. The Development Projects were assigned to Emergen on April 23, 2024 with no cost basis and deemed to be intangible

From an accounting perspective, we treated the transaction as an acquisition of assets versus a business combination due to the lack of any operations. Also, the projects that were purchased in the acquisition were development stage and deemed to not be tangible assets under FASB 805-10-20 and have classified these as intangible assets with indefinite useful lives and are not amortized but are tested for impairment annually, or more frequently if events or changes in circumstances indicate the assets may be impaired. To the extent that an intangible asset is successfully developed into a revenue-generating asset, it will be relieved over time in the same time period as the property, plant and equipment purchased to have the project become a revenue-generating project. To the extent that an intangible asset is not successfully developed into a revenue-generating assets, it will be considered impaired and charged to operations at that time. The Company valued the transaction at the value of $22,222,200, the value of the restricted stock ($14.00 closing price per share on April 24, 2024) issued as consideration for Emergen. Emergen had no liabilities associated with it at the time of the transaction.

In December 2023, Bimergen received an initial purchase order from a strategic customer to implement a Building Energy Management System (BEMS) Virtual Power Plant (VPP) Program designed to save electricity for approximately 4,000 multi-dwelling units (MDUs). This customer is working with PJM, a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in the District of Columbia in the U.S. and all or parts of 13 states including Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia. We believe that our BEMS solutions can benefit building owners who get paid by RTOs for energy saving bonuses, which is in alignment with federal reward programs initiated by the U.S. Department of Energy (DoE). Our real time BEMS solutions are being designed to reduce energy consumption and enhance personalized temperature control options and comfort levels for tenants living in these MDUs. As of the date of this filing, the customer has yet to make the payment for us to commence production on this project and there has been no update since receipt of the purchase order.

On May 30, 2024, Emergen entered into a Project Sale Agreement (“Agreement”) with Bridgelink for an estimated 2.425 GW of Emergen’s estimated 3.840 GW of solar energy development projects. Bridgelink has sold these greenfield projects, along with projects in its own portfolio, to an unrelated third party (“Purchaser”) which also executed that agreement on May 30, 2024. The total amount to be received by Emergen for the projects sold to Bridgelink is $19,400,000, provided the projects achieve a Point of Interconnection and subsequently obtain all Necessary Land Rights. Bridgelink retains the option to transfer or return certain or all projects within ten (10) days written notice to Emergen. A deposit from Bridgelink will be received within five business days of the execution of the agreement for $943,500 and Emergen will pay 62.5% ($589,687.50) to Energy Independent Partners LLC, a Delaware limited liability company, (“EIP”) in accordance with the Project Management Services Agreement by and between (i) Bimergen Energy; (ii) Emergen; and (iii) EIP and the remaining 37.5% (353,812.50) of the proceeds shall remain with Emergen. The remaining proceeds of $18,456,500 shall be received within five business days of when Bridgelink receives milestone payments from the Purchaser for these projects. This Agreement is still in effect and there have been no changes to the Agreement. The $943,500 deposit was paid to Emergen in June 2024.

In the event that Purchaser, under the purchase agreement decides to transfer any Project along with its interests to Bridgelink or any creditworthy entity designated by Bridgelink (“Returned Project”), Bridgelink shall provide written notice to Emergen within ten (10) business days of receipt of such notice from the Purchaser and Bridgelink shall convey, transfer, assign, deliver, and contribute over certain rights and interests to the Returned Project to Emergen within ten (10) business days of receipt of such Returned Project, unless otherwise agreed upon by Emergen in writing. For clarity, any creditworthy entity designated by Bridgelink shall be confirmed in writing by Emergen. Bridgelink is to receive payment from the Purchaser no later than March 31 of the year following each calendar year end for any milestones that have been achieved during that calendar year. Emergen is to receive payment within five days from Bridgelink receiving payment from the Purchaser. Effective December 31, 2024, Emergen and Bridgelink amended the Agreement to provide that Bridgelink could only return a Project if it has not yet made a milestone payment to Emergen on prior to the seventh (7th) anniversary of the Effective Date of the Agreement

The Projects sold by Emergen to Bridgelink are in what are termed as “Greenfield Projects.” With respect to each Greenfield Project, Emergen will be paid:

(i) $5,000 per megawatt (in alternating current) measured at the Point of Interconnection after such Greenfield Project has secured all necessary land rights as determined in good faith ($12,125,000 for the estimated 2,425 megawatts sold); and

(ii) $3,000 per megawatt (in alternating current) measured at the Point of Interconnection when the relevant Greenfield Project has achieved ready-to-build (RTB) status as determined in good faith ($7,275,000 for the estimated 2,435 megawatts sold.

There is no specified timeframe for the milestones to be achieved.

The deposit has been recorded as proceeds received on sale of intangible assets - subject to return rights until there is no longer a right to return the Projects. The remainder of the transaction is disclosed as a footnote to the financial statements but not recorded within the financial statements. All payments that are received will be recorded as proceeds received on sale of intangible assets - subject to return rights with proper footnote explanation of the transaction and will not be recorded as revenue until the right Bridgelink to return the Project and request a full refund no longer exists. There are no other sale contingencies besides those disclosed herein.

The following agreements were entered into on the date of Closing as provided for in the MIPA:

Project Management Services Agreement

At the Closing, the Company and Emergen entered into a Project Management Services Agreement (the “PMSA”) with Energy Independent Partners LLC (“Energy Independent Partners”), an entity owned or controlled by Mr. Johnson. Pursuant to the terms of the PMSA, Energy Independent Partners is obligated to provide the following project management services in connection with the development and operation of each of the Development Projects (collectively, the “Services”): (i) assist as needed with qualifying the Development Projects for financing; (ii) assist as needed with obtaining all permits required for development of the Development Projects which have sufficient rights to use all necessary real property, and for which the applicable draft interconnection agreement has been received for the Development Projects (“RTB Status”); and (iii) if Emergen foregoes the development of a Development Project, Energy Independent Partners will assist the Company as needed with marketing the Development Project to a third party or develop and retain the Development Project outside of Emergen.

Payment for Service. The Issuer agreed to pay Energy Independent Partners the following fees for providing the Services:

BESS Development Fees. In consideration of the provision of the Services related to the BESS Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per BESS Development Project: $0.035 per W for each applicable BESS Development Project, subject to such BESS Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“BESS Development Fees”). Currently, the Company is focusing on developing the BESS projects and the total fees related to all 23 of the BESS projects would be the $0.035 per watt multiplied by the estimated capacity 1.965 GW (1,965,000,000 watts) or approximately $69 million.

Solar Development Fees. In consideration of the provision of the Services related to the Solar Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per Solar Development Project: $0.035 per W for each applicable Solar Development Project, subject to such Solar Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“Solar Development Fees”). The Solar projects still in the Emergen portfolio have an estimated capacity of 1.640 GW and would have Solar Development Fees of approximately $57 million if developed.

If any Development Projects pursuant to the Agreement are sold by Emergen to a third-party then EIP would be due the greater of: (i) any unpaid project’s specific BESS Development Fees or Solar Development Fees defined in the PMSA agreement; or (ii) 62.5% of the proceeds less any project specific BESS Development Fees or Solar Development Fees paid previously.

Other Development Fees. For each other renewable energy development asset held by the Company, which are neither BESS Development Projects nor Solar Development Projects, located in the United States in which the Company engages during the term of the PMSA (the “Other Development Projects”), the Company shall pay Energy Independent Partners the higher of either (a) fifty percent (50%) of the gross margin or (b) $0.02 per watt in cash, subject to such Other Development Project achieving RTB Status (the “Other Development Fees”).

Timing of Payment of Fees

The BESS Development Fees shall be due and payable upon (i) Bitech, or any of its Affiliates, receiving project financing directly related to and collateralized by BESS Projects, this specifically excludes any general public or private offerings by Bitech not directly related to financing a BESS Project, and (ii) when a BESS Project’s financing funding terms is sufficient to pay the project specific Development Fees. EIP will be paid on the same timing as the funding terms. For example: if the terms for development fees are 50% at acceptance, 40% RTB and 10% at COD then EIP will be paid as the project development fees are funded.

These fees will be recorded as liabilities once the above contingencies and milestones are met, the most important being that of appropriate project financing enabling payment of these fees.

Acceleration of Payment Clause: Within ninety (90) days (i) of the effective date of a Change of Control or (ii) the removal of Cole W. Johnson as an employee or consultant to Emergen and/or the head of the BESS and Solar Division of Bimergen Energy, 62.5% of any remaining BESS and Solare Development Fees shall become due and payable. A “Change of Control” shall be deemed to have occurred if, after the Effective Date, (x) the beneficial ownership (as defined in Rule 13d-3 under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) of securities representing more than 50% of the combined voting power of the Company is acquired by any “person” as defined in sections 13(d) and 14(d) of the Exchange Act (other than the Company, any subsidiary of the Company, or any trustee or other fiduciary holding securities under an employee benefit plan of the Company); (y) the merger or consolidation of the Company with or into another corporation where the shareholders of the Company, immediately prior to the consolidation or merger, would not, immediately after the consolidation or merger, beneficially own (as such term is defined in Rule 13d-3 under the Exchange Act), directly or indirectly, shares representing in the aggregate 50% or more of the combined voting power of the securities of the corporation issuing cash or securities in the consolidation or merger (or of its ultimate parent corporation, if any) in substantially the same proportion as their ownership of the Company immediately prior to such merger or consolidation; or (z) the sale or other disposition of all or substantially all of the Company’s assets to an entity, other than a sale or disposition by the Company of all or substantially all of the Company’s assets to an entity, at least 50% of the combined voting power of the voting securities of which are owned directly or indirectly by shareholders of the Company, immediately prior to the sale or disposition, in substantially the same proportion as their ownership of the Company immediately prior to such sale or disposition.

If any Development Projects pursuant to the Agreement are sold by Emergen to a third-party then EIP would be due the greater of: (i) any unpaid project’s specific BESS Development Fees or Solar Development Fees defined in Section 2.06; or (ii) 62.5% of the proceeds less any project specific BESS Development Fees or Solar Development Fees paid previously.

The timing and other requirements for the payment of Other Development Fees shall be as agreed in writing by the parties to the PMSA via an addendum to the PMSA prior to the parties undertaking such Other Development Projects.

Subject to the terms and conditions of the PMSA, in addition to the other requirements therein, payment of the BESS Development Fees, the Solar Development Fees and any Other Development Fees is further contingent upon Cole W. Johnson (a) remaining an employee or consultant to Emergen and/or the head of the BESS and Solar Division of the Company and/or (b) as an interest owner in the Energy Independent Partners during the period of time in which the applicable BESS Development Fees, the Solar Development Fees or Other Development Fees are payable. Subject to the foregoing, the BESS Development Fees, the Solar Development Fees or Other Development Fees are payable within ten (10) days of satisfaction of the conditions to payment as discussed above.

Payment for Sale of Development Projects. In the event the Company decides not to proceed with any Development Project(s), the Company may elect to sell such Development Project(s) to one or more third parties. In such event, the Company and Energy Independent Partners agree to a sales price for the applicable Development Project being sold, and provided that the parties to the PMSA agree that any sale agreement for such Development Projects shall provide that the buyer thereof shall remain obligated to pay to Energy Independent Partners the BESS Development Fees and/or the Solar Development Fee(s), as applicable, to the extent not already paid by the Company hereunder, unless otherwise agreed upon by the Company and Energy Independent Partners.

Termination. The PMSA may be terminated at any time prior to the expiration of its term: (a) by the mutual written consent of the parties; (b) by the Company if Energy Independent Partners has violated or breached any of the covenants or agreements of Energy Independent Partners set forth therein, or any of the representations or warranties of Energy Independent Partners set forth in the PMSA has become inaccurate or untrue, which violation, breach, inaccuracy or untruth, if reasonable capable of cure, has not been cured by Energy Independent Partners, within 20 business days after receipt by Energy Independent Partners of written notice thereof from the Company; (c) by Energy Independent Partners if the Company or Emergen has violated or breached any of the covenants or agreements of the Company or Emergen set forth in the PMSA, or any of the representations or warranties of the Company or Emergen set forth in the PMSA has become inaccurate or untrue, which violation, breach, inaccuracy or untruth, if reasonable capable of cure, has not been cured by the Company or Emergen, within 20 business days after receipt by the Company of written notice thereof from Energy Independent Partners; or (d) by any party, if a court of competent jurisdiction or other governmental authority shall have issued an order or taken any other action permanently restraining, enjoining or otherwise prohibiting the Combination or the transactions contemplated by the PMSA and such order or action shall have become final and nonappealable. Any of the Parties has a right to seek specific performance of the other parties’ obligations under the PMSA in lieu of its right to terminate the agreement.

Indemnification. Subject to certain limitations provided for in the PMSA, each of the parties to the PMSA mutually agreed to indemnify and hold harmless each other and each of their affiliates and each of their respective members, managers, partners, directors, officers, employees, stockholders, attorneys and agents and permitted assignees to the fullest extent permitted by applicable law, against and in respect of any and all losses incurred or sustained by such party as a result of or in connection with (i) any breach, inaccuracy or nonfulfillment or the alleged breach, inaccuracy or nonfulfillment of any of the representations, warranties, covenants and agreements of the other party contained in the PMSA or in any of the additional agreements or any certificate or other writing delivered pursuant hereto; or (ii) any claim for brokerage commissions in connection with the transactions contemplated hereby as a result of the actions or agreements of the other party or any of their representatives.

The Company acquired BTM on March 31, 2022 (the “Closing Date”) through a share exchange pursuant to a Share Exchange Agreement (the “Share Exchange Agreement”) by and among the Company, BTM, each of BTM’s shareholders (each, a “Seller” and collectively, the “Sellers”), and Benjamin Tran, solely in his capacity as Sellers’ Representative (“Sellers’ Representative”). The transaction contemplated by the Share Exchange Agreement is hereinafter referred to as the “Share Exchange”). The Share Exchange Agreement provides that the Company will acquire from the Sellers, an aggregate of 673,659 shares of BTM’s Common Stock, par value $0.001 per share, representing 100% of the issued and outstanding shares of BTM (collectively, the “BTM Shares”). In consideration of the BTM Shares, the Company issued to the Sellers an aggregate of 9,000,000 shares of the Company’s newly authorized Series A Convertible Preferred Stock, par value $0.001 per share (the “Series A Preferred Stock”). Each BTM Share shall be entitled to receive 0.09543 shares of Series A Preferred Stock. Each share of Series A Preferred Stock shall automatically convert into 0.385541 shares (an aggregate of approximately 3,469,867) of the Company’s Common Stock (the “Company Common Stock”) upon filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock so that there are a sufficient number of shares of Company Common Stock authorized but unissued to permit a full conversion of all the Series A Preferred Stock. Effective as of June 27, 2022, the Series A Preferred Stock automatically converted into 3,469,866 shares of Company Common Stock following the June 27, 2022 filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock to 1,000,000,000 shares. Upon conversion of the Series A Preferred Stock, the Sellers held, in the aggregate, approximately 96% of the issued and outstanding shares of Company capital stock on a fully diluted basis.

The Share Exchange was treated as a recapitalization and reverse acquisition for financial reporting purposes, and BTM is considered the acquirer for accounting purposes. As a result of the Share Exchange and the change in our business and operations, a discussion of the past financial results of our predecessor, Spine Injury Solutions Inc., is not pertinent, and under applicable accounting principles, the historical financial results of BTM, the accounting acquirer, prior to the Share Exchange are considered our historical financial results.

Prior to March 31, 2022, we were engaged in the business of owning, developing and leasing the Quad Video Halo video recording system (“QVH”) used to record medical procedures including the collection of accounts receivables related to previously provided spine injury diagnostic services (collectively, the “QVH Business”). On June 30, 2022, we sold the assets related to the QVH Business.

Core Business in Battery Energy Storage Systems (BESS)

Our core business plan is focused on sustainable revenue growth through the successful commercialization of our BESS and solar projects, following our recent acquisition of Emergen Energy LLC. This acquisition has given us Development Projects of an estimated 3.6 GWAC power capacity from our BESS and solar project pipeline, each of which are strategically located in various ISO’s we are currently collaborating with. In addition to these large utility-scale projects, we are actively exploring potential joint ventures and partnerships with operating partners to generate further revenue streams from our BESS operations. Our Technology Enabler Solutions division is also expected to contribute to our revenue growth through in-house technology innovations and strategic mergers and acquisitions targeting specific green energy applications. These initiatives align with our overall strategy of developing utility-scale renewable energy projects to meet the growing demand for sustainable energy solutions with emphasis in microgrid as strategic unique approach on the market.

Equipment Suppliers

We have engaged in discussions with multiple advanced Tier 1 battery energy storage system (BESS) suppliers and other major equipment providers. These potential suppliers bring several benefits to the table, including a strong emphasis on safety, cost-effectiveness, and a long lifespan for their products. Additionally, many of these suppliers offer product warranties, providing added assurance to our customers. At this time, no definitive supplier agreements have been executed

Energy Purchasing Customers

We have taken a proactive approach in expanding its energy business by engaging in thorough discussions with local utility suppliers. These suppliers are key players in the region’s energy infrastructure, operating both electric transmission and distribution systems. They boast advanced grid infrastructure and provide electricity and natural gas services to millions of customers across multiple states including Texas, Arkansas, Louisiana, Minnesota, Mississippi, Oklahoma, Midwest and South regions such as Ohio and West Virginia. By building strong partnerships with these suppliers, the Company aims to achieve its presence in the energy market and provide reliable and efficient services to a wider range of customers.

Collaboration with Independent System Operators (ISOs)

Our potential BESS customers are key players in the energy industry, such as utility companies, who operate within regions covered by major entities like the Electric Reliability Council of Texas (ERCOT), California Independent System Operator (CAISO), Western Electricity Coordination Council (WECC), Midcontinent Independent System Operator (MISO), and PJM Interconnection (PJM). These are some of the largest and most influential organizations in the United States responsible for managing the transmission and distribution of electricity. They play a critical role in ensuring reliable access to power for millions of people. Our BESS systems can provide utility companies with valuable tools for selling and buying stored energy, improving their overall efficiency and resiliency. By partnering with these leading ISO’s, we can help drive the widespread adoption of sustainable energy solutions across various regions, ultimately working towards a more sustainable future.

Our Future Growth Plan

Bimergen Energy is committed to leveraging our renewable energy platform, technology, leadership, and strong market position to revolutionize the clean energy sector for a sustainable future. Our growth strategy is multi-faceted, focusing on key initiatives designed to achieve a market presence, drive innovation, and deliver long-term value to our shareholders.

Expansion of Battery Energy Storage Systems (BESS)

We will continue to expand our current development pipeline of approximately 2 gigawatts (GW) of BESS in strategically selected regions of the U.S. in key ISO’s. We expect to expand this pipeline to over 5GW over the next 3-5 years Leadership may choose to accelerate this goal as we expand the business. We believe this expansion will enhance grid stability and facilitate the integration of renewable energy sources, addressing the increasing demand for sustainable energy solutions.

Grid Management Enhancement

By concentrating on specific areas requiring additional support, we aim to enhance grid management capabilities. We believe this effort will ensure a more reliable and efficient energy distribution network, minimizing disruptions and optimizing energy flow.

Technological Innovation

Bimergen Energy will actively pursue partnerships and acquisitions of cutting-edge technology solutions. We believe these initiatives will support grid balancing and green energy projects, allowing us to stay at the forefront of technological advancements in the energy sector. Our commitment to innovation is expected to drive the development of new technologies that support sustainable energy infrastructure.

Expansion of Service Offerings

We plan to broaden our portfolio of value-add services to meet the diverse needs of our potential global customer base. Our planned expanded service offerings will include product upgrades, performance analysis, risk management products, and software support. By leveraging data-driven insights from our extensive installation base, we believe these service offerings will provide tailored solutions that enhance operational efficiency and performance assurance for our customers.

Strategic Partnerships

Forming strategic alliances with leading technology groups and other investment companies is a cornerstone of our growth strategy. We believe these partnerships will enable us to maximize the output and efficiency of our BESS assets; and collaborative efforts in these partnerships will also facilitate the development and deployment of innovative solutions, enhancing the overall performance of our energy storage systems and driving mutual growth.

Acquisition of Proven Technologies

We will seek out and acquire proven technologies that complement our existing offerings. This approach is expected to ensure that we deliver state-of-the-art solutions to our potential customers, maintaining our competitive edge and reinforcing our commitment to technological excellence. Through these strategic initiatives, we believe Bimergen Energy is well-positioned to lead the energy industry’s transition to sustainable practices. Our comprehensive growth strategy is designed to drive innovation, achieve market presence, and create long-term value for our stakeholders, ensuring a brighter and more sustainable future for the global energy sector.

Seasonality of Business

There is no significant seasonality in our business.

Government Regulation

We will be required to comply with all regulations, rules and directives of governmental authorities and agencies applicable to our business in any jurisdiction which we would conduct activities. On the federal level, the General Energy Regulatory Commission (FERC) regulates battery energy storage systems (BESS). FERC regulates the sale of energy, capacity, and ancillary services at wholesale and the transmission of electricity in interstate commerce pursuant to its authority under the Federal Power Act. FERC has authority over the rates, charges and other terms for the sale of electricity at wholesale by entities that own or operate projects subject to FERC jurisdiction, including both generation and battery storage projects, as well as for transmission services. In Texas, generating facilities within the footprint of the Electric Reliability Council of Texas (“ERCOT”) are regulated by the Public Utility Commission of Texas (the “PUCT”). The markets covering most of Texas (ERCOT) are not overseen by FERC and are not under FERC jurisdiction. We do not believe that these regulations will have a material impact on the way we currently conduct our business.

Recent History of the Company

Acquisition of Bitech Mining Corporation

The Company acquired Bitech Mining Corporation (“BTM”) on March 31, 2022 (the “Closing Date”) through a share exchange pursuant to a Share Exchange Agreement (the “Share Exchange Agreement”) by and among the Company, BTM, each of BTM’s shareholders (each, a “Seller” and collectively, the “Sellers”), and Benjamin Tran, solely in his capacity as Sellers’ Representative (“Sellers’ Representative”). The transaction contemplated by the Share Exchange Agreement is hereinafter referred to as the “Share Exchange”). The Share Exchange Agreement provides that the Company will acquire from the Sellers, an aggregate of 673,659 shares of BTM’s Common Stock, par value $0.001 per share, representing 100% of the issued and outstanding shares of BTM (collectively, the “BTM Shares”). In consideration of the BTM Shares, the Company issued to the Sellers an aggregate of 9,000,000 shares of the Company’s newly authorized Series A Convertible Preferred Stock, par value $0.001 per share (the “Series A Preferred Stock”). Each BTM Share shall be entitled to receive 0.09543 shares of Series A Preferred Stock. Each share of Series A Preferred Stock shall automatically convert into 0.385541 shares (an aggregate of approximately 3,469,867) of the Company’s Common Stock (the “Company Common Stock”) upon filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock so that there are a sufficient number of shares of Company Common Stock authorized but unissued to permit a full conversion of all the Series A Preferred Stock. Effective as of June 27, 2022, the Series A Preferred Stock automatically converted into 3,469,866 shares of Company Common Stock following the June 27, 2022 filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock to 1,000,000,000 shares. Upon conversion of the Series A Preferred Stock, the Sellers held, in the aggregate, approximately 96% of the issued and outstanding shares of Company capital stock on a fully diluted basis.

The Share Exchange was treated as a recapitalization and reverse acquisition for financial reporting purposes, and BTM is considered the acquirer for accounting purposes. As a result of the Share Exchange and the change in our business and operations, a discussion of the past financial results of our predecessor, Spine Injury Solutions Inc., is not pertinent, and under applicable accounting principles, the historical financial results of BTM, the accounting acquirer, prior to the Share Exchange are considered our historical financial results.

Recent Developments

On January 28, 2025, Bitech Technologies Corporation, now known as Bimergen Energy Corporation (the “Registrant”), filed a Certificate of Amendment (the “Amendment”) to its Certificate to Incorporation, as amended (the “Charter”) to: (i) effect a reverse stock split of its common stock, par value $0.001 per share (the “Common Stock”) at a ratio of 1 post-split share for every 140 pre-split shares (the “Reverse Split”); and (ii) to change the name of the Registrant to Bimergen Energy Corporation (the “Name Change”).

On April 20, 2025 the Company’s wholly owned subsidiary, Emergen Energy, LLC, executed a definitive agreement with RelyEZ Energy Group to form a joint venture to develop, construct, and operate up to 2 GW of utility-scale battery-energy-storage projects (2- to 4-hour BESS) in the United States through 2027.

Capital commitments. RelyEZ has committed up to $50 million, including an initial $10 million funding within 10 days of closing. The Company will contribute up to $12.5 million on a pro-rata basis after the first $10 million from RelyEZ.

Ownership and economics. Until project refinancing, each project SPV will be owned 80 % by RelyEZ and 20 % by Emergen. After refinancing, the Company may repurchase RelyEZ’s interest at cost plus a 12 % annual return.

Initial projects. Four Texas projects totaling approximately 274 MW / 773 MWh (Redbird, Dos Rios, White Rock, and Oak Hill) are expected to reach notice-to-proceed (NTP) within six months of closing.

Status of accounting evaluation. This agreement was executed after December 31, 2024; therefore, no amounts related to the joint venture are reflected in the accompanying 2024 financial statements.

Employees

As of December 31, 2024, the Company currently employed a total of 6 individuals in executive or managerial positions. This includes three full-time employees and three contracted consultants who bring their expertise and experience to our team. To date, we have not experienced any work stoppages and we consider our relationship with our employees to be good. None of our employees are either represented by a labor union or are subject to a collective bargaining agreement.

Cybersecurity

As filed, 3,887 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Cybersecurity Risk Management and Strategy

We recognize the importance of assessing, identifying, and managing material risks associated with cybersecurity threats, as such term is defined in Item 106(a) of Regulation S-K. These risks include, among other things: operational risks, intellectual property theft, fraud, extortion, harm to employees or customers and violation of data privacy or security laws.

We do not presently have any general processes for assessing, identifying, and managing material risks from cybersecurity threats. As we expand our business operations, we plan to develop processes that will allow for the identification and assessment of cybersecurity risk that will be integrated into an overall risk management system, which will be managed by senior management and overseen by the Board of Directors. As part of this development, we plan to identify and address cybersecurity risks related to our business, privacy and compliance issues through a multi-faceted approach that is expected to include third party assessments, internal information technology (IT) audit, IT security, governance, risk and compliance reviews. In connection with these planned approaches, and to defend, detect and respond to cybersecurity incidents, we, among other things, will consider: conducting proactive privacy and cybersecurity reviews of systems and applications, audits of applicable data policies, performing penetration testing using external third-party tools and techniques to test security controls, conducting employee training, monitoring emerging laws and regulations related to data protection and information security, and implementing appropriate changes.

As part of the above planned processes, we may engage external auditors and consultants with expertise in cybersecurity to assess our internal cybersecurity programs and compliance with applicable practices and standards.

We plan to design our risk management program to also assesses third party risks, and we plan to perform third-party risk management to identify and mitigate risks from third parties, such as vendors, suppliers, and other business partners associated with our use of third-party service providers. In addition to new vendor onboarding, we plan to perform risk management during third-party cybersecurity compromise incidents to identify and mitigate risks to us from third-party incidents.

Cybersecurity Governance

We expect that cybersecurity will become an important part of our risk management processes and an area of focus for our Board of Directors and management. We expect that our Board of Directors will be responsible for the oversight of risks from cybersecurity threats. We expect our senior management will provide our Board of Directors updates on a quarterly basis regarding matters of cybersecurity. This is expected to include existing and new cybersecurity risks, status on how management is addressing and/or mitigating those risks, cybersecurity and data privacy incidents (if any) and status on key information security initiatives. We expect that our Board members will also engage in periodic conversations with management on cybersecurity-related news events and discuss any updates to our cybersecurity risk management and strategy programs.

Currently, our Chief Executive Officer is expected to lead our cybersecurity risk assessment and management processes and oversees their implementation and maintenance. Our Chief Executive Officer will be tasked with staying informed about, and monitoring the prevention, mitigation, detection and remediation of cybersecurity incidents through his management of, and participation in, the cybersecurity risk management and strategy processes we plan to develop and as described above, including the operation of an incident response plan, and report to the Board of Directors on any appropriate items.

Properties

As filed, 197 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Our principal executive offices are located at 895 Dove Street, Suite 300, Newport Beach, CA 92660. We occupy this location pursuant to a lease that may be terminated by us on 90 days prior notice.

As filed, 8,087 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

As of the date of this Annual Report, to our knowledge, there are no legal proceedings or regulatory actions material to us to which we are a party, or have been a party to, or of which any of our property is or was the subject matter of, and no such proceedings or actions are known by us to be contemplated except as provided below:

Due to the misrepresentations and omissions of SuperGreen, Calvin C. Cao and Michael H. Cao, among other reasons, the Company filed a complaint in the U.S. District Court, Central District of California on February 2, 2023 against SuperGreen, Michael H. Cao, Linh T. Dao, Calvin C. Cao and entities affiliated with them alleging fraud-concealment, breach of contract, breach of fiduciary duty-duty of good faith, breach of fiduciary duty-undivided loyalty, conversion and violation of California Penal Code Sec. 496 (the “Cao Lawsuit”). This lawsuit seeks compensatory damages of at least $33.6 million, treble and punitive damages, imposition of a constructive trust over the defendants assets, pre-judgment and post-judgment interest, attorney’s fees and such other relief as determined by the court.

Settled Matters

Effective February 20, 2023, the Company, together with its wholly owned subsidiary Bitech Mining Corporation, entered into a Confidential Settlement, Mutual Release, and Share Transfer Agreement (the “C. Cao Settlement Agreement”) with C. Cao and SuperGreen (collectively, the “C. Cao Parties”). The C. Cao Settlement Agreement settled the Cao Lawsuit as to the C. Cao Parties. Pursuant to the C. Cao Settlement Agreement, the C. Cao Parties terminated the License Agreement and SuperGreen canceled 367,913 shares of the Company’s common stock, par value $0.001 per share issued by the Company to SuperGreen pursuant to the License Agreement. In addition, the parties to the C. Cao Settlement Agreement agreed to a mutual general release of liabilities against each other, refrain from making any disparaging remarks about each other and the Company’s filing a dismissal with prejudice of the Cao Lawsuit as to the C. Cao Parties

Effective October 7, 2024, the Company entered into a Confidential Settlement, Mutual Release, and Share Transfer Agreement (the “Thomason Settlement Agreement”) with Mr. Thomason. Pursuant to the Thomason Settlement Agreement, the Company canceled 18,396 shares of the Company’s common stock, par value $0.001 per share previously issued by the Company to Mr. Thomason. In addition, the parties to the Thomason Settlement Agreement agreed to a mutual general release of liabilities against each other, refrain from making any disparaging remarks about each other and the Company’s filing a dismissal with prejudice as to Mr. Thomason in the Cao State Court Lawsuit.

Unsettled Matters

On March 6, 2023, Michael Cao and Linh Dao filed a pro se Motion to Dismiss for Lack of Jurisdiction. On April 17, 2023, the court dismissed the Cao Lawsuit without prejudice due to a lack of subject matter jurisdiction. On April 18, 2023, the Company filed a complaint against Michael H. Cao, Linh T. Dao, B & B Investment and Cory Thomason in the Orange County California Superior Court containing substantially the same allegations included in the Cao Lawsuit (the “Cao State Court Lawsuit”). Mr. Thomason was dismissed from the Cao State Court Lawsuit on November 8, 2024. The Company continues to pursue the Cao State Court Lawsuit as to the remaining defendants in that case, namely Michael Cao, Linh Dao, and B&B Investment.

After serving Defendants Mr. Cao, Ms. Dao and B & B Investment on April 26, 2023, the Defendants (pro se) filed a Motion to Quash Service of Summons; Motion to Dismiss or Stay Complaint (the “B & B Motions”). In response, the Company filed a Motion to Strike B & B Investment’s motion (the “Motion to Strike”), Request for Sanctions in Amount of $2,400 and Request for Default as to B & B Investment because it is being impermissibly represented by Michael H. Cao who is engaging in the unauthorized practice of law as to a corporate entity. On October 13, 2023, the Court granted in part the Company’s unopposed Motion to Strike, striking the B & B Investment Motions and ordering B &B Investment to retain an attorney no later than October 27, 2023 or be subject to default because corporate entities are not permitted to appear in court without an attorney. The Court denied Mr. Cao’s Motion to Quash and took Linh Dao’s Motion to Quash off calendar, thus keeping all Defendants in the case. The Court ruled that Michael Cao already waived his rights to file such a motion by making a general appearance in the case and noted that Defendants failed to appear at the hearing. On or about October 27, 2023, the Company’s counsel received an initial communication from an attorney attaching responses to the Company’s complaint on behalf of Mr. Cao and B&B Investment. On November 27, 2023, Mr. Cao and B&B Investment filed a Demurrer to the Complaint and Motion to Strike Portions of the Complaint. On May 10, 2024, the court heard responses to the Company’s complaint and motions filed by Mr. Cao. The court sustained the demurrer to the first, second, fifth, and sixth causes of action, granting 30 days to amend. It overruled the demurrer to the third and fourth causes of action. The court also sustained the motion to strike paragraph 6 of the prayer for relief and granted the motion to strike punitive damages with leave to amend. A case management conference was set for August 19, 2024.

The Company filed a first amended complaint in the Cao State Court Lawsuit on June 7, 2024. On July 10, 2024, the counsel for Mr. Cao, B & B Investment, and Ms. Dao filed motions to be relieved, which the court granted on August 2, 2024. The case management conference was postponed to November 25, 2024. Defendants had until August 16, 2024 to file a response to the first amended complaint but failed to do so, leading to defaults being entered against them on August 23, 2024. The Company filed applications for default judgment against Mr. Cao, Ms. Dao and B & B Investment on November 8, 2024, that are pending review by the Court. On November 18, 2024, the Court vacated the case management conference and set an order to show cause hearing for April 28, 2025, and ordered the Company to submit a default judgment packet in advance of that date.

Current Status

Thus far, the Company has recovered 386,309 shares of the Company’s common stock from the C. Cao Settlement Agreement and the Thomason Settlement Agreement. The Company has not otherwise received any cash recovery to date. The Company is seeking return of the remaining 1,287,694 shares of the Company’s common stock through the default judgment sought against Mr. Cao, Ms. Dao and B & B Investment in the Cao State Court Lawsuit, as well as $29,309 in damages, prejudgment interest, and costs.

Litigation Assessment

We have evaluated the foregoing Cao Lawsuit to assess the likelihood of any unfavorable outcome and to estimate, if possible, the amount of potential loss as it relates to the litigation. Based on this assessment and estimate, which includes an understanding of our intention to vigorously prosecute the Cao Lawsuit, we believe that the potential defenses of any of the remaining defendants lack merit, however, and we cannot predict the likelihood of any recoveries by any of our claims against the remaining defendants. This assessment and estimate is based on the information available to management as of the date of this Annual Report and involves a significant amount of management judgment, including the inherent difficulty associated with assessing litigation matters in their early stages. As a result, the actual outcome or loss may differ materially from those envisioned by the current assessment and estimate. Our failure to successfully prosecute, defend or settle the Cao Litigation with the remaining defendants could have a material adverse effect on our financial condition, revenue and profitability and could cause the market value of our common stock to decline.

Management's discussion and analysis

As filed, 47,412 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

This management discussion and analysis (“MD&A”) of the financial condition and results of operations of Bimergen Energy Corporation (the “Company,” “Bimergen Energy,” “our” or “we”) is for the years ended December 31, 2024 and 2023. It is supplemental to, and should be read in conjunction with, our financial statements for the period January 8, 2021 (inception) through December 31, 2024 and the accompanying notes for such period included in our Current Report on Form 8-K filed with the Securities and Exchange Commission, or SEC, on April 4, 2022. Our financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”). Financial information presented in this MD&A is presented in United States dollars (“$” or “US$”), unless otherwise indicated.

The information about us provided in this MD&A, including information incorporated by reference, may contain “forward-looking statements” and certain “forward-looking information” as defined under applicable United States securities laws. All statements, other than statements of historical fact, made by us that address activities, events or developments that we expect or anticipate will or may occur in the future are forward-looking statements, including, but not limited to, statements preceded by, followed by or that include words such as “may”, “will”, “would”, “could”, “should”, “believes”, “estimates”, “projects”, “potential”, “expects”, “plans”, “intends”, “anticipates”, “targeted”, “continues”, “forecasts”, “designed”, “goal”, or the negative of those words or other similar or comparable words and includes, among others, information regarding: our future business activities; our ability to generate revenues; our need for substantial additional financing to operate our current and future business and difficulties we may face acquiring additional financing on terms acceptable to us or at all; risks related to competition; risks related to our lack of internal controls over financial reporting and their effectiveness; increased costs we are subject to as a result of being a public company in the United States; and other events or conditions that may occur in the future.

Forward-looking statements may relate to future financial conditions, results of operations, plans, objectives, performance or business developments. These statements speak only as at the date they are made and are based on information currently available and on the then current expectations of the party making the statement and assumptions concerning future events, which are subject to a number of known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from that which was expressed or implied by such forward-looking statements.

Although we believe that the expectations and assumptions on which such forward-looking statements are based are reasonable, undue reliance should not be placed on the forward-looking statements, because no assurance can be given that they will prove to be correct. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results could differ materially from those currently anticipated due to a number of factors and risks discussed above.

Consequently, all forward-looking statements made in this MD&A and other documents, as applicable, are qualified by such cautionary statements, and there can be no assurance that the anticipated results or developments will actually be realized or, even if realized, that they will have the expected consequences to or effects on us. The cautionary statements contained or referred to in this section should be considered in connection with any subsequent written or oral forward-looking statements that we and/or persons acting on its behalf may issue. We do not undertake any obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, other than as required under securities legislation.

Overview of the Business

We are a renewable energy project developer dedicated to enabling the clean energy transition and providing critical grid stability via solutions across a range of applications through our portfolio of utility-scale Battery Energy Storage System (BESS) and solar development projects. In April 2024, we acquired a portfolio of development-stage BESS and solar energy projects from Emergen Energy LLC (“Emergen”), making us the project owner of 23 development stage utility-scale BESS projects with an estimated cumulative storage capacity of 1.965 gigawatts (GW) and 13 development stage solar energy projects with an anticipated cumulative generation capacity of 1.640 GW (collectively, the “Development Projects”) once constructed and operational.

Our primary business objective is to become a grid-balancing operator by developing, commercializing, and operating a diversified portfolio of BESS and solar energy projects. We aim to leverage by partnering with advanced BESS technologies and Energy Management Systems (EMS) to address the critical challenges associated with the integration of renewable energy into the electrical grid, particularly the imbalance between energy supply and demand caused by the intermittent nature of solar and wind resources. This approach aligns with the increasing demand for grid stability in regions with high penetration of renewable energy, where imbalances between peak solar generation and peak energy demand create revenue opportunities through energy storage and dispatch. We plan to store excess energy generated during periods of low demand and dispatch it during peak demand periods, thereby enhancing grid stability and efficiency. Upon reaching commercial operation, we hope to play a key role in stabilizing grid demand and supporting renewable energy integration through energy arbitrage and ancillary services.

Core Business in Battery Energy Storage Systems (BESS)

Our core business is anchored in the development and operation of BESS projects, which are strategically designed to mitigate the energy imbalances and power deficits observed in markets with substantial solar and wind energy generation. This event, often depicted by the grid balancing, highlights the timing mismatch between peak renewable energy generation and peak electricity demand. As renewable energy production peaks during daylight hours and declines in the evening when energy demand is highest, supplemental energy supply sources become increasingly critical. Our BESS projects are positioned to address this imbalance by storing surplus energy during periods of low demand and releasing it during high-demand periods, capturing value from daily price fluctuations. By purchasing and storing energy during low-cost, high-supply hours and selling it during high-demand periods when prices are at their peak, known as energy arbitrage trading, our BESS systems will provide critical support to compensate for the lack of supply from the current outdated energy grid infrastructure.

In addition to energy arbitrage, our BESS assets are positioned to provide essential grid services, including frequency regulation, voltage support, and emergency backup during grid outages. Frequency regulation refers to the rapid response to changes in grid frequency, maintaining stability and preventing potential grid failures. Voltage control enhances the quality and reliability of power supplied to consumers. The rapid response capabilities also maintain stability for key infrastructure during outages via immediate response to fluctuations in voltage and frequency. By reducing demand imbalances at peak times, known as peak shaving, we hope to flatten the energy demand and lower electricity costs for consumers. By integrating advanced EMS controls, we aim to optimize the dispatch timing and increase the overall economic value of stored energy, delivering both reliable performance efficient operation in dynamic market conditions. Our systems will enable more flexible and adaptive grid operations, accommodating dynamic energy flows and diverse generation sources. These ancillary services both relieve grid stress, offer additional potential revenue streams, and maximize likelihood of punctual project development within budget and ensure product quality standards. We believe we well- positioned to leverage our existing relationships to secure multi-year customer contracts prior to project construction and integrate cutting-edge battery technologies as they are developed into future developments. Our systems will also be capable of deferred infrastructure upgrades, which reduce the need for expensive grid infrastructure upgrades by efficiently managing local supply and demand.

We expect our BESS projects to be located alongside traditional power transmission lines or near large offtakers with high energy demands, enhancing grid stability and reducing energy costs. These locations are suitable for battery storage facilities of approximately thirty acres and undergo environmental studies and assessments to ensure feasibility. While the letters of intent the Company has entered into or negotiated for these projects are for specific locations, the Company’s development plans are not dependent on the landowner or address, but, rather, are county based. The Company believes it could adjust its plans to find a similar, suitable location if it is unable to negotiate a definitive agreement to develop a project with the landowner.

We maintain strong relationships with tier-one battery and equipment suppliers, utilities, and power purchasers to optimize transmission efficiency and lower consumer costs. We believe these partnerships may also help us secure regulatory support, ensure timely project development within budget, and uphold high product quality standards. Our strategic position allows us to secure multi-year customer contracts before project construction and integrate emerging battery technologies into future developments. Additionally, our systems are designed to enable deferred infrastructure upgrades, reducing the need for costly grid enhancements by efficiently managing local supply and demand.

Development Projects and Operational Progress

Our portfolio of Development Projects includes approximately 3.6 GW of alternating current (GWAC) power capacity across various regions served by Independent System Operators (ISOs) such as ERCOT, WECC, PJM, and MISO. These regions have been selected strategically based on favorable market conditions, grid infrastructure, and regulatory environments conducive to renewable energy integration. In connection with the Emergen transaction, we have secured rights to comprehensive “Work Product” Intangible assets essential for project development, including but not limited to: feasibility studies determining capacity and compatibility, establishing a production model of the project parameters, identifying any curtailment for the project, power flow site verification and substation identification, permitting and regulatory compliance documentation, engineering designs, equipment procurement plans, site preparation guidelines, and noting project specific challenges.

Subsequent to positive feasibility studies is the process of legal formation, analyzing and negotiating site control/surface and materials, and identifying engineering requirements for construction, identifying and negotiating interconnection to the grid, identifying tax abatements, and identifying permitting and study requirements, and noting additional project specific challenges. These assets provide a robust foundation for advancing our projects through the development lifecycle efficiently and effectively. We are in the process of negotiating grid interconnection agreements, ensuring compliance with applicable grid codes and standards, registering our projects for market participation, and coordinating with ISOs to align dispatch and grid service requirements. In addition, we are actively engaging with these ISOs to address cybersecurity compliance and to develop comprehensive monitoring and reporting frameworks, which are essential for maintaining operational integrity and grid support.

Our Redbird and Wildfire projects are currently the most advanced within our portfolio and are ready to proceed to the financing and construction phases. We are actively pursuing project-level debt and equity financing to fund the construction and/or operationalization of these projects. Upon securing financing, of which there can be no assurance we will be able to do so or do so on terms favorable to us, we intend to execute binding agreements with key counterparties, initiate site preparation activities, and commence construction in accordance with our development timelines. As part of the rights to the Work Product and continued development, we identify and negotiate with the appropriate counterparts in the specific project, but do not enter into binding contracts until specific project financing is obtained so as to not create liabilities before project financing is secured. We recognize the importance of managing risks associated with project development, including regulatory, technical, financial, and market risks. Our approach involves conducting thorough feasibility studies, engaging in proactive stakeholder consultations, and maintaining flexibility in project planning. We do not enter into binding contracts related to site control, equipment procurement, or construction until project-specific financing is secured, mitigating financial exposure. The next steps for these projects will include executing contracts with key counterparties, purchasing equipment, and initiating the construction process. Our current project pipeline consists of multiple BESS initiatives, with an estimated development timeline spanning eight to nine years. The Redbird and Wildfire projects are prioritized, as they are closest to a ready-to-build status. The current progress of our portfolio of 23 BESS projects and 13 Solar Projects are included in the table below:

Emergen Energy LLC BESS Projects:

Projects (2) (3) (4) (5) (6) (11) County State Zone BESS (MWac) BESS (MWhr) Site Control Estimated Permitting Complete (9) Estimated Cost of Project (10) Development Fees
Redbird BESS (1) Fort Bend TX ERCOT-Houston 100 400 LOI (7) 65% $160,000,000 $3,500,000
Wildfire BESS (1) Caldwell TX ERCOT-South 100 400 LOI (7) 45% $160,000,000 $3,500,000
Friendship Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
Lady Bird Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
Longhorn Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
Pecan Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
Prickly Pear Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
Yellow Rose Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
Bright Light Llano TX ERCOT/West 60 240 LOI (7) 35% $100,000,000 $2,100,000
TPLT 1-10 BESS El Paso TX ERCOT/West 100 400 (8) 25% $160,000,000 $2,100,000
WR Ranch TX BESS 1 El Paso TX ERCOT/North 120 480 (8) 25% $185,000,000 $2,100,000
TOTAL 840 3,360
TPL EPE El Paso TX WECC 25 100 (8) 25% $55,000,000 $875,000
X-One Solar Ranch 1 Mohave AZ WECC 100 400 (8) 25% $160,000,000 $3,500,000
Dunton Ranch 1 Mohave AZ WECC 100 400 (8) 25% $160,000,000 $3,500,000
Aldahra Farm 1 Maricopa AZ WECC 100 400 (8) 25% $160,000,000 $3,500,000
Aldahra Farm 2 Maricopa AZ WECC 100 400 (8) 25% $160,000,000 $3,500,000
TOTAL 425 1,700
BL PJM BESS 1 Smyth VA PJM 50 200 (8) 25% $90,000,000 $1,750,000
BL PJM BESS 2 Huntingdon PA PJM 50 200 (8) 25% $90,000,000 $1,750,000
TOTAL 100 400
Gibbs Ranch BESS 1 DeSoto Parish LA MISO 120 480 (8) 25% $185,000,000 $4,200,000
Gibbs Ranch BESS 2 DeSoto Parish LA MISO 120 480 (8) 25% $185,000,000 $4,200,000
TG BESS 1 DeSoto Parish LA MISO 120 480 (8) 25% $185,000,000 $4,200,000
TG BESS 2 DeSoto Parish LA MISO 120 480 (8) 25% $185,000,000 $4,200,000
Neighbors BESS 1 DeSoto Parish LA MISO 120 480 (8) 25% $185,000,000 $4,200,000
TOTAL 600 2,400
TOTAL MWac 1,965 7,860 $3,165,000,000 $68,775,000

(1) At 15% Engineering complete with 30% attainable in 45 days. At Project Financing, Engineering will be with third party contractor.

(2) Battery and connection component procurement is expected to be 6 to 9 months after funding has been secured

(3) Project Construction is expected to be 2-3 months, after funding is secured and battery and connection procurement arrives on site.

(4) No Project Financing is currently secured for these projects and no milestone will be achieved until financing is secured.

(5) No contractual arrangements have been executed with third parties to construct.

(6) No contractual arrangements have been executed with customers.

(7) Letter of Intent (LOI) for land lease originally executed but expired.

(8) Pre-LOI for land lease

(9) Permitting and/or no permit required letter is estimated to be complete 90 - 150 days after funding is secured for the project. This includes This includes Jurisdictional Waters of U.S. Delineation, Protected Species Habitat Assessment, Cultural Resources Review & Consultation, FAA Filing, Approved Jurisdictional Determination Request, Wildlife Agency Consultation, Bird and Wildlife Conservation Strategy, Unanticipated Discovery Plan (UDP), Final Interconnection Permit.

(10) The main components of the Estimated cost of the Project are (a) 75% Purchased Equipment including but not limited to batteries and electrical interconnections, (b) 17% construction costs and labor for system set up, (c) 6% project financing costs and fees and (d) 2% milestone development fees.

(11) We are targeting obtaining financing for 2 to 3 projects each fiscal year depending on respective project capital needs. Redbird and Wildfire projects are anticipated to be the first to be financed given they are closest to a ready to build status. We will be maintaining and moving forward the development status of the projects not yet funded by managing the various aspects of the project as required. Funding is initially being sought from tier one lenders and alternative financing institutions currently funding renewable energy projects. We currently are focusing our efforts on the BESS projects for financing and operations and with the current project profile expect to have an 8 to 9 year pipeline of existing BESS projects. If for any reason a project is not developed or constructed due to lack of funding we will either sell the project in its current development stage, partner with another group on that specific BESS project or close down the project if it is no longer seen to be a viable project.

22

Emergen Energy LLC Solar Projects:

Solar Projects (1) (2) (3) (4) (5) (6) (11) County State Zone Solar Mwac Site Control Estimated Permitting Complete (9) Estimated Cost of Project (10) Development Fees
Redbird Solar Fort Bend TX ERCOT-Houston 100 LOI (7) 10% $125,000,000 $3,500,000
Friendship Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
Lady Bird Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
Longhorn Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
Pecan Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
Prickly Pear Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
Yellow Rose Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
Bright Light Llano TX ERCOT/ West 120 LOI (7) 15% $150,000,000 $4,200,000
TPL EPE Solar El Paso TX WECC 50 (8) 10% $63,000,000 $1,750,000
X-One Solar Ranch 3 Mohave AZ WECC 75 (8) 10% $94,000,000 $2,625,000
X-One Solar Ranch 4 Mohave AZ WECC 75 (8) 10% $94,000,000 $2,625,000
Aldahra Farm 1 Solar Maricopa AZ WECC 250 (8) 10% $315,000,000 $8,750,000
Aldahra Farm 2 Solar Maricopa AZ WECC 250 (8) 10% $315,000,000 $8,750,000
TOTAL MWac 1,640 $2,056,000,000 $57,400,000

(1) Minimal Engineering complete with 30% attainable in 180 days. At Project Financing, Engineering would be with third party contractor.

(2) Battery and connection component procurement is expected to be 6 to 9 months after funding has been secured

(3) Project Construction is expected to be 2-3 months, after funding is secured and battery and connection procurement arrives on site.

(4) No Project Financing is currently secured for these projects and no milestone will be achieved until financing is secured.

(5) No contractual arrangements have been executed with third parties to construct.

(6) No contractual arrangements have been executed with customers.

(7) Letter of Intent (LOI) for land lease originally executed but expired.

(8) Pre-LOI for land lease

(9) Permitting and/or no permit required letter is estimated to be complete 90 - 150 days after funding is secured for the project. This includes This includes Jurisdictional Waters of U.S. Delineation, Protected Species Habitat Assessment, Cultural Resources Review & Consultation, FAA Filing, Approved Jurisdictional Determination Request, Wildlife Agency Consultation, Bird and Wildlife Conservation Strategy, Unanticipated Discovery Plan (UDP), Final Interconnection Permit.

(10) The main components of the Estimated cost of the Project are (a) 60% Purchased Equipment including but not limited to solar panels and electrical interconnections, (b) 32% construction costs and labor for system set up, (c) 6% project financing costs and fees and (d) 2% milestone development fees.

(11) We are focusing our project financing efforts on our BESS projects. We will be maintaining and moving forward the development status of the Solar projects by managing the various aspects of the project as required with minimal capital requirement. If for any reason a project is not developed or constructed due to lack of funding we will either sell the project in its current development stage, partner with another group on that specific solar project or close down the project if no longer seen to be a viable project

23

Corporate History

Bimergen Energy Corporation was incorporated under the laws of Delaware on March 4, 1998. The Company acquired Bitech Mining Corporation (“BTM”) on March 31, 2022 pursuant to a Share Exchange Agreement. Pursuant to the Share Exchange Agreement we acquired an aggregate of 673,659 shares of BTM’s common stock representing 100% of the issued and outstanding shares of BTM in exchange for an aggregate of 9,000,000 shares of the Company’s newly authorized Series A Convertible Preferred Stock. Effective June 27, 2022, each share of Series A Preferred Stock automatically converted into 0.385541 shares (an aggregate of 3,469,866 shares) of the Company’s Common Stock upon filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock to 1,000,000,000. Upon conversion of the Series A Preferred Stock, the former share owners of BTM held, in the aggregate, approximately 96% of the issued and outstanding shares of the Company’s capital stock on a fully diluted basis.

The Share Exchange was treated as a recapitalization and reverse acquisition for financial reporting purposes, and BTM is considered the acquirer for accounting purposes. As a result of the Share Exchange and the change in our business and operations, a discussion of the past financial results of our predecessor, Spine Injury Solutions Inc., is not pertinent, and under applicable accounting principles, the historical financial results of BTM, the accounting acquirer, prior to the Share Exchange are considered our historical financial results. The Company filed a Certificate of Amendment to its Certificate of Incorporation with the Secretary of State of the State of Delaware on April 29, 2022 to change its name to Bitech Technologies Corporation. On January 28, 2025, the Company filed a Certificate of Amendment to its Certificate to Incorporation to: (i) effect a reverse stock split of its common stock, par value $0.001 per share (the “Common Stock”) at a ratio of 1 post-split share for every 140 pre-split shares; and (ii) to change the name of the Company to Bimergen Energy Corporation.

On April 24, 2024 (the “Closing”) the Company completed the acquisition of Emergen in accordance with the MIPA whereby the Company issued 1,587,300 unregistered shares of its common stock to Emergen’s sole member, C&C Johnson Holdings LLC (“C&C”) in exchange for 100% of Emergen’s equity interests. C&C is controlled by Cole Johnson who became our President and a director following the Closing as well as the President of the Company’s BESS and Solar Divisions. In addition, Emergen became a wholly-owned subsidiary of the Company with C&C’s owning approximately 31.3% of the Company’s issued and outstanding shares of the Company’s capital stock.

Emergen holds a portfolio of battery energy storage system (“BESS”) projects identified in the MIPA with a cumulative storage capacity estimated at 1.965 gigawatts (GW) upon completion of the construction of such project (the “BESS Development Projects”) and rights to develop a portfolio of solar energy development projects with a cumulative capacity estimated at 1.640 GW upon completion of construction of such project (the “Solar Development Projects,” together with the BESS Development Projects, collectively, the “Development Projects”). The Company agreed that following the Closing, the Company would take all commercially reasonable steps necessary to uplist the Company to the NASDAQ stock exchange. The Company’s uplist to NASDAQ in connection with the consummation of the offering contemplated in this prospectus will satisfy the terms set forth in the Closing.

In December 2023, Bimergen received an initial purchase order from a strategic customer to implement a Building Energy Management System (BEMS) Virtual Power Plant (VPP) Program designed to save electricity for approximately 4,000 multi-dwelling units (MDUs). This customer is working with PJM, a Regional Transmission Organization (RTO) that coordinates the movement of wholesale electricity in the District of Columbia in the U.S. and all or parts of 13 states including Delaware, Illinois, Indiana, Kentucky, Maryland, Michigan, New Jersey, North Carolina, Ohio, Pennsylvania, Tennessee, Virginia, West Virginia. We believe that our BEMS solutions can benefit building owners who get paid by RTOs for energy saving bonuses, which is in alignment with federal reward programs initiated by the U.S. Department of Energy (DoE). Our real time BEMS solutions are being designed to reduce energy consumption and enhance personalized temperature control options and comfort levels for tenants living in these MDUs. As of the date of this filing, the customer has yet to make the payment for us to commence production on this project and there has been no update since receipt of the purchase order.

The following agreements were entered into on the date of Closing as provided for in the MIPA:

Project Management Services Agreement

At the Closing, the Company and Emergen entered into a Project Management Services Agreement (the “PMSA”) with Energy Independent Partners LLC (“Energy Independent Partners”), an entity owned or controlled by Mr. Johnson. Pursuant to the terms of the PMSA, Energy Independent Partners is obligated to provide the following project management services in connection with the development and operation of each of the Development Projects (collectively, the “Services”): (i) assist as needed with qualifying the Development Projects for financing; (ii) assist as needed with obtaining all permits required for development of the Development Projects which have sufficient rights to use all necessary real property, and for which the applicable draft interconnection agreement has been received for the Development Projects (“RTB Status”); and (iii) if Emergen foregoes the development of a Development Project, Energy Independent Partners will assist the Company as needed with marketing the Development Project to a third party or develop and retain the Development Project outside of Emergen.

Payment for Service. The Issuer agreed to pay Energy Independent Partners the following fees for providing the Services:

BESS Development Fees. In consideration of the provision of the Services related to the BESS Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per BESS Development Project: $0.035 per W for each applicable BESS Development Project, subject to such BESS Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“BESS Development Fees”). Currently, the Company is focusing on developing the BESS projects and the total fees related to all 23 of the BESS projects would be the $0.035 per watt multiplied by the estimated capacity 1.965 GW (1,965,000,000 watts) or approximately $69 million.

Solar Development Fees. In consideration of the provision of the Services related to the Solar Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per Solar Development Project: $0.035 per W for each applicable Solar Development Project, subject to such Solar Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“Solar Development Fees”). The Solar projects still in the Emergen portfolio have an estimated capacity of 1.640 GW and would have Solar Development Fees of approximately $57 million if developed.

If any Development Projects pursuant to the Agreement are sold by Emergen to a third-party then EIP would be due the greater of: (i) any unpaid project’s specific BESS Development Fees or Solar Development Fees defined in the PMSA agreement; or (ii) 62.5% of the proceeds less any project specific BESS Development Fees or Solar Development Fees paid previously.

Other Development Fees. For each other renewable energy development asset held by the Company, which are neither BESS Development Projects nor Solar Development Projects, located in the United States in which the Company engages during the term of the PMSA (the “Other Development Projects”), the Company shall pay Energy Independent Partners the higher of either (a) fifty percent (50%) of the gross margin or (b) $0.02 per watt in cash, subject to such Other Development Project achieving RTB Status (the “Other Development Fees”).

Timing of Payment of Fees

The BESS Development Fees shall be due and payable upon (i) Bitech, or any of its Affiliates, receiving project financing directly related to and collateralized by BESS Projects, this specifically excludes any general public or private offerings by Bitech not directly related to financing a BESS Project, and (ii) when a BESS Project’s financing funding terms is sufficient to pay the project specific Development Fees. EIP will be paid on the same timing as the funding terms. For example: if the terms for development fees are 50% at acceptance, 40% RTB and 10% at COD then EIP will be paid as the project development fees are funded.

These fees will be recorded as liabilities once the above contingencies and milestones are met, the most important being that of appropriate project financing enabling payment of these fees.

Acceleration of Payment Clause: Within ninety (90) days (i) of the effective date of a Change of Control or (ii) the removal of Cole W. Johnson as an employee or consultant to Emergen and/or the head of the BESS and Solar Division of Bimergen Energy, any remaining BESS Initial Fee and Solar Initial Fee shall become due and payable. A “Change of Control” shall be deemed to have occurred if, after the Effective Date, (x) the beneficial ownership (as defined in Rule 13d-3 under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) of securities representing more than 50% of the combined voting power of the Company is acquired by any “person” as defined in sections 13(d) and 14(d) of the Exchange Act (other than the Company, any subsidiary of the Company, or any trustee or other fiduciary holding securities under an employee benefit plan of the Company); (y) the merger or consolidation of the Company with or into another corporation where the shareholders of the Company, immediately prior to the consolidation or merger, would not, immediately after the consolidation or merger, beneficially own (as such term is defined in Rule 13d-3 under the Exchange Act), directly or indirectly, shares representing in the aggregate 50% or more of the combined voting power of the securities of the corporation issuing cash or securities in the consolidation or merger (or of its ultimate parent corporation, if any) in substantially the same proportion as their ownership of the Company immediately prior to such merger or consolidation; or (z) the sale or other disposition of all or substantially all of the Company’s assets to an entity, other than a sale or disposition by the Company of all or substantially all of the Company’s assets to an entity, at least 50% of the combined voting power of the voting securities of which are owned directly or indirectly by shareholders of the Company, immediately prior to the sale or disposition, in substantially the same proportion as their ownership of the Company immediately prior to such sale or disposition.

If any Development Projects pursuant to the Agreement are sold by Emergen to a third-party then EIP would be due the greater of: (i) any unpaid project’s specific BESS Development Fees or Solar Development Fees defined in Section 2.06; or (ii) 62.5% of the proceeds less any project specific BESS Development Fees or Solar Development Fees paid previously.

The timing and other requirements for the payment of Other Development Fees shall be as agreed in writing by the parties to the PMSA via an addendum to the PMSA prior to the parties undertaking such Other Development Projects.

Subject to the terms and conditions of the PMSA, in addition to the other requirements therein, payment of the BESS Development Fees, the Solar Development Fees and any Other Development Fees is further contingent upon Cole W. Johnson (a) remaining an employee or consultant to Emergen and/or the head of the BESS and Solar Division of the Company and/or (b) as an interest owner in the Energy Independent Partners during the period of time in which the applicable BESS Development Fees, the Solar Development Fees or Other Development Fees are payable. Subject to the foregoing, the BESS Development Fees, the Solar Development Fees or Other Development Fees are payable within ten (10) days of satisfaction of the conditions to payment as discussed above.

Payment for Sale of Development Projects. In the event the Company decides not to proceed with any Development Project(s), the Company may elect to sell such Development Project(s) to one or more third parties. In such event, the Company and Energy Independent Partners agree to a sales price for the applicable Development Project being sold, and provided that the parties to the PMSA agree that any sale agreement for such Development Projects shall provide that the buyer thereof shall remain obligated to pay to Energy Independent Partners the BESS Development Fees and/or the Solar Development Fee(s), as applicable, to the extent not already paid by the Company hereunder, unless otherwise agreed upon by the Company and Energy Independent Partners.

Termination. The PMSA may be terminated at any time prior to the expiration of its term: (a) by the mutual written consent of the parties; (b) by the Company if Energy Independent Partners has violated or breached any of the covenants or agreements of Energy Independent Partners set forth therein, or any of the representations or warranties of Energy Independent Partners set forth in the PMSA has become inaccurate or untrue, which violation, breach, inaccuracy or untruth, if reasonable capable of cure, has not been cured by Energy Independent Partners, within 20 business days after receipt by Energy Independent Partners of written notice thereof from the Company; (c) by Energy Independent Partners if the Company or Emergen has violated or breached any of the covenants or agreements of the Company or Emergen set forth in the PMSA, or any of the representations or warranties of the Company or Emergen set forth in the PMSA has become inaccurate or untrue, which violation, breach, inaccuracy or untruth, if reasonable capable of cure, has not been cured by the Company or Emergen, within 20 business days after receipt by the Company of written notice thereof from Energy Independent Partners; or (d) by any party, if a court of competent jurisdiction or other governmental authority shall have issued an order or taken any other action permanently restraining, enjoining or otherwise prohibiting the Combination or the transactions contemplated by the PMSA and such order or action shall have become final and nonappealable. Any of the Parties has a right to seek specific performance of the other parties’ obligations under the PMSA in lieu of its right to terminate the agreement.

Indemnification. Subject to certain limitations provided for in the PMSA, each of the parties to the PMSA mutually agreed to indemnify and hold harmless each other and each of their affiliates and each of their respective members, managers, partners, directors, officers, employees, stockholders, attorneys and agents and permitted assignees to the fullest extent permitted by applicable law, against and in respect of any and all losses incurred or sustained by such party as a result of or in connection with (i) any breach, inaccuracy or nonfulfillment or the alleged breach, inaccuracy or nonfulfillment of any of the representations, warranties, covenants and agreements of the other party contained in the PMSA or in any of the additional agreements or any certificate or other writing delivered pursuant hereto; or (ii) any claim for brokerage commissions in connection with the transactions contemplated hereby as a result of the actions or agreements of the other party or any of their representatives.

Comparison of the years ended December 31, 2024 and 2023.

We have generated no revenues from our primary business for the year ended December 31, 2024 and 2023.

During the year ended December 31, 2024, we incurred $2,758,731 of general and administrative expenses compared to $927,726 for the same period in 2023. General and administrative expenses have increased during 2024 compared to 2023 as the Company began operations related to Emergen (acquired April 2024, it’s BESS operation.)

During the year ended December 31, 2024, a significant portion of general and administrative expenses was $1,246,182 of stock compensation expenses compared to $378,559 for the same period in 2023. Stock compensation expenses are related to stock awards and stock option valuation over the life of the option.

As a result of the foregoing, we had net loss of ($2,757,687) for the year ended December 31, 2024, compared to a net loss of ($920,418) for the year ended December 31, 2023.

Liquidity and Capital Resources

As of December 31, 2024 and 2023, we had total current liabilities of $1,756,985 and $35,229, respectively, and current assets of $1,028,877 and $163,417, respectively, to meet our current obligations. As of December 31, 2024, we had working capital of ($728,108), a decrease of working capital of ($856,296) as compared to December 31, 2023, driven primarily by an increase deferred revenues, accounts payable and accrued expenses.

For the year ended December 31, 2024, cash used in operations was ($349,833) which primarily included the net loss of ($2,757,687) partially offset by $1,246,182 related to stock compensation expense, the issuance of common stock for services of $79,209 and $943,500 increase in deferred revenue.

The Company received and recorded as deferred revenue a $943,500 deposit payment from the Project Sale Agreement with Bridgelink for an estimated 2.425 GW of Emergen’s estimated 3.840 GW of solar energy development projects. The total amount to be received by Emergen for the projects sold to Bridgelink is expected to be $19,400,000 unless certain of the projects are returned without development to the payment milestones. We have paid EIP $250,000 during 2024 related to the $943,500 deposit and owe an additional $339,688 currently recorded in due to related party. EIP will be due 62.5% of the proceeds received related to the Project Sale Agreement. If the remaining $18.5 million is received from the ultimate purchaser via Bridgelink we will owe EIP $11.5 million for their portion per the agreement.

We have a history of operating losses. We have not yet achieved profitable operations and expect to incur further losses. We have funded our operations primarily from equity financing. As of December 31, 2024, cash generated from financing activities was not sufficient to fund our growth strategy in the short-term or long-term. The primary need for liquidity is to fund working capital requirements of the business, including operational expenses in connection with our efforts to become a provider of a suite of green energy solutions and to fund the development projects. The primary source of liquidity has primarily been private financing transactions. The ability to fund operations and pursue these opportunities and projects within the green energy industry depends on our ability to raise funds from debt and/or equity financing which is subject to prevailing economic conditions and financial, business and other factors, some of which are beyond our control. There can be no assurance that additional financing will be available to us when needed or, if available, that it can be obtained on commercially reasonable terms.

Off-Balance Sheet Arrangements

As of the date of this Annual Report on Form 10-K, we do not have any off-balance-sheet arrangements that have, or are reasonably likely to have, a current or future effect on our results of operations or financial condition, including, and without limitation, such considerations as liquidity and capital resources.

Changes in or Adoption of Accounting Practices

There were no material changes in or adoption of new accounting practices during the year ended December 31, 2024.

Critical Accounting Estimates

Our management’s discussion and analysis of our financial condition and results of operations is based on our financial statements, which have been prepared in accordance with generally accepted accounting principles in the United States, or GAAP. The preparation of these financial statements requires us to make estimates and assumptions that affect the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements, as well as the reported expenses incurred during the reporting periods. On an ongoing basis, we evaluate our estimates and judgments, including, but not limited to, those related to accrued research and development costs and stock-based compensation expense. These estimates and assumptions are monitored and analyzed by us for changes in facts and circumstances, and material changes in these estimates and assumptions could occur in the future. Our estimates are based on our historical experience and on various other factors that we believe are reasonable under the circumstances, the results of which form the basis for making judgments about the carrying value of assets and liabilities that are not readily apparent from other sources. Changes in estimates are reflected in reported results for the period in which they become known. Actual results may differ from these estimates under different assumptions or conditions.

Although our significant accounting policies are described in more detail in Note 2 to our financial statements included in Part II, Item 8 of this Annual Report on Form 10-K, we believe that the following accounting estimates are those most critical to the judgments and estimates used in the preparation of our financial statements.

Stock Options

We measure stock-based option awards made to employees and non-employees based on the estimated fair value of the awards as of the grant date using the Black-Scholes option-pricing model. The model requires management to make a number of assumptions including common stock fair value, expected volatility, expected term, risk-free interest rate and expected dividend yield.

Fair Value of Common Stock — The fair market value of our common stock is based on its closing price on the OTC Listing as reported on the date of the stock option grant.

Expected Volatility — Expected volatility is estimated by studying the volatility of the prices of shares of common stock of comparable public companies for similar terms. We will continue to apply this process until enough historical information regarding the volatility of our stock price becomes available.

Expected Term — Expected term represents the period that our stock-based awards are expected to be outstanding and is determined using the simplified method.

Risk-Free Interest Rate — The risk-free interest rate is based on the U.S. Treasury zero-coupon bonds issued in effect at the time of grant for periods corresponding with the expected term of the option.

Expected Dividend — The Black-Scholes valuation model calls for a single expected dividend yield as an input. To date, we have not declared or paid any dividends and we do not expect to declare or pay any dividends in the future.

Income Tax Expense (Benefit)

We have not made a provision for income taxes in 2024 or 2023, which reflects our valuation allowance established against our benefits from net operating loss carryforwards.

Controls and procedures

As filed, 6,266 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.

Benjamin B. Tran, our President and Chief Executive Officer, is our principal executive officer and Robert J. Brilon, our Chief Financial Officer, is our principal financial officer.

Evaluation of Disclosure Controls and Procedures

Our management, with the participation of our Chief Executive Officer (“CEO”) and Chief Financial Officer (“CFO”) (our principal executive officer and principal financial officer, respectively), evaluated the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934 (the “Exchange Act”)) as of December 31, 2024 (the “Evaluation Date”). Disclosure controls and procedures are controls and other procedures designed to ensure that information required to be disclosed in the reports we file or submit under the Exchange Act is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our CEO and CFO, as appropriate, to allow timely decisions regarding required disclosure.

Management recognizes that any system of controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving its objectives, and necessarily applies judgment in evaluating the cost-benefit relationship of possible controls and procedures.

Based on their evaluation, our CEO and CFO concluded that, as of December 31, 2024, our disclosure controls and procedures were not effective to provide reasonable assurance that information required to be disclosed by us is recorded, processed, summarized, and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to management, including our CEO and CFO, as appropriate, to allow timely decisions regarding required disclosure. These conclusions were due to the material weaknesses in our internal control over financial reporting described below.

Notwithstanding the identified material weaknesses, management concluded that our financial statements included in this Annual Report on Form 10-K are fairly stated, in all material respects, in accordance with U.S. GAAP for each of the periods presented.

Management’s Annual Report on Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting, as defined in Rules 13a-15(f) and 15d-15(f) under the Exchange Act. Internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with U.S. GAAP.

Management conducted an evaluation of the effectiveness of our internal control over financial reporting based on the criteria set forth in the 2013 Internal Control - Integrated Framework issued by the Committee of Sponsoring Organizations of the Treadway Commission (“COSO Framework”). Based on this evaluation, management concluded that our internal control over financial reporting was not effective as of December 31, 2024, due to the following material weaknesses:

  • Inadequate segregation of duties consistent with control objectives;
  • Insufficient number of personnel with an appropriate level of U.S. GAAP knowledge, experience, and ongoing training in the application of U.S. GAAP and SEC disclosure requirements commensurate with our financial reporting requirements;
  • Failure to appropriately design and maintain entity-level controls impacting the control environment, risk assessment, control activities, information and communication, and monitoring activities to prevent or detect material misstatements;
  • Insufficient qualified resources to ensure adequate oversight and accountability over the performance of controls, including retention of control evidence;
  • Ineffective identification and assessment of risks impacting internal control over financial reporting;
  • Insufficient evaluation and determination as to whether components of internal controls were present and functioning, particularly for management review controls and activity-level controls across substantially all financial statement areas;
  • Ineffective general controls over information systems supporting the financial reporting process;
  • Ineffective controls over the completeness and accuracy of information used in the operation of control activities; and
  • Ineffective management review controls at a sufficient level of precision to detect material misstatements across substantially all financial statement areas involving complex and judgmental accounting and disclosure matters.

47

Attestation of Independent Registered Public Accounting Firm

This Annual Report on Form 10-K does not include an attestation report of our independent registered public accounting firm regarding internal control over financial reporting. Management’s report was not subject to attestation by our independent registered public accounting firm pursuant to rules of the SEC that permit certain companies, including newly public companies, to provide only management’s report.

Changes in Internal Control over Financial Reporting

There were no changes in our internal control over financial reporting during the year ended December 31, 2024, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

Inherent Limitations on Effectiveness of Controls

Internal control over financial reporting has inherent limitations. It may not prevent or detect all misstatements, and projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate due to changes in conditions or that the degree of compliance with policies and procedures may deteriorate. Internal control systems are also subject to human error or intentional circumvention. Therefore, even effective internal controls can provide only reasonable assurance with respect to financial statement preparation and presentation.

Changes in Disclosure Controls and Procedures

None.

Figures reported in this filing

Standardized line items from the XBRL in this filing, for the period ended 2024-12-31. Comparative periods it repeats are left out.

Figures reported in this filing
Line itemPeriodValueXBRL concept
Operating income12 months2024-01-01 to 2024-12-31−$2.8mus-gaap:OperatingIncomeLoss
Net income12 months2024-01-01 to 2024-12-31−$2.8mus-gaap:NetIncomeLoss
Diluted EPS12 months2024-01-01 to 2024-12-31−$0.54us-gaap:EarningsPerShareDiluted
Basic EPS12 months2024-01-01 to 2024-12-31−$0.54us-gaap:EarningsPerShareBasic
Diluted shares (weighted)12 months2024-01-01 to 2024-12-315,144,443 sharesus-gaap:WeightedAverageNumberOfDilutedSharesOutstanding
Operating cash flow12 months2024-01-01 to 2024-12-31−$349.8kus-gaap:NetCashProvidedByUsedInOperatingActivities
Cash and equivalentsAt period end2024-12-31$156.1kus-gaap:CashAndCashEquivalentsAtCarryingValue
Current assetsAt period end2024-12-31$1.0mus-gaap:AssetsCurrent
Total assetsAt period end2024-12-31$23.3mus-gaap:Assets
Current liabilitiesAt period end2024-12-31$1.8mus-gaap:LiabilitiesCurrent
Shareholders' equityAt period end2024-12-31$21.5mus-gaap:StockholdersEquity

Source: SEC EDGAR, the filing index for accession 0001641172-25-013018. Last ingested by Listed: Oct 24, 2026, 15:03 ET. Listed shows no prices and gives no investment advice.