Energy Vault Holdings, Inc.: Form 10-Q for the period ended Jun 30, 2025
Filed with the SEC on Aug 8, 2025 and accepted by EDGAR at Aug 8, 2025, 08:10 ET.
Management's discussion and analysis
As filed, 70,156 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
The following discussion and analysis provide information which Energy Vault’s management believes is relevant to an assessment and understanding of Energy Vault’s condensed consolidated results of operations and financial condition. The discussion should be read together with our unaudited interim condensed consolidated financial statements, the respective notes thereto, and other financial information included elsewhere in this Quarterly Report. The discussion and analysis should also be read together with the audited consolidated financial statements, the respective notes thereto, and other financial information included elsewhere in the Annual Report for the year ended December 31, 2024 filed by us with the SEC on April 1, 2025. This discussion may contain forward-looking statements based upon Energy Vault’s current expectations that involve risks, uncertainties, and assumptions. Energy Vault’s actual results may differ materially from those anticipated in these forward-looking statements. You should review the section titled “Cautionary Note Regarding Forward-Looking Statements” for a discussion of forward-looking statements and the section titled “Risk Factors,” for a discussion of factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis and elsewhere in this Quarterly Report. Energy Vault’s historical results are not necessarily indicative of the results that may be expected for any period in the future. Unless the context otherwise requires, all references in this Quarterly Report to “we,” “our,” “us,” “the Company,” or “Energy Vault” refer to Energy Vault Holdings, Inc., a Delaware corporation, and its subsidiaries..
Our Business
Energy Vault provides a diverse technology portfolio of turnkey energy storage platforms, including proprietary gravity, battery, and green hydrogen energy storage hardware technologies, supported by our technology-agnostic energy management system software and integration platform. In 2024, we began a multi-year transition from providing this technology portfolio solely to third parties through a build-and-transfer model or licensing model, to also taking an ownership interest in energy storage assets in select attractive markets. We believe that our experience in the build-and-transfer business, combined with our proprietary energy storage technologies and geographical footprint, uniquely positions us to build and operate storage projects with superior efficiency and reliability.
We incorporate a customer-centric, solutions-based approach toward helping utilities, independent power producers, and large industrial energy users reduce their energy costs while maintaining power reliability. As the global demand for electricity increases and the world transitions to an economy powered by increasingly intermittent renewable energy such as solar and wind, the ability to provide clean, reliable, and affordable electricity to a growing global population will depend heavily on the ability to store and distribute energy at appropriate times. We are striving to create a world powered by renewable resources so that everyone will have access to clean, reliable, sustainable, and affordable energy.
Key Factors and Trends Affecting our Business
We believe that our performance and future success depend upon several factors that present significant opportunities for us, but also pose risks and challenges including those discussed below and in Part I, Item 1A. “Risk Factors” of our 2024 Annual Report on Form 10-K filed with the SEC on April 1, 2025 and Part II, Item 1A. “Risk Factors” in this Quarterly Report.
Impact of Tariffs
Effective March 4, 2025, the U.S. government implemented a 20% tariff under the International Emergency Economic Powers Act (“IEEPA”) on imports from China, including lithium-ion batteries. Subsequently, on April 10, 2025, an additional 125% reciprocal tariff was imposed on Chinese-origin goods. These tariffs are in addition to the preexisting 3.4% Most-Favored-Nation (MFN) base tariff and the 7.5% Section 301 tariff applicable to lithium-ion batteries imported from China. As a result, our B-Vault products, all of which have been sourced and manufactured in China, became subject to a cumulative U.S. import tariff burden of approximately 155.9%.
The imposition of these tariffs materially affected our operations. Several third-party sales projects within our backlog and development pipeline experienced delays or cancellations due to the anticipated increase in costs associated with importing B-Vault products from China. On May 12, 2025, the U.S. and Chinese governments announced a temporary 90-day pause in certain reciprocal tariffs as a measure to de-escalate trade tensions and renew negotiations. This temporary suspension, which became effective May 14, 2025, temporarily lowered the cumulative tariff rate on certain products, including our B-Vault products, during this period. However, there is no assurance that this de-escalation will continue beyond its expiration in mid-August 2025, or that a long-term agreement will be reached. The potential for the tariffs to be fully reinstated following this 90-day period continues to represent a significant risk and creates substantial uncertainty in our supply chain and pricing models.
Furthermore, on May 28, 2025, the U.S. Court of International Trade issued a ruling in litigation challenging the executive branch's authority to impose the March 4, 2025 tariffs under the IEEPA. While the court ruled against the government, the decision is currently under appeal and its ultimate outcome remains uncertain. The legal and political ambiguity surrounding the status of these tariffs further complicates our ability to forecast costs and secure long-term sales contracts. The Company continues to monitor these trade and legal developments closely, as their resolution could have a material impact on our financial results.
In response, we are actively exploring alternative sourcing options, including vendors with manufacturing capabilities outside of China, to mitigate the impact of these tariffs. As of the filing date of this Quarterly Report, we have not successfully imported our B-Vault products from non-Chinese suppliers on an economical basis.
Should trade tensions escalate further or if additional tariffs, trade restrictions, or retaliatory measures are implemented on our products or components originating from countries outside the U.S., our ability to source B-Vault products or sell them at competitive prices could be adversely affected. Such developments may have a material and adverse impact on our business operations, financial results, and cash flows.
U.S. Energy Storage Regulation and Legislation
The U.S. Congress and state legislatures are continuously reviewing and passing various climate change proposals, incentives, regulations, and legislation that may support the energy storage industry, including in the form of tax credits and incentives. The implementation of these laws can vary greatly across administrations and take long periods of time before the full extent of regulations are adopted. We cannot guarantee we will realize any or all of the anticipated benefits or incentives under any such enacted regulations or legislation.
The IRA, adopted by the U.S. Congress in August 2022, contained a number of tax incentive provisions that directly support the adoption of energy storage solutions and services. Before the enactment of the IRA, the Section 48 ITC did not apply to standalone energy storage projects. The IRA added Section 48(a)(3)(A)(ix) to allow a taxpayer that placed in service a standalone energy storage technology with a minimum capacity of 5 kWh to claim the ITC, if certain requirements are met.
The OBBBA, which was enacted in July 2025, contains a broad range of changes to U.S. federal income tax laws, including with respect to ITCs. Some of these changes could dampen demand for battery energy storage systems in the U.S., while other changes preserve robust support for standalone battery storage.
The OBBBA also broadened Prohibited Foreign Entity (“PFE”) restrictions to apply to all technology-neutral credits (§ 45Y, § 48E), the advanced manufacturing credit (§ 45X), and other related incentives. Under these rules, projects or component suppliers with disqualifying foreign-entity ties must satisfy new sourcing and ownership tests or forfeit credit eligibility; however, legacy IRA credits under Sections 45/48 for projects with construction commenced by December 31, 2024 remain fully grandfathered and unaffected by the PFE regime. Final eligibility and compliance will depend on forthcoming Treasury, IRS, and FERC guidance on domestic-content metrics, PFE/material-assistance certifications, and storage-specific interconnection standards. We continue to monitor these developments.
Development and Deployment Plan for Energy Storage Products
In our third-party business, we primarily rely on two models for project delivery, which are (i) EPC delivery and (ii) EEQ delivery. Under the EPC model, we generally rely on third-party EPC firms to construct our storage systems, under our supervision with dedicated teams tasked with project management. Under the EEQ model, we are responsible for the delivery of the equipment we provide, as well as resolving issues within our scope of supply.
Our cost projections for our third-party business and for our owned projects are heavily dependent upon raw materials (such as steel), equipment (such as motors, batteries, inverters, and power electronic devices), and technical and construction service providers (such as engineering, procurement, construction firms).
Energy Storage Industry
The utility-scale energy storage industry is increasing at a rapid pace, driven by increased demand for electricity, global transitions toward renewable energy, and increased focus on grid resilience.
According to a report from the U.S. Department of Energy in December 2024, electricity demand is forecasted to grow substantially in the United States over the next few decades. Electricity demand is expected to be driven primarily by new data centers, artificial intelligence, new manufacturing facilities, electric vehicles, and sector-wide electrification. In June 2024, the Australian Energy Market Operator (“AEMO”) released their Integrated System Plan (“ISP”), a development path to transition their national electricity market to net-zero by 2050. Between 2024 and 2050, the ISP anticipates that electricity consumption from the Australian electric grid will increase by approximately 80% and energy storage capacity will increase by approximately 1,500%.
Over the past decade, deployment of renewable energy resources has accelerated and there has been an industry-wide push for decarbonization, which is increasing the demand for grid-scale energy storage. A major obstacle to transitioning to renewable sources of energy such as wind and solar is the intermittent availability of these types of energy sources. Energy storage solutions are needed to balance the production intermittency of variable renewable energy to support a clean-energy future and a balanced electrical grid infrastructure. Both government mandates and companies focused on reducing energy use, cost, and emissions are expected to propel the shift to renewable sources of power.
Additionally, software solutions play a vital role in assisting energy storage owners in managing the growing complexities of renewable energy and energy storage markets. As renewable and energy storage asset portfolios expand globally, these stakeholders will need software solutions that enhance asset performance and boost revenue while reducing total ownership costs.
Our expansion of revenue depends on the ongoing adoption of energy storage solutions by our customers and our ability to source, execute, and operate energy storage projects with attractive economics. The growth of the energy storage market that we address is primarily driven by the decreasing cost of energy storage technologies, government mandates, financial incentives to reduce GHG emissions, and efforts to enhance grid stability and efficiency. These dynamics are driving demand for increased energy storage capacity and duration.
Increasing Deployment of Renewable Energy
Deployment of renewable energy resources has accelerated over the last decade, and solar and wind have become a low cost energy source. Energy storage is critical to reducing the intermittency and volatility of renewable energy generation. However, there is no guarantee that the deployment of renewable energy will occur at the rate that is expected. Inflationary pressures, supply chain disruptions, geopolitical conflicts, government regulations, and other factors could result in fluctuations in demand for and deployment of renewable energy resources, adversely affecting our revenue and ability to generate profits in the future.
Competition
The market for our products is competitive, and we may face increased competition as new and existing competitors introduce energy storage solutions and components. Furthermore, as we expand our services and digital applications in the future, we may face other competitors including software providers and hardware manufacturers that offer software solutions. If our market share declines due to increased competition or if we are not able to compete as we expect, our revenue and ability to generate profits in the future may be adversely affected.
Inflation
In the markets in which we operate, there have been higher rates of inflation in recent years. If inflation continues to increase in our markets, it may increase our expenses that we may not be able to pass through to customers. It may also increase the costs of our products that could negatively impact their competitiveness.
Government Regulation and Compliance
Federal, state, and local government statutes and regulations concerning electricity heavily influence the market for our product and services. These statutes and regulations directly affect our owned asset business and indirectly affect our third-party sales business. These statutes and regulations often relate to electricity pricing, net metering, incentives, taxation, competition with utilities and the interconnection of customer-owned electricity generation. In the United States, governments continuously modify these statutes and regulations. Governments, often acting through state utility or public service commissions, change and adopt different rates for commercial customers on a regular basis. These changes could affect our ability to deliver cost savings to our current and future customers for the purchase of electricity.
Each of our owned installations or our customer installations must be designed, constructed, and operated in compliance with applicable federal, state and local regulations, codes, standards, guidelines, policies, and laws. To install and operate energy storage systems on its platform, we, our customers or our partners, as applicable, are required to obtain applicable permits and approvals from applicable federal, state, and local authorities having jurisdiction to install energy storage systems and to interconnect the systems with the local electrical utility.
Recent Developments
Between October 2024 and March 2025, the Company agreed to loan Stoney Creek BESS Pty Ltd (“Stoney Creek”) up to AUD 8.8 million (or $5.5 million) to assist them in paying for BESS project development related costs. The Company also agreed to provide Stoney Creek a bank guarantee of up to AUD 2.5 million (or $1.6 million) as security for a performance bond. On March 17, 2025, the Company entered into a share purchase agreement to acquire Stoney Creek for a nominal purchase price of one hundred Australian dollars. On August 5, 2025, the Company completed the acquisition of Stoney
Creek for total purchase consideration of approximately AUD 4.0 million, (or $2.6 million). The consideration consisted primarily of the assumption of notes receivable owed by Stoney Creek to the Company and a nominal cash payment. The acquisition was made to expand the Company’s portfolio of BESS projects in Australia. The acquisition provides the Company with project rights to a 125 MW / 1,000 MWh BESS in Narrabri, New South Wales, including land use rights and a long-term energy service agreement.
On March 31, 2025, the Company entered into a license and royalty agreement with a publicly listed infrastructure development company in India. The agreement is expected to accelerate the manufacturing and deployment of Energy Vault’s B-Vault BESS technology alongside the Company’s VaultOS EMS software, in the Indian market. The agreement includes upfront licensing fees paid to Energy Vault, in addition to long-term recurring royalty revenue streams.
On April 16, 2025, the Company was notified by the NYSE that it was not in compliance with Section 802.01C of the NYSE Listed Company Manual because the average closing price of the Company’s common stock was less than $1.00 over a consecutive 30 trading-day period. The notice did not result in the immediate delisting of the Company’s common stock from the NYSE. Under NYSE rules, Energy Vault has a period of six months from receipt of the notice to regain compliance with the NYSE minimum stock price listing requirement. The Company intends to consider available alternatives, subject to stockholder approval, to cure the stock price non-compliance. Under the NYSE’s rules, if Energy Vault determines that it will cure the stock price deficiency by taking an action that will require stockholder approval, the price condition will be deemed cured if the average closing price exceeds $1.00 per share over a 30-day trading period and the Company has a closing share price of at least $1.00 on the last day of the cure period. Energy Vault’s common stock will continue to be listed and trade on the NYSE during this cure period.
On May 31, 2025, the Cross Trails BESS, a 57 MW two-hour BESS, began commercial operations. The project marks the first fully executed asset under the Company’s “Own and Operate” growth strategy, which is supported by a 10-year tolling (offtake) agreement with Gridmatic, an AI-enabled power marketer.
Key Operating Metrics
The following tables present our key operating metrics for the periods presented (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| New bookings | $25,944 | $182,830 | $251,673 | $182,830 |
| Cancellations | — | (182,238) | — | (182,238) |
| Net bookings | $25,944 | $592 | $251,673 | $592 |
| New bookings (in MWh) | 15 | 400 | 1,019 | 400 |
| Cancellations (in MWh) | — | (400) | — | (400) |
| Net bookings (in MWh) | 15 | — | 1,019 | — |
| June 30, 2025 | December 31, 2024 | |
|---|---|---|
| Developed Pipeline | $2,353,214 | $2,085,908 |
| Developed Pipeline (in MWh) | 5,968 | 9,194 |
| Backlog | $682,248 | $433,886 |
| Backlog (in MWh) | 2,392 | 1,574 |
Bookings
Net bookings represent the total aggregate contract value and total MWhs to be delivered from customer contracts signed during the period (i.e., gross bookings), net of the total aggregate value and total MWhs of contracts that were cancelled during the period. The aggregate contract value includes any potential future variable payments from tolling and offtake arrangements that the Company believes are probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in bookings. Due to the long-term nature of our contracts, bookings are a key metric that allows us to understand and evaluate the growth of our Company and our estimated future revenue related to our customer contracts.
Developed Pipeline
Developed pipeline represents uncontracted potential revenue from third-party projects where potential prospective customers have either awarded the Company a project or shortlisted the Company for consideration. It also includes potential tolling revenue from projects where the Company is in advanced negotiations to build, own, and operate energy storage systems. Developed pipeline is an internal management metric that we construct using information from our global sales team and is monitored by management to understand the potential anticipated growth of our Company and to estimate potential future revenue. Developed pipeline is influenced by the prevailing foreign exchange rates and equipment prices and may vary from period to period if these inputs change.
Developed pipeline may not generate margins equal to our historical operating results. We have only recently begun to track our developed pipeline on a consistent basis as a performance measure, and as a result, we do not have significant experience in determining the level of realization that we may achieve on these potential contracts. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control.
Backlog
Backlog represents contracted but unrecognized revenue from third-party projects and services yet to be completed, unrecognized revenue or other income from IP licensing agreements, and unrecognized revenue from tolling arrangements for projects operated by Energy Vault or affiliates. Backlog includes any potential future variable payments from tolling and offtake arrangements that the Company believes is probable of being realized. Probable future variable payments are forecasted by an independent third-party firm using simulation software that factors in current and projected energy market dynamics, historical and forecasted volatility, and location specific data. The Company considers the low-end simulation results to be probable. Potential future IP royalties are not included in backlog. Backlog is a common measurement used in our industry. Our methodology for determining backlog may not, however, be comparable to the methodologies used by others.
We cannot guarantee that our bookings, backlog, or developed pipeline will result in actual revenue in the originally anticipated period, or at all. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control. Many of our projects require government approvals, third-party financing, and other contingencies, many of which are beyond our control. If our bookings, backlog, or developed pipeline fail to result in revenue as anticipated or in a timely manner, we could experience a reduction in revenue, profitability, and liquidity. See “Risk Factors - Our total backlog, bookings, and developed pipeline may not be indicative of our future revenue, which could have a material impact on our business, financial condition, and results of operations” in the Annual Report for the year ended December 31, 2024 filed by us with the SEC on April 1, 2025.
Key Components of Results of Operations
Revenue
The Company generates revenue from the sale of our energy storage products, tolling arrangements related to owned projects, the licensing of the Company’s software solutions and IP, and from long-term service agreements to operate and maintain customer owned energy systems. To date, the Company has primarily generated revenue from the sale of our BESSs and from licensing our IP.
The Company sells its BESSs under (i) an EPC model and (ii) an EEQ model. When the Company sells a BESS under the EPC model, the Company recognizes revenue over time as we transfer control of our product to the customer. Under an EEQ model, the Company recognizes revenue related to equipment sales upon delivery to the customer and service revenue over time as we provide specialized technical services to the customer.
The Company enters into tolling agreements under which counterparties may sell energy stored in the Company’s energy storage systems or request that the Company dispatch energy on their behalf. Each agreement is evaluated to determine whether it qualifies as a lease under ASC 842 or a customer contract under ASC 606. As of June 30, 2025, one system had commenced commercial operations and was classified as an operating lease under ASC 842. Fixed fees for operating leases under ASC 842 are recognized on a straight-line basis over the contract term, and variable fees are recognized in the period in which the related energy is delivered.
When the Company licenses its IP, revenue is recognized at the point in time at which the customer obtains control of the licensed technology. When the Company licenses its software solutions or provides operation and maintenance services, the transaction price for each contract is recognized as revenue on a straight-line basis over the term of the contract.
Our revenue is affected by changes in the price, volume, and mix of products and services purchased by our customers, which is driven by the demand of our products, geographic mix of our customers, strength of competitor’s product offerings, and the availability of government incentives to the end-users of our products.
Our revenue growth is dependent on continued growth in the number of energy storage systems constructed each year and our ability to increase our share of demand in the geographic regions where we currently compete and plan to compete in the future. Additionally, our revenue growth is dependent on our ability to find attractive projects to build, own, and operate.
Cost of Revenue
Cost of revenue primarily consists of product costs, materials and supplies, and costs associated with subcontractors, direct labor, and product warranties. Product costs include the cost of purchased equipment, as well as tariffs and shipping costs directly attributable to that equipment.
Our cost of revenue is affected by underlying costs of equipment and materials such as batteries, inverters, enclosures, transformers, and cables, as well as the cost of subcontractors to provide construction services. We do not currently hedge against changes in the price of raw materials as we do not purchase raw materials. We purchase energy storage system components from our suppliers.
Gross Profit and Gross Profit Margin
Gross profit and gross profit margin may vary from period to period due to the timing of transferring control of significant uninstalled equipment to customers under contracts to sell energy storage systems. When control of significant uninstalled equipment is transferred to customers in a EPC project, the Company recognizes revenue in an amount equal to the cost of that equipment. The profit margin inherent in these materials is deferred until the Company fulfills its obligation to install the materials during construction of the energy storage systems. Generally, margins in an EPC project are lower in the beginning and middle stages as the equipment is delivered, and margins are higher in the later stages as the Company performs the construction, installation, and commissioning services. As a result, gross profit and gross profit margin will vary from period to period.
Additionally, gross profit and gross profit margin may vary from period to period due to our sales volume, product prices, product costs, product mix, geographical mix, and change in estimates for warranty liabilities.
Sales and Marketing (“S&M”) Expenses
S&M expenses consist primarily of internal personnel-related costs for marketing, sales, and related support teams, as well as external costs such as professional service fees, trade shows, marketing and sales-related promotional materials, public relations expenses, and website operating and maintenance costs. Personnel-related expenses include salaries, benefits, and stock-based compensation expenses.
Research and Development (“R&D”) Expenses
R&D expenses consist primarily of internal and external expenses incurred in connection with our research activities and development programs that include materials costs directly related to product development, testing and evaluation costs, construction costs including labor and transportation of material, overhead related costs and other direct expenses consisting of personnel-related expenses and consulting expenses relating to study of product safety, reliability and development. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense.
General and Administrative (“G&A”) Expenses
G&A expenses consist of information technology expenses, legal and professional fees, travel costs, and personnel-related expenses for our corporate, executive, finance, and other administrative functions, including expenses for professional and contract services. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense. To a lesser extent, general and administrative expenses include investor relations costs, insurance costs, rent, office expenses, and maintenance costs.
Provision for Credit Losses
Provision for credit losses represents the expense recognized to account for potential losses on accounts receivable, contract assets, and customer financing receivable due to customer defaults or credit deterioration. This provision reflects management’s estimate of expected credit losses based on historical trends and forward-looking assessments.
Depreciation and Amortization Expense
Depreciation and amortization expense consists of costs associated with property and equipment, and amortization of intangibles. We expect to invest in additional property, equipment, and other assets as we construct and own energy storage systems, which will result in additional depreciation expense in the future.
Interest Expense
Interest expense consists of contractual interest expense and amortization of non-cash debt and financing costs related to short and long-term loans, insurance premium financings, and finance leases.
Interest Income
Interest income consists of interest income from our money market funds, interest-bearing savings accounts, customer financing receivable, and convertible note receivable.
Other income (expense)
Other income (expense) includes foreign currency gains and losses and non-recurring non-operating gains and losses.
Results of Operations
Consolidated Comparison of Three and Six Months Ended June 30, 2025 to June 30, 2024
The following table sets forth our results of operations for the periods indicated (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | $ Change | Six Months Ended June 30, 2025 | 2024 | $ Change | |
|---|---|---|---|---|---|---|
| Revenue | $8,512 | $3,770 | $4,742 | $17,046 | $11,529 | $5,517 |
| Cost of revenue | 5,996 | 2,721 | 3,275 | 9,654 | 8,412 | 1,242 |
| Gross profit | 2,516 | 1,049 | 1,467 | 7,392 | 3,117 | 4,275 |
| Operating Expenses: | ||||||
| Sales and marketing | 3,161 | 4,861 | (1,700) | 7,306 | 9,031 | (1,725) |
| Research and development | 4,074 | 6,951 | (2,877) | 7,898 | 13,917 | (6,019) |
| General and administrative | 19,113 | 15,836 | 3,277 | 36,619 | 31,189 | 5,430 |
| Provision for credit losses | 3,843 | 442 | 3,401 | 3,832 | 353 | 3,479 |
| Depreciation and amortization | 473 | 279 | 194 | 778 | 574 | 204 |
| Loss on impairment and sale of long-lived assets | — | 565 | (565) | — | 565 | (565) |
| Total operating expenses | 30,664 | 28,934 | 1,730 | 56,433 | 55,629 | 804 |
| Loss from operations | (28,148) | (27,885) | (263) | (49,041) | (52,512) | 3,471 |
| Other income (expense): | ||||||
| Interest expense | (2,516) | (38) | (2,478) | (2,611) | (46) | (2,565) |
| Interest income | 312 | 1,746 | (1,434) | 627 | 3,572 | (2,945) |
| Other income (expense), net | (2,507) | (22) | (2,485) | (2,625) | 1,648 | (4,273) |
| Loss before income taxes | $(32,859) | $(26,199) | $(6,660) | $(53,650) | $(47,338) | $(6,312) |
38
Revenue
The Company recognized revenue for the product and service categories as follows for the three and six months ended June 30, 2025 and 2024 (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| Sale of energy storage products | $7,711 | $2,958 | $12,602 | $10,683 |
| Tolling revenue | 390 | — | 390 | — |
| Operation and maintenance services | 277 | 545 | 553 | 545 |
| Software licensing | 120 | 152 | 232 | 186 |
| IP licensing | 14 | 115 | 3,269 | 115 |
| Total revenue | $8,512 | $3,770 | $17,046 | $11,529 |
Revenue increased by $4.7 million to $8.5 million for the three months ended June 30, 2025, compared to $3.8 million for the same period in 2024. The increase was driven by a $4.8 million increase in energy storage product sales, reflecting the ramp-up of an EPC project in 2025 and the recognition of $2.6 million in nonrefundable deposits upon cancellation of an EEQ contract. In addition, the Cross Trails BESS began commercial operations in May 2025, contributing $0.4 million in tolling revenue. In the comparable 2024 quarter, EPC projects were either substantially complete or in early stages, resulting in minimal revenue.
Revenue increased by $5.5 million to $17.0 million for the six months ended June 30, 2025, compared to $11.5 million for the same period in 2024. The increase was driven by a $3.2 million increase in IP licensing revenue following the B-Vault licensing agreement signed in the first quarter of 2025, and a $1.9 million increase in energy storage product sales, which includes $2.6 million of nonrefundable deposits recognized upon cancellation of an EEQ contract in the second quarter of 2025.
Revenue from three customers accounted for 50%, 31%, and 10% of total revenue, respectively, for the three months ended June 30, 2025 and revenue from three customers accounted for 52%, 19%, and 15% of total revenue, respectively, for the six months ended June 30, 2025. Revenue from three customers accounted for 46%, 30%, and 14% of total revenue, respectively, for the three months ended June 30, 2024 and revenue from two customers accounted for 69% and 19% of total revenue, respectively, for the six months ended June 30, 2024.
Cost of Revenue
Cost of revenue increased by $3.3 million to $6.0 million for the three months ended June 30, 2025, compared to $2.7 million for the same period in 2024. The increase was driven by increased EPC project costs as EPC activity accelerated in the second quarter of 2025.
Cost of revenue increased by $1.2 million to $9.7 million for the six months ended June 30, 2025, compared to $8.4 million for the same period in 2024. The increase was driven by increased EPC project costs as EPC activity accelerated in the second quarter of 2025.
Gross Profit and Gross Profit Margin
Gross profit increased by $1.5 million to $2.5 million for the three months ended June 30, 2025, compared to $1.0 million for the same period in 2024, driving gross profit margin to 29.6% from 27.8%. This improvement primarily reflects higher contributions from energy storage product sales and reduced warranty expenses compared to the prior-year period.
Gross profit increased by $4.3 million to $7.4 million for the six months ended June 30, 2025, compared to $3.1 million for the same period in 2024, driving gross profit margin to 43.4% from 27.0%. This improvement primarily reflects higher margin IP licensing revenue, which carries no associated cost of revenue, and reduced warranty expenses compared to the prior-year period.
Sales and Marketing Expenses
Sales and marketing expenses decreased by $1.7 million to $3.2 million for the three months ended June 30, 2025, compared to $4.9 million for the same period in 2024. The decrease was driven by cost-control measures and lower S&M headcount, which together reduced personnel-related expenses by $0.8 million, consulting fees by $0.6 million, and marketing and public relation costs by $0.2 million.
Sales and marketing expenses decreased by $1.7 million to $7.3 million for the six months ended June 30, 2025, compared to $9.0 million for the same period in 2024. The decrease was driven by cost-control measures and lower S&M headcount, which together reduced personnel-related expenses by $0.9 million, consulting fees by $0.4 million, and marketing and public relations costs by $0.3 million.
Research and Development Expenses
Research and development expenses decreased by $2.9 million to $4.1 million for the three months ended June 30, 2025, compared to $7.0 million for the same period in 2024. The decrease was driven by cost-control measures and lower R&D headcount, which together reduced personnel-related expenses by $1.9 million and engineering and development costs by $0.8 million.
Research and development expenses decreased by $6.0 million to $7.9 million for the six months ended June 30, 2025, compared to $13.9 million for the same period in 2024. The decrease was driven by cost-control measures and lower R&D headcount, which together reduced personnel-related expenses by $4.3 million, engineering and development costs by $0.9 million, and software costs by $0.5 million.
General and Administrative Expenses
General and administrative expenses increased by $3.3 million to $19.1 million for the three months ended June 30, 2025, compared to $15.8 million for the same period in 2024. The increase primarily reflects higher personnel-related costs due to expanded G&A headcount, which added $2.0 million, along with a $0.5 million increase in legal and professional fees and a $0.4 million increase in consulting costs.
General and administrative expenses increased by $5.4 million to $36.6 million for the six months ended June 30, 2025, compared to $31.2 million for the same period in 2024. The increase primarily reflects higher personnel-related costs due to expanded G&A headcount, which added $4.2 million, along with a $0.4 million increase in legal and professional fees and a $0.4 million increase in consulting costs.
Provision for Credit Losses
Provision for credit losses increased by $3.4 million to $3.8 million for the three months ended June 30, 2025, compared to $0.4 million for the same period in 2024. Provision for credit losses increased by $3.5 million to $3.8 million for the six months ended June 30, 2025, compared to $0.4 million for the same period in 2024.
The increase in provision for credit losses for the three and six months ended June 30, 2025 was driven by an increase in the allowance for credit losses related to the customer financing receivable and DG Fuels convertible note receivable compared to the same periods in 2024.
Depreciation and Amortization Expense
Depreciation and amortization expense increased by $0.2 million to $0.5 million for the three months ended June 30, 2025, compared to $0.3 million for the same period in 2024. Depreciation and amortization expense increased by $0.2 million to $0.8 million for the six months ended June 30, 2025, compared to $0.6 million for the same period in 2024.
The increase in depreciation and amortization expense for the three and six months ended June 30, 2025 primarily reflects depreciation on the Cross Trails BESS, which was placed into service in May 2025, and higher amortization of capitalized software assets compared to the same periods in 2024.
Interest Expense
Interest expense increased by $2.5 million to $2.5 million for the three months ended June 30, 2025, compared to $38 thousand for the same period in 2024. Interest expense increased by $2.6 million to $2.6 million for the six months ended June 30, 2025, compared to $46 thousand for the same period in 2024.
The increase in interest expense for the three and six months ended June 30, 2025 reflects the interest on debt financings obtained in 2025, whereas in the comparable 2024 periods the Company’s borrowings were limited to insurance premium financing arrangements with minimal interest costs.
Interest Income
Interest income decreased by $1.4 million to $0.3 million for the three months ended June 30, 2025, compared to $1.7 million for the same period in 2024. Interest income decreased by $2.9 million to $0.6 million for the six months ended June 30, 2025, compared to $3.6 million for the same period in 2024.
The decrease in interest income for three and six months ended June 30, 2025 reflects lower average interest-bearing cash balances compared to the same periods in 2024.
Other Income (Expense), Net
Other expense, net was $2.5 million for the three months ended June 30, 2025, compared to other income, net of $22 thousand for the same period in 2024, representing a year-over-year change of $2.5 million. The change primarily reflects a $1.4 million loss on the extinguishment of debt incurred upon early repayment of the CRC Bridge Loan prior to its maturity date in the second quarter of 2025 and $0.9 million in commitment and transaction fees related to the Hudson Equity Purchase Agreement.
Other expense, net was $2.6 million for the six months ended June 30, 2025, compared to other income, net of $1.6 million for the same period in 2024, representing a year-over-year change of $4.3 million. The change primarily reflects a $1.4 million loss on debt extinguishment related to the early repayment of the CRC Bridge Loan, $0.9 million in commitment and transaction fees related to the Hudson Equity Purchase Agreement, and the absence of a $1.5 million gain on derecognition of a related-party contract liability that was recorded in the prior-year period.
Liquidity and Capital Resources
Sources of Liquidity
Since inception, Energy Vault has financed its net cash used in operating and investing activities primarily through the issuance and sale of equity, as well as proceeds from the reverse recapitalization and private investment in public equity transaction completed in 2022.
As part of our ongoing business operations, the Company had a sales backlog of $682.2 million as of June 30, 2025. Management expects this backlog to contribute to the future funding of our business, supported by a robust developed pipeline, which we anticipate to convert into additional contracted backlog as new agreements are executed.
To support non-cash backed performance bonding and surety obligations required under project EPC agreements, the Company partners globally with Marsh to access bonding and surety instruments issued by top-rated insurance firms.
Energy Vault has historically incurred negative operating cash flows and operating losses and may continue to incur operating losses in the future. The Company may seek to raise additional capital through combinations of equity and/or debt financings, subject to prevailing market conditions. Issuance of equity securities could result in dilution to existing stockholders and may include rights, preferences, or privileges senior to those of the Company’s common stock. Separately, the Company has announced its intention to raise preferred equity in connection with project-specific financing vehicles. These vehicles are expected to be non-dilutive to common stockholders and would be directly tied to individual project cash flows.
The Company has raised funds through debt financing secured by one project owned by the Company, and the resulting debt ranks senior to the Company’s common equity. If the Company raises additional funds through the issuance of debt securities, such instruments could also rank senior to common equity and may include covenants or terms that impose significant restrictions on operations. Volatility in the credit markets and broader financial services sector could impact the availability and cost of both debt and equity financing in the future.
Management believes that its cash, cash equivalents, and restricted cash on hand as of the filing date of this Quarterly Report will be sufficient to fund our operating activities for at least the next twelve months without regard to any cash proceeds we may receive in the future upon the exercise of our private warrants.
The exercise price for our private warrants is $11.50 per warrant, subject to certain specified adjustments. To the extent that the price of our common stock exceeds $11.50 per share, it is more likely that our private warrant holders will exercise their warrants. To the extent that the price of our common stock declines, including a decline below $11.50 per share, it is less likely that our private warrant holders will exercise their warrants.
Tax Credit Transfer Commitment
On March 28, 2025, the Company entered into a Tax Credit Transfer Commitment, on behalf of its wholly owned subsidiary companies, with a third-party purchaser pursuant to which the Company agreed to sell certain ITCs generated by the Calistoga Resiliency Center hybrid energy storage system, the Cross Trails BESS, and the Snyder CDU. The Tax
Credit Transfer commitment is subject to certain conditions set forth therein, and requires the Company to incur the remaining associated capital expenditures to complete the projects (via internal sources or external sources such as project financing). The third-party purchaser has agreed to purchase on or before December 15, 2025, all the eligible ITCs generated by these projects, in an amount to be finalized subject to final cost segregation reports, which management believes will be approximately $39.9 million, net of fees, across all three projects.
ATM Facility and Equity Purchase Agreements
On November 12, 2024, we entered into an open market sales agreement (“Sales Agreement”) with Jefferies LLC, as sales agent (the “Sales Agent”), pursuant to which we may, from time to time, sell shares of our common stock, having an aggregate offering price of up to $50.0 million through the Sales Agent under an “at-the-market” equity offering program. We may seek, from time to time, to raise additional capital either under the Sales Agreement or otherwise.
On March 31, 2025, we entered into the Hudson Equity Purchase Agreement. Pursuant to the Hudson Equity Purchase Agreement, the Company has the right at its sole discretion, but not the obligation, to sell to Hudson, and Hudson is obligated to purchase, up to $25.0 million of newly issued shares of the Company’s common stock, from time to time during the term of the Hudson Equity Purchase Agreement, subject to certain limitations and conditions.
In connection with the Hudson Equity Purchase Agreement, the Company entered into a Registration Rights Agreement, pursuant to which the Company agreed to register the Commitment Shares and the shares issuable pursuant to the Hudson Equity Purchase Agreement. The securities to be offered pursuant to the Hudson Equity Purchase Agreement will be offered pursuant to our effective shelf registration statement on Form S-3/A (File No. 333-273089), which was filed with the SEC on July 14, 2023 and declared effective on July 20, 2023.
During the six months ended June 30, 2025, the Company received proceeds of $1.2 million related to the sale of common stock under the Hudson Equity Purchase Agreement.
On August 6, 2025, the Company entered into the Helena Purchase Agreement. Pursuant to the Helena Purchase Agreement, the Company has the right, but not the obligation, to sell to Helena, and Helena is obligated to purchase, up to $25.0 million of newly issued shares of the Company’s common stock, from time to time over a 36-month term, subject to certain limitations and conditions. The obligations under the Helena Purchase Agreement are subject to a standstill period and will not commence until the later of (i) ninety days from the execution of the agreement, or (ii) the termination or expiration of the Company's existing Hudson Equity Purchase Agreement.
CRC Bridge Loan
On March 31, 2025, CRC, a wholly-owned subsidiary of the Company, entered into a $27.8 million credit agreement with Jefferies, as administrative agent, collateral agent, and lender. The CRC Bridge Loan was intended to provide interim financing until long-term debt could be arranged. The CRC Bridge Loan carried a 9.5% annual interest rate and had a scheduled maturity date of April 23, 2025. After deducting closing fees, net proceeds totaled $26.8 million. The loan proceeds were included in the line item, restricted cash, current portion in the condensed consolidated balance sheet as of March 31, 2025.
On April 4, 2025, the Company refinanced the full outstanding balance of the CRC Bridge Loan through the issuance of $27.8 million in CRC Senior Notes (as described below).
CRC Senior Notes
On April 4, 2025, CRC issued $27.8 million of senior notes (“CRC Senior Notes”), with Eagle Point Credit as lender and Jefferies serving as agent for the transaction. The CRC Senior Notes were priced at 99.25% of par, resulting in gross proceeds of $27.6 million. After deducting debt issuance costs, net proceeds totaled $23.2 million.
The CRC Senior Notes bear interest at 12.5% per annum until the earlier of (i) the Company’s receipt of any tax credit transfer proceeds and (ii) December 31, 2025, and thereafter at a rate of 9.50% per annum. The CRC Senior Notes are senior secured obligations of CRC, backed by a first-priority pledge of all CRC assets and equity interests. The CRC Senior Notes include customary affirmative and negative covenants, including minimum cash reserves and a minimum debt service coverage ratio.
Principal and interest are payable semi-annually, with installments due each February 28 and August 31. The first principal payment of $12.9 million is due on August 31, 2025, with subsequent payments as set forth in the financing agreement. A final balloon payment of $7.0 million is due at maturity on April 4, 2032.
The Company may, at its option, redeem all or a portion of the CRC Senior Notes prior to maturity, subject to specified call protection provisions and any prepayment premiums set forth in the agreement. In the event of a change of control, the Company may be required to offer to repurchase the notes at a specified price.
Proceeds from the CRC Senior Notes are held as restricted cash until the CRC HESS reaches pre-agreed milestones. Subsequent to June 30, 2025, $13.0 million of the previously restricted proceeds was released from restriction and became available for general corporate purposes.
Cross Trails Bridge Loan
On May 12, 2025, the Company entered into a secured bridge loan with Crescent Cove for $10.0 million, bearing interest at 24% per annum and with a maturity date of July 14, 2025. The loan was issued net of a 5% original issue discount and a structuring fee of $0.2 million, for gross proceeds of $9.3 million. Total interest expense on the loan of $0.4 million was deducted from the loan proceeds. On July 14, 2025, the Company repaid $5.0 million of principal and simultaneously amended the loan to extend the maturity of the remaining $5.0 million to July 21, 2025. In connection with the extension, the Company paid a $0.2 million amendment fee. The remaining principal and additional interest for the extension were paid on July 18, 2025.
Cross Trails Senior Notes
On July 23, 2025, Cross Trails, a wholly-owned subsidiary of the Company, entered into a credit agreement with Wilmington Trust, National Association, as administrative agent and collateral agent, and Jefferies Capital Services, LLC, as initial lender.
The Cross Trails Senior Note provides for a senior secured term loan facility in an aggregate principal amount of approximately $17.8 million. The proceeds are intended to support the Cross Trails energy storage project, including payment of operating costs, funding of required reserve accounts, payment of fees and expenses related to the transaction, and certain distributions to the project sponsor or its designee at closing. The Cross Trails Senior Note is structured as a single-draw term loan, with the full amount funded on July 23, 2025. Loans under the Cross Trails Senior Note bear interest at a rate per annum equal to 5.00% for loans bearing interest at the ABR and 6.00% for loans bearing interest at the SOFR and has a maturity date of July 23, 2032, with principal amortization in accordance with a pre-agreed schedule. Loans under the Cross Trails Senior Note may be repaid at any time, subject to payment of accrued interest, breakage costs and a repayment premium. Mandatory prepayments are required upon the occurrence of certain customary events, including the receipt of insurance or condemnation proceeds (subject to customary reinvestment rights), asset sales above specified thresholds, the incurrence of additional non-permitted indebtedness, or the non-permitted issuance of new equity interests by the borrower, and are subject to the payment of accrued interest, breakage costs and a repayment premium.
The obligations under the Cross Trails Senior Note are secured by a first priority security interest in substantially all of the assets of the Cross Trails Borrower, including the project assets, accounts, and related collateral, as well as the membership interests in the Cross Trails Borrower. The Cross Trails Senior Note contains customary affirmative and negative covenants for a project financing of this type, including limitations on additional indebtedness, liens, asset sales, investments, affiliate transactions, and distributions. The Cross Trails Borrower is also required to maintain certain financial ratios, including a minimum debt service coverage ratio of 1.10:1.00, and to maintain of insurance, deliver certain financial and other reports, and comply with applicable laws and permits.
The Cross Trails Senior Note also includes customary representations and warranties, indemnification provisions and requirements for the maintenance of insurance and compliance with applicable laws and permits.
The Cross Trails Senior Note was issued net of a $0.3 million financing fee, resulting in gross proceeds of $17.6 million. After deducting debt issuance costs, net proceeds totaled $14.7 million. Upon issuance of the note, $7.2 million of the proceeds became unrestricted for general use and $7.5 million of the proceeds remained restricted to satisfy minimum reserve requirements.
Cash, Cash Equivalents, and Restricted Cash
The following table summarizes our cash, cash equivalents, and restricted cash balances as of June 30, 2025 and December 31, 2024 (amounts in thousands):
| June 30, 2025 | December 31, 2024 | |
|---|---|---|
| Cash and cash equivalents | $21,416 | $27,091 |
| Restricted cash | 36,683 | 2,982 |
| Total cash, cash equivalents, and restricted cash | $58,099 | $30,073 |
Our cash equivalents are highly liquid investments purchased with an original or remaining maturities of three months or less. $22.1 million of our restricted cash balance as of June 30, 2025 was attributable to the CRC Bridge Loan. The remaining restricted cash balance was primarily held by banks as collateral for the Company’s letters of credit, bank guarantees, and performance and payment bonds.
Contractual Obligations
Our principal commitments as of June 30, 2025 consisted primarily of obligations under debt financing arrangements, operating leases, finance leases, a deferred pension, warranty liabilities, and issued purchase orders. Our non-cancellable purchase obligations as of June 30, 2025 totaled approximately $5.0 million.
The following table summarizes the cash maturities of the Company’s debt instruments as of June 30, 2025 (amounts in thousands):
| 2025 | 2026 | 2027 | 2028 | 2029 | Thereafter | |
|---|---|---|---|---|---|---|
| Debt obligations | $22,905 | $669 | $917 | $1,074 | $1,261 | $11,000 |
Cash Flows
The following table summarizes cash flows from operating, investing, and financing activities for the periods indicated (amounts in thousands):
| Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|
| Net cash provided by (used in) operating activities | $12,629 | $(11,846) |
| Net cash used in investing activities | (17,336) | (20,832) |
| Net cash provided by financing activities | 32,140 | 360 |
| Effects of exchange rate changes on cash | 593 | (286) |
| Net increase (decrease) in cash | $28,026 | $(32,604) |
Operating Activities
Cash provided by operating activities was $12.6 million for the six months ended June 30, 2025, compared to cash used in operating activities of $11.8 million for the same period in 2024.
For the six months ended June 30, 2025, cash provided by operating activities reflects a net loss of $56.1 million, adjusted for $26.3 million in non-cash charges, a $52.5 million increase in operating liabilities, and a $10.1 million increase in operating assets. Significant non-cash items include $18.3 million in stock-based compensation expense, $3.8 million in provision for credit losses, $1.4 million in loss on debt extinguishment, $1.4 million in non-cash debt and financing costs, and $0.8 million in depreciation and amortization expense. The increase in operating liabilities was driven by a $56.1 million increase in contract liabilities, partially offset by a $3.3 million decrease in accounts payable and accrued expenses. The increase in contract liabilities relate to advance customer payments for ongoing projects. The increase in operating assets was driven by an $18.1 million increase in advances to suppliers and a $1.9 million increase in prepaid and other current assets, partially offset by a $10.2 million decrease in accounts receivable.
Cash provided by operating activities for the six months ended June 30, 2025, improved compared with the same period in 2024, primarily reflecting higher upfront customer collections and reduced outflows for accounts payable and accrued liabilities, partially offset by increased advances to suppliers.
Investing Activities
Cash used in investing activities was $17.3 million for the six months ended June 30, 2025, compared to $20.8 million, for the same period in 2024
Cash used in investing activities for the six months ended June 30, 2025 consisted of $15.2 million for the purchase of property and equipment, primarily for the construction of the Snyder CDU, Cross Trails BESS, and the Calistoga HESS and $2.1 million of loans extended to Stoney Creek.
The decrease in cash used in investing activities for the six months ended June 30, 2025, compared to the same period in 2024, was driven by lower property and equipment expenditures.
Financing Activities
Cash provided by financing activities was $32.1 million for the six months ended June 30, 2025, compared to $0.4 million for the six months ended June 30, 2024.
Cash provided by financing activities for the six months ended June 30, 2025 was primarily attributable to proceeds of $63.8 million from debt financings, $1.7 million from insurance premium financing arrangements, and $1.2 million from the issuance of shares, partially offset by $27.8 million of debt repayments, $5.4 million of debt issuance costs, and $1.2 million of insurance premium financing repayments.
The increase in cash provided by financing activities for the six months ended June 30, 2025, compared to the same period in 2024, was driven by proceeds from debt financings and the issuance of shares, neither of which occurred in the prior year, partially offset by debt repayments and payments for equity issuance costs.
Non-GAAP Financial Measures
To complement our condensed consolidated statements of operations and comprehensive loss, we use non-GAAP financial measures of adjusted S&M expenses, adjusted R&D expenses, adjusted G&A expenses, adjusted operating expenses, adjusted net loss, and adjusted EBITDA. Management believes that these non-GAAP financial measures complement our GAAP amounts and such measures are useful to securities analysts and investors to evaluate our ongoing results of operations when considered alongside our GAAP measures. The presentation of these non-GAAP measures is not meant to be considered in isolation or as an alternative to other measures of financial performance calculated in accordance with GAAP. These non-GAAP measures and their reconciliation to GAAP financial measures are shown below.
The following table provides a reconciliation from GAAP S&M expenses to non-GAAP adjusted S&M expenses (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| S&M expenses (GAAP) | $3,161 | $4,861 | $7,306 | $9,031 |
| Non-GAAP adjustments: | ||||
| Stock-based compensation expense | 1,039 | 1,782 | 2,084 | 3,497 |
| Reorganization expenses | 32 | 288 | 32 | 288 |
| Adjusted S&M expenses (non-GAAP) | $2,090 | $2,791 | $5,190 | $5,246 |
The following table provides a reconciliation from GAAP R&D expenses to non-GAAP adjusted R&D expenses (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| R&D expenses (GAAP) | $4,074 | $6,951 | $7,898 | $13,917 |
| Non-GAAP adjustments: | ||||
| Stock-based compensation expense | 1,368 | 2,059 | 2,736 | 4,286 |
| Reorganization expenses | 318 | 503 | 318 | 503 |
| Adjusted R&D expenses (non-GAAP) | $2,388 | $4,389 | $4,844 | $9,128 |
The following table provides a reconciliation from GAAP G&A expenses to non-GAAP adjusted G&A expenses (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| G&A expenses (GAAP) | $19,113 | $15,836 | $36,619 | $31,189 |
| Non-GAAP adjustments: | ||||
| Stock-based compensation expense | 6,577 | 5,663 | 13,440 | 11,405 |
| Reorganization expenses | 812 | 918 | 812 | 918 |
| Adjusted G&A expenses (non-GAAP) | $11,724 | $9,255 | $22,367 | $18,866 |
45
The following table provides a reconciliation from GAAP operating expenses to non-GAAP operating expenses (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| Operating expenses (GAAP) | $30,664 | $28,934 | $56,433 | $55,629 |
| Non-GAAP adjustments: | ||||
| Depreciation and amortization | 473 | 279 | 778 | 574 |
| Stock-based compensation expense | 8,984 | 9,504 | 18,260 | 19,188 |
| Reorganization expenses | 1,162 | 1,709 | 1,162 | 1,709 |
| Provision for credit losses | 3,843 | 441 | 3,832 | 353 |
| Loss on impairment and sale of long-lived assets | — | 565 | — | 565 |
| Adjusted operating expenses (non-GAAP) | $16,202 | $16,436 | $32,401 | $33,240 |
The following table provides a reconciliation from net loss attributable to Energy Vault Holdings, Inc. to non-GAAP adjusted net loss, (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| Net loss attributable to Energy Vault Holdings, Inc. (GAAP) | $(34,927) | $(26,188) | $(56,063) | $(47,327) |
| Non-GAAP adjustments: | — | |||
| Stock-based compensation expense | 8,984 | 9,504 | 18,260 | 19,188 |
| Reorganization expenses | 1,162 | 1,709 | 1,162 | 1,709 |
| Provision for credit losses | 3,843 | 441 | 3,832 | 353 |
| Loss on debt extinguishment | 1,412 | — | 1,412 | — |
| Expenses related to equity purchase agreement | 906 | — | 906 | — |
| Foreign exchange losses | 216 | 47 | 349 | 107 |
| Loss on impairment and sale of long-lived assets | — | 565 | — | 565 |
| Gain on derecognition of contract liability | — | — | — | (1,500) |
| Adjusted net loss (non-GAAP) | $(18,404) | $(13,922) | $(30,142) | $(26,905) |
46
The following table provides a reconciliation from net loss to non-GAAP adjusted EBITDA, with net loss being the most directly comparable GAAP measure (amounts in thousands):
| Three Months Ended June 30, 2025 | 2024 | Six Months Ended June 30, 2025 | 2024 | |
|---|---|---|---|---|
| Net loss attributable to Energy Vault Holdings, Inc. (GAAP) | $(34,927) | $(26,188) | $(56,063) | $(47,327) |
| Non-GAAP adjustments: | ||||
| Interest expense | 2,516 | 38 | 2,611 | 46 |
| Interest income | (312) | (1,746) | (627) | (3,572) |
| Provision for income taxes | 2,073 | — | 2,456 | — |
| Depreciation and amortization | 473 | 279 | 778 | 574 |
| Stock-based compensation expense | 8,984 | 9,504 | 18,260 | 19,188 |
| Reorganization expenses | 1,162 | 1,709 | 1,162 | 1,709 |
| Provision for credit losses | 3,843 | 441 | 3,832 | 353 |
| Loss on debt extinguishment | 1,412 | — | 1,412 | — |
| Expenses related to equity purchase agreement | 906 | — | 906 | — |
| Foreign exchange losses | 216 | 47 | 349 | 107 |
| Loss on impairment and sale of long-lived assets | — | 565 | — | 565 |
| Gain on derecognition of contract liability | — | — | — | (1,500) |
| Adjusted EBITDA (non-GAAP) | $(13,654) | $(15,351) | $(24,924) | $(29,857) |
We present adjusted EBITDA, which is net loss excluding adjustments that are outlined in the quantitative reconciliation provided above, as a supplemental measure of our performance and because we believe this measure is frequently used by securities analysts, investors, and other interested parties in the evaluation of companies in our industry. The items excluded from adjusted EBITDA are excluded in order to better reflect our continuing operations.
In evaluating adjusted EBITDA, one should be aware that in the future we may incur expenses similar to the adjustments noted above. Our presentation of adjusted EBITDA should not be construed as an inference that our future results will be unaffected by these types of adjustments. Adjusted EBITDA is not a measurement of our financial performance under GAAP and should not be considered as an alternative to net loss, operating loss, or any other performance measures derived in accordance with GAAP or as an alternative to cash flow from operating activities as a measure of our liquidity.
Our adjusted EBITDA measure has limitations as an analytical tool, and should not be considered in isolation or as a substitute for analysis of our results as reported under GAAP. Some of these limitations are:
- it does not reflect our cash expenditures, future requirements for capital expenditures, or contractual commitments;
- it does not reflect changes in, or cash requirements for, our working capital needs;
- it does not reflect stock-based compensation, which is an ongoing expense;
- although depreciation and amortization are non-cash charges, the assets being depreciated and amortized will often have to be replaced in the future, and our adjusted EBITDA measure does not reflect any cash requirements for such replacements;
- it is not adjusted for all non-cash income or expense items that are reflected in our consolidated statements of cash flows;
- it does not reflect the impact of earnings or charges resulting from matters we consider not to be indicative of our ongoing operations;
- it does not reflect limitations on or costs related to transferring earnings from our subsidiaries to us; and
- other companies in our industry may calculate this measure differently than we do, limiting its usefulness as a comparative measure.
Because of these limitations, adjusted EBITDA should not be considered as a measure of discretionary cash available to us to invest in the growth of our business or as a measure of cash that will be available to use to meet our obligations. You should compensate for these limitations by relying primarily on our GAAP results and using adjusted EBITDA only supplementally.
Critical Accounting Estimates
The preparation of these financial statements in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of expenses during the reporting period. Actual results could differ from those estimates.
There have not been any changes to our critical accounting policies and estimates as compared to those disclosed under the caption Critical Accounting Estimates in Item 7 Management’s Discussion and Analysis of Financial Condition and Results of Operations included in the 2024 Annual Report on Form 10-K filed with the SEC on April 1, 2025.
Emerging Growth Company Accounting Election
We are an “emerging growth company” as defined in Section 2(a) of the Securities Act of 1933, as amended, and have irrevocably elected to take advantage of the benefits of this extended transition period for new or revised financial accounting standards. We are expected to remain an emerging growth company through the end of 2026 and expect to continue to take advantage of the benefits of the extended transition period. This may make it difficult or impossible to compare our financial results with the financial results of another public company that is either not an emerging growth company or is an emerging growth company that has chosen not to take advantage of the extended transition period exemptions for emerging growth companies because of the potential differences in accounting standards used.
Recently Adopted and Issued Accounting Pronouncements
Recently issued and adopted/unadopted accounting pronouncements are described in Note 2 of the unaudited condensed consolidated financial statements included elsewhere in this Quarterly Report.
Market risk
As filed, 3,750 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Market risk represents the risk of loss that may impact our financial position because of adverse changes in financial market prices and rates.
Foreign Currency Risk
The majority of our contracts with customers are denominated in U.S. dollars or the Australian dollar, and certain of our definitive agreements could be denominated in other currencies, including the Euro, the Swiss franc, the South African rand, the Brazilian real, and the Saudi riyal. A strengthening of the U.S. dollar could increase the cost of our solutions to our international customers, which could adversely affect our business and results of operations.
In addition, a portion of our operating expenses are incurred outside the United States and are denominated in foreign currencies, such as the euro, the Swiss franc, and the Australian dollar, and are subject to fluctuations due to changes in foreign currency exchange rates. If we increase our exposure to foreign currencies and are not able to successfully hedge against the risks associated with currency fluctuations, our results of operations could be adversely affected.
Inflation Risk
Our operations could be adversely impacted by inflation, primarily from higher material, labor, and construction costs. While it is difficult to measure the impact of inflation for such estimates accurately, we believe, if our costs are affected due to significant inflationary pressures, we may not be able to fully offset higher costs through price increases or other corrective measures, which may adversely affect our business, financial condition, and results of operations.
Credit Risk
Credit risk refers to the risk that a counterparty may default on its contractual obligations resulting in a loss to us. Our customers include the counterparties for the sale of our energy storage products and solutions and the licensees of our IP. A loss of one or more of our significant customers, their inability to perform under their contracts, or their default in payment could harm our business and negatively impact revenue, results of operations, and cash flows. Credit policies have been approved and implemented to assess our existing and potential customers with the objective of mitigating credit losses. These policies establish guidelines, controls, and credit limits to manage credit risk within approved tolerances by mandating an appropriate evaluation of the financial condition of existing and potential customers, monitoring agency credit ratings, and by implementing credit practices that limit exposure according to the risk profiles of the counterparties. In addition, customers are required to make milestone payments based on their project’s progress. We may also, at times, require letters of credit, parent guarantees, or cash collateral when deemed necessary.
Our overall exposure may be affected positively or negatively by macroeconomic or regulatory changes that may impact our counterparties. We continuously monitor the creditworthiness of all our customers.
Commodity Price Risk
We are subject to risk from fluctuating market prices of certain commodity raw materials, including cement, steel, aluminum, and lithium, that are used in the components that we purchase from our suppliers and then as inputs to our products. Prices of these raw materials may be affected by supply restrictions or other logistic costs market factors from time to time. We do not enter into hedging arrangements to mitigate commodity risk. Significant price changes for these raw materials could reduce our operating margins if suppliers increase component prices and we are unable to recover such increases from our customers and could harm our business, financial condition, and results of operations.
Controls and procedures
As filed, 1,593 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Limitations on the Effectiveness of Controls
In designing and evaluating our disclosure controls and procedures, management recognizes that any controls and procedures, no matter how well designed and operated, can provide only reasonable assurance of achieving the desired control objectives. In addition, the design of disclosure controls and procedures must reflect the fact that there are resource constraints, and that management is required to apply judgment in evaluating the benefits of possible controls and procedures relative to their costs.
Evaluation of Disclosure Controls and Procedures
Our management, with the participation of our principal executive officer and principal financial officer, evaluated, as of the end of the period covered by this Quarterly Report on Form 10-Q, the effectiveness of our disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Exchange Act). Based on that evaluation of our disclosure controls and procedures as of June 30, 2025, our principal executive officer and principal financial officer concluded that our disclosure controls and procedures as of such date are effective at the reasonable assurance level.
Changes in Internal Control Over Financial Reporting
There were no changes in our internal control over financial reporting identified in management’s evaluation pursuant to Rules 13a-15(d) or 15d-15(d) of the Exchange Act during the quarter ended June 30, 2025 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
Risk factors
As filed, 2,272 characters, with its headings, lists and tables. Extracted from the main document; charts and exhibits are in the original on sec.gov.
Except as set forth below, as of the date of this report, there are no material changes to our risk factors as previously disclosed in Part I, Item 1A of our 2024 Annual Report on Form 10-K filed with the SEC on April 1, 2025. You should carefully consider the risks set forth in Part 1, Item 1A, Risk Factors, of the Company’s 2024 Annual Report, and all other information included in this Quarterly Report before making an investment decision. Our business, financial condition, and results of operations could be materially and adversely affected by any of these risks or uncertainties.
An active, liquid trading market for our securities may not be sustained.
There can be no assurance that we will be able to maintain an active trading market for our common stock on the NYSE or any other exchange. On April 16, 2025, we were notified by the NYSE that we are not in compliance with Rule 802.01C of the NYSE Listed Company Manual because the average closing price of our common stock was less than $1.00 over a consecutive 30 trading-day period. The notice has no immediate impact on the listing of our common stock, which will continue to be listed and traded on the NYSE during the period allowed to regain compliance, subject to our compliance with other listing standards. We informed the NYSE that we intend to cure the deficiency and to return to compliance with the NYSE continued listing requirements. If an active market for our securities is not maintained, or if we fail to satisfy the continued listing standards of the NYSE for any reason and our securities are delisted, it may be difficult for our security holders to sell their securities without depressing the market price for our securities, or at all. Further, if we are unable to cure the stock price deficiency within the cure period and our common stock is delisted, Hudson has the right to return to us any remaining amount of Put Shares associated with such Put, and the Purchase Price with respect to such Put shall be reduced accordingly (as such terms are defined in the Hudson Equity Purchase Agreement). Further, an inactive trading market may also impair our ability to raise capital by selling shares of capital stock, attract and motivate employees through equity incentive awards.
Figures reported in this filing
Standardized line items from the XBRL in this filing, for the period ended 2025-06-30. Comparative periods it repeats are left out.
| Line item | Period | Value | XBRL concept |
|---|---|---|---|
| Revenue | 3 months2025-04-01 to 2025-06-30 | $8.5m | us-gaap:Revenues |
| Revenue | 6 months2025-01-01 to 2025-06-30 | $17.0m | us-gaap:Revenues |
| Cost of revenue | 3 months2025-04-01 to 2025-06-30 | $6.0m | us-gaap:CostOfRevenue |
| Cost of revenue | 6 months2025-01-01 to 2025-06-30 | $9.7m | us-gaap:CostOfRevenue |
| Gross profit | 3 months2025-04-01 to 2025-06-30 | $2.5m | us-gaap:GrossProfit |
| Gross profit | 6 months2025-01-01 to 2025-06-30 | $7.4m | us-gaap:GrossProfit |
| Research and development | 3 months2025-04-01 to 2025-06-30 | $4.1m | us-gaap:ResearchAndDevelopmentExpense |
| Research and development | 6 months2025-01-01 to 2025-06-30 | $7.9m | us-gaap:ResearchAndDevelopmentExpense |
| Operating income | 3 months2025-04-01 to 2025-06-30 | −$28.1m | us-gaap:OperatingIncomeLoss |
| Operating income | 6 months2025-01-01 to 2025-06-30 | −$49.0m | us-gaap:OperatingIncomeLoss |
| Interest expense | 3 months2025-04-01 to 2025-06-30 | $2.5m | us-gaap:InterestExpenseNonoperating |
| Interest expense | 6 months2025-01-01 to 2025-06-30 | $2.6m | us-gaap:InterestExpenseNonoperating |
| Income tax | 3 months2025-04-01 to 2025-06-30 | $2.1m | us-gaap:IncomeTaxExpenseBenefit |
| Income tax | 6 months2025-01-01 to 2025-06-30 | $2.5m | us-gaap:IncomeTaxExpenseBenefit |
| Net income | 3 months2025-04-01 to 2025-06-30 | −$34.9m | us-gaap:NetIncomeLoss |
| Net income | 6 months2025-01-01 to 2025-06-30 | −$56.1m | us-gaap:NetIncomeLoss |
| Diluted EPS | 3 months2025-04-01 to 2025-06-30 | −$0.22 | us-gaap:EarningsPerShareDiluted |
| Diluted EPS | 6 months2025-01-01 to 2025-06-30 | −$0.36 | us-gaap:EarningsPerShareDiluted |
| Basic EPS | 3 months2025-04-01 to 2025-06-30 | −$0.22 | us-gaap:EarningsPerShareBasic |
| Basic EPS | 6 months2025-01-01 to 2025-06-30 | −$0.36 | us-gaap:EarningsPerShareBasic |
| Diluted shares (weighted) | 3 months2025-04-01 to 2025-06-30 | 156,911,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Diluted shares (weighted) | 6 months2025-01-01 to 2025-06-30 | 155,326,000 shares | us-gaap:WeightedAverageNumberOfDilutedSharesOutstanding |
| Operating cash flow | 6 months2025-01-01 to 2025-06-30 | $12.6m | us-gaap:NetCashProvidedByUsedInOperatingActivities |
| Capital expenditure | 6 months2025-01-01 to 2025-06-30 | $15.2m | us-gaap:PaymentsToAcquirePropertyPlantAndEquipment |
| Cash and equivalents | At period end2025-06-30 | $21.4m | us-gaap:CashAndCashEquivalentsAtCarryingValue |
| Current assets | At period end2025-06-30 | $94.9m | us-gaap:AssetsCurrent |
| Total assets | At period end2025-06-30 | $248.8m | us-gaap:Assets |
| Current liabilities | At period end2025-06-30 | $143.8m | us-gaap:LiabilitiesCurrent |
| Total liabilities | At period end2025-06-30 | $158.5m | us-gaap:Liabilities |
| Long-term debt | At period end2025-06-30 | $10.2m | us-gaap:LongTermDebtNoncurrent |
| Current portion of debt | At period end2025-06-30 | $23.1m | us-gaap:LongTermDebtCurrent |
| Shareholders' equity | At period end2025-06-30 | $90.3m | us-gaap:StockholdersEquityIncludingPortionAttributableToNoncontrollingInterest |
Source: SEC EDGAR, the filing index for accession 0001828536-25-000107. Last ingested by Listed: Nov 11, 2026, 01:45 ET. Listed shows no prices and gives no investment advice.